Psbr01 Art g1 DR STXXX 02 ST Markup
Psbr01 Art g1 DR STXXX 02 ST Markup
Psbr01 Art g1 DR STXXX 02 ST Markup
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
K7
NOTES
I S S U E S
CONSULTANT :
DRAWING TITLE :
DRAWING LIST
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
K7
NOTES
15500
3200 5450 6850
500
250
200
200
200
2.1 g1.1
400
400
400
C1 C1 C1
250 250
500 500
7200
DELETE THIS COLUMN
10000
500 500 500
250 250 250
C1 C1 C1
200
400
400
400
200
200
2.2
16000
OCEAN INTAKE
2800
C1
200 C1 C1
200
200
400
400
400
2.3 g1.2
400
400
200
200
200
2.4 PURE SALMON LAND-BASED
ATLANTIC SALMON FARM
10000
g1.B g1.C
DRAWING TITLE :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
K7
NOTES
15500
3200 5450 6850
200
200
200
2.1 g1.1
SC1 SC1 SC1
7200
10000
250 150 250
200
200
200
2.2 SC1 SC1 SC1
16000
2800
2.3 g1.2
SC1 SC1 SC1
I S S U E S
6000
200
2.4 SC1 SC1 SC1 ATLANTIC SALMON FARM
10000
g1.B g1.C
CONSULTANT :
DRAWING TITLE :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
K7
NOTES
2.A 2.B 2.C 2.D THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
15500 SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.
F1 F2
400 400
-1650 -1650
F2
2000
2000
2000
300 1600 2000 2000
2000
FTB1
FTB1
FTB1
7200
10000
2000 2000
2000
F1 F2 F2
2000
2000
2.2
16000
FTB1
FTB1
FTB1
2800
F2 F2 F2
FTB1 FTB1
2000
2000
2000
2.3 g1.2
I S S U E S
FTB1
FTB1
6000
FTB1 FTB1
2000
2000
2000
PURE SALMON LAND-BASED
2.4 ATLANTIC SALMON FARM
g1.B g1.C
CONSULTANT :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
2.A 2.B 2.C 2.D K7
15500 NOTES
3200 5450 6850 THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
BEFORE PROCEEDING THE WORK.
2.1 g1.1
1510 4000
2949
SSL=+0.200 SSL=+0.500
SSL=+0.500
T10-200 T10-200 T10-1000x1000
1100
7200
SSL
150
1900
10000
SSL=+0.200 SSL=+0.500
2700
151
2.2
SSL=+0.000
1200
875 800
16000
1749
2800
1300
1900
- MIXED CRUSHED STONE 5-25 mm, COMPACTED K=98%, 300mm THK.
- MIXED CRUSHED STONE 5-40 mm, COMPACTED K=98%, 300mm THK.
SSL=+0.200 SSL=+0.500 - BACK FILL IF NEEDED, COMPACTED K=95%.
- EXISTING SUBSOIL, COMPACTED TO K=95%.
1300
SSL=+0.200
1100
1000
6000
1900
1300
SSL=+0.200 SSL=+0.500
SSL=+0.200
570 1500
1051
2.4
CONSULTANT :
LEGENDS:
PLOT NO. LOCATION
- SLAB ON GRADE MARK Kg Sabun, Mukim Serasa,
SOG Daerah Brunei - Muara,
150 - SLAB ON GRADE THICKNESS (mm) Negara Brunei Darussalam
LEGENDS:
DRAWN BY CHECKED BY APPROVED BY DATE
COLUMNS & WALLS ABOVE
PM CR/RB LG 05/17/2024
0.8 0 0.8 1.5 2.3 3 3.8
JOB NO. DRAWING NO. SCALE
COLUMNS & WALLS BELOW
SCALE m PSBR01 1:75
1: 75 ST100_FRA03
SHEET SIZE REV. NO.
DATE PRINTED 17/05/2024 5:52:01 pm
A1
G1 AREAS KEY PLAN NORTH
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
K7
NOTES
15500 15500
3200 5450 6850 3200 5450 6850
G1 G1 SB1 SB1
2.1 g1.1 2.1 g1.1
SB1
SB1
G1
G1
7200
7200
SB1
G1
3 3
ST300_FRA02 ST300_FRA02
10000
10000
G2
G1 G1 SB1 SB1
2.2 2.2
16000
16000
SB1
G1
2 2
ST300_FRA02 G2 ST300_FRA02
2800
2800
SB1
SB1
G1
G1
2 2
ST300_FRA03 ST300_FRA03 SB1 SB1
G1 G1
2.3 g1.2 2.3 g1.2
I S S U E S
SB1
SB1
SB1
G1
G1
6000
6000
4 4
G1
ST300_FRA02 ST300_FRA02
1 1 1 1
ST300_FRA02 ST300_FRA03 ST300_FRA02 ST300_FRA03
g1.B g1.C
g1.B g1.C
CONSULTANT :
AREA 2 FRAMING PLAN @ EL +4.00M & EL +5.00M AREA 2 ROOF FRAMING PLAN
1 Scale 1 : 75 2 Scale 1 : 75
SCHEMATIC DESIGN PHASE
BUILDING G1
STRUCTURAL DRAWINGS
DRAWING TITLE :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
K7
NOTES
15500
3200 5450 6850
2.1 g1.1
SSL=+0.200 SSL=+0.500
EQUIPMENT EQUIPMENT
(7000 kgs) (3000 kgs)
SSL=+0.500
7200
3
ST300_FRA02
10000
SSL=+0.200 SSL=+0.500
2.2
SSL=+0.000
16000
EQUIPMENT
(1000 kgs) - SSL=+0.200
ASSUMED AND 2
TO BE VERIFIED
ST300_FRA03
2.3 2 g1.2
ST300_FRA06 I S S U E S
SSL=+0.200 SSL=+0.500
EQUIPMENT SSL=+0.200
(1000 kgs)
6000
4
ST300_FRA02
SSL=+0.200
SSL=+0.200 SSL=+0.500 No. Date Description Chk'd By
R E V I S I O N
PROJECT :
10000
1 1
ST300_FRA02 ST300_FRA03
g1.B g1.C
DRAWING TITLE :
LEGENDS:
AREA 2 LOADING PLAN AT LEVEL
0.00
1000 kg/m2
Eurocode 1 - Tab.6.2
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
K7
1425
SC1 SC1
SC1
SB1 SB1 SC1
+5.000 SC1 SB1 +5.000 SC1
g1.2 TOP OF BEAM G1 G1 G1 g1.2 TOP OF BEAM G1 G1
6425
6425
5000
5000
500mm THK. EQUIPMENT PAD (TYP.)
500mm THK. EQUIPMENT PAD (TYP.) +0.500
1500
g1.2 -0.150 g1.2 -0.150
10000 F2 F2
LEAN CONCRETE (TYP.) 400 LEAN CONCRETE (TYP.) 400
-1650 -1650 g1.B
g1.1 g1.2
AREA 2 FRAMING ELEVATION @ GRID 2.A AREA 2 FRAMING ELEVATION @ GRID 3.1
1 Scale 1 : 75 2 Scale 1 : 75
16000 15500
6000 2800 7200 3200 5450 6850
+6.425 +6.425
g1.2 TOP OF ROOF SB1 SB1 g1.2 TOP OF ROOF
SB1 No. Date Description Chk'd By
1425
1425
SC1 SC1 SC1 SC1 SC1 R E V I S I O N
SC1 SC1
+5.000 +5.000 PROJECT :
g1.2 TOP OF BEAM G1 G1 G1 g1.2 TOP OF BEAM G1 G1
PURE SALMON LAND-BASED
ATLANTIC SALMON FARM
6425
6425
5000
5000
500mm THK. EQUIPMENT PAD (TYP.)
500mm THK. EQUIPMENT PAD (TYP.)
C1 C1 C1 C1
CONSULTANT :
+0.000 +0.000 +0.000 +0.000 +0.000
+0.000 +0.000 C1 C1 C1
400 1100 150
1500
g1.2 -0.150 g1.2 -0.150 SINGAPORE 068809
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
2.4 2.3 2.2 2.1 L1 G1
K7
16000 NOTES
6000 2800 7200 15500 THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
3200 5450 6850 STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
+6.425 +6.425 BEFORE PROCEEDING THE WORK.
g1.2 TOP OF ROOF g1.2 TOP OF ROOF
1425
1425
SC1
SC1
+5.000 +5.000 SC1
g1.2 TOP OF BEAM G1 G1 g1.2 TOP OF BEAM G1 G1 G1 G1
6425
6425
5000
5000
500mm THK. EQUIPMENT PAD (TYP.)
500mm THK. EQUIPMENT PAD (TYP.) +0.500
+0.000 +0.000
C1 C1 C1 C1 C1
200
+0.000 +0.000
150
1500
g1.2 -0.150 g1.2 -0.150
I S S U E S
15500 12300
3200 5450 6850 5450 6850
1425
SB1 SB1 PROJECT :
SC1 SB1 SC1
SB1 SC1 SC1
+5.000 SC1 +5.000 SC1
PURE SALMON LAND-BASED
g1.2 TOP OF BEAM G1 G1 g1.2 TOP OF BEAM G1 G1 ATLANTIC SALMON FARM
6425
6425
5000
5000
CONSULTANT :
500mm THK. EQUIPMENT PAD (TYP.) 500mm THK. EQUIPMENT PAD (TYP.)
1500
g1.2 -0.150 g1.2 -0.150
FTB1 FTB1
F1 FTB1 FTB1
SCHEMATIC DESIGN PHASE
-1.650 F2 F2 -1.650 F2 F2 F2
g1.2 -1.650 g1.2 -1.650
BUILDING G1
1900 2000 1817
STRUCTURAL DRAWINGS
10000 2000 2000 2000
F1 F2 10000
400 LEAN CONCRETE (TYP.) 400 LEAN CONCRETE (TYP.) PLOT NO. LOCATION
-1650 g1.B g1.C -1650 Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam
g1.B g1.C
DRAWING TITLE :
AREA 2 FRAMING SECTION 3 AREA 2 FRAMING SECTION 4 AREA 2 FRAME SECTION -SHEET 1
3 Scale 1 : 75 4 Scale 1 : 75
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
K8 N K1
L1 G1
K7
16000
6000 2800 7200
NOTES
1425
DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
SB1 SB1 SB1 SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
SC1 SC1 SC1 SC1 BEFORE PROCEEDING THE WORK.
+5.000
g1.2 TOP OF BEAM G1 G1 G1
6425
5000
500mm THK. EQUIPMENT PAD (TYP.)
+0.000 C1 C1 C1 C1
1500
g1.2 -0.150
2.2 2.1
I S S U E S
7200
+6.425
g1.2 TOP OF ROOF
1425
+5.000 SB1
g1.2 TOP OF BEAM G1
PROJECT :
5000
+0.000 C1 C1
400 1100 150
g1.2 +0.000
-0.150
1500
g1.2 -0.150
CONSULTANT :
-1.650 F1 FTB1 F1
g1.2 -1.650
ARTELIA Singapore Pte. Ltd.
2000 2000 6 Shenton Way – 39-02 OUE Downtown 1
F1 SINGAPORE 068809
400 LEAN CONCRETE (TYP.)
-1650 g1.1
SCHEMATIC DESIGN PHASE
BUILDING G1
STRUCTURAL DRAWINGS
AREA 2 FRAMING SECTION 6
2 Scale 1 : 75
PLOT NO. LOCATION
Kg Sabun, Mukim Serasa,
Daerah Brunei - Muara,
Negara Brunei Darussalam
DRAWING TITLE :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
K7
NOTES
W W
0.25L1 0.25L1 0.5L1 Max(L1 & 0.25L2)
(Min. Lt)
S1 S2
(Min. Lt)
S3 S2
(Min. Lt)
S1
(Min. Lt)
Max(0.5L1 & 0.25L2)
NORMAL LINK
e.g. 2R8-100/200
TORSION LINK
e.g. 2R8-100/200
NOTES:
2
(Min. Lt) 1. * U.N.O. LAPPINGS ARE INDICATE ONLY. NO LAPPING IF THE
H
* LAP * LAP * LAP 1 REINFORCEMENT ARE OF SAME SIZE AND LENGTH OF REINFORCEMENT NOT
T11 T12 T13 T41 T42 EXCEEDING 11.7M. REFER TO GENERAL NOTES FOR LOCATION AND LAP LENGTH.
DETAIL OF LINKS
TYPE 1 TYPE 2 2. ORIENTATION OF REBARS IN BEAMS (FROM LEFT TO RIGHT, BOTTOM TO TOP)
W SHALL SAME THAT OF BEAM MARKS.
W W
PROVIDE 1T10 @800 (MAX) 3. REFER TO GENERAL NOTES AND STANDARD DRAWINGS
WHEN 600 < D1 < 1000 FOR OTHER DETAILING REQUIREMENTS.
B12 I S S U E S
H > 700
0.08L1 * LAP SB * LAP 0.08L1 B41 SB * LAP 2 1 2
B11 B13 1 SB SB 4. Lt: TENSION LAP LENGTH.
