B-55.855-Bd-Jha For Assembling and Installation of Lift

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 15

JHA FOR

ASSEMBLING AND INSTALLATION OF LIFT

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING


CENTRE PROJECT
11/PDR/142

APPROVED FOR CONSTRUCTION -


BD 07NOV22 M.MUONEKE G.JOHN J.IDORNIGIE UPDATED
APPROVED FOR CONSTRUCTION-
BC 10MAY22 E. UGBE S. IMADOL J. IDORNIGIE
UPDATED
APPROVED FOR CONSTRUCTION-
BB 07FEB22 E. UGBE S. IMADOL J. IDORNIGIE
UPDATED
APPROVED FOR CONSTRUCTION-
BA 24JAN22 E. UGBE S. IMADOL J. IDORNIGIE
UPDATED
B 25OCT21 E. UGBE S. IMADOL J. IDORNIGIE APPROVED FOR CONSTRUCTION
A 20OCT21 E. UGBE S. IMADOL J. IDORNIGIE ISSUED FOR APPROVAL
O 14OCT21 E. UGBE S. IMADOL J. IDORNIGIE ISSUED FOR COMMENT
ISSUE DATE BY CHKD APPVD DESCRIPTION
WHEN REVISION HAVE BEEN MADE TO THIS DOCUMENT, THE INDEX OF ISSUE SHALL BE INDICATED IN A
TRIANGLE NEAR THE PART(S) CONCERNED
CLASSIFICATION: MOST CONFIDENTIAL CONFIDENTIAL RESTRICTED UNRESTRICTED
REV PAGES REVISED REMARKS
This document is confidential. The copyright therein is vested in Nigeria LNG Ltd ENGINEERING,
Recipients must obtain theOwritten authority of the said company before wholly or
First Issue Issued for Comment
PROCUREMENT,
partly duplicating these contents or disclosing the same to others.
CONSTRUCTION &
All rights reserved. A Cover Page CommentsOF
COMMISSIONING Incorporated
IA
ADMIN BUILDING
B Approved
EXTENSION for Construction
& LEARNING
DISIPLINE JHA CENTRE PROJECT
BA Pages 1-15 CONT. NO B120229PPI
Comments incorporated
LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
BB Cover Page Comment Incorporated
NIGERIA LNG LTD
PAGE 1 OF 14 Rev BD
BC Page 3 Comment Incorporated
JHA FOR
UNIT: 8002
ASSEMBLING AND INSTALLATION OF LIFT
BD Additional information on pages
DOC4,5,9,10
NO: B-55.855 Comments incorporated
REVISION PAGE

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 2 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMLING/ INSTALLATION OF LIFT
JOB HAZARD ANALYSIS WORKSHEET
Date:
7/11/2022
TASK NAME: JHA FOR ASSEMBLING AND INSTALLATION OF LIFT FOR NEW IA ADMIN PROJECT
EQUIPMENT: SCAFFOLD, ELECTRICAL WINCH HOISTING MACHINE, SHACKLES, COMPLETE MECHANICAL TOOLBOX, Location: IA
DRILLING AND GRINDING MACHINE, SPIRIT LEVEL, BODY LANYARD AND HARNESS , WINCH, LIFTING BELT. ELECTRICAL
EXTENSION CABLE
JHA REVIEW TEAM:
SOLOTONE: MUONEKE MAUREEN, SUNNY UGODO, GIDEON JOHN
ALCON/ SMI: JESSICA JUMBO, THOMAS VICTOR,
NLNG: CHIKE OKORIE, BENJAMINE OGOLO
Task Step# Hazard Threats Top Event Consequences Who/What Inherent Control Measures Recovery Action Party
Description of Affected Risk Measures
Step

