22nd January, 2024

LOT 1. (ASHAIMAN)

1. Irrigation Infrastructure
2. Bridge
3. Drainage works
4. Seepage Control Works
5. Spillway gabions works

LOT 2

1. Reservoir – Ave
2. Drying floor – Ave
3. Rice Mill Warehouse – Ash.

LOT 3

1. Solar
2. Irrigation (ext.)
3. Drainage works (main)
4. Stream trimming

22nd January, 2024

Comments from Mr. Adu about drawings

 Colour of H2O = Blue


 Bridge ELS
 Canal x Section x Freeboard
 Show gabions
 Link road from bridge to existing road in LB
 Title block
-Title must reflect the type of drawings