Professional Documents
Culture Documents
The Adorner 22 - 5
The Adorner 22 - 5
Special Edition
COMMEMORATING
TWO DECADES
OF ALUDECOR
2002
PART 1 2012
Special Edition
COMMEMORATING
TWO DECADES
OF ALUDECOR
2002
PART 1 2012
Editor’s
Note
I ndia is witnessing a sea change in architectural
transformation. With rapid urbanisation and
contemporary trends, Indian buildings are becoming
aesthetically brilliant and more sustainable. As a
harbinger of change through our product basket we, at
Aludecor, have witnessed the CHANGES of TWO
DECADES.
A Brief History
O
1
wing to the extraordinary properties of ACP its
invention was to meet special requirements of Germany
the industries it was developed for. The initial
production of the material was to meet the needs of
9
the transportation industry. Soon it was realized that
most of the features of the panels were useful for
architectural projects. Slowly manufacturers started
using cutting-edge technologies and equipment for
6
faster development.
9
ALUCOBOND Manufacturing Unit
of these panels in today’s
It was after significant research that they
construction industry. could confirm the production process of
Although the discovery of using aluminium and low-density polyethylene
composite panels. It was a decade later in
ACP in construction material was 1969 when a German company officially
finalized only in the 1980s, launched and created ALUCOBOND, a
brand to produce these materials for
research reveals that the further projects. Alucobond® was the first
production of such material brand and it was much later that other
brands such as Reynobond, Alpolic, and
dates back to the 1960s. Etalbond came into existence.
19 2
The development of ACP panels can A big milestone for the material was
be traced back to the 1960s in when it reached China in the 1990s.
60
Switzerland. Swiss researchers The production growth took a
0
came up with the idea of combining considerable leap from then. The
Aluminium alloy panels with other material was utilized extensively
types of substances. from there on, for production
0
technologies, and application fields.
0
China
Special Edition
COMMEMORATING
TWO DECADES
OF ALUDECOR
2002
PART 1 2012
ACP Industry
Gets Structured
Initially, the composition of ACP remained the same
although it might have been marketed under various
brand names.
One thing that was consistently overlooked in the Stephen Court Fire Tragedy – Kolkata
initial years of ACP usage was safety. Even the A fire broke out in the historical building,
developed economies had few safety standards that Stephen Court, in Park Street, on March 23,
could test and accommodate an entirely new concept 2010. It killed at least 42 people. Apart from the
of building material like the ACP. As a result, when fire brigade taking 80 minutes to reach the
defects were noticed, it was too late. In India, the spot, there were no proper fire escapes, and
defects came to light because of some major the exit from the roof was also blocked with the
disasters, the latest and the most prominent ones gate to the terrace locked. The people on
being: higher floors perished for they were trapped with no
AMRI Fire Tragedy – Kolkata way out. To add to the woes, the sky lifts, which were
supposed to be used for the rescue operation, had
Another fire disaster, made worse on account of
been stored far away in Behala and Salt Lake, and
having taken place in a hospital, occurred at the AMRI
took one-and-a-half hours to reach the site resulting
Hospital at Dhakuria in South Kolkata at 3 am on
in more deaths. The building was old and proper
9 December 2011. A short-circuit in the basement of
maintenance had also not been done.
the building resulted in inflammable substances
catching fire which spread through the hospital at a The Srirangam Marriage Hall Fire Tragedy – Tamil
very rapid rate. The central AC system carried the Nadu
smoke all through the building, causing asphyxiation This fire disaster occurred on January 23, 2004 in the
and 95 people including members of the staff died as Padmapriya Marriage Hall in Srirangam. A
a result. While the fire broke out at 3 am, the short-circuit in the electric wire connecting the video
fire tenderswere called for only at 4 am and by camera resulted in the thatched roof catching fire,
the time they arrived it was 5 am. Meanwhile, resulting in the death of 57 people attending the
local youth succeeded in saving many lives. The wedding, including the groom. Temporary power lines
rescue operation by the fire brigade was to the unauthorised makeshift thatch were the major
further hampered due to lack of a blueprint of reasons for the fire.
the building plan.
Special Edition
COMMEMORATING
TWO DECADES
OF ALUDECOR
2002
PART 1 2012
2012
India’s first indigenously
made FR ACP was
launched
2002 ONWARDS
Aludecor Gains Visibility
Look Out
for THE ADORNER
Special Edition
2013
PART 2 2022
COMMEMORATING
TWO DECADES
OF ALUDECOR
1 RN Mukherjee Road
Suite 52 Floor 5 Kolkata 7000 01
P +91 33 40276600 1800 102 04 07 (Toll Free)
E crm@aludecor.com / info@aludecor.com
YEARS
W aludecor.com
OF TRUST & EXCELLENCE CIN: U 27203WB2004 PTC09 9221 Follow us on