CDC-GMT-011-P100 Emergency Management Procedure
CDC-GMT-011-P100 Emergency Management Procedure
EMERGENCY
MANAGEMENT
PROCEDURE
1
Doc No: CDC-GMT-011-P100
Page: 2 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
TABLE OF CONTENTS
2
Doc No: CDC-GMT-011-P100
Page: 3 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
3
Doc No: CDC-GMT-011-P100
Page: 4 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
1 PURPOSE
This Emergency Management Procedure contains, validates and implements the effective emergency
response in the event of an emergency while working at the PTAMNT mine site.
• Prevent injury or subsequent loss of life;
• Minimize property losses, damage to equipment and the environment;
• Describe the chain of command to ensure there is a prompt and coordinated approach in an
emergency;
• Ensure that all necessary equipment, personnel and other resources are available for effective
emergency control;
• Ensure that all necessary equipment, personnel and other resources are available for effective
emergency control.
2 SCOPES
This procedure applies to all employees working at the Batu Hijau plant and surrounding projects which
are the responsibility of PTAMNT. This procedure complies with the Decree of the Minister of Energy
and Mineral Resources of the Republic of Indonesia Number 1827 K / 30 / MEM / 2018. Attachment III,
Part A - Guidelines for Mineral and Coal Processing and / or Purification Safety Implementation, Point
F - Scope of Emergency Management.
This Emergency Management Procedure contains provisions on planning, implementing and reporting
emergencies at the PTAMNT mine site including in the exploration area, outlining the obligations and
responsibilities of PTAMNT personnel, Business Partners, dependents and visitors.
This procedure describes the types of emergencies and key personnel who can be contacted in an
emergency that occurs in the PTAMNT Project.
This procedure applies to all types of emergency response plans in the effort to anticipate the potential
hazards faced by all personnel working at PTAMNT. This procedure covers the following emergencies:
4
Doc No: CDC-GMT-011-P100
Page: 5 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
3 Fire and Explosion • Storage and processing facilities that use flammable /
combustible fuels.
• Facilities close to potential fire areas with operational
implications for the company
• Forest
4 Altitude and Confined • The victim depends on the accident at high altitude
Space Rescue • The victim is trapped in an accident in a confined space
5
Doc No: CDC-GMT-011-P100
Page: 6 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
Crisis Situation A crisis situation is any problem related to the continuity, reputation or
business liabilities that threatens PTAMNT's commercial position or
sustainability. Crises can be triggered by an event or problem which is turning
point - beyond normal business contingencies and emergencies.
MoEMR Ministry of Energy and Mineral Resources.
Disasters Disaster - an event that is or is imminent, which endangers or threatens the
safety of life, causes property loss or environmental damage, and whose
control is beyond the capacity of an organization because it requires the
coordination of a number of significant emergency management activities.
Emergency An unpredictable crisis condition that occurs suddenly (usually followed by
the appearance of danger) that requires immediate control action..
Emergency Response Actions taken by the Emergency Response Team at the location of the incident
and other places to detain, stop and remedy the incident in order to protect
employees and other parties affected by the incident, such as the environment,
property and other assets.
Evacuation An emergency when all personnel are asked to leave the affected area and
gather in a designated safe place.
FES Fire and Emergency Services
ECC Emergency Communication Centre
EMP Emergency Management Procedure
ERG Emergency Response Group yang terdiri dari FES, Klinik dan Sekuriti.
EMT Emergency Management Team
Incident Organization An organizational structure that identifies the various tasks and responsibilities
(IO) and functions performed to deal with an emergency.
Incident Commander Led by the Head of Chief of Mining Officer or Deputy Head of Mining Mining
(IC) Officer or Sr Manager or Area Manager who is overall responsible for
emergency operations and coordinating the resources needed to handle
emergencies.
Operational Command Superintendent / Specialist Fire & Emergency Services who leads and is
(OC) responsible at the emergency location in handling and controlling through the
implementation of operational strategies and tactics or Manager / Supt /
Specialist Dept. Areas specifically designated for handling specific
emergency.
Support The Manager Area or superintendent area who is at the location and is
Command (SC) responsible for providing support for emergency handling operations,
including but not limited to providing technical advisers, heavy equipment, air
transportation, logistics, lighting etc.
Recovery The Manager Area or Superintendent Area who is at location and is
Command (RC) responsible for planning and implementing the recovery / recovery plan,
including emergency investigation activities, loss estimates, site cleaning,
recovery operations, and post-emergency recovery reports.
Fire Warden Staff who is responsible to help the process of evacuating personnel in the fire
emergency situation.
HSE / HSEQT Health Safety and Environment, Quality and Training
6
Doc No: CDC-GMT-011-P100
Page: 7 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
CMO Chief Mining Officer – person in charge or person who is responsible for the
implementation and compliance of laws and regulations in the field of OHS
and the Mining Environment (Good Mining Technical Principles)
MERP Medical Emergency Response Plan
Must The word "must" means obliged to be obeyed.
Personel PTAMNT employees, business partners, dependents of employees, visitors
and others who were on site when an emergency occurred.
Should The word "should" means advice, not obligatory.
Injury & Disease Injury or wound is damage to the structure or function of the body due to
physical or chemical force or pressure. While disease is a health problem that
is more caused by problems from the body.
Mining Operation Each area after passing the Shift Change security post at the Plant includes the
Area Primary Crusher workshop area, Air Merah Batching plant workshop.
The EMT must act as a PUSKODALOPS (Operations Control Command Center) which is
equipped at a minimum, among others:
• Meeting rooms equipped with communication facilities, telephone, radio, satellite telephone)
• The map of working area (including exploration area map), and
• CCTV.