1, Visual H1.1 Poor T1.1 Other work 1. Trip and 1. injury Personnel P-2B(L) C1.1a Ensure R1.1 C1.1, C1.2, C1.3,
Inspection work house keeping materials lying fall & continuous Administer C1.4-Supervisor.
site. H1.2Trialing across access. 2. Contact 2. Electric shock. Asset housekeeping first aid R1.1, R1.2, R1.4-
Electric cables. T1.2 Exposed with live frequently. R1.2 Initiate Site nurse/ first
H1.3 stagnated electrical cable electric C1.1b Ensure all Emergency aider
water. T1.3 Poor drain cables. work materials are Procedure (ie R1.3 Supervisor/
H1.4 Poor system 3. slip and properly Stacked in call 3030) team member
illuminance. T1.4 Insufficient fall. their containment. R1.3. Report
lightings. 4. poor C1.1c Ensure incident.
visibility access is free from R1.4
obstruction. Administer
C1.2 Ensure all first aid
cables have their
route away from
access.
C1.2 Ensure cables

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 3 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMBLING/ INSTALLATION OF LIFT
are not submerged
in water.
C1.2c Ensure all
damaged cables
are replaced.
C1.3 Ensure water
is evacuated from
work area before
start of work.
C1.4. Ensure work
is properly
Illuminated.

.
2 H2.1 Heavy duty T2.1 Over Injury Personnel P-4B(M) C2.1a Maintain the R2.1. Initiate C2.1, C2.2, C2.3
Mobilization/Dem equipment in Speeding 1 Loss of & A-3B(M) site authorized emergency C2.4, C2.5, C2.6,
obilization of motion. T2.2a Walking/ control Damage to asset Assets speed limit and procedure. C2.7 –
equipment and H2.2 Lifting of working under a engage a banks Call NLNG Supervisor.
personnel to site. work materials suspended load 2 R.T.A man. Clinic on R2.1, R2.2, R2.4,
H2.3 T2.2b Use of C2.1b Ensure 3030. R2.5, R2.6 R2.7-
Incompetent uncertified lifting 3 Equipment journey R2.2 Initiate Site nurse/ first
Personnel gear. failure management plan emergency aider
H2.4 Manual T2.3 Poor is adhered to. procedure R2.3 Supervisor
handling. Knowledge of C2.1c Ensure load R2.3 Send
H2.5 Uncertified task to be is properly secured personnel for
tools/ equipment carried out before start of adequate
H2.6 Fatigued T2.4a Poor journey. training
driver. assessment of C2.2a Ensure R2.4
H2.7Cutting/ load prior to Lifting area is Administer
drilling machine lifting cordoned off and First Aid.
T2.4b Awkward lifting signages are R2.5 Initiate
positioning in place. emergency
T2.5 the use of C2.2b Ensure all procedure.

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 4 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMLING/ INSTALLATION OF LIFT
uncertified tools/ lifting gears are Call NLNG
equipment inspected and color Clinic on
T2.6 Loss of coded. 3030.
concentration/ C2.3 Ensure only R2.6. Initiate
sleep competent emergency
T2.7a personnel should procedure.
Unguarded carry out task Call NLNG
cutting disk C2.4a Weight of Clinic on
T2.7b load should be 3030.
Unfastened determined prior to C2.7. Initiate
cutting disk lifting. emergency
T2.7c exposure C2.4b Ensure procedure.
High noise personnel engaged Call NLNG
T2.7d Dust/ fling are trained in Clinic on
debris manual handling 3030.
techniques.
C2.5 Ensure the
use of only .
inspected and
tagged equipment/
tools.
C2.6a Ensure all
drivers/operators
should have a valid
driver’s license and
NLNG DDC/
operator’s permit.
C2.6b Ensure
Drivers / operators
adhere to rest plan.
C2.7a Ensure
cutting/ grinding
machine has
provision for disk
guard.
C2.7b Ensure disk

