Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 7

Supervisor

SHARAVAN KUMAR
Adampur, Dist-Siwan, Bihar
Mob. No: + 965 99265836
Email :skshravan886@gmail.com

Dear sir

I read with interest your posting for Piping Supervisor. I believe I possess the necessary skills &

experience you are seeking and would make a valuable addition to your company.

As my resume indicates, I possess more than 15 years of progressive experience in the

Piping/Mechanical field. My professional history includes positions such as Piping Supervision.

Most recently my responsibilities as a Piping Supervisor at L & T Kuwait construction co W.L.L.

match the qualification you are seeking, my responsibilities included Piping (CS , SS , GRP )

fabrication ,Erection, Testing and Commissioning various Piping systems related to as per refinery and Oil

and Gas as per isometric and GA drawings. I assisted in the successful completion of Sulfur Handling

Facilities Project Mina Al-Ahmadhi refinery in ( KNPC), North Kuwait (KOC) And Mina AL-Zour Power

Plant or Refinery.

I have attached my resume for your review and I look forward to meet with you further your available

position.
Page 1 of 7
Sincerely

SHRAVAN KUMAR PRASAD.

Kuwait.

CURRICULUM VITAE

Sharavan Kumar Prasad


E-mail: skshravan886@gmail.com

Mobile: +965 99265836

POST APPLIED FOR: Supervisor


_____________________________________________________________________________

CARRIER OBJECTIVE

I am seeking a challenging and responsible position as a SUPERVISOR in an Oil and Gas Industry,
and where I would utilize my gained experience and sound knowledge in Mechanical , Piping and associated
works for Construction Projects.

CARRIER SUMMARY:

Overall 15 years experience in supervising job of Piping Construction works of, on various facilities including
KOC & KNPC Oil and Gas Plants, Refineries, Power Plants and my responsibilities includes supervision and
execution of fabrication, erection & testing of piping works, planning & organizing site work force for day to
day activities, arranging inspections, ensure safety requirements, organize construction equipment & arranging
materials, etc.

ACADEMIC / TECHNICAL QUALIFICATION

DIPLOMA IN MECHANICAL ENGINEERING ( DME )

Intermediate of Science PASSED

COMPUTER SKILL

WINDOWS 7, WORD , EXCEL, WORKING PROGRAMME.

AWARD & HONORS

 Certification of Safety award from L & T Kuwait co.l.l. Safety team in KOC & KNPC.

Page 2 of 7
 Certification of good work efficiency and supporting award from AHMADIAH (KNPC).

 Permit System : Work permit & Confined Space Entry.

 Certification of good work efficiency and supporting award from FDH , (KNPC).

 First AID Course Certification form 28-11-2011, ( Department of EMS , KOC)

1.Project Details and Experience in KUWAIT :

K. STEEL Factory (Steelwork Design Company) Kuwait.

Client : FIRST UNITED General Trading & Contracting Co.


Project Title : Construction Contract GTM DC SEA City, Khairan kuwait Project.
Period of Work : From Nov, 2023 to Till .
Position : Supervisor.
Duties and Responsibilities
 Steel Structral Fabrication ,Erection with, Inspection and Testing various Structral systems related to a
as per isometric and GA drawings.
 Steel Structral Support Fabrication and erection with as per GA and isometric drawings.
 Ensure the completion of shop fabrication on time as per given schedule.
 Cross checking Isometric drawings with Plan and P&ID drawings.
 Referring codes, standards and company approved procedures, Specifications.
 Preparation of as built drawings, as built control sheet and other related documents.
 Conducted the Project meetings, Safety and tool box meeting .
 To maintain associated works in equipment erection , foundation etc.
 Fully conversant with Safety systems.

2.Project Details and Experience in Dubai (Abu Dhabi) :

SEPCOⅢ Electri Power Construction Co. Ltd. (Abu Dhabi Project).

Client : Taweelah RO Desalination Company LLC.


Project Title : Taweelah SWRO Project
Period of Work : From Nov, 2020 to Till .
Position : Piping Supervisor.
Duties and Responsibilities
 Under ground Piping Fabrication ,Erection with, Inspection and Testing various Piping systems
related to as per refinery and Oil and Gas as per isometric and GA drawings.
 Piping Support Fabrication and erection with as per GA and isometric drawings.
 Ensure the completion of shop fabrication on time as per given schedule.
 Cross checking Isometric drawings with Plan and P&ID drawings.
 Referring codes, standards and company approved procedures, Specifications.
 Preparation of as built drawings, as built control sheet and other related documents.
 Conducted the Project meetings, Safety and tool box meeting .
 To maintain associated works in equipment erection , foundation etc.
 Fully conversant with Safety systems.
 GRP, GRE, and CS pipe Laying, Erection and Fit-up work.

3.Project Details and Experience in Kuwait :


SAHARA AIR-CONDITIONING CO.W.L.L., AL-ZOUR Refinery, Kuwait.

Client : Kuwait National Petroleum Company ( KIPIC ).