7
Doc No: CDC-GMT-011-P100
Page: 8 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
The EMT consists of a maximum of the following personnel but not limited to:
1. EMT Leader
2. Secretary
• A person appointed by the EMT Leader assigned to document all activities and make
regular updates to the work team.
3. Safety and Emergency Response Coordinator
• Sr Manager HSE/Sr Manager Reliability and Training/Manager SHLP/ Superintendent
Fire and Emergency Services
4. Environmental Coordinator
• Sr Manager HSE/Manager Environmental Manager and / or appointed Supt
5. Security coordinator
• Manager Security and/or appointed Supt
6. Mining Engineering Coordinator
• Sr Manager Mining Alliance/Sr Manger Mine Technical Services/Sr Manager Mine
Maintenance/Operational Person in Charge (PJO) or Operational Vice Person in charge
(WPJO) of Mining
7. Exploration Coordinator
• Sr Exploration/Exploration Manager and or appointed Supt
8. Processing Coordinator
• Sr Manager Fixed Plant/Manager Process Maintenance/Manager Process
Operation/Manager Mobile Fleet Mangement
9. Power Plant Coordinator
• Sr Manager Power Business and/or appointed Manager/Supt
10. Townsite Services Coordinator
• Manager Facility and Services and/or appointed Supt
11. External Relations Coordinator
• Sr Manager Social Responsibilty/Sr Manager SR and Long Term Planning/Manager Gov
Rel, dan/atau Supt yang ditunjuk
12. HR Coordinator
• HR Manager and/or appointed Supt
13. IT and Communication Coordinator
• IT Manager and/or appointed Supt
14. Port Operation Coordination
• Port Operation Manager and/or appointed Supt
15. Multimedia and Publication Coordinator
• Sr Manager Coorp Communication and/or appointed Supt
8
Doc No: CDC-GMT-011-P100
Page: 9 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
9
Doc No: CDC-GMT-011-P100
Page: 10 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
10
Doc No: CDC-GMT-011-P100
Page: 11 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
• Support the process of investigating emergency events that are carried out, calculating
estimated losses, providing all technical documents and resources required for the investigation
process.
11
Doc No: CDC-GMT-011-P100
Page: 12 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
4.15 Employees
• Immediately conduct emergency call.
• Provide initial assistance until a suitable emergency response team arrives but do not put
yourself or others in danger, especially during a fire, or any chemical or life-threatening
emergency.
• Evacuate to a designated temporary assembly point and remain there until an alarm sounds or
is ordered to leave.
• Follow directions and ensure all personnel (including visitors) are recorded by your supervisor.
• Perform shutdown procedures (if necessary).
• Do not go to the scene to watch or offer assistance unless called upon to do so when responders
have an emergency.
4.16 Dependents
• Immediately conduct emergency call.
• Evacuate to a designated temporary assembly point and remain there until an alarm sounds or
is ordered to leave.
• Do not go to the location to watch or offer assistance unless called upon to do so when
responders have an emergency.
12
Doc No: CDC-GMT-011-P100
Page: 13 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
4.17 Visitors
• Follow a safety orientation on site.
• Signed a list of visitors when entering and leaving the site each day.
• Prohibited from entering any area without the company supervisor;
• Follow the mentor's instructions while on site and stay with the mentor at all times.
5 PROCEDURES
5.1 Emergency Management Procedures
This procedure (EMP) specifies criteria for management and emergency response activities at
PTAMNT's mine sites and exploration areas. This procedure applies to all PTAMNT personnel,
Business Partners and visitors, which are adjusted to the conditions of PTAMNT facilities,
infrastructure and personnel.
The main function of this procedure is to give the highest priority to the safety of all personnel and
to ensure that the safety of personnel takes precedence over assets during an emergency. This
procedure is available as an electronic file on the Prospector, and a print stored in the following
location:
• Emergency Communication Center (ECC);
• Fire and Emergency Services (FES); and
• Buin Batu Clinic (BBC).
Other areas / departments and business partners that prepare a specific Emergency Response Plan
(ERP) according to their respective work areas (MWM, Exploration, Mining, etc.) must make this
procedure a reference source of main information in preparing and implementing emergency plans
and procedures in their respective areas.
13
Doc No: CDC-GMT-011-P100
Page: 14 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
In general, events above the consequence level are 1 or 2 based on the Risk Management
Procedure.
In general, events above the consequence level are 3 based on the Risk Management
Procedure.
14
Doc No: CDC-GMT-011-P100
Page: 15 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
In general, events above the consequence level are 4 or 5 under the Risk Management
Procedure.
15
Doc No: CDC-GMT-011-P100
Page: 16 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
16
Doc No: CDC-GMT-011-P100
Page: 17 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
Firefighting Post
1 closest FES Post 2 closest FEST Post 3 closest FEST Post
(Station)
UNIT RESPONSE
1 Rescue/1 Engine 2 EMS, 2 Engine, 2 Rescue 3 EMS, 3 Engine, 3 Rescue
(MINIMUM)
INFORM FES
SPECIALIST & SUPT NO YES YES
FES
INFORM SHE NO
YES YES
SUPERINTENDET
INFORM SHLP NO
YES YES
MANAGER
INFORM SR. NO
YES YES
MANAGER SHS
17
Doc No: CDC-GMT-011-P100
Page: 18 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
* FES Supervisor, Specialist FES, Supt FES or Manager SHLP can set the alarm response that is higher than
the table, when getting more detailed information for emergency response, or arriving at the scene earlier than
the FES team
18
Doc No: CDC-GMT-011-P100
Page: 19 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
INCIDENT/
ACCIDENT
ACTIVATE ERG
FES, MEDIC & SECURITY
EMERGENCY LEVEL
ASSESSMENT BY ERG
LEVEL 2 OR 3
LEVEL 1 (ALARM 1)
(ALARM 2 OR 3)
ERG CONTINUE
EMERGENCY RESPONSE ACTIVATE EMT
ACTIVITIES UNTIL FINISH
ERG CONTINUE
EMERGENCY RESPONSE
ACTIVITIES UNTIL FINISH
19
Doc No: CDC-GMT-011-P100
Page: 20 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
Incident
Commander
IC
Emergency
Management Team
Admin & Support
EMT
20
Doc No: CDC-GMT-011-P100
Page: 21 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
EMERGENCY SITUATION
DO NOT PANIC
IMMEDIATE CALL!
