SCR system is widely used to remove NOx in Power plants, Steel Plants, Petrochemical Plants, and Incinerators more
effectively. However, the costs of replacing catalyst in every 3~5 years and its wastes became a huge burden.
KC Cottrell successfully adopts advanced Ex-situ type SCR Catalyst Regeneration technology for the first time in Korea and
2 Advantages
achieved over 90% more efficient system with lower costs. - Lower costs with longer lifetime
1 Process 1
0,8
0,4
0,2
0
0 10000 20000 30000 40000 50000 60000 70000 80000 90000
operation time (h)
4 5 6
3 Flow Chart
500MW Power Plant standard
Customer inquiry
Receipt of sample catalyst
Examine catalyst activity and status 1. Examine sample catalyst activity 4-7 days
2. Site inspection of SCR and Catalyst 1 day
Alkali washing step, reduces adhesive power of the pollution material
3. Decide regenerability of catalyst
Air bubbling unit, handling deactivation material
Separate internal part and catalyst module movement 5-7 days
Ultrasonic step, reduces catalyst poison and pollution material in micro-pore
Transportation Factory 1 day
Reduce pollution material by acid washing and neutralization reaction Catalyst Regeneration max 40m3/day 2-3 weeks