Saic-Q-1065 Rev 1 (Final)

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

SAUDI ARAMCO ID/PID - 30-April-13 - REV 0 (Standards Cutoff - March 2013) Rev 1 31-Mar-13

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Structural and Architectural Pre-cast Concrete Pre-
SAIC-Q-1065 30-Apr-13 CIVIL-
Installation Inspection
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-Q-012-01
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

The structural component to which the member is to be attached is SAES-Q-012


A1
checked for elevation and alignment. Survey report shall be provided. Sec. 8.1
The space to be occupied by the grout shall be thoroughly cleaned, SAES-Q-012
A2
removing all dirt, oil, grease and loose material. Sec. 8.3

The cast-in-place concrete component to which the member is to be


attached are not subjected to construction loads and load induced SAES Q-001
A3
stresses during the curing period or until the concrete has achieved the Sec. 3.2
minimum strength specified in the IFC drawings. (ACI 301 Sec. 1.8)

The structures to which the precast units are to be constructed are also
checked for line and grade of bearing surfaces, notches, blockouts, SAES Q-012, .
A4
anchor bolts, cast-in hardware and dimensional deviations. 3.2
(PCI Design Handbook, Section 5.7.1.3)

Check the site conditions such as access ramps, overhead electrical SAES Q-012, .
A5
lines, truck access, etc. (PCI Design Handbook, Section 5.7.1.3) 3.2

Any discrepancies between actual conditions and those shown on the SAES Q-012, .
A6
drawings are addressed prior to erection. (PCI Handbook, Sec 5.7.1.3) 3.2

Control points, benchmarks and lines are established in an undisturbed


SAES Q-012, .
A7 location to ensure that the precast members are erected within the limits
3.2
of the project erection tolerances. (PCI-MNL-117 Sec. 11.3)

All precast members shall be installed in proper sequence and adequate


SAES-Q-012
A8 temporary supports shall be provided to control alignment, deflection,
Sec. 8.1
and stress levels.

Precast concrete members damaged by handling, transporting, or storing SAES-Q-012


A9
are rejected and replaced with undamaged members. Sec. 7.1

REMARKS:

REFERENCE DOCUMENTS:
1- SAES Q-012 -- Criteria for Design and Construction of Precast and Prestressed Concrete Structures, 3 July 2012

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

Page 1 of 2
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2