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 5 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMBLING/ INSTALLATION OF LIFT
is properly fastened
and locked with the
key
C2.7c Ensure the
use of ear
protection while
working.
C2.7d Ensure the
use of face shield
and dust mask
while cutting.
3. Drilling for H3.1 Flying T3.1 Contact of 1.Loss of 1. Eye irritation Personnel P-2B(L) C3.1 Ensure Eye R3.1 Initiate C1, C2, C3, C4,
Installation of particles. flying particles to control 2. Finger numbness/ & wash Station are in emergency C5 and C7 –
Anchor bolt for H3.2 Vibration. the eye 2.Body Muscle weakness. Assets place procedure. Supervisor.
rails, brackets H3.3 High noise. T3.2 Vibration vibration 3.Deafness C3.1a Ensure Call NLNG R1, R3 –
and lift doors H3.4 Dust. from equipment. 3. Inhaling of proper use of Clinic on Supervisor/
4.Breathing difficulty
H3.5 Sharp T3.3 Exposure dust appropriate PPE 3030. Any member of
edges 5.Finger injury for the task eye R3.2 the team.
to high noise. 3.Loss of
H3.6 Working at 6. Dislocation goggle, face Administer R2. Qualified or
T3.4 Inhalation. hearing
height. 7.increase the speed shield/full face First Aid. Trained First
H3.7 Poor T3.5 Exposed 4. Drop of variance visor. R3.3 Report Aider/Site Nurse.
illuminance. edges Object C3.2 Ensure job incident.
T3.6. Exposed 5.Poor rotation to reduce
platforms visibility the effect on
T3.7. Insufficient personnel
lighting C3.2a Ensure the
Luminaires Drilling Machine is
fit for purpose and
certified.
C3.3 Warning signs
for high noise
C3.3a Ensure all
personnel are

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 6 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMLING/ INSTALLATION OF LIFT
working in that area
make use of ear
protection
C3.4 Ensure the
use of Dust nose
mask
C3.5 Ensure
effective
supervision
C3.5a Ensure the
appropriate use if
hand glove
C3.6 Ensure all
engaged to work at
height have been
trained on working
at height.
C3.6a. Always
ensure 100% tie-off
at height.
C3.7 Ensure area
is well light up.
C3.61. Always
ensure 100% tie-off
at height.

4. Cutting of H4.1. Flying T4.1 Puncture 1.Loss of 1.Scratched and P-2B(L) C4.1 Ensure proper R4.1 Initiate C1, C2, C3 –
guide rail base to particles. the outer eye control Damage retinas use of appropriate emergency Supervisor.
required standard H4.2 Pinch point T4.2 Lack of leading to 2. Dislocation. PPE for the task procedure. R1, R3 –
H4.3. Rotating situational accident 3. Finger numbness/ eye goggle, face Call NLNG Supervisor/
Part T4.3 use of shield/full face Clinic on Any member of
Muscle weakness.
H4.4 Fumes unguarded visor. 3033. the team.
H4.5 Sparks 4 Respiratory C4.2Ensure R4.2 R2. Qualified or
cutting machine Damage personnel are Administer Trained First
T4.4 Inhalation H4.5 Fire competent and First Aid. Aider/Site Nurse.
T4.5 Fire attend LMRA R4.3 Report

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 7 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMBLING/ INSTALLATION OF LIFT
C4.3 Ensure incident.
cutting disc guard
is in place prior to
cutting and ensure
guard are placed
properly
C4.4 Ensure proper
use of Nose mask
C4.5. Barricade
area and Ensure
fire extinguisher is
handy.
..

5. Installation of H5.1 Falling T5.1 Unstable 1. Loss of 1. Dislocation Personnel P-3B(L) C5.1Ensure good R5.1. Initiate C1, C2, C3 –
lift doors, guide object. load. control. 2. Fracture. & housekeeping and emergency Supervisor.
rails, Lift car, H5.2 Defective T5.2 Unsafe 2. Assets the use of stable, procedure. R1, R3 –
handrails, Mirrors lifting hoisting of load. Overturning certified platform Call NLNG Supervisor/
and Ceilings, gears/accessori T5.3. of equipment. C5.2 Ensure use of Clinic on Any member of
electric motors, es Incompetent competent 3030. the team.
lift platforms. H5.3. personnel. Personnel / lifting R5.2 R2. Qualified or
Incompetent and H5.4 Suspended crew Administer Trained First
unfit Personnel. load with a C5.2a. Ensure First Aid. Aider/Site Nurse.
H5.4. potential to drop lifting equipment R5.3 Report
Suspended H5.5 Unsecured /accessories are incident.
object. platform certified and color
H5.5 Working at H5.6 Poor coded.
height over 1.8m Illumination C5.2b Adequate
H5.6 Poor T5.7 Inference lifting procedure
illumination. of Noise C5.2c Engage
H5.7. Poor T5.8 Uncertified competent Riggers
communication. tools to coordinate lifting