ECC (EMERGENCY COMMAND
CENTER)
DESK PHONE: 49999
HANDPHONE: 08113949999
PERSONAL: (0372) 635318 / (0370) 636318 EXT. 49999
RADIO: CHANNEL # 1
Mention your name / no. badge, emergency conditions
encountered, location, number of injured victims, telephone
number, and waiting for directions.
For all emergency evacuations to off-site medical service facilities, the doctor will provide referral
and coordinate as well as seek approval to use PTAMNT ambulance / aircraft or helicopters if
necessary.
21
Doc No: CDC-GMT-011-P100
Page: 22 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
There is a helipad for emergency evacuation that has been determined near office buildings such
as the 106 Concentrator office area, and certain areas at the Mine and Exploration Site (which must
be evaluated in advance by the Pilot and Aviation Safety Technical Team).
The main football field at Townsite is also used as an emergency evacuation helipad for Buin Batu
clinic.
Any emergency that requires evacuation in the port area using the existing helipad.
Depending on the severity of the injury and the availability of flight transportation, either a
seaplane or a helicopter will be used for aerial evacuation.
5.9 Posters / Stickers of Emergency Response Plans and Information on Fire Warden Buildings
on Site
On-site emergency response plan posters are installed in all office buildings and other areas to
provide information to employees on what to do and who to contact in an emergency. This poster
contains:
• Exit instructions;
• Assembly point;
• Location of light fire extinguishers (APAR);
• Emergency service telephone numbers;
• Fire Warden building and telephone number that can be contacted
• Instructions - what to do when you hear an evacuation alarm sound;
• Names of personnel competent in providing first aid - a separate list is provided by the fire
warden.
The workplace emergency response plan should be kept in a place that is easily accessible to all
employees.
22
Doc No: CDC-GMT-011-P100
Page: 23 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
23
Doc No: CDC-GMT-011-P100
Page: 24 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
company operations such as infrastructure and other important facilities including guarantees for
the process of procuring goods and services.
These departments include:
1. Safety and Emergency Response
(Sr Manager HSE/Sr Manager Reliability and Training/Manager SHLP/ Superintendent Fire
and Emergency Services)
2. Environment
(Sr Manager HSE/Manager Lingkungan and / or appointed Supt)
3. Security
(Manager Security and / or appointed Supt)
4. Mining
(Sr Manager Mining Alliance/Sr Manager Mine Technical Services/Sr Manager Mine
Maintenance/ Operational Person in Charge (PJO) or Operational Vice Person in Charge
(WPJO) Mining)
5. Exploration
(Sr Manager Eksploration/Exploration Manager and / or appointed Supt)
6. Processing
(Sr Manager Fixed Plant/Manager Process Maintenance/Manager Process Operation)
7. Power Plant
(Sr Manager Power Business and/or appointed Manager/Supt)
8. Townsite Services
Manager Facility and Services and / or appointed Supt
9. External Relation
Sr Manager Social Responsibilty/Sr Manager SR and Long-Term Planning/Manager Gov Rel,
and / or appointed Supt
10. HR
HR Manager and / or appointed Supt
11. IT and Communication
IT Manager and / or appointed Supt
12. Port Operations
Manager Port Operation and / or appointed Supt
13. Multimedia and Publication
Sr Managre Coorp Communication and / or appointed Supt
14. SCM
Sr Manager Capital Procurement and Services and / or appointed Supt
15. Transportation
Manager Transport and / or appointed Supt
16. Financial Advisor
Manager Finansial and / or appointed Supt
17. Legal Advisor
Sr Legal Councel/Legal Councel or their appointed representative
24
Doc No: CDC-GMT-011-P100
Page: 25 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
25
Doc No: CDC-GMT-011-P100
Page: 26 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
6.2 Annex
Annex 1 – PTAMNT Project Details
Annex 2 – Injuries and Disease
Annex 3 – Evacuation
Annex 4 – Fire and Explosion
Annex 5 – Altitude and Confined Space Rescue
Annex 6 – Vehicle Accidents
Annex 7 – Hydrocarbon Spills or Toxic and Hazardous Materials
Annex 8 – Electric Shock
Annex 9 – Mine Well Slope / Wall Avalanche
Annex 10 – Dam / Reservoir Overflows
Annex 11 – Aircraft or Shipwreck Crash
Annex 12 – Leakages of Inland and Marine Tailings Pipes
Annex 13 – Security Interference
Annex 14 – Natural Disasters (Storms, Lightning, Volcanic Eruptions, Earthquake, Tsunami)
Annex 15 – List of Emergency Management Team (EMT)
Annex 16 – List of Emergency Response Group (ERG)
Annex 17 – Government Emergency Services Contact Numbers
26
Doc No: CDC-GMT-011-P100
Page: 27 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
• Location: Sekongkang District, West Sumbawa Regency, Sumbawa Island, West Nusa Tenggara
Province.
