JOB TITLE / AIM: Jsa for drilling with HDD includes crossing of RBOD.
JSA DATE: 21/02/2007 JSA NO./ REVISION:
SUPERVISOR/ JSA LEADER: SCRIBE: Abdullah Khan
PARTICIPANTS:
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1.Mobilization of tools workers and equipments
2.Positioning of HDD
3.Pilot drilling 6’’ Dia
4.Fixing of back rimmer
5.Positioning of pipe
6.Demobilization

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the HSE personnel is the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.

File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of workers, equipments Unauthorised equipment/tools brought to site o Before mobilizing any equipment/tools
make sure that the E &P Personnel got
inspected the equipment.
o Checklist shall be updated on daily basis
and approved by authorized personnel
o Check all oil leaks.
Unskilled and uninducted personnel starting o Ensure that all personnel prior to start the
the job have been inducted and oriented about the
hazard in the job site
o Toolbox meeting to be organized on daily
basis.
Workers starting the job unfit to work o All personnel not fit to work shall not be
allowed to work at the project site.
o All persons to be medically assessed by
DEL doctor.

Workers starting the job without JSA o Prior to work all participants of activity
must be Participant toolbox meeting
discussion.
o Persons signed at the back of JSA on daily
basis
Miscommunication o Mobile phone / Radio shall be at the site at
all times.
2 Positioning of HDD & Setting the Improper Marking Ensure that drawing shall be reviewed prior to
angle to drill positioning
Unauthorized persons entering the work area Ensure that proper barrication shall be done no
un-authorized person to enter the vicinity of the
area.
3 Pilot drilling 6’’ Dia Persons coming in front of the drill bit o No person shall be allowed to come in
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
front of the drill bit.
Sand collapse o Persons to be kept away where drilling are
going on.
o Soil condition to be checked prior to drill
Snake o Be aware of snakes. No killing of snakes
Water coming in to the Canal o Schedule for the water coming into the
canal shall be obtained from the irrigation
department
o Proper Retrieval plan to be submitted.
o Proper securing by means of shuttering
plates to be done.
4 Fixing of back rimmer and. Pulling Heavy rimmer (50 Kg) o Proper hauling techniques shall be done
back rimmer while fixing the rimmer
o Get help if required
Improper Transportation to the end point of the o Proper means of transporting the rimmer
drill bit shall be done .Wheel barrow shall be used
for the transportation.
5 Positioning of pipe Back injury o Proper posture shall be maintained while
inserting the pipe in the hole
Improper PPE’s o Proper PPE’s shall be worn at all times.

6 Demobilization Same o Area shall be secured prior to


demobilization.