31st May, 2024

To: Mr. Seyi


CONSTRUCTION OF 6 X 6 X 24 FEET HEIGHT WATER TANK SCAFFOLDING

1. RSJ 150 x 70 x 5mm x 12m @ 190,000 (3 length) = 570,000


2. RSJ 100 x 50 x 5.5m @ 49,000 (8 length) = 392,000
3. 50 x 50 x 5mm (6 length) @ 20,000 = 120,000
4. Wire Mesh 1 sheet = 45,000
5. Paint 2 gallons @ 10,000 = 20,000
6. Electrode 2 packets @ 10,000 = 20,000
7. Cutting Disc 5 pcs @ 2,000 = 10,000
8. Grinding disc 3 @ 2,000 = 6,000
9. 20mm foundation bolt (16 pcs) @ 5,000 = 80,000
10.12mm Ms plate 1 x 4 = 80,000
11.Transportation = 45,000
12.Fabrication = 120,000
13.Excavation = 60,000
14.Cement additional 3 bags to those on ground @ 8,000
Including transporting it to the site = 24,000
15.First casting = 30,000
16.Carpentry
* 1 x 9 x 9 plank (6 length) @ 3,500 = 21,000
* Nail 3 dozen of 3 inches = 2,100
* Form work/transportation = 30,000
17.Casting of the base to the surface = 90,000
18.Installation of the scaffolding = 100,000

TOTAL = 1,865,100