• Located on Sumbawa Island, West Sumbawa Regency, Taliwang, West Nusa Tenggara Province
or about 1,530 KM (950 mi) east of the capital city of Indonesia (Jakarta). The Batu Hijau Mine
is located at Latitude 8 ° 57 '59.99 "S and Longitude 116 ° 51'59 E
Site: Lemurung
• Location: Lenangguar District, Sumbawa Regency, Sumbawa Island, West Nusa Tenggara
Province.
• Located approximately 54 KM (33 mi) east of the Batu Hijau mine, southern Sumbawa Besar,
West Nusa Tenggara Province. Lemurung Camp is at the coordinates Latitude 8 ° 48 '38.18 "S
and Longitude 117 ° 20'09. 10
Site: Elang
• Location: Lenangguar District, Sumbawa Regency, Sumbawa Island, West Nusa Tenggara
Province.
• • Located approximately 57 KM (35 mi) east of the Batu Hijau mine, southern Sumbawa Besar,
West Nusa Tenggara Province. The Elang Prospect is at the Latitude coordinates of 8 ° 57 '56.54
"S and Longitude 117 ° 23'2.35.
27
Doc No: CDC-GMT-011-P100
Page: 28 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
A. Trigger
• Industrial accidents
• Single or multiple vehicle accidents (eg Bus)
• Natural disasters
• Health problems
28
Doc No: CDC-GMT-011-P100
Page: 29 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
E. Follow-up Action
• Handling of victims in the emergency room according to emergency procedures
• The doctor determines whether further treatment to the referred health facility is required.
• The Buin Batu Clinic Manager coordinates with the hospital. Reference, Dept. HR and
Dept. Transport for the evacuation of victims.
G. Recovery
• Manage emergency recovery at the scene with the SHLP / HSEQT Department team, after
written approval to KTT/ WKTT or Sr. Department Manager to remove the barricade /
Danger Tape from the scene.
• Support the process of investigating the occurrence of an emergency that is carried out,
calculating estimated losses, providing all technical documents and resources required for
the investigation process
29
Doc No: CDC-GMT-011-P100
Page: 30 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
Annex 3 – Evacuation
A. Trigger
• The fire alarm is active
• Fire incident
• Incidents of hazardous toxic material spills
• Natural disasters
• Health problems
• Injury
• Evacuation from remote areas
• Evacuation from the site
• Security interfence
30
Doc No: CDC-GMT-011-P100
Page: 31 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
• If the evacuation is requested by a Paramedic who is in the FAP or a Doctor to Buin Batu
Clinic, the ECC must receive notification of the movement of the Ambulance and forward
the information to the PTAMNT Management.
• If the evacuation is at the request of a paramedic or doctor from a remote area to Buin
Batu Clinic, then the area Manager, Sr. Manager SHS, SHLP Manager, Transport
Manager, Security Manager and Supt.FES, must receive information to coordinate and
handle the evacuation.
E. Follow-up Action
• Communication with the Fire Warden and area owner when the building area has been
declared safe.
• Fire Warden can tell workers to return to work
• Coordinate with the area owner or the person assigned to secure the scene (attaching the
barricade / danger tape) if necessary.
• The Buin Batu Clinic Manager coordinates with the hospital. Reference, Dept. HR and
Dept. Transport for the evacuation of victims.
G. Recovery
• Manage emergency recovery at the scene of the incident with the SHLP / HSEQT
Department team, after written approval to the KTT / WKTT or Sr. Department Manager
to remove the barricade / Danger Tape from the scene.
• Support the process of investigating the occurrence of an emergency that is carried out,
calculating estimated losses, providing all technical documents and resources required for
the investigation process.
31
Doc No: CDC-GMT-011-P100
Page: 32 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
A. Trigger
• Electricity
• Chemical material
• Gas
• Fuel / Oil
• Vehicles
• Forest Fire Drought
32
Doc No: CDC-GMT-011-P100
Page: 33 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
E. Follow-up Action
• Consider the resource requirements needed to carry out a shutdown operation.
• Consider the amount of fuel burned against the needs of extinguishing media and existing
logistics.
• Plan for ongoing operations
• Consider asking for outside help if the fire is beyond the capacity of existing resources.
G. Recovery Plan
• Manage emergency recovery at the scene of the incident with the SHLP / HSEQT
Department team, after written approval to KTT / WKTT or Sr. Department Manager to
remove the barricade / Danger Tape from the scene.
• Support the process of investigating the occurrence of an emergency that is carried out,
calculating estimated losses, provide all technical documents and resources required for the
investigation process.
33
Doc No: CDC-GMT-011-P100
Page: 34 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
A. Trigger
• The victim depends on the accident at high altitude
• The victim is trapped in an accident at the confined space
34
Doc No: CDC-GMT-011-P100
Page: 35 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
E. Follow-up Action
• Handling of victims in the emergency room according to emergency procedures
• The doctor determines whether further treatment to the referred health facility is
required.
• The Buin Batu Clinic Manager coordinates with the hospital. Reference, Dept. HR and
Dept. Transport for the evacuation of the victims.
G. Recovery Plan
• Manage emergency recovery at the scene with the SHLP / HSEQT Department team,
after written approval to KTT / WKTT or Sr. Department Manager to remove the
barricade / Danger Tape from the scene
• Support the process of investigating the occurrence of an emergency that is carried out,
calculating estimated losses, providing all technical documents and resources required
for the investigation process
35
Doc No: CDC-GMT-011-P100
Page: 36 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
A. Trigger
• A single vehicle or bus accident
• Vehicle or bus crash accidents
36
Doc No: CDC-GMT-011-P100
Page: 37 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
E. Follow-up Action
• Handling of victims in the emergency room according to emergency procedures
• The doctor determines whether further treatment to the referred health facility is
required.
• The Buin Batu Clinic Manager coordinates with the hospital. Reference, Dept. HR and
Dept. Transport for the evacuation of victims.
