Subject: Scheduled Work List for Interruption - Electrical

Section: Electrical
Date: 08.06.2024
Time: 08:00 Hrs. to 17:00 Hrs.
Location: Ambathale Production Complex

Major Scheduled Repair and Maintenance Woks


Item Work Description Location Work Crew
New Elli House 11kV Distribution Panel
01.
Cleaning / Condition Monitoring
02 Nos. of 500kVA 11kV:400V Power
New Elli House Supervision:
02. Distribution Transformers Cleaning /
Pump House EA(E) Mr. Nishantha
Condition Monitoring
Electrical Crew 01
01 No. of 630kVA 11kV:400V Power
03. Distribution Cleaning / Condition
Monitoring
Intake Double Circuit Overhead Line
04. Supervision:
Insulators Cleaning
Intake EA(E) - Mr. Saman
Intake Overhead Line Surge Divertor Earth
05. Mix. Crew 01
system Installation
06. Kolonnawa Old LV Cable removal work
Kolonnawa / Gothatuwa 11kV:400V
07. Transformers Cleaning / Condition
Kubota
Monitoring Supervision:
Transformer Yard
04 Nos. of Old Kubota and New EA(E) Mr. Nishantha
08. Maligakanda 11kV:3.3kV Transformers Mix. Crew 02
Cleaning / Condition Monitoring
02Nos. of 11kV:400V Jubilee Transformers
09. SPH 02 Kubota PH
Cleaning / Condition Monitoring
SPH 01 Dehiwala Pump No. 04 VSD Repair
10.
/ condition monitoring Supervision:
Power Analyzers Replacement for SPH SPH 01 Dehiwala EA(E) Mr. Saman
11.
Main LV distribution panels PH Electrical Crew 02 +
SPH Pump Motor 04 old cable removal Electronic Crew
12.
work
Supportive Activates
Item Work Description Location Work Crew
Sump Light Arrangement and Temporary Required Sumps
13.
(Submersible) Pump operations and Reservoirs Electrical Crew 02
14. Standby Generator Operations Work Sites

Crew Members List


Supervision
ID Members Co-ordination
Officer
Electrical Electricians: Mr. Kapila EA(E) Mr.
Crew 01 Helpers: Mr. Chanaka (SLRDC) Nishantha
Electricians: Mr. Yasitha and Mr.
Electrical Shantha
EA(E) Mr. Saman Manager
Crew 02 Helpers: Mr. Sanjeewa
(Maintenance)
And Trainees
Electricians: Mr. Wimalasena
EE - Ambathale
Mix. Crew Mechanic: Mr. Vijekumara and Mr.
EA(E) Mr. Saman
01 Asitha
Helpers: Mr. Sanju (SLRDC)
Mix. Crew Mechanic: Mr Kokila, Mr. Susantha, Mr. EA(E) Mr.
02 Chamika Nishantha

Preliminary Activities
1. Earth Rods Installation for Intake and other transformers

2. Check, test and refill fuel tank of fuel for all standby generators prior to the work
start.
Proposed Temporary Power Arrangements:
• 110 kVA Generator Supply for DGM Office
• 40 kVA Intake Generator Supply for Intake
• 50 kVA SPH Generator Supply for SPH – 01 and Main TP
• 37 kVA Mobile Generator (Denyo - Premises) Supply for Dehiwala GR
• 30 kVA Generator (Kiraloskar - Workshop) Supply for Workshop
• 150 kVA New Plant Generator for New Plant
• 37 kVA Mobile Generator (Denyo - Workshop) Supply for Main Plant
Chlorine House

3. Supply of safety materials (dust masks and cotton glows etc.), cleaning Items and
tools etc.
Note:
• Each team should be ready with;
✓ Complete 2 Nos Tool boxes
✓ Electrical Tools, Multimeter
✓ Scotch Tape, Insulation Tape, Nut and bolts, ect.
✓ Air Blower
✓ Vacuum Cleaner
✓ Paint Brushes
✓ Cotton Waste
✓ 2 ltr. Turpentine
✓ Contact Cleaners
✓ Penetration oil (WD40)

4. Special Tools required:


• 10kV HV Insulation Tester (KRB)
• 5kV HV Insulation Tester (Ambathale)
• HV Tester (Ambathale)
• Hydraulic Clamping Tool (KRB)
• 02Nos. Toque Wrench’s
• Pallet Truck (Ambathale)