Intermediate Lane Highway (Re-Construction/New Construction Section) (Open Country & Isoiated Built-Up Aera:Plane/Rolling Terrain) (Modified Figure 2.3 of IRC:SP:73:2015)
Region Name: WADI ZAINE Team Leader: WALID ABOU KACHFE Special concerns about the day:
Contractor: Filled by:
Date: 9-May-20 Phone number: 71241918
Three Four Six Sub-
One Sub- One Sub- Two Sub- Two Sub- Three Four 7-Way Sub-Duct Sub-Duct Duct in Design Duct in Duct in Duct in Duct in Sub-Duct Sub-Duct Sub-Duct in in Empty Remarks From #MH / HH To #MH / HH / Cab Feeder Duct # Length Empty Occupied Empty Occupied in Empty in Empty in Empty Occupied Occupied Duct (LM) Duct Duct Duct Duct Duct Duct Duct Duct Duct ( LM.) ( LM.) (LM.) ( LM.) (LM.) ( LM.) ( LM.) ( LM.) (LM.) (LM.) NEW
Intermediate Lane Highway (Re-Construction/New Construction Section) (Open Country & Isoiated Built-Up Aera:Plane/Rolling Terrain) (Modified Figure 2.3 of IRC:SP:73:2015)