G. Recovery Plan
• Manage emergency recovery at the scene of the incident with the SHLP / HSEQT
Department team, after written approval to KTT / WKTT or Sr. Department Manager
to remove the barricade / Danger Tape from the scene.
• Support the process of investigating the occurrence of an emergency that is carried out,
calculating estimated losses, providing all technical documents and resources required
for the investigation process.
37
Doc No: CDC-GMT-011-P100
Page: 38 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
A. Trigger
• Oil spills on land and / or at sea from work processes
• Spills and / or releases of liquid and / or toxic gases from work processes
• Accidents involving means of transportation
Emergency Level:
• Low:
1 liter spill with impact area <30cm (stain diameter), need not be reported if there is no
potential for environmental damage.
• Medium:
Spills ≥ 1 to 40 liters, a Spill Incident Report must be prepared and completed before
the end of the shift then submitted to the Dept. Environment within 96 hours.
• High:
Spills and leaks ≥ 40, Spill Incident Report generated and completed within 2 hours.
38
Doc No: CDC-GMT-011-P100
Page: 39 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
can threaten rescuers and victims, such as electric current, vehicle stability,
fuel spills and others. Deal with looming hazards before responding.
➢ Request information from fellow victims about the incident history and
hazardous materials involved to determine treatment measures.
➢ The FES commander on site can raise the alarm status if additional personnel
and equipment resources are required.
➢ If there are victims, the priority of the operation to save the victim.
➢ Perform standard decontamination or emergency decontamination before
being handled by paramedics.
➢ Assess the condition of the victim and deal with the main problems that
threaten the victim's life and continue efforts to deal with advanced life
support (Advance Life Support) until it is successful where the victim's
condition has stabilized
➢ Immediately evacuate the victim to Buin Batu Clinic.
➢ Cover the source of the leak as you try to contain the spill.
E. Follow-Up Action
• Consider the resource requirements needed to carry out emergency operations.
• Consider the amount of material spilled against the needs of dispersants, oil spill
skimmers, spill containers, estimated length of operation, available resources and
logistics.
• Plan for ongoing operations
• Consider asking for external help if the fire is beyond the capacity of existing resources.
39
Doc No: CDC-GMT-011-P100
Page: 40 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
• Cleaning the respond equipment, wash and decontaminate equipment as needed before
returning to response unit
• Completing the respond report and reporting to the SHLP Manager / Sr. Manager SHS
according to the report format.
G. Recovery Plan
• Manage emergency recovery at the scene of the incident with the SHLP / HSEQT
Department team, after written approval to the KTT / WKTT or Sr. Department
Manager to remove the barricade / Danger Tape from the scene.
• Support the process of investigating the occurrence of an emergency that is carried out,
calculating estimated losses, providing all technical documents and resources required
for the investigation process.
40
Doc No: CDC-GMT-011-P100
Page: 41 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
A. Trigger
• Thunderbolt
• Short circuit
• Broken wires
• Insulator leak
41
Doc No: CDC-GMT-011-P100
Page: 42 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
• Paramedics, update information on the status of victims and the handling measures
that have been taken to Buin Batu Clinic. Doctor, declares the victim's status if the
rescue efforts fail to save the victim's life.
• Security, secure the scene, cover and provide limit access to the scene, and be
prepared to help if requested.
E. Follow-Up Action
• Consider the resource requirements needed to carry out the rescue operation (cranes
or other equipment for easy access)
• Handling of victims in the emergency room according to emergency procedures
• The doctor determines whether further treatment to the referred health facility is
required.
• The Buin Batu Clinic Manager coordinates with the hospital. Reference, Dept. HR
and Dept. Transport for the evacuation of victims.
G. Recovery Plan
• Manage emergency recovery at the scene of the incident with the SHLP / HSEQT
Department team, after written approval to KTT / WKTT or Sr. Department Manager
to remove the barricade / Danger Tape from the scene.
• Support the process of investigating the occurrence of an emergency that is carried
out, calculating estimated losses, providing all technical documents and resources
required for the investigation process.
42
Doc No: CDC-GMT-011-P100
Page: 43 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
A. Trigger
• Land subsidence or landslides
• Collapsed
• Other geophysical events
43
Doc No: CDC-GMT-011-P100
Page: 44 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
• Assessing the victim's condition and addressing the main problems that threaten the
victim's life, always suspect that the victim has compartment syndrome and spinal cord
injury.
• Paramedics, continue the effort to handle Advance Life Support until it is successful
where the victim's condition has stabilized.
• Immediately evacuate the victim to Buin Batu Clinic.
• Paramedics, update information on the status of victims and the handling measures that
have been taken to the Buin Batu Clinic.
• Doctor, declares the victim's status if the rescue efforts fail to save the victim's life.
• Coordination with the Area Owner, and periodically report at the location of the
incident to the SHLP Manager / Sr Manager SHS (if it has arrived at the location)
E. Follow-up Action
• Consider the resource requirements needed to carry out the rescue operation (cranes
or other equipment for easy access)
• Handling of victims in the emergency room according to emergency procedures
• The doctor determines whether further treatment to the referred health facility is
required.
• The Buin Batu Clinic Manager coordinates with the hospital. Reference, Dept. HR
and Dept. Transport for the evacuation of victims.
G. Recovery Plan
• Manage emergency recovery at the scene of the incident with the SHLP / HSEQT
Department team, after written approval to the Summit / WKTT or Sr. Department
Manager to remove the barricade / Danger Tape from the scene.
• Support the process of investigating the occurrence of an emergency that is carried
out, calculating estimated losses, providing all technical documents and resources
required for the investigation process.
