PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 1 of 7
TERWD/ENG/FR-1 Rev.No.00
PROJECT LOCATION.........................................................................................................................5
PROPOSED PROGRAM OF WORKS AND PLAN.....................................................................................6
COST ESTIMATE....................................................................................................................................... 6
PROPOSED PLAN...................................................................................................................................... 8
AS BUILT PLAN................................................................................................................................8
APPENDIX A ACTUAL PROJECT EXPENSES........................................................................................ 9
Appendix B PROJECT PHOTOS...........................................................Error! Bookmark not defined.
Table of Figures
Figure 1 - Location Map.............................................................................................................................. 5
Figure 2 Cost Estimate................................................................................................................................ 7
____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 2 of 7
TERWD/ENG/FR-1 Rev.No.00
Abbreviations
____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 3 of 7
TERWD/ENG/FR-1 Rev.No.00
PROJECT PROFILE
____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 4 of 7
TERWD/ENG/FR-1 Rev.No.00
PROJECT LOCATION
Below is the location map of the project. The project is located at Lower Sitio Burol, Brgy. May Iba, Teresa,
Rizal.
____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 5 of 7
TERWD/ENG/FR-1 Rev.No.00
EXCAVATION OF
TRENCHES
PIPE LAYING
BACKFILLING OF
TRENCHES
CONCRETE
POURING
____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 6 of 7
TERWD/ENG/FR-1 Rev.No.00
____________________________________________________________________________________________
PIPE LAYING OF DISTRIBUTION LINE (80 METERS) FOR LOWER BUROL Page 7 of 7