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 8 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMLING/ INSTALLATION OF LIFT
H5.8 Defective T5.9 low oxygen activities.
tool (Chain level C5.3
block) effective
H5.9. Working supervision.
within a confined C5.4 No
space working/walking
under suspended
load
C5.5 Ensure all
engaged to work at
height have been
trained on working
at height.
C5.6. Provide
illumination via
floodlight.
C5.7 Ensure
Effective
Communication
C5.8 Ensure daily
inspection of all
lifting
equipment/accesso
ries
C5.9 Ensure the
use of PGM to
monitor the oxygen
level
C5.9a Ensure a
qualified standby
man
C5.9b Ensure safe
access and ingress
at all times
C5.9C Ensure
good ventilation is

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 9 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMBLING/ INSTALLATION OF LIFT
provided
C5.9d Ensure rest
break every 30mins
or at any time
personnel feel
distress
C5.9e Ensure
clean drinking
water is available
to avoid
dehydration
C5.9F Ensure
personnel have
undergone
confined space
tanning and have
their stickers
C5.10. Ensure
manual lock is
engage before
personnel start
work
C5.11 Ensure No
lone working inside
the cabin
C5.12 Ensure the
daily checked list
completed and
signed by the
supervisor
C5.13 Ensure a
Safety
Personnel /Permit
holder is present at

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 10 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMLING/ INSTALLATION OF LIFT
all time

6.Wiring of lift, H6.1. Falling T6.1. Cuts. 1. Loss of 1. Dislocation Personnel P-2B(L) C6.3. Ensure use R6.1 Initiate C1, C2, C3 –
Installation of object. T6.2 Use of control. 2. Fracture. & of competent emergency Supervisor.
Electrical and H6.2 Defective uncertified tools. 2. Assets Personnel / lifting procedure. R1, R3 –
Instrument Tools T6.3 Poor Overturning crew Call NLNG Supervisor/
Distribution H6.3 knowledge of of equipment. C6.2 Ensure visual Clinic on Any member of
boards/Panels, Incompetent the task inspection of work 3030. the team.
and Personnel. T6.4 Object in tool R6.2 R2. Qualified or
synchronization H6.4. motion C6.3 Ensure Administer Trained First
of electrical and Suspended T6.5 Uneven personnel are First Aid. Aider/Site Nurse.
instrument object. platforms. trained for the task R6.3,5
systems H6.5. Working at T6.6 Poor C6.3a Ensure Report
height. Illumination effective incident.
H6.6. Poor supervision.
illumination. C6.5 Ensure the
work area is
barricaded.
C6.5a Ensure all
engaged to work at
height have been
trained on working
at height.
C6.5b Safe access
and egress must
be always
maintained.
C6.5c Always
ensure 100% tie-off
at height by the
waistline.
C6.5d Ensure
adequate
communication
C6.6 Ensure area

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 11 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMBLING/ INSTALLATION OF LIFT
is well light up

7. Carry out load H7.1 T7.1 Damage to 1.Asset 1.Damage to asset Assets P-2B(L) C7.1 Ensure use of R7.1 Initiate C1, C2-
weight Test and Incompetency / existing facilities damage 2.Laceration Personnel competent emergency C5Supervisor
commissioning of Poor handling T7.2Electrical 2.Electrocutio personnel procedure. R3-Any member
lift. H7.2 Electricity shock n C2. Ensure close Call NLNG of the crew
H7.3 Sharp T7.3 Lack of 3. Fire supervision and all Clinic on R2. Trained First
edges/pinch situational tools are insulated 3033. Aider/Site Nurse
point awareness. C7.3 Ensure the R7.2.
H7.4 Sub- T7.4 Uncertified use of appropriate Administer
standard work equipment PPE (hand glove) First Aid.
equipment T7.5 Fatigue C7.3a Ensure R7.3Report
H7.5 Poor personnel are incident.
manual competent
handling/awkwar C7.4 Study and
d posture adhere to
manufactures
standard and
install in line with
approved
standard
C7.5 Personnel to
ensure adequate
positioning to
avoid/waist pain
8. Testing. H8.1 T8.1 Untrained 1.Asset 1.Damage to Personnel P-2B(L) C8.1 Ensure use R8.1 Initiate C1, C2-
Personnel personnel damage asset & of competent emergency C5Supervisor
H8.2 Electricity T8.2 Electrical 2. Shock 2.Laceration Assets personnel procedure. R3-Any
H8.3 shock 3. Fire 3. Electrocution C8.1aEnsure Call NLNG member of the
Explosion T8.3 Short close supervision Clinic on crew
H8.4 Awkward circuit. and all tools are 3033. R2. Trained
posture T8.4Repetitive insulated R8.2 First Aider/Site

