Republic of the Philippines


Date: 10-Jun-2024
TERESA WATER DISTRICT Rev: 00
Omega Subdivision, Brgy. San Gabriel, Teresa, Rizal

PIPE LAYING OF DISTRIBUTION LINE (80 METERS)


FOR LOWER BUROL

October 2023

Prepared by: Noted by:

SHERMANE LYLE D. SANTIAGO ENGR. GILBERT ROLAND R. DENILLA


Engineering Aide Division Manager

Approved by:

MARNELLE D. MAALA-REYES
General Manager

Table of Contents
PROJECT PROFILE..........................................................................................................................4

____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 1 of 7
TERWD/ENG/FR-1 Rev.No.00

Republic of the Philippines


Date: 10-Jun-2024
TERESA WATER DISTRICT Rev: 00
Omega Subdivision, Brgy. San Gabriel, Teresa, Rizal

PROJECT LOCATION.........................................................................................................................5
PROPOSED PROGRAM OF WORKS AND PLAN.....................................................................................6
COST ESTIMATE....................................................................................................................................... 6
PROPOSED PLAN...................................................................................................................................... 8
AS BUILT PLAN................................................................................................................................8
APPENDIX A ACTUAL PROJECT EXPENSES........................................................................................ 9
Appendix B PROJECT PHOTOS...........................................................Error! Bookmark not defined.

Table of Figures
Figure 1 - Location Map.............................................................................................................................. 5
Figure 2 Cost Estimate................................................................................................................................ 7

____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 2 of 7
TERWD/ENG/FR-1 Rev.No.00

Republic of the Philippines


Date: 10-Jun-2024
TERESA WATER DISTRICT Rev: 00
Omega Subdivision, Brgy. San Gabriel, Teresa, Rizal

Abbreviations

ADM Administrative Division Manager


BFP Bureau of Fire Protection
CDM Commercial Division Manager
Department of Environment and Natural
DENR
Resources
DOH Department of Health
DPWH Department of Public Works and Highways
EDM Engineering Division Manager
GM General Manager
GSS General Services Section
HOA Home Owners Association
HRS Human Resource Section
MERALCO Manila Electric Company
MWCI Manila Water Co. Inc.
LGU Local Government Unit
LLDA Laguna Lake Development Authority
LWUA Local Water Utilities Administration
OGM Office of the General Manager
PDM Production Division Manager
PNP Philippine National Police
Philippine National Standard for Drinking
PNSDW
Water
SWQI Senior Water Quality Inspector
TerWD Teresa Water District
WHO World Health Organization
WMM Water Maintenance Man
WSP Water Safety Plan
WTP Water Treatment Plant

____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 3 of 7
TERWD/ENG/FR-1 Rev.No.00

Republic of the Philippines


Date: 10-Jun-2024
TERESA WATER DISTRICT Rev: 00
Omega Subdivision, Brgy. San Gabriel, Teresa, Rizal

PROJECT PROFILE

PROJECT ACCOMPLISHMENT REPORT


Project Title Pipe Laying of Distribution Line (80 meters) for Division Manager Engr. Gilbert
Lower Burol Roland R. Denilla
Project Start Date October Project End Date Project Budget Teresa Water
28, 2023 District
PROJECT COST
Approved Cost Actual Cost

Total Project Cost 217,000

Project Team Approval/ Review Committee


Project Lead Elvin ES. Estrada Project Budget Teresa Water District
Technical Lead Operations/Engineering Engr. Gilbert Roland R.
Division Manager Denilla
Team Members General Manager Ms. Marnelle D. Maala-Reyes
Finance Manager

____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 4 of 7
TERWD/ENG/FR-1 Rev.No.00

Republic of the Philippines


Date: 10-Jun-2024
TERESA WATER DISTRICT Rev: 00
Omega Subdivision, Brgy. San Gabriel, Teresa, Rizal

PROJECT LOCATION
Below is the location map of the project. The project is located at Lower Sitio Burol, Brgy. May Iba, Teresa,
Rizal.

Figure 1 - Location Map

____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 5 of 7
TERWD/ENG/FR-1 Rev.No.00

Republic of the Philippines


Date: 10-Jun-2024
TERESA WATER DISTRICT Rev: 00
Omega Subdivision, Brgy. San Gabriel, Teresa, Rizal

APPENDIX A: PROJECT PHOTOS

EXCAVATION OF
TRENCHES

PIPE LAYING

BACKFILLING OF
TRENCHES

CONCRETE
POURING

____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 6 of 7
TERWD/ENG/FR-1 Rev.No.00

Republic of the Philippines


Date: 10-Jun-2024
TERESA WATER DISTRICT Rev: 00
Omega Subdivision, Brgy. San Gabriel, Teresa, Rizal

APPENDIX B: SUPPORTING DOCUMENTS


The supporting documents is as follows:
1. Cost Estimate
2. Approved Plan
3. As-Built Plan
4. Actual Cost

____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 7 of 7