Project Title : KIPIC AL-Zour Refinery Project (Package #05)
Page 3 of 7
Period of Work : From Fab’2019 to Oct’2019 .
Position : Piping Supervisor.
Duties and Responsibilities:
 Fire Fighting System: - Installation of piping with sprinkler, Fire Hydrants, dry Riser, and wet Riser,
including testing and commissioning of fire pumps, victoria grouping types and threading types.
 Water Supply System: - Building and industrial type of water supply system including connection to
COPPER, PVC, etc.
 Drainage System: - Building and industrial type of sewerage system including connection of all type
of drainage lines. Raising the inspection for board closing and interact with consultant for getting the
approval of the same.
 Piping Support Fabrication and erection with as per GA and isometric drawings.
 Ensure the completion of shop fabrication on time as per given schedule.
 Cross checking Isometric drawings with Plan and P&ID drawings.
 Referring codes, standards and company approved procedures, Specifications.
 Coordinating the shop Inspection and testing activities.
 Coordinating all documentation and correspondence with client.
 Planning of erection sequence as per site conditions.
 Piping Inspection of the systems as per P & ID.
 Preparation of weld & Fit-up for Site condition.
 Preparation of as built drawings, as built control sheet and other related documents.
 Conducted the Project meetings, Safety and tool box meeting .
 To maintain associated works in equipment erection , foundation etc.
 Fully conversant with Safety systems.
CS pipe Laying, Erection and Fit-up work.

4.Project Details and Experience in Kuwait :

SUNGBO, AL-ZOUR Refinery, Kuwait.


Client : Kuwait National Petroleum Company ( KNPC & FDH ).
Project Title : New Refinery Project (NRP)
Period of Work : From Apr’2018 to 18 Fab’2019 .
Position : Piping Supervisor.
Duties and Responsibilities:
 Under ground Piping Fabrication ,Erection with, Inspection and Testing various Piping systems
related to as per refinery and Oil and Gas as per isometric and GA drawings.
 Piping Support Fabrication and erection with as per GA and isometric drawings.
 Ensure the completion of shop fabrication on time as per given schedule.
 Cross checking Isometric drawings with Plan and P&ID drawings.
 Referring codes, standards and company approved procedures, Specifications.
 Preparation of as built drawings, as built control sheet and other related documents.
 Conducted the Project meetings, Safety and tool box meeting .
 To maintain associated works in equipment erection , foundation etc.
 Fully conversant with Safety systems.
 GRP, GRE, and CS pipe Laying, Erection and Fit-up work.

5.Project Details and Experience in Kuwait :

Alkulaib Trading & Contracting Co, KNPC MAB Refinery, Kuwait.


(SUNGCHANG)
Client : Kuwait National Petroleum Company ( KNPC )
Project Title : Clean Fuel Project (Green fild & Brown Fild)

Page 4 of 7
Period of Work : From November’2016 to Sep 2017.
Position : Mechanical & Piping Supervisor.
Duties and Responsibilities

 Above ground Piping Fabrication ,Erection with Pipe rack, Inspection and Testing various Piping
systems related to as per refinery and Oil and Gas as per isometric and GA drawings.
 Piping Support Fabrication and erection with Pipe rack as per GA and isometric drawings.
 Ensure the completion of shop fabrication on time as per given schedule.
 Cross checking Isometric drawings with Plan and P&ID drawings.
 Referring codes, standards and company approved procedures, Specifications.
 Boiler Stack , platform, handrail, grating, installation and Eraction work.
 Coordinating of vissel, pump and correspondence with client.
 Planning of erection sequence as per site conditions.
 Piping Inspection of the systems as per P & ID.
 Preparation of Mechanical & piping work for Site condition
 Conducted the Project meetings, Safety and tool box meeting .
 To maintain associated works in equipment erection , foundation etc.
 Fully conversant with Safety systems.

6.Project Details and Experience in Kuwait:


Global Engineering Corporation (G.E.C.) , Kuwait.
Client : Hyundai Heavy Industries Co. LTD , (HHI).
Project Title : AL-Zour North Phase 1 Power Plant , Project Kuwait.
Period of Work : From Sep’2014 to Mar’2015.
Position : Piping Supervisor..
Duties and Responsibilities:
 Tank Related Piping Fabrication ,Erection with , Inspection and Testing various Piping systems
related to as per power plant , refinery and Oil and Gas as per isometric and GA drawings.
 Piping Nossel, Support Fabrication and erection with as per GA and isometric drawings.
 Ensure the completion of shop fabrication on time as per given schedule.
 Cross checking Isometric drawings with Plan and P&ID drawings.
 Referring codes, standards and company approved procedures, Specifications.
 Coordinating the shop Inspection and testing activities.
 Coordinating all documentation and correspondence with client.
 Planning of erection sequence as per site conditions.
 Piping Inspection of the systems as per P & ID.
 Preparation of weld & Fit-up for Site condition
 Conducted the Project meetings, Safety and tool box meeting .
 To maintain associated works in equipment erection , foundation etc.
 Fully conversant with Safety systems.
 Tank Bottom Plate, Annular plate And Shell plate , Erection and Fit-up work.
 Tank Roof Fabrication , Erection and Fit-up work.

