With the development of precast concrete industry, the precast concrete units, such as kerbs, channels, edgings,
quadrants, etc, have gained popularity in this country due to their ease of manufacture, technology upgradation,
consistent quality and architectural features and other considerations. The different sections of these products
shown in this standard are, as far as possible, a fair representation of the types which are used in the field.
This standard was first published in 1970 under the title ‘Specification for precast concrete kerbs’. The first
revision was published in 1984 under the modified title ‘Specification for precast concrete kerbs, channels,
edgings, quadrants and gutter aprons’ so as to reflect the contents of the standard in the title.
This second revision of the standard incorporates modifications found necessary as a result of the experience
gained with the use of the standard and to bring the standard in line with present good practices being followed
in the country and abroad. The principal modifications in this revision are as follows:
a) New types and sizes of products have been included as per the current practice;
b) Interlocking end treatment of units has been introduced;
c) Additional details of the sections/profiles have been added; and
d) Requirement of testing for compressive strength has been included for products, where bending moment
testing may be difficult due to shape constraint.
In the formulation of this standard, assistance has been also derived from the EN 1340 : 2003 ‘Concrete kerb
units — Requirements and test methods’.
The composition of the Committee responsible for the in the formulation of this standard is given in Annex E.
For the purpose of deciding whether a particular requirement of this standard is complied with the final value,
observed or calculated, expressing the result of a test or analysis shall be rounded off in accordance with
IS 2 : 1960 ‘Rules for rounding off numerical values ( revised )’. The number of significant places retained in the
rounded off value should be the same as that of the specified value in this standard.
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
Indian Standard
PRECAST CONCRETE KERBS, CHANNELS,
EDGING, QUADRANTS AND OTHER
ASSOCIATED FITTINGS — SPECIFICATION
( Second Revision )
1 SCOPE 3.8 Height (H) — Distance between the bed face and
the top of the unit, as shown in Fig. 1
This standard covers requirements of precast concrete
units for kerbs, channels, edgings, quadrants, angles, 3.9 Overall Length (L) — Length of a unit, or any
off lets and other associated fittings for the use in the other element excluding any interlocking features or
construction of carriage ways and footpaths. spacers, as shown in Fig. 1
2 REFERENCES 3.10 Profile — Part of a unit where two faces meet. It
can be square, bull nosed, splayed and half batter, as
The standards listed in Annex A contain provisions
shown in Fig. 1 and Fig. 2.
which through reference in this text constitute
provisions of this standard. At the time of publication, 3.11 Quadrant — Any of the four portions into which
the editions indicated were valid. All standards are a precast unit is divided by the horizontal and vertical
subject to revision, and parties to agreement based axes.
on this standard are encouraged to investigate the
possibility of applying the most recent edition of the 3.12 Radiussed Kerbs — Radiussed kerbs shall be
standards indicated in Annex A. described as convex or concave. The description shall
refer to the reference line. The radius of a kerb and
3 DEFINITIONS its overall length shall be measured to and along its
reference line, (see Fig. 8).
For the purposes of this standard, the following terms
and their definitions shall apply. 3.13 Reference Line — Line to which the unit is
intended to be laid.
3.1 Actual Dimension — Dimension of a unit or any
other element as measured. 3.14 Traffic Face — Face of a unit intended by the
manufacturer to be above a road surface and which
3.2 Bed Face — Lower surface in contact with the
provides containment of traffic.
ground after laying.
3.15 Unit — precast concrete unit such as kerb, channel,
3.3 Channel — Precast concrete unit structure typically
edging, quadrant, angle, offlet and complementary
located at the edge of a road, used to move water from
fittings, etc, individual or in combination with other
the pavement to a gutter to prevent excess water build
units, intended to separate surfaces of the same or of
upon roads as shown in Fig. 4.
different levels to provide physical or visual delineation
3.4 Draw — Intended angle of the side face from the or containment and separation between areas submitted
vertical plane over the full height of a unit. to different kinds of traffic.
