5.25 F25 - Safety Committee 01062024
5.25 F25 - Safety Committee 01062024
HSE-F25
PROJECT: Taman Seri Perkasa, Lapangan, Ipoh, Perak. DATE: 01/06/2024
Time: 09:00 am
Venue: Sample house Phase 2
Contractor: Man Hoe Development Sdn. Bhd.
1.0 Attendance form
Name/Position Mr. Adnan Zainun @ Ahmad Jalaludin Mr. Cheng Chee Ping (PM)
Date
1
HEALTH & SAFETY
SAFETY COMMITTEE MANAGEMENT SYSTEM
HSE-F25
PROJECT: Taman Seri Perkasa, Lapangan, Ipoh, Perak. DATE: 01/06/2024
1.0 Introduction
The chairman welcomed everyone for attending the Chairman
meeting.
4.0 Issues
4.1 Subcontractors assign
Any new worker or new subcontractors shall meet safety PM, SS, SSS, Per event
personnel on site to do safety induction and to be briefed subcontractors.
regarding the safety requirements.
4.2 Personal Protective Equipment (PPE)
4.2.1 Ensure that all personnel to put on mandatory PPE as All
long as within site area at all time such as:
a) Safety helmets
b) Safety footwear
c) Safety gloves
Meanwhile, for those working at height (working more
than 10 ft) it is mandatory to put on safety harness.
4.2.2 Main contractor shall provide mandatory PPE such as PM, SS
‘4.2.1 a,b & c’ above before work begin.
4.2.3 Subcontractors’ leader shall provide suitable PPE to their Subcontractors’
workers before work begin. head
4.2.4 To enforce that no personnel are allowed to be within site All
area without mandatory PPE.
4.3 Wiring
4.3.1 No wire shall be laid on the ground without any All
mechanical protection.
4.3.2 Wire shall be hung high enough for vehicle or workers to All
pass by.
4.3.3 Proper power supply (distribution board). PM, Engineer
4.4 Opening edge
To install guard-rails and toe boards at relevant phase 2B SSS
4.5 blocks.
Hoarding SS, SSS
Proper installation of hoarding to isolate site area and
public area.
2
HEALTH & SAFETY
SAFETY COMMITTEE MANAGEMENT SYSTEM
HSE-F25
PROJECT: Taman Seri Perkasa, Lapangan, Ipoh, Perak. DATE: 01/06/2024
4.6 Housekeeping
4.6.1 Workers’ quarters SSS On going
Weekly schedule for housekeeping after toolbox meeting from
lead by Gupron (Man Hoe worker) involving 4 workers 11/05/2024
from main contractor and sub-contractor.
4.6.2 On site SSS, SS
Propose weekly schedule for housekeeping after toolbox
meeting lead by ______________ (Man Hoe worker)
involving 4 workers from main contractor and sub-
contractor.
4.7 Workers’ quarters
4.7.1 Quarters’ layout PM, Engineer
On 28 February 2024, safety department has proposed
th
3
HEALTH & SAFETY
SAFETY COMMITTEE MANAGEMENT SYSTEM
HSE-F25
PROJECT: Taman Seri Perkasa, Lapangan, Ipoh, Perak. DATE: 01/06/2024
4.9.3 Record shall be kept at the site office and office for SSS
reference.
4.9.4 Who is responsible to bring the workers to the hospital or Employer
clinic?