Equipment Procurement and Installation Contract

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

Equipment Procurement and Installation Contract

Contract Number: _________________

Party A: _________________
Registered Address: _________________
Legal Representative: _______________
Contact Information: _________________

Party B: _________________
Registered Address: _________________
Legal Representative: _______________
Contact Information: _________________

In view of Party A's need to procure and install equipment for its project, and Party B's
agreement to provide the said services, both parties, based on the Contract Law of the
People's Republic of China and relevant laws and regulations, and on the principles of
equality, voluntariness, fairness, and good faith, have reached the following agreement
through friendly negotiations regarding the equipment procurement and installation:

Chapter 1: Contract Subject

Article 1: Equipment Name, Model, Specification, and Quantity


1. Party A agrees to purchase the following equipment from Party B:
- Equipment Name: ________
- Model: ________
- Specification: ________
- Quantity: ________
- Detailed equipment technical parameters and list are specified in Attachment 1.

Article 2: Equipment Quality Standards


1. The equipment shall comply with relevant national and industry standards.
2. The equipment provided by Party B shall be brand new, unused, and original, with
complete quality certificates and user manuals.

Article 3: Equipment Price


1. The total contract price for the equipment is RMB ________ (in words: ________).
2. The total price includes all costs such as equipment costs, packaging, transportation,
insurance, installation, commissioning, training, and other costs as agreed in the contract.

Chapter 2: Equipment Delivery and Acceptance

Article 4: Delivery Time and Place


1. Delivery Time: ________ year ________ month ________ day.
2. Delivery Place: _________________.

Article 5: Delivery Method


1. Party B shall adopt appropriate packaging to ensure that the equipment is not damaged
during transportation.
2. Transportation Method: ________, the transportation costs shall be borne by ________.

Article 6: Acceptance Standards and Methods


1. After the equipment arrives at the delivery location, Party A shall conduct a preliminary
acceptance within ________ days.
2. The preliminary acceptance includes checking the equipment's name, specifications, model,
quantity, appearance, and accompanying documents.
3. After passing the preliminary acceptance, Party A shall conduct installation and
commissioning acceptance within ________ days. The acceptance standards are detailed in
Attachment 2.
4. If the acceptance is not passed, Party B shall replace or repair the equipment free of charge
within ________ days upon receipt of the notification.

Chapter 3: Equipment Installation and Commissioning

Article 7: Installation and Commissioning


1. Party B is responsible for the installation and commissioning of the equipment.
2. Party B shall send technical personnel to the site for installation and commissioning within
________ days upon notification from Party A.
3. Party B shall provide operational training to ensure that Party A's personnel can correctly
operate and maintain the equipment.

Article 8: Installation Site Requirements


1. Party A shall prepare the installation site according to the requirements provided by Party B
and ensure that the installation conditions are met.
2. If the installation cannot proceed on schedule due to reasons attributable to Party A, Party A
shall bear any additional costs incurred.

Chapter 4: Payment Terms

Article 9: Payment Terms and Deadlines


1. Advance Payment: Within ________ days after signing the contract, Party A shall pay Party
B ________% of the total contract price, amounting to RMB ________ (in words: ________).
2. Delivery Payment: Within ________ days after the equipment is delivered, Party A shall
pay Party B ________% of the total contract price, amounting to RMB ________ (in words:
________).
3. Final Payment: Within ________ days after the acceptance is passed, Party A shall pay the
remaining amount, RMB ________ (in words: ________).
Chapter 5: Rights and Obligations of Both Parties

Article 10: Rights and Obligations of Party A


1. Party A has the right to supervise and inspect Party B's supply and installation and to
propose reasonable improvement suggestions.
2. Party A shall pay the contract amount on time as stipulated and provide necessary
assistance to Party B.
3. Party A shall prepare the installation site according to Party B's requirements to ensure the
smooth progress of the installation work.

Article 11: Rights and Obligations of Party B


1. Party B has the right to receive payment according to the contract.
2. Party B shall deliver the equipment on time as required by the contract and provide the
necessary installation and commissioning services.
3. Party B shall ensure that the provided equipment meets the quality standards agreed in the
contract and provide relevant technical support and after-sales service.

Chapter 6: Equipment Quality Guarantee and After-Sales Service

Article 12: Quality Guarantee


1. Party B shall provide a quality guarantee period of not less than ________ years from the
date of acceptance.
2. During the quality guarantee period, Party B shall provide free repair or replacement
services for faults caused by equipment quality issues.

Article 13: After-Sales Service


1. Party B shall provide lifelong maintenance services and ensure to respond within ________
hours and arrive at the site within ________ days for repairs after receiving Party A's repair
notice.
2. Party B shall conduct regular visits to understand the operation status of the equipment and
provide corresponding technical support.

Chapter 7: Breach of Contract

Article 14: Breach of Contract


1. If either party fails to perform its obligations as agreed in the contract, it shall be deemed as
a breach of contract, and the breaching party shall bear the breach of contract liability.
2. The breaching party shall pay liquidated damages to the non-breaching party, which shall
be ________% of the total contract price.
3. If the actual loss caused by the breach exceeds the liquidated damages, the breaching party
shall compensate the non-breaching party for all losses.

Article 15: Delayed Delivery Responsibility


1. If Party B fails to deliver on time, it shall pay Party A liquidated damages amounting to
________% of the total contract price for each delayed day.
2. If the delay exceeds ________ days, Party A has the right to terminate the contract and
demand compensation from Party B.

Chapter 8: Force Majeure

Article 16: Force Majeure


1. If the contract cannot be performed due to a force majeure event, the affected party shall
promptly notify the other party and provide relevant certification documents within ________
days.
2. Force majeure events include but are not limited to natural disasters, wars, riots, and
government actions.
3. If the contract is partially performed or delayed due to a force majeure event, both parties
shall amicably negotiate a solution.

Chapter 9: Contract Termination and Rescission

Article 17: Contract Rescission


1. Both parties may rescind the contract by mutual agreement.
2. If the contract is rescinded due to one party's breach, the breaching party shall bear the
liability for breach of contract and compensate the non-breaching party for losses.

Article 18: Contract Termination


1. The contract shall automatically terminate upon the completion of its performance and the
settlement of all payments.
2. If the contract cannot be continued due to a force majeure event, both parties shall
negotiate to terminate the contract.

Chapter 10: Dispute Resolution

Article 19: Dispute Resolution


1. Any disputes arising from this contract shall be settled through amicable negotiations
between the parties.
2. If the negotiations fail, either party may bring the dispute to the people's court in the place
where the contract was signed.

Chapter 11: Miscellaneous Provisions

Article 20: Contract Effectiveness


1. This contract shall become effective upon signature and seal by both parties.
2. This contract is made in ________ copies, with each party holding ________ copies, all of
which have the same legal effect.
Article 21: Contract Attachments
1. The attachments to this contract include but are not limited to: equipment technical
parameters, detailed list, acceptance standards and methods, mutually confirmed installation
and commissioning plans, and training plans.
2. The attachments have the same legal effect as the main body of the contract.

Party A (Seal): _______________


Legal Representative (Signature): ___________
Date: ________ year ________ month ________ day

Party B (Seal): _______________


Legal Representative (Signature): ___________
Date: ________ year ________ month ________ day