44
Doc No: CDC-GMT-011-P100
Page: 45 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
A. Trigger
• High intensity rain
• Faulty pump
• Damage to the dam wall
Emergency Level:
• Low:
▪ The depth of the pond (7.5 - 8.5 m), based on the consideration of concentrator
conditions, does not rain in Santong (sunny weather), Katala at a level <8
meters.
▪ Pump flow to concentrator = 0 - 6000 m3 / hour
• Medium:
▪ Pond at depth (8.5 - 9.5m), sunny weather forecast, no rain (light rain in
Santong III), no overflow in the Nangka diversion channel, no overflow in Jalit
/ Cut 21 diversion channel, Katala is at a low level <8 meters.
▪ Pump flow to concentrator = 6000 - 9000 m3 / hour
▪ Pond depth (8.5 - 9.5m), cloudy weather forecast (maybe rainy), rain seen in
Santong, Katala area. There was no overflow in the Nangka / Jalit diversion
channel, Katala was at a high level (> 8.0 meters).
▪ Pump flow to concentrator = 9000 - 12,500 m3 / hour
• High:
▪ Pond depth at> 8.5 m or> 9.5 m, cloudy weather forecast (rain seen around the
island), rain seen in Santong, Katala, Tongoloka areas. Overflows occurred in
the Nangka diversion channel, overflows occurred at the Jali / Cut 21 diversion
channel, Katala at a high level (> 8.0 meters).
▪ Pump flow to concentrator> 12,500 m3 / hour
45
Doc No: CDC-GMT-011-P100
Page: 46 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
E. Follow-up Action
• Coordinate with the area owner or the person assigned to secure the scene (attaching
the barricade / danger tape) if necessary.
G. Recovery Plan
• Manage emergency recovery at the scene of the incident with the SHLP / HSEQT
Department team, after written approval to KTT / WKTT or Sr. Department Manager
to remove the barricade / Danger Tape from the scene.
• Support the process of investigating the occurrence of an emergency that is carried out,
calculating estimated losses, providing all technical documents and resources required
for the investigation process.
46
Doc No: CDC-GMT-011-P100
Page: 47 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
A. Trigger
• Bad weather
• Damage to the equipment on the aircraft or ship
Tingkat Kedaruratan:
• Low:
▪ Ships and ferries without any apparent reason are 15 minutes late from the
scheduled arrival and no / disconnected radio communication indicates that the
ship is in trouble / damage.
▪ Aircraft (seaplane and helicopters) without any apparent reason are 10 minutes
late from the scheduled arrival (time indicated when the aircraft departed from
its last destination) and no / disconnected radio communication indicates that
the aircraft is in trouble / damage
▪ If you see someone who has fallen into the sea.
• Medium:
▪ Ships and ferries, employee carriers are officially reported 30 minutes late from
the scheduled arrival (time is shown from the hour since the ship departed from
the port of departure).
▪ Aircraft (seaplane and helicopter), employee carriers are officially reported 15
minutes late from the scheduled arrival (time indicated from the plane
departing from the departure airport).
▪ It is known that there is a passenger fell into the sea
• High:
▪ Employee ships experiences an emergency, eg. the hull breaks, the ship
capsizes, the captain orders the ship to leave the ship as it begins to sink, etc.
▪ Seaplane and helicopters make emergency landing in water and on land.
47
Doc No: CDC-GMT-011-P100
Page: 48 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
• Conduct an urgent meeting in the SAR room to determine a search plan under the
coordination of the Harbormaster or BASARNAS.
• Coordinate with the Berting Master and Port Manager to support search vessels.
• For all emergencies on the water, the harbormaster is the final responsibility for the
safety and control of all ships within the port boundaries, so that if deemed necessary,
he can cancel decisions made by any ship captain or senior official of any facility at the
port, if according to In his view, the port's public safety is in jeopardy.
• Port Manager is the Operation Command for emergencies at sea and in the air. The
second person in charge is the port berthing master for emergencies at sea and the
Transport Manager for aviation services and ferry passengers.
E. Follow-up Action
• Consider the resource requirements needed to perform the search operation.
• Consider the number of personnel required for the search operation, the estimated
length of operation, available resources and logistics.
• Plan for ongoing operations
G. Recovery Plan
• Manage emergency recovery at the scene of the incident with the SHLP / HSEQT
Department team, after written approval to KTT / WKTT or Sr. Department Manager
to remove the barricade / Danger Tape from the scene.
• Support the process of investigating the occurrence of an emergency that is carried out,
calculating estimated losses, providing all technical documents and resources required
for the investigation process.
48
Doc No: CDC-GMT-011-P100
Page: 49 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
• Plane crash
If an airplane is reported to have crashed while flying over the Alas Strait, all available fast boats
must perform search above the flight path coordinates taking into account the speed and direction
of local currents. Always contact the rescue team to monitor developments and pass information
and other needs to the FES Team. Helicopter monitoring on VHF 122.95 and VHF channel 1.
• Sinking Ships
Verify the final position of the ship as per radio reports or visually. The fast boat at port (3) was
immediately launched to the final location according to reports to rescue passengers. A tug was
launched to assist in the rescue and towing of the ship.
49
Doc No: CDC-GMT-011-P100
Page: 50 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
A. Background
This procedure applies to all relevant PT AMNT employees, in accordance with the procedures
and strategy described in section K of this annex.
PTAMNT tailings are the remainder of the copper ore processing through a flotation process
which separates the ore into concentrate and tailings. The flotation process (flotation) is a
physical separation process so that the chemical and physical properties of the minerals in the
tailings material and the concentrate remain the same as the chemical and physical properties
of the minerals in the rock from the feed ore from the processing plant. PTAMNT tailings are
classified as hazardous waste with the waste code B416.