3.5 Edging — Precast concrete unit forming an edge 3.16 Work Dimension — Dimension of a unit or any
or border of a paved area, surfacing of carriage way or other element specified for its manufacture to which
footpath as shown in Fig. 5. the actual dimension should conform within specified
permissible deviations.
3.6 Face — Surface intended by the manufacturer to be
seen when laid and in use. 4 SHAPE AND DIMENSIONS
3.7 Facing Layer — Layer of concrete on the face, or 4.1 The units shall be made in shape and dimensions to fit
part of a face, of different materials and/or properties to different construction needs. They include kerb, channel,
the main body or backing layer. edging, quadrant, angles, offlets and radiussed kerb.
NOTE — It is distinguished from wipe, being a fine cement
mortar or slurry applied to the surface of the unit or any other 4.2 The shape and dimensions of unit shall be as per
element. Table 1.
1
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
2
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
4.3 All references to dimensions are work dimensions. These finishes or treatments shall be described and
The work dimensions shall be stated by the declared by the manufacturer.
manufacturer.
4.6 End Treatment
4.4 For the manufacturing of units the profile given in Units may be manufactured with plain ends or with
Table 2 and Fig. 2 shall be used. end features to facilitate interlocking or laying. These
features shall be declared by the manufacturer. Typical
Table 2 Profile of the Manufacturing Units detail are given in Figs. 10, 11 and 12.
( Clause 4.4 ) 5 DESIGNATION OF SIZES
Sl No. Profiles Ref to Fig. For the designation of unit, dimensions of the face
which will be horizontal after laying shall be given first,
(1) (2) (3)
and the dimensions of the face which will be vertical,
i) Square Fig. 2A second. Thickness shall be specified separately.
ii) Bullnosed Fig. 2B
iii) Splayed Fig. 2C 6 TOLERANCES
iv) Half Batter Fig. 2D
6.1 The values for the permissible deviations on the
manufacturer’s declared work dimensions are as given
below:
4.5 Units with Special Faces a) Length: ± 1 percent or ± 10 mm, whichever is
4.5.1 The units with special facing and backing layers smaller.
shall be manufactured and supplied as agreed upon b) Other dimensions, except radius:
between the supplier and the purchaser. When units 1) For faces: ± 3 percent or ± 5 mm, whichever
are produced with a facing or backing layer this layer is smaller.
shall have a minimum thickness of 4 mm over that area 2) For other parts: ± 5 percent or ± 10 mm,
claimed by the manufacturer. whichever is smaller.
4.5.2 The units may be produced with functional and/or The difference between any two measurements
decorative profiles, which shall not be included in the of a single dimension of a single unit shall be
work dimensions of a units. The surface of units may ≤ 5 mm.
be textured, secondary processed or treated chemically. c) The radius in the profiles shall be given in Fig. 2.
3
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
4
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
5
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
Key
1 Kerb
2 Carriageway
3 Length
4 Radius
5 Channel
6
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
Key
Y ≤ X – 3 mm and Zy ≤ ZX – 3 mm,
X minimum: ≥ 1/5 T and ≥ 20 mm,
X maximum: ≤ 1/3 T and ≤ 70 mm,
ZY maximum : Y/2
Tolerance on X and Zx : - 1, + 2 mm,
Tolerance on Y and Zy: - 2, + 1 mm
Key
a & b – Dimensions of chase
c – Dimension of draw
7
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
Key
h – Height of the cut-out
l – Length of recess or cut-out
6.2 For faces described as flat and edges described c) Sulphate resisting Portland cement conforming to
as straight, the permissible deviations on flatness and IS 12330,
straightness are given in Table 3. d) Portland pozzolana cement conforming to IS 1489
(Part 1),
Table 3 Permissible Deviations on Flatness
and Straightness e) Portland pozzolana cement, calcined clay based
conforming to IS 1489 (Part 2),
( Clause 6.2 )
f) Super sulphated cement conforming to IS 6909,
Sl No. Length of Permissible Deviations on g) Rapid hardening Portland cement conforming to
Gauge Flatness and Straightness IS 8041,
mm mm h) White Portland cement conforming to IS 8042,
(1) (2) (3) j) Hydrophobic Portland cement conforming to
i) 300 ± 1.5 IS 8043, and
ii) 400 ± 2.0 k) Composite cement conforming to IS 16415.
iii) 500 ± 2.5
7.2 Aggregates
iv) 800 ± 4.0
7.2.1 Fine and coarse aggregates used in the manufacture
shall conform to IS 383.
