Activity A B C D E F G H I J K L M N O P Q R
Predecessor - - A C D D D, B D, B E, H F E, G, H F, I, J I, J K, L, M K, L, M N O N, O
Activity A B C D E F G H I J K
Predecessor - - A,B A C A,B A, B,C,F B,F,G C,D,F I,H C
f) It is now one week later, and the manager is ahead of schedule. He has already
finished activity A, and all the other activities are on schedule. Will this shorten the
length of the project? Why or why not?
➢ It will not shorten the project Duration, because there is an other critical path
have the same duration
b) Find the earliest start time, latest finish time, and slack time for each event.
a) Which Activities can be delayed without delaying the project's completion time? And by
how many weeks?
b) Which Activities can be delayed without delaying the predecessor activities? And by how
many weeks?
6
27 32
10 22 26 49 77 82 89 92
8
5
3
A B C E
D F
1 62
0 2 6 10 47 52 55 57 77 180
0
0 10 20 30 40 50 60 70 80 90
b) What is the time between the end of activity C on the 3rd floor and the beginning of
implementing activity D on the same floor?
Ans: 170
Ans: 105
a) the activity’s expected time (te), variance (σ2 )critical, deviation (σ),
𝑡0 + 4 𝑡𝑚 + 𝑡𝑝 (𝑡𝑝 − 𝑡0 )
2
(𝑡𝑝 − 𝑡0 )
𝑡𝑒 = (𝜎)2 = [ ] (𝜎) =
6 6 6
A 5 0.11 0.33
B 8 4 2
C 3 1.78 1.33
D 4 1.78 1.33
E 8 0.44 0.67
F 16 11.11 3.33
G 9 0.11 0.33
H 13 2.78 1.67
I 2 0.11 0.33
b) TE, TL and slack time for each event
Are there any non-critical paths which also must have a watch over
B-E-F-H أي مسار قيمة 𝜎 أكبر من 𝑙𝑎𝑐𝑡𝑖𝑟𝑐𝜎 يجب مراقبته
c) Calculate the probability of completing the project in 50 days
𝑡𝑠 − 𝑡𝑒 ( 𝐶𝑅𝐼𝑇𝐼𝐶𝐴𝐿 )زمن
𝑍=
𝜎 (𝐶𝑅𝐼𝑇𝐼𝐶𝐴𝐿)
50 − 46
𝑍𝐀𝐂𝐄𝐇𝐈 = = 0.9925
4.03
Solution
𝒕𝒆 , (𝜎)2 , 𝜎 حساب: )1( الخطوة
𝑡0 + 4 𝑡𝑚 + 𝑡𝑝 (𝑡𝑝 − 𝑡0 )
2
(𝑡𝑝 − 𝑡0 )
𝑡𝑒 = (𝜎)2 = [ ] (𝜎) =
6 6 6
A 5 0.11 0.33
B 6 0.44 0.67
C 5 0.44 0.67
D 3 0.44 0.67
E 5 1.00 1.00
F 5 1.78 1.33
G 6 1.78 1.33
H 5 1.00 1.00
I 7 1.78 1.33
26 − 27
𝑍𝐀𝐂𝐄𝐇𝐈 = = −0.48077
2.08