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 12 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMLING/ INSTALLATION OF LIFT
movement C8.2 Ensure fire Administer Nurse
extinguishers and First Aid.
extinguishers and R3.4 Report
fire wardens incident.
C8.2a proper use
of PPE e.g.
Insulated gloves
C8.3 Ensure
proper Isolation
where necessary
is carried out by
authorized
electrical
personnel.
(LOTO)
C8.3b Cordon off
area with hard
barricades and
safety signs
C8.4 Ensure
good body
posture
9.. Energizing / H9.1 T9.1. Lack of 1.Asset 1.Damage to Personnel & P-3B(L) C9.1 Ensure use R9.1 Initiate C1, C2-
Commissioning Unqualified personnel damage asset Assets of competent emergency C5Supervisor
personnel trained 2. shock 2. Electrocution personnel procedure. R3-Any
H9.2 Electricity T9.2 Exposed 3. Fire C9.1a Ensure Call NLNG member of the
H9.3 power lines/ close supervision Clinic on crew
Explosion Cables and all tools are 3033. R2. Trained
H9.4 Sub- T9.3 Short insulated R9.2 First Aider/Site
standard work Circuit. C9.2 Ensure fire Administer Nurse
equipment T9.4. extinguishers and First Aid.
Uncertified fire wardens R9.3 Report
equipment C9.2a Cordon off incident.
IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 13 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMBLING/ INSTALLATION OF LIFT
area with hard
barricades and
safety signs
C9.3 Ensure
proper Isolation
where necessary
is carried out by
authorized
electrical
personnel.
(LOTO).
C9.4 Ensure
equipment is
certified
10.. Proper H10.1 Poor T10.1. 1. Trip and 1. Dislocation of Personnel C10.1. Ensure R10.1 C1, C2, C3 –
Housekeeping. housekeeping Accumulated fall the leg and hand use of Initiate Supervisor.
debris or 2. Body appropriate emergency R1, R3 –
particles. pains/injury PPEs. procedure. Supervisor/
C10.1a Ensure Call NLNG Any member of
waste is Clinic on the team.
evacuated 3030. R2. Qualified or
properly during, R10.2. Trained First
after the close of Administer Aider/Site
the job First Aid. Nurse.
C10.b Ensure R10.3
close supervision. Report
C10.c Ensure incident.
continuous
housekeeping is
carried out on

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 14 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMLING/ INSTALLATION OF LIFT
site.

TEAM MEMBERS SIGN-OFF ROW

NAME/SIGN/DATE MAUREEN MUONEKE NAME/SIGN/DATE CHIKELUE OKOYE

NAME/SIGN/DATE SUNNY UGODO NAME/SIGN/DATE THOMAS VICTOR

NAME/SIGN/DATE GIDEON JOHN NAME/SIGN/DATE BENJAMIN OGOLO

NAME/SIGN/DATE JESSICA JUMBO NAME/SIGN/DATE

IA ADMINISTRATION BUILDING EXTENSION AND LEARNING CENTRE PROJECT

LOCATION: BONNY ISLAND, NIGERIA AREA: INDUSTRIAL AREA PROJECT NO: 11/PDR/142
NIGERIA LNG LTD PAGE 15 OF 14 Rev BD

DOC NO:B-55.855
UNIT 8002 JHA FOR
ASSEMBLING/ INSTALLATION OF LIFT

You might also like