Professional Documents
Culture Documents
HV Battery Component Certificate (ECE R100) Final Report - 15560-23-Ec3
HV Battery Component Certificate (ECE R100) Final Report - 15560-23-Ec3
TEST REPORT
for
Part II: Safety requirements with respect to the Rechargeable Electrical Energy
Storage System (REESS), of road vehicles of categories M and N equipped with
electric power train, excluding vehicles permanently connected to the grid.
according to
03 series of amendments
Supplement 2
The Test Report shall be reproduced and published in full by the client only. It shall however be
reproduced partially with the written permission of the Testing Laboratory only.
1. General Information
1.1. Name and address of the applicant : PCA Automobiles India Private Limited
Adhigattur Village, Kadambathur P.O, Thiruvallur,
Tamilnadu-631203
1.2. Name and address of the battery : Taizhou Division of SVOLT Energy Technology
pack manufacturer Co., Ltd
No. 666-1 Tongjiang East Road, Gaogang District,
Taizhou City, Jiangsu Province, P.R.China
1.3. Address of Manufacturing Plant : Taizhou Division of SVOLT Energy Technology
Co., Ltd
No. 666-1 Tongjiang East Road, Gaogang District,
Taizhou City, Jiangsu Province, P.R.China
1.4. Make of component cell : SVOLT
2. Test information
2.1. Details of battery pack
3. List of Appendices
1 Vibration test : 06
3 Mechanical shock : 09 to 10
4 Fire resistance : 11 to 12
6 Over-charge protection : 15 to 16
7 Over-discharge protection : 17 to 18
8 Over-temperature protection : 19 to 20
9 Over-current protection : 21 to 22
10 Mechanical Integrity : 23 to 24
4. Statement of conformity
The ‘Rechargeable Electrical Energy Storage System (REESS)’ submitted by PCA Automobiles India
Private Limited were tested as per UN Regulation No. 100.
That satisfactorily meets all the applicable requirements, The test results in this report refer to the
object(s) described under section 2.1. and 2.2. with regards to the required level of performance to be
achieved.
The test report (including appendices 1 to 10) consists of total 24 pages and shall not be reproduced
except in full without the written approval of the TÜV Rheinland (India) Pvt. Ltd.
Place / Date
Pune / 2023-07-19
Hemant N. Lohar
Expert Technical Service
Test Photographs:
Test Photographs:
The test shall end with an observation period of : Complies with requirements.
1 h at the ambient temperature conditions of the At the end of test, no electrolyte leakage,
test environment. The tested-device shall be no rupture, no fire, and no explosion
secured to the testing machine by means of a were observed from tested device.
rigid mount which will support all mounting Standard cycle applicable and performed
surfaces of the tested-device. successfully.
Test Requirement: During the test, there shall Isolation resistance measurement after
be no evidence of Electrolyte leakage, Rupture the test was greater than 100 Ω/V.
(applicable to high voltage REESS(s) only),
Fire, Explosion.
Evidence of electrolyte leakage shall be verified
by visual inspection without disassembling any
part of the tested device.
Test Photographs:
6.5. and This test applies for vehicles with a passenger : Complies with requirements.
Annex compartment only. At the end of test, no explosion was
9E (a) The test shall be conducted at a temperature observed from tested device.
of at least 0 °C.
(b) At the beginning of the test, the SOC shall
be adjusted in accordance with Annex 9,
Appendix 2.
(c) At the beginning of the test, all protection
devices which affect the function of the Tested-
Device and are relevant for the outcome of the
test shall be operational.
Test Requirement: During the test, the tested
device shall exhibit no evidence of explosion.
Test Parameter
Parameter Parameter
During Test
Pre-Heating Duration 60 s
(Phase-A)
Duration of DUT 60 s
Indirect exposure to
flame (Phase-C)
Test Photographs:
Test Photographs:
Test Photographs:
Test Photographs:
Test Photographs:
Test Photographs:
Test Photographs: