Project Details

TP No. Description Deliverables produced / Responsibilities held

Civil work repair in West Response received on 26 Feb 2024 from


TP-203121 Harbor LNG Loading Jetties Maintenance Eng. Division stating ”No comments”
(Dock A & B) to our transmittal dated 21 Feb 2024

Performed engineering calculations, finalized


design drawings for steel structure, foundations
etc. SOW for Civil completed.
Heavy Equipment
TP-223112 Action memo initiated on 12 Dec 2023 seeking
Maintenance Workshop 2
SOW from other disciplines viz., communication,
mechanical etc.
Response is still awaited

Heavy Equipment
TP-6133TR Issued for comments on 13 Mar 2024
Maintenance Workshop 1

New Platform Structure for


All comments incorporated and to be Issued for
TP-223108 water tank in the Refinery
Construction
Area

A study report on the effect of


- Action Completed on 14 Feb 2024
U/G gas line due to buoyancy

Inspection report on the


- runway cracks at brega Action Completed on 27 Feb 2024
airport

Assessment of D1704 Vessel


TA-224101 foundation at Raguba Gas Action Completed on 25 Feb 2024
Plant

Structural Analysis and Design drawings completed


TP-203112 Additional Shelter for Mosque Preparing to Issue for Comments