7 MATERIALS
7.2.2 The maximum size of coarse aggregates shall be
7.1 Cement 20 mm graded or one-fourth of the minimum thickness
Cement complying with any of the following Indian of the section, whichever is less.
Standards may be used: 7.3 Pulverized Fuel Ash
a) Ordinary Portland cement conforming to IS 269, Pulverized fuel ash, if used shall conform to IS 3812
b) Portland slag cement conforming to IS 455, (Part 1) or IS 3812 (Part 2).
8
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
9
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
extreme conditions of temperature, relative humidity and marking the units. The supplier/manufacturer
and wind until they are required for test. The tests shall shall, free of cost provide or make arrangements for
be undertaken as soon as practicable after the sample the provision of every facility and all labour required
has been taken. for such examination, sampling, inspecting, testing and
marking before delivery, and shall provide and maintain
10.4 Number of Tests or make arrangements of providing and maintaining in
10.4.1 All the 8 units shall be checked for dimensions good working order suitable, convenient and accurate
and inspected for visual defects. apparatus for testing samples as hereinafter shall be
provided.
10.4.2 Out of the 8 units, 3 units shall be subjected
to the test for water absorption and 5 units bending 14 MANUFACTURER’S CERTIFICATE
strength and later to the test for facing or backing layer, The manufacturer shall satisfy himself that the units,
if applicable. comply with the requirements of this Indian Standard
and, if requested, shall forward a certificate to this effect
11 CRITERIA FOR CONFORMITY to the purchaser or his representative. The manufacturer
shall, if requested to do so, supply a certificate stating the
11.1 The lot shall be considered as conforming to the
date of manufacture of the units. If the purchaser or his
requirements of the specification, if the conditions
representative requires independent tests, the samples
mentioned in 9.1, 9.3 and 9.4 are satisfied.
shall be taken before or immediately after delivery
11.2 The number of units with dimensions outside the at the option of the purchaser or his representative.
tolerance limit and/or with visual defects, among those The tests shall be carried out in accordance with the
inspected shall be not more than two. standard on the written instructions of the purchaser
or his representative in a testing laboratory mutually
12 RETESTS agreed upon by the purchaser and manufacturer.
10
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
ANNEX A
( Clause 2 )
44 :1991 Iron oxide pigments for paints — 3812 Pulverized fuel ash —
Specification (second revision) Specification
50 : 1980 Lead and scarlet chromes — (Part 1) : 2013 For use as pozzolan in cement,
Specification (third revision) cement mortar and concrete
54 : 1988 Green oxide of chromium for (third revision)
paints — Specification (second (Part 2) : 2013 For use as admixture in cement,
revision) cement mortar and concrete
55 : 1970 Ultramarine blue for paints — (third revision)
Specification (first revision)
4905 : 2015 Random sampling and
56 : 1993 Prussian blue (iron blue) for randomization procedures (first
paints — Specification (second revision)
revision)
6909 : 1990 Super sulphated cement —
269 : 2015 Ordinary Portland cement — Specification
Specification (sixth revision)
383 : 2016 Coarse and fine aggregate for 8041 : 1990 Rapid hardening Portland
concrete — Specification (third cement — Specification
revision) 8042 : 2015 White Portland cement —
411 : 1991 Titanium dioxide, anatase, for Specification (third revision)
paints — Specification (third
8043 : 1991 Hydrophobic Portland cement —
revision)
Specification
455 : 2015 Portland slag cement —
Specification (fifth revision) 9103 : 1999 Concrete admixtures —
Specification
456 : 2000 Plain and reinforced concrete —
Code of practice (fourth revision) 12330 : 1988 Specification for sulphate
1489 Portland pozzolana cement — resisting Portland cement
Specification: 16415 : 2015 Composite cement —
(Part 1) : 2015 Fly ash based (fourth revision) Specification
(Part 2) : 2015 Calcined clay based (fourth 16714 : 2018 Ground granulated blast furnace
revision) slag — Specification
11
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
ANNEX B
( Clauses 6 and 9.2 )
B-0 Fifteen full size units shall be measured for B-3.2 Procedure
dimension. Alternative test methods, for example go Place two units together (or the two halves of one unit
and no-go gauges, may be used provided at least the after the bending test) and measure the opening at the
same accuracy is achieved as in the following test top between the two units. Record the mean opening in
method. whole millimetres. When the specification is in angular
terms, use appropriate tables and record the angle.