H
PROVIDE 2T10 @800 (MAX)
D1
3 3 4 SB SB WHEN 1000 < D1 < 2000
SPAN L1 SPAN L1 SPAN L2
2/3H
SB SB
SINGLE SPAN CANTILEVER TYPE 3 TYPE 4
DRAWING TITLE :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
Ldt TOP LEVEL K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
S1
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
lcr
K7
STOREY HEIGHT
NOTES
SPACING
THIS DRAWING SHALL BE READ IN CONJUCTION WITH THE GENERAL
LINK
LEVEL + 5.000M NOTES, ALL RELEVENT DESIGN DRAWINGS OF ARCHITECTURE,
S
STRUCTURE, MECHANICAL, ELECTRICAL, PLUMBING, FIRE
PROTECTION AND SPECIFICATION AND OTHER CONSULTANT'S
SPACING OF LINKS AT LAP NOT DRAWINGS. ANY DISCREPANCY SHALL BE REFERRED TO THE
50
SUPERVISE OFFICER/ CLIENT REPRESENTATIVE TO GET APPROVAL
GREATER THAN:
Iₒ
BEFORE PROCEEDING THE WORK.
- 12∅ OF LONGITUDINAL BAR
Lt
- 0.6 x LESSER DIM OF COLUMN/WALL
400
- 100
50
LINK SPACING (S1)
12T25
500
MAX(lcr;Lt)
Lt
S1
KICKER 100
LEVEL (X+1)
50
FOUDATION
S1
LINK SPACING (S1)
LINKS (S) T10-200 T10-200 T10-200
REINF. (REFER SCHEDULE)
lcr
LEVEL
C1
COLUMN
STOREY HEIGHT
SPACING
LINK
S
LINK SPACING (S)
SPACING OF LINKS AT LAP
Iₒ
50
NOT GREATER THAN:
- 12∅ OF LONGITUDINAL BAR
- 0.6 x LESSER DIM OF COLUMN/WALL
Lt
- 100
50
A-A
Lt
S1
KICKER 100
LEVEL X
50
S1
45 Ø
I S S U E S
100MAX
S1
TYPICAL COLUMN/ WALL DETAIL
No. Date Description Chk'd By
R E V I S I O N
PROJECT :
A-A
NOTES:
CONSULTANT :
1. S: REFERS TO LINK SPACING IN COLUMN/WALL
SCHEDULE
2. S1 = MIN(bo/2; 100; 8dbL) ARTELIA Singapore Pte. Ltd.
bo: MINIMUM DIMENSION OF THE CONCRETE 6 Shenton Way – 39-02 OUE Downtown 1
CORE (THE CENTERLINE OF THE HOOPS) SINGAPORE 068809
dbL: MINIMUM DIAMETER OF THE LONGITUDINAL
BARS (mm)
3. lcr = MAX(hc; lo/6; 450)
hc: THE LARGEST CROSS-SECTIONAL DIMENSION SCHEMATIC DESIGN PHASE
OF THE COLUMN/WALL (mm).
4. THE TIE C IN THE WEB (FOR RC WALL ONLY)
BUILDING G1
SHALL BE ALTERNATED ALONG WALL HEIGHT STRUCTURAL DRAWINGS
DRAWING TITLE :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
K7
NOTES
CONCRETE
COLUMN
CONCRETE
50 2000 50 SLAB
0.000
50
±0.000
150
-0.150
COLUMN TIES.
COLUMN
1100
REINF.
1500
2000
STARTER BARS
T12-250
ST500-FOU02
1
400
1.700
50
LEAN CONCRETE
T12-250
50
FOUNDATION PLAN F1 SECTION F1 DETAIL
1 2
CONCRETE
COLUMN
CONCRETE
SLAB
50 2000 50
0.000
±0.000
50
150
-0.150
I S S U E S
COLUMN TIES.
COLUMN
1100
REINF.
1500
2000
400
No. Date Description Chk'd By
ST500-FOU02
1.700 R E V I S I O N
2
50
PROJECT :
LEAN CONCRETE
T12-250 PURE SALMON LAND-BASED
50
DRAWING TITLE :
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
K7
NOTES
I S S U E S
CONSULTANT :
DRAWING TITLE :
AREA 2 3D MODEL
5
2 4 6
3 7
9
10
1
14
8
23
11 12 & 13
KEY PLAN
15 22
20 21
17
19
16 18
K10
K9 L2 K12
B2 CD2
G2
K11
P
K5 K6
RV
E F
A B1 C1 D1
K4
J M
K2 K3 U
K8 N K1
L1 G1
K7
NOTES
15500
3200 5450 6850
2.1 g1.1
Z220X2 SPACED
@ 600 OC
7200
10000
2.2
16000
2800
2.3 g1.2 I S S U E S
6000
10000
g1.B g1.C
CONSULTANT :
DRAWING TITLE :