Scissorlift Daily Inspection Checklist

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

AIN TSILA DEVELOPMENT PROJECT

A-CNT-CON-000-00282
SCISSOR LIFT PRE-USE INSPECTION CHECKLIST

Sl ITEMS SAT SUN MON TUE WED THU FRI COMMENTS


1 Air lines are in good condition
2 Hydraulic hoses are in good condition
3 Connections are in good condition
4 There is no leakage
5 There is no loose or missing parts
6 Outriggers are working properly
7 Tyres/wheels are in good condition with proper inflation
8 Brakes are working properly
9 Park brake is working properly
10 Exhaust emission is acceptable (if applicable)
11 Safe Working Load (SWL) is written on the equipment
12 Horn is in good working condition
13 Amber flashing beacon is in good working condition

14 Reversing alarm is in good working condition

15 Head, tail and turn indicators are in good working condition


16 Current colour code is visible on the equipment
17 Engine guarding is in place
BASKET
1 Levers/controls are properly functioning
2 Guardrails are intact
3 Self-closing gate is in good condition
4 Instruments and labelling are in good condition

5 Levers/controls basket and base are in good condition


6 Interior is clean
AIN TSILA DEVELOPMENT PROJECT
A-CNT-CON-000-00282
SCISSOR LIFT PRE-USE INSPECTION CHECKLIST

Sl ITEMS SAT SUN MON TUE WED THU FRI COMMENTS


Operator instruction, in a language that can be fully understood by the
7
operator, is available
8 Harness anchorage point(s) is in good condition
9 Copy of the 3rd Party Certificate is available

Operator Name: From Date : To Date :


Signature : Responsible Contractor:
Note: Use (/) if it is OK, put (X) if not OK and put NA if Not Applicable

You might also like