HEALTH & SAFETY

SAFETY COMMITTEE MANAGEMENT SYSTEM

HSE-F25
PROJECT: Taman Seri Perkasa, Lapangan, Ipoh, Perak. DATE: 01/06/2024

Time: 09:00 am
Venue: Sample house Phase 2
Contractor: Man Hoe Development Sdn. Bhd.
1.0 Attendance form

No. Name Trade / Position Role Signature

1. Mr. Cheng Chee Ping Project manager (PM) Chairman

2. Mr. Adnan Zainun @ Ahmad Jr. Site Safety Secretary


Jalaludin Supervisor (SSS)

3. Nur Fadzilah Binti Amat Daud Safety admin Deputy secretary

4. Ms. Arina Binti Bukhari Jr. Safety and Health Member


Officer (SHO)

5. Mr. Hairudin Bin Munip Site engineer Member

6. Mr. Cheng Chee Yong Site supervisor Member

7. Mr. Samin Workers’ leader Member

8. Mr. Shamim Mosaic Member

9. Mr. Toyes Plaster Member

10. Mr. Ng Chooi Weng Electrical Member

11. Mr. Sammah Carpenter Member

12. Mr. Yi Ming Railing Member

13. Mr. Teh Tuam Guan Slab Member

Prepared by: Acknowledged by:


Signature

Name/Position Mr. Adnan Zainun @ Ahmad Jalaludin Mr. Cheng Chee Ping (PM)
Date

1
HEALTH & SAFETY
SAFETY COMMITTEE MANAGEMENT SYSTEM

HSE-F25
PROJECT: Taman Seri Perkasa, Lapangan, Ipoh, Perak. DATE: 01/06/2024

2.0 Minute meeting

Item Description Action Dateline /


Status

1.0 Introduction
The chairman welcomed everyone for attending the Chairman
meeting.

2.0 Meeting agenda


Appointment of Safety Committee members New
subcontractors

3.0 Last committee meeting review


3.1 Personal Protective Equipment (PPE)
3.1.1 MEMO and notice system SSS Ongoing
3.2 Open burning SSS 24/02/2024
3.3 Housekeeping at workers’ quarters SSS 11/05/2024

4.0 Issues
4.1 Subcontractors assign
Any new worker or new subcontractors shall meet safety PM, SS, SSS, Per event
personnel on site to do safety induction and to be briefed subcontractors.
regarding the safety requirements.
4.2 Personal Protective Equipment (PPE)
4.2.1 Ensure that all personnel to put on mandatory PPE as All
long as within site area at all time such as:
a) Safety helmets
b) Safety footwear
c) Safety gloves
Meanwhile, for those working at height (working more
than 10 ft) it is mandatory to put on safety harness.
4.2.2 Main contractor shall provide mandatory PPE such as PM, SS
‘4.2.1 a,b & c’ above before work begin.
4.2.3 Subcontractors’ leader shall provide suitable PPE to their Subcontractors’
workers before work begin. head
4.2.4 To enforce that no personnel are allowed to be within site All
area without mandatory PPE.
4.3 Wiring
4.3.1 No wire shall be laid on the ground without any All
mechanical protection.
4.3.2 Wire shall be hung high enough for vehicle or workers to All
pass by.
4.3.3 Proper power supply (distribution board). PM, Engineer
4.4 Opening edge
To install guard-rails and toe boards at relevant phase 2B SSS
4.5 blocks.
Hoarding SS, SSS
Proper installation of hoarding to isolate site area and
public area.

2
HEALTH & SAFETY
SAFETY COMMITTEE MANAGEMENT SYSTEM

HSE-F25
PROJECT: Taman Seri Perkasa, Lapangan, Ipoh, Perak. DATE: 01/06/2024

Item Description Action Dateline /


Status

4.6 Housekeeping
4.6.1 Workers’ quarters SSS On going
Weekly schedule for housekeeping after toolbox meeting from
lead by Gupron (Man Hoe worker) involving 4 workers 11/05/2024
from main contractor and sub-contractor.
4.6.2 On site SSS, SS
Propose weekly schedule for housekeeping after toolbox
meeting lead by ______________ (Man Hoe worker)
involving 4 workers from main contractor and sub-
contractor.
4.7 Workers’ quarters
4.7.1 Quarters’ layout PM, Engineer
On 28 February 2024, safety department has proposed
th

and submitted workers’ quarters layout plan according to


Jabatan Tenaga Kerja (JTK).
Arising issue:
a) Workers failed to comply according to the layout plan
submitted.
b) Isolate workers’ quarters with workplace.
4.7.2 Complaint received PM, Engineer
a) Existing toilets are out numbers.
b) Poor water storage and bath space.
c) Poor drainage system near the quarters lead to
unpleasant odor from the stagnant water.
4.8 Scaffold
4.8.1 Scaffold to be inspected: Scaffold
a) Safety access (Every block) inspector (SI)
b) Working platform
c) Perimeter scaffold
d) Rubbish chute (Every block)
4.8.2 Scaffold inventory
Subcontractors shall inform scaffolder inspector before Subcontractors
installation of scaffolding on site.
4.8.3 All scaffold shall have Perakuan Pematuhan Standard PM
(PPS) CIDB.
4.8.4 All subcontractors’ workers should attend training for Subcontractors
scaffolding usage on site.
4.9 Accident and incident reporting
4.91 Please report any of these things: SSS
a) Accident
b) Dangerous occurrence
c) Unsafe condition
d) Occupational poisoning
e) Occupational disease
4.9.2 Investigation will be made regarding the accident that
happened.

3
HEALTH & SAFETY
SAFETY COMMITTEE MANAGEMENT SYSTEM

HSE-F25
PROJECT: Taman Seri Perkasa, Lapangan, Ipoh, Perak. DATE: 01/06/2024

Item Description Action Dateline /


Status

4.9.3 Record shall be kept at the site office and office for SSS
reference.
4.9.4 Who is responsible to bring the workers to the hospital or Employer
clinic?

5.0 Upcoming meeting


Safety Committee meeting will be held in another 3 Info
months which the date will be informed to all the Safety
Committee members 1 week earlier.