The pipe system for draining tailings by gravity through the deaeration box, onshore tailings
pipe, choke station, and marine tailings pipe to the tailings dumping area at sea.
B. Purpose
This Emergency Management Procedure contains effective emergency response efforts in the
event of an emergency related to tailings management at the PTAMNT mining site.
• Prevent injury or subsequent loss of life;
• Minimize the property losses, damage to equipment and the environment;
• Describe the chain of command to ensure there is a prompt and coordinated approach
in an emergency;
• Ensure that all necessary equipment, personnel and other resources are available for
effective emergency control;
• Ensure all personnel know their responsibilities and are prepared to carry out these
procedures in the emergency.
C. Legal Basis
This procedure fulfills:
• Regulation of the Minister of Environment and Forestry of the Republic of Indonesia
Number P.74 / MENLHK / SETJEN / KUM.1 / 10/2019 of 2019 concerning Emergency
Program for Management of Hazardous and Toxic Materials and / or Hazardous and Toxic
Waste
• Decree of the Minister of Energy and Mineral Resources of the Republic of Indonesia
Number 1827 K / 30 / MEM / 2018. Appendix III, Part A - Guidelines for Mineral and
Coal Processing and / or Purification Safety Implementation, Point F - Scope of Emergency
Management.
D. Definition
Definitions and Abbreviations can be found in Chapter 3.
50
Doc No: CDC-GMT-011-P100
Page: 51 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
carried out every two years or if there is a change in the technology design, method, process,
and production capacity.
G. Level of Emergency:
The level of emergency can be seen in Chapter 5.2.
H. Organization
Organization for emergency response can be found in Chapter 5.4.
I. Coordination
Emergency handling coordination can be found in Chapter 5.3.
PTAMNT has an emergency complaint center called the Emergency Command Center at the
Townsite which is equipped with 24 hour information service rooms and officers.
The leak detection early warning tool that is owned in the operation of the tailings dump pipe
is a pressure gauge which is monitored in the Processing Plant Control Room 130.
51
Doc No: CDC-GMT-011-P100
Page: 52 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
Emergency evacuation routes can be carried out by the land, sea and air. Each building in the
processing plant area and SWIS has an evacuation route and place in each area. This includes
the location of the helipad if an emergency evacuation by air is required.
K. The procedures and strategy for tailings dumping emergency countermeasures and the
responsibilities of each authorized personnel are as follows:
1. The initial action by Reporter / Worker
• Immidiate assess the situation to determine all safety considerations such as timing,
size of leak, volume of spill, location (spool number), and whether the leak is inside or
outside the holding area (inland tailings pipe).
• Report to ECC at 49999 and Process Control Room operator (Radio CH # 26 or ext.
47941/47942).
• Immidieate response (land tailings pipe leakage) - control leakage where possible
(close isolation valve, tighten bolts, insert wooden pegs into holes).
• Attempt to prevent onshore tailings pipe leakage out of the containment corridor (divert
flow, strengthen embankments).
52
Doc No: CDC-GMT-011-P100
Page: 53 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
▪ The Process Operations Manager and Environmental Manager will inform the
KTT / Site Director if there is a tailings pipe leak.
▪ KTT will inform the Director of Operations and the President Director if there
is a tailings pipe leak.
▪ Incident Commander mobilizes Rapid Response Team in case of high level
emergency. Fast response movement becomes mandatory in the event of a
marine tailings pipeline leak.
3. Follow-up Action
• All tailings pipe leaks with a high level of emergency must be reported to the Ministry
of Energy and Mineral Resources (MEMR) and the Ministry of Environment and
Forestry (MoEF), the Governor of NTB, the Office of Environment & Forestry of NTB
Province, the Regent of West Sumbawa Regency, and the Office West Sumbawa
Regency Environmental Service within 24 hours after the incident. Site Rapid
Response Team will be activated in the event of a high level emergency.
• The outside of the onshore tailings pipe is inspected at least every 6 hours (3 times per
work shift), while the offshore tailings pipe is usually inspected monthly using a
remotely operated vehicle (ROV). The inside of the onshore tailings pipe is manually
inspected every 6 months and the wall thickness of the offshore tailings pipe is also
inspected every 6 months using Smart PIG (Pipeline Integrity Gauging Tool). This pipe
also has a pressure detection system to monitor when a leak occurs, which is monitored
from the Process Control Room.
53
Doc No: CDC-GMT-011-P100
Page: 54 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
• Cleaning the respond equipment, wash and decontaminate equipment as needed before
returning to response unit
• Completing the respond report and reporting to the SHLP Manager / Sr. Manager SHS
according to the report format.
5. Recovery Plan
• Manage the emergency recovery at the scene of the incident with the SHLP / HSEQT
Department team, after written approval to KTT / WKTT or Sr. Manager Department
to remove the barricade / danger tape from the scene.
• Support the process of investigating the emergency events that are carried out,
calculating estimated losses, providing all technical documents and resources required
for the investigation process.
M. Countermeasures Function
The countermeasures function can be found in Chapter5.11.
N. References
CDC-GMT-332-Y001 Standard for Management of Hazardous and Toxic Materials
CDC-GMT-341-Y001 Standard for Tailings Management and Heap Leach Facilities
CDC-GMT-346-Y001 Waste Management Standard
CDC-POP-000-S302 Operation of the Tailing Line in Emergency Conditions
PTAMNT Tailings Dumping Permit
54
Doc No: CDC-GMT-011-P100
Page: 55 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
A. Trigger
• Bomb Threats / Terror Attacks
• Riot
• Kidnapping / extortion
• Piracy
• Criminal
E. Follow-up Action
• Handling of victims in the emergency room according to emergency procedures
• The doctor determines whether further treatment to the referred health facility is
required.