7.Project Details and Experience in Kuwait:


K.D.D.B. CO , Kuwait.
Client : Hyundai Heavy Industries Co. LTD , (HHI).
Project Title : AL-Zour North Phase 1 Power Plant , Project Kuwait.
Period of work : From Mar’2015 to January’2016
Position : Piping Supervisor.
Duties and Responsibilities
 GRP Above ground Piping Fabrication ,Erection with Pipe rack, Inspection and Testing various
Piping systems related to as per Power Plant, refinery and Oil and Gas as per isometric and GA
drawings.
 GRP Piping Support Fabrication and erection with Pipe rack as per GA and isometric drawings.
 GRP Pipe Fabrication ,Erection, Inspection and Testing various Piping systems related to as per
Power Plant , refinery and Oil and Gas as per isometric and GA drawings
Page 5 of 7
 Follow the detailed Engineering drawings & procedures also by KOC & KNPC standards.
 Handling of Manpower on site
 Preparing and arranging the Shop & Site require material ,consumable, Equipment and Tools .
 Submitting the daily activity reports and next day plan to the site Engineer/representative.
 Coordinating with site peoples, foreman’s and construction team.
 Organizing site work force planning and executing day to day activities.
 Supervise, inspect and monitor project for Time, Cost and Quality at all levels.
 Check the Truss & Column fabrication and structural, welding, grinding.
 Preparation of as built drawings, as built control sheet and other related documents.
 Contacted the Safety and tool box meetings.
 Monitor Safety guidelines from project coordinator.

8.Project Details and Experience in Kuwait:


Larson & Toubro Construction Co, Kuwait.
Client : Kuwait Oil Company (KOC).
Project Title : EPF 120, Project (KOC) Kuwait.
Period of work : From May’2009 to Jan’2011.
Position : Piping Supervisor.
 Duties and Responsibilitie.
 Work Shop , pipe and support Fabrication work.
 Above ground Piping Fabrication ,Erection with Pipe rack, Inspection and Testing various Piping
systems related to as per refinery and Oil and Gas as per isometric and GA drawings.
 Piping Support Fabrication and erection with Pipe rack as per GA and isometric drawings.
 Fabrication ,Erection, Inspection and Testing various Piping systems related to as per refinery and Oil
and Gas as per isometric and GA drawings.
 Ensure the completion of shop fabrication on time as per given schedule.
 Coordinating the shop Inspection and testing activities.
 Tank shell plate , bottom , annular plate and roof fabrication,Fit-up, welding , Erection work.
 Planning of erection sequence as per site conditions.
 Piping Inspection of the systems as per P & ID.
 Conducted the Project meetings, Safety and tool box meeting .
 To maintain associated works in equipment erection , foundation etc.
 Fully conversant with Safety systems.
 Hydro test , bolting , commisining work.

9.Project Details and Experience in Kuwait:


Client : Petrofac (Kuwait Oil Company)
Project Title EWSW PROJECT FOR KUWAIT OIL COMPANY (KOC).
KNPC MINA ABDULA PROJECT (KNPC) KUWAIT.
AIRPORT PIPELINE PROJECT KUWAIT.
PIC SHUT-DOWN Project (KNPC) Kuwait.
Period of work : From Aug’2011 to Jan’2014
Position : Piping Supervisor.
Duties and Responsibilities
 To carry out routine surveillance of Construction works in shop fabrication, welding and erection
works at site.
 Ensure the completion of shop fabrication on time as per given schedule.
 Preplanning of construction activities and job completion without delay.
 Preparation of Construction reports.
 Prepare and take the PTW for Cold, Hot and Confined face work activities.
 Cross checking of Isometric drawings with Plan & P&ID drawings.
 Planning of erection sequence as per site condition.
 Preparation of daily report and submits to Site engineer.
 Control and monitor the Subcontractor site and fabrication shop activities.

Page 6 of 7
 Supervised the teams of foreman’s, fabricators ,Fitters and Welders.
 Co ordinate with company and client Inspection personnel for Mechanical completion of construction
works.
 Contacting the Safety and tool box meeting with work site grew.
 Monitor safety guidelines from Project coordinator.

PERSONAL PROFILE

Father’s Name : Mr. Laxman Prasad.


Nationality : Indian
Marital Status : Married
Languages Known : English, Arabic, Hindi, Bhojpuri
Passport No : S4699872 (Expiry Date 09-06-2028)
:
Permanent Address : Village- Adampur,
Adampur (PO)
Siwan Dist,
Bihar– 841504
Mob: +91 7352782057.

Declaration

I certify that all information contained herein is true and accurate to the best of my knowledge and belief, I
am also confident of my ability to work in a team spirit with integrity. I am awaiting for your Favorable reply.

Date : …………………… ……………………

Place : …………………… (SHARAVAN KUMAR PRASAD)

Page 7 of 7

You might also like