Periode 15 hari Ke - 1 2 3 4 5
Padi (NEDECO) 1.2 1.27 1.33 1.3 1.3
Kedelai 0.5 0.75 1 1 0.82

Tabel nilai Evapotranspirasi Tabel Curah Hujan Efektif (R80)


Bulan Eto (mm/hari) Bulan R80
Januari 3.2 Januari 3.3
Februari 3.2 Februari 4
Maret 3.4 Maret 3.2
April 3.2 April 3.1
Mei 3.2 Mei 2.3
Juni 3 Juni 2
Juli 3 Juli 3.3
Agustus 2.6 Agustus 3.1
September 2.6 September 3.2
Oktober 2 Oktober 1
November 2.3 November 2.3
Desember 2.8 Desember 2.8

Kebutuhan air selama Pengolahan Tanah (khusus untuk padi)


Eo= 1.1 x ETo
P= 2.3 mm/hr
T= 30 hari
S= 250 mm

Uraian JANUARI FEBRUARI MARET APRIL MEI


ETo= 3.200 3.200 3.400 3.200 3.200
Eo= 3.520 3.520 3.740 3.520 3.520
M= 5.820 5.820 6.040 5.820 5.820
k= 0.6984 0.6984 0.7248 0.6984 0.6984
e^k 2.0105 2.0105 2.0643 2.0105 2.0105
IR=LP (mm/hari) 11.5793 11.5793 11.7150 11.5793 11.5793
LP-Re padi 8.2793 11.5793 11.7150 11.5793 11.5793
(LP-Re padi)/8,64 (lt/d 0.9583 1.3402 1.3559 1.3402 1.3402
6 7 8
0 - -
0.45 - -

JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOVEMBER


3.000 3.000 2.600 2.600 2.000 2.300
3.300 3.300 2.860 2.860 2.200 2.530
5.600 5.600 5.160 5.160 4.500 4.830
0.672 0.672 0.6192 0.6192 0.54 0.5796
1.9581 1.9581 1.8574 1.8574 1.7160 1.7853
11.4446 11.4446 11.1779 11.1779 10.7849 10.9803
11.4446 11.4446 11.1779 11.1779 10.7849 10.9803
1.3246 1.3246 1.2937 1.2937 1.2482 1.2709
DESEMBER
2.800
3.080
5.380
0.6456
1.9071
11.3108
11.3108
1.3091
Gol I
ETo P Re
Bulan WLR M
C1 C2 C3
mm/hari 2.3 mm/hari mm/hari mm/hari
Agustus 2 2.6 2.3 3.1
1 2.6 2.3 3.2 LP LP LP 5.16
September
2 2.6 2.3 3.2 1.2 LP LP 5.16
1 2 2.3 1 1.67 1.27 1.2 1.235
Oktober
2 2 2.3 1 1.67 1.33 1.27 1.3
1 2.3 2.3 2.3 1.67 1.3 1.33 1.315
November
2 2.3 2.3 2.3 1.67 1.3 1.3 1.3
1 2.8 2.3 2.8 0 1.3 0.65
Desember
2 2.8 2.3 2.8 0 0
1 3.2 2.3 3.3 LP LP LP 5.82
Januari
2 3.2 2.3 3.3 1.2 LP LP 5.82
1 3.2 2.3 4 1.67 1.27 1.2 1.23
Februari
2 3.2 2.3 4 1.67 1.33 1.27 1.3
1 3.4 2.3 3.2 1.67 1.3 1.33 1.32
Maret
2 3.4 2.3 3.2 1.67 1.3 1.3 1.3
1 3.2 2.3 3.1 0 1.3 0.65
April
2 3.2 2.3 3.1 0 0
1 3.2 2.3 2.3 0.5
Mei
2 3.2 2.3 2.3 0.75
1 3 2.3 2 1
Juni
2 3 2.3 2 1
1 3 2.3 3.3 0.82
Juli
2 3 2.3 3.3 0.45
Agustus 1 2.6 2.3 3.1

T 30 hari
S 250 mm
A 1245 ha

Padi
Padi
Palawija
ol I Gol II
k ETc G1 WLR M k ETc
C1 C2 C3
mm/hari mm/hari mm/hari mm/hari mm/hari mm/hari mm/hari

0.62 11.18 7.98


0.62 11.18 7.98 LP LP LP 4.83 0.58 10.98
2.47 5.44 1.2 LP LP 4.83 0.58 10.98
2.60 5.57 1.67 1.27 1.2 1.235 2.47
3.02 4.69 1.67 1.33 1.27 1.3 2.99
2.99 4.66 1.67 1.3 1.33 1.315 3.02
1.82 1.32 1.67 1.3 1.3 1.3 3.64
0.00 0.00 0 1.3 0.65 1.82
0.70 11.58 8.28 0 0 0.00
0.70 11.58 8.28 LP LP LP 5.82 0.70 11.58
3.95 3.92 1.2 LP LP 5.82 0.70 11.58
4.16 4.13 1.67 1.27 1.2 1.23 3.95
4.47 5.24 1.67 1.33 1.27 1.3 4.42
4.42 5.19 1.67 1.3 1.33 1.32 4.47
2.08 1.28 1.67 1.3 1.3 1.3 4.16
0.00 0.00 0 1.3 0.65 2.08
1.60 1.60 0 0 0.00
2.40 2.40 0.5 1.60
3.00 3.30 0.75 2.25
3.00 3.30 1 3.00
2.46 1.46 1 3.00
1.35 0.35 0.82 2.46
0.45 1.17
G2
G1+G2 NFR Q
mm/hari mm/hari mm/hari m2/dtk

7.98 3.99 884.30


8.88 16.86 8.43 1868.63
8.88 14.32 7.16 1587.32
5.44 11.01 5.51 1220.39
4.66 9.35 4.68 1036.89
4.69 9.35 4.68 1036.89
4.81 6.13 3.06 679.47
1.32 1.32 0.66 146.31
0.00 8.28 4.14 917.71
8.28 16.56 8.28 1835.43
7.93 11.85 5.93 1313.65
3.92 8.05 4.03 892.52
5.19 10.43 5.22 1156.21
5.24 10.43 5.22 1156.21
5.03 6.31 3.15 699.43
1.28 1.28 0.64 141.88
0.00 1.60 0.80 177.35
1.60 4.00 2.00 443.38
2.55 5.85 2.93 648.44
3.30 6.60 3.30 731.57
2.00 3.46 1.73 383.52
1.46 1.81 0.91 200.63
0.37 0.37 0.18 41.01
Q PENGAMBILAN 1868.63