• The Buin Batu Clinic Manager coordinates with the hospital. Reference, Dept. HR and
Dept. Transport for the evacuation of victims.
55
Doc No: CDC-GMT-011-P100
Page: 56 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
G. Recovery Plan
• Manage emergency recovery at the scene of the incident with the SHLP / HSEQT
Department team, after written approval to KTT / WKTT or Sr. Department Manager
to remove the barricade / Danger Tape from the scene.
• Support the process of investigating the occurrence of an emergency that is carried
out, calculating estimated losses, providing all technical documents and resources
required for the investigation process.
56
Doc No: CDC-GMT-011-P100
Page: 57 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
A. Trigger
• Typhoon
• Thunderbolt
• Volcanic Eruption
• Eartquake
• Tsunami/Flood
• Thunderbolt
▪ ECC is equipped with a "Thunderbolt" detector. This tool provides clues to the
activity and distance of lightning, although not always accurate, therefore the
direct observations of weather conditions will be more considered;
▪ The ECC monitors weather conditions in the operating area through direct
observation and uses existing thunderbolt detector to identify approaches and
presence of thunderbolt hazardous thunderstorm activity. When direct
observation sees these conditions which are confirmed by the results of the
thunderbolt detector, the ECC must immediately convey the conditions and
presence of the lightning activity according to the predetermined risk level;
▪ Contact your ECC and Supervisor if necessary;
▪ If trained in providing first aid, provide assistance to every victim. Do not move
the victim unless absolutely necessary. Touching a person struck by lightning
is harmless;
▪ Supervisors go to the scene and assess the situation and provide assistance;
▪ Help FES if rquested.
57
Doc No: CDC-GMT-011-P100
Page: 58 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
• Volcanic Eruption
▪ All the Managers are responsible for monitoring volcanic eruption conditions
in their respective areas and issuing warnings to personnel in the field;
▪ After receiving advice / input from PTAMNT, the Department Manager
informs all personnel in the field about the extreme conditions and levels of
emergency
▪ Conduct a rapid response assessment of occupational health and safety
emergencies.
▪ Preparing essential health services for displaced residents by sending mobile
units to remote areas.
▪ Replenishing essential medical supplies, in coordination with the Buin Batu
Clinic / HR.
▪ Distribute PPE to the affected residents as needed.
• Earthquake
▪ Duck, cover, and hold on to something to protect yourself from the earthquake.
▪ When the earthquake stops, get your crew members together and discuss
evacuation plans.
▪ Stay calm and wait for orders from the Emergency Coordinator, ECC, OHS or
security personnel.
▪ Follow tsunami procedures if you believe tsunami will occur.
▪ Stay away from permanent appliances, windows, cabinets, and electricity.
▪ Help people with disabilities find safe places.
▪ Evacuate according to the orders of the Emergency Coordinator and / or
designated officers.
▪ If trained as a first aider, give first aid to the victim. Don't pick up victims
unless absolutely necessary.
▪ Report to the ECC if you become aware of anyone trapped in the rubble of the
building.
▪ Help FES if requested.
• Tsunami
▪ Duck, cover, and hold on to something to protect yourself from the earthquake.
▪ When the earthquake stops, get your crew members together and discuss
evacuation plans. A tsunami might occur in a few minutes.
▪ Take advantage of the ECC, Security and Police to get the latest information about
emergency conditions.
▪ Follow the instructions issued by the above authorities. The recommended
evacuation route may be different from the route you planned, or you may be
advised to climb higher place.
▪ If you hear an official tsunami warning or detect signs of a tsunami, immediately
secure yourself to higher ground. A tsunami warning is issued when the authorities
believe a tsunami threat exists, and there may not be much to escape.
▪ Bring your emergency kit. By bringing supplies, you will feel more comfortable
during the evacuation.
58
Doc No: CDC-GMT-011-P100
Page: 59 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
E. Follow-up Action
• Maintain the communication with the Incident Commander if the disaster area has been
declared safe.
• Coordinate with the area owner or the person assigned to secure the scene (attaching
the barricade / danger tape) if necessary.
G. Recovery Mitigation
• Manage emergency recovery at the location of the incident with the SHLP / HSEQT
Department team, after written approval to the KTT / WKTT or Sr. Department
Manager to remove the barricade / Danger Tape from the scene.
• Support the process of investigating the occurrence of an emergency that is carried out,
calculating estimated losses, providing all technical documents and resources required
for the investigation process.
59
Doc No: CDC-GMT-011-P100
Page: 60 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
PTAMNT KTT (Site Director) Wudi Raharjo 48300 +62 811 39 49803
PTAMNT Senior Manager
Ilyas Yamin 47120 +62 811 39 49036
Power Business
PTAMNT Senior Manager SHS Raymond Boyska 47576 +62 811 39 49593
PTAMNT Sr. Manager F&S John Noldi Dajoh 48483 +62 811 39 49372
60
Doc No: CDC-GMT-011-P100
Page: 61 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
61
Doc No: CDC-GMT-011-P100
Page: 62 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
PTAMNT Senior Manager SHS Raymond Boyska 47576 +62 81139 49593
PTAMNT Manager SHLP Galuh Yudha Satria 47458 +62 81139 49245
Site ISOS Medical Centre Duty Doctor 48215/16 +62 81139 49357
62
Doc No: CDC-GMT-011-P100
Page: 63 of 63 Version: 11.3 GENERAL MANAGEMENT
Approval Date: 4/18/2022
Review Cycle: 2 Years
Author: Manager SHLP
AuthorPosID: 50000973 Emergency Management Procedure_
Approval: Site Director
ApprovalPosID: 50000009
63