SECTION 2
SECTION 2
INTRODUCTION
TABLE OF CONTENTS
Title Page
2.0 INTRODUCTION
Project Canary Consist of Design and Build MEP Main Contract for the detail
design, authority submission, supply, delivery, installation, testing & commissioning,
obtain certificate of completion & compliance, support during defects liability period,
and maintenance of Project Canary 03- A new 53MW IT, Greenfield Data Centre
(Phase 3) For Bridge Data Centres Malaysia III Sdn Bhd on Hs (D) 78142 PTD 32674,
Mukim of Bukit Batu, District of Kulai, State of Johor, Malaysia.
Project Particulars:
This manual described the Fire Protection Services for the development of:
The Fire Protection services scope of work for this project include the followings:
The building is designed with the following Fire Protection Services according to
standard listed below and comply to local fire authority requirement:
The purpose of the operation and maintenance is to assist and provide information to
the personnel maintaining and upkeep of the system.