B-1 PREPARATION
Remove all flashings and burrs from the unit to be B-4 CHASE
measured.
B-4.1 Apparatus
B-2 OVERALL DIMENSIONS Measuring equipment capable of measuring with an
accuracy of 0.5 mm.
B-2.1 Apparatus
Measuring equipment capable of measuring with an B-4.2 Procedure
accuracy of 0.5 mm. Put the units on a side and measure the chase at both
ends of the unit. Record the appropriate dimensions of
B-2.2 Procedure the chase, in whole millimetres.
B-2.2.1 Length
B-5 FLATNESS AND STRAIGHTNESS
Measure the overall length of a unit at the front and
back at 10 mm above the bottom in whole millimetres. B-5.1 Apparatus
Record the measurements and the calculated Measuring equipment capable of measuring with an
difference. The chase and draw shall not be taken into accuracy of 0.1 mm.
account.
B-5.2 Procedure
B-2.2.2 Width
The maximum convex and concave deviation shall be
Measure the width on both ends of a unit at the top measured along the trafficked face.
(only if the width at the top is intended to be equal to
the width at the bottom) and at 10 mm from the bottom. B-6 THICKNESS OF FACING LAYER
Record the measurements in whole millimetres and
the calculated difference. B-6.1 Apparatus
B-2.2.3 Height Measuring equipment capable of measuring with an
accuracy of 0.5 mm.
Measure the height at the back of the units at 10 mm
from both ends. Record the measurements in whole B-6.2 Procedure
millimetres and the calculated difference. Take a unit which has been broken during bending
moment test. Measure the thickness of the facing
B-3 DRAW
layer on the broken face at the point where, by visual
B-3.1 Apparatus inspection, the value will be a minimum. Record
the measurement to the nearest millimetre. Isolated
Measuring equipment capable of measuring with an particles of aggregate protruding into the facing layer
accuracy of 0.5 mm. shall be ignored.
12
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
ANNEX C
( Clauses 9.3 )
P× L× y
T=
4× I
where
Key: T= strength, in megapascals;
1 Centre of gravity line
P= failure load, in newtons;
2 Packing piece
L= distance apart of the supports, in millimetres;
3 Hardwood wedge or mortar pack
I= second moment of area, determined from the
Fig. 13 Principal of Bending Strength Testing work dimensions; and
Y = distance from the centroid to the extreme
tensile fibre.
C-2 PREPARATION
Record the individual result, in megapascals.
Use whole units and remove any burrs and high spots,
if necessary. Immerse the units in water at 27 ± 2 °C
for 24 ± 3 h. Remove, wipe dry and test immediately. C-5 TEST REPORT
Other methods of preparation may be used for routine The test report shall include the strength, T, of the
testing providing there is a correlation between the unit.
results of the two methods.
