DESIGN OF R.C.C.

CIRCULAR TANK OF CAPACITY 180000 LITRES

Dimensions :

Required capacity = 180000 Litres


Usefull depth = 3.5 m
Extra Capacity due to central supporting
column of size 300 X 300 mm = 315 Litres
Total capacity required = 180315 Litres
Free Board = 0.3 m
Dead Storage = 0.1 m
Height of wall (i/c Dead storage) "H" = 3.6 m
Assume Thickness of wall "t" = 200 m
Diameter required "D" = 8.00 m
H2/Dt Ratio = 8.10

Provide circular tank having total depth as 3.9 m and wall thickness at bottom
as 200 mm and at top as 150 mm as shown below.

0.15 0.15
8.00

Inlet Level F.B. = 0.3 m

3.5

Out-let Level
Dead storage = 0.1 m Scour Level

R.C.C. 1:1.5:3 0.20

Design Roof Slab :


Dia of Roof slab = 8.30 m
Provide 2 Nos radial beams to support the roof slab resting