13
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
ANNEX D
( Clauses 9.4 )
14
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
ANNEX E
( Foreword )
COMMITTEE COMPOSTION
Cement Matrix Products Sectional Committee, CED 53
Organization Representative(s)
National Council for Cement and Building Shri V. V Arora (Chairman)
Materials, Ballabgarh
Ambuja Cements Limited, Ahmedabad Shri J. P. Desai
Shri B. K. Jagetiya (Alternate)
Asbestos Information Centre, New Delhi Shri Durgesh C. Sharma
Shri John Nicodemus (Alternate)
Brihanmumbai Municipal Corporation, Mumbai Shri Vishal Thombare
Central Design Organization Nasik, Mumbai Representative
Central Pollution Control Board, Delhi Representative
Central Public Health & Environmental Engineering Representative
Organization, New Delhi
Central Public Works Department, New Delhi Shri Manoj Kumar Sharma
Shri Prem Pal Singh (Alternate)
CSIR-Central Building Research Institute, Roorkee Shri S. K. Singh
Shrimati M. Surya (Alternate)
CSIR-Structural Engieering Research Centre, Shri P. Srinivasan
Chennai Dr B. H. Bharat Kumar (Alternate)
Delhi Development Authority, New Delhi Representative
Directorate General of Factory Advise Services and Dr Champak Bhattacharya
Labour Institute, Mumbai
Engineers India Limited, New Delhi Shri Rajanji Srivastava
Shri Anurag Sinha (Alternate)
Everest Industries Limited, New Delhi Shri Y. Srinivasa Rao
Shri S. P. Bolar (Alternate)
Gammon Engineers and Contractors Pvt Ltd, Shri Manish Mokal
Mumbai Shri Sudeesh Rajendran (Alternate)
HIL Limited, Hyderabad Shri R Pradeep Kumar
Dr D. Satyanarayana (Alternate)
Housing & Urban Development Corporation Chairman and Managing Director
Limited, New Delhi Shri Deepak Bansal (Alternate)
Military Engineer Service, Engineer-in-Chief’s Shri V. K. Manglik
Branch, Integrated HQ of MoD (Army), Shri P. K. Gupta (Alternate)
New Delhi
Ministry of Science & Technology, New Delhi Representative
Ministry of Environment and Forest, New Delhi Representative
National Council for Cement & Building Materials, Shri P. N. Ojha
Ballabgarh Dr Varsha Liju (Alternate)
National Test House, Kolkata Shri B. R. Meena
Shri Aloke De (Alternate)
North Delhi Municipal Corporation, New Delhi Shri Pradeep Bansal
Shri M. P. Gupta (Alternate)
15
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
Organization Representative(s)
Public works department, Government of Haryana, Shri Lalit Arora
Chandigarh
Rural Electrification Corporation Limited, New Shri G. S. Bhati
Delhi Shri Ranjit Ranjan (Alternate)
Spun Pipes Manufacturer’s Association of Shri C. Y. Gavhane
Maharashtra, Nanded Shri D. N. Joshi (Alternate)
Tamil Nadu Water Supply & Drainage Board, Shri S. Hariramasamy
Chennai
The Indian Hume Pipe Company Limited, Mumbai Shri P. R. Bhat
Shri S. J. Shah (Alternate)
In personal capacity, (B-806, Oberoi Exquisite Shri A. K. Jain
Oberoi Garden City, Goregaon East, Mumbai)
BIS Directorate General Shri Sanjay Pant Scientist ‘F’ and Head (Civil Engineering)
[ Representing Director General ( Ex-officio ) ]
Member Sectary
Dr Manoj Kumar Rajak
Scientist ‘D’ (Civil Engineering), BIS
SUB-COMMITTEE COMPOSTION
Precast Concrete Products Subcommittee, CED 53:3
Organization Representative(s)
In Personal Capacity, ( C-2/2220, Vasant Kunj Shri Suddhodan Roy (Convener)
Near D.P. School, New Delhi 110070, New Delhi )
B.G. Shirke Construction Technology Pvt Ltd, Pune Shri V. G. Jana
Shri Y. P. Kajale (Alternate)
Central Electricity Authority, New Delhi Director (RE)
Deputy Director (RE) (Alternate)
Central Public Works Department, New Delhi Shri B. B. Dhar
Shri Mathura Prasad (Alternate)
Central Soil and Materials Research Station, New Delhi Shri N. Chander Shekharan
Shri N. Shiv Kumar (Alternate)
CSIR-Central Building Research Institute, Roorkee Shri S. K. Singh
Shrimati M. Surya (Alternate)
CSIR-Structural Engineering Research Centre, Chennai Dr J. Prabhakar
Dr S. Bhaskar (Alternate)
Delhi Development Authority, New Delhi Suptdg Engineer (Design) - I
Executive Engineer (Design) - I (Alternate)
Gammon Engineers and Contractors Pvt Ltd, Mumbai Shri Ratnaji T. N. V. S.
Shri Prakash Ramachandran (Alternate)
HIL Limited, Hyderabad Shri Sharad Dalmia
Dr D. Satyanaryana (Alternate)
Hindustan Prefab Limited, New Delhi Shri Rajesh Goel
Shri Satish Kumar Jain (Alternate)
16
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
IS 5758 : 2020
Organization Representative(s)
Housing & Urban Development Corporation Limit, Chairman and Managing Director
New Delhi Shri Deepak Bansal (Alternate)
JVS Comatsco Industries Pvt Ltd, Pune Shri Jigenesh V Patel
Shri Vipul V Patel (Alternate)
K.K. Manhole & Grating Co (P) Ltd, New Delhi Shri P. S. Gupta
Shri C. G. Gupta (Alternate)
Larsen & Toubro Limited, Chennai Shri S. R. Kumar
Shri Sthaladipti Saha (Alternate)
Maharashtra State Electricity Board, Mumbai Shri C. B. Runwal
Medhavi Cement Products, Nanded Shri Chandrakant Y. Gavhane
Shri Abhijit C. Gavhane (Alternate)
Military Engineer Service, Engineer-in-Chief’s Branch Shri Yashwant Kumar
(MES), New Delhi Shri K. G. Dua (Alternate)
Ministry of Science and Technology, New Delhi Representative
National Council for Cement & Building Materi, Shri H. Suresh Kumar
Ballabgarh Shri Y. N. Daniel (Alternate)
Public Works Department, Haryana Shri Lalit Arora
Siporex India Pvt Limited, Pune Shri D. N. Dhongde
Shri D. V. Kulkarni (Alternate)
System Building Technologists, New Delhi Shri G. B. Singh
The Indian Hume Pipe Company Limited, Mumbai Shri P. R. Bhat
Shri S. J. Shah (Alternate)
The Institution of Engineers (India), Kolkata Representative
U.P. Electricity Board, Lucknow Chief Engineer
17
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
Free Standard provided by BIS via BSB Edge Private Limited to STEDRANT TECHNOCLINIC PVT LTD -
Bangalore(labblr@stedrant.com) 49.206.29.19 [for non-commercial use only].
BIS is a statutory institution established under the Bureau of Indian Standards Act, 2016 to promote harmonious
development of the activities of standardization, marking and quality certification of goods and attending to
connected matters in the country.
Copyright
BIS has the copyright of all its publications. No part of these publications may be reproduced in any form without
the prior permission in writing of BIS. This does not preclude the free use, in the course of implementing the
standard, of necessary details, such as symbols and sizes, type or grade designations. Enquiries relating to
copyright be addressed to the Director (Publications), BIS.
Amendments are issued to standards as the need arises on the basis of comments. Standards are also reviewed
periodically; a standard along with amendments is reaffirmed when such review indicates that no changes are
needed; if the review indicates that changes are needed, it is taken up for revision. Users of Indian Standards
should ascertain that they are in possession of the latest amendments or edition by referring to the latest issue of
‘BIS Catalogue’ and ‘Standards: Monthly Additions’.
This Indian Standard has been developed from Doc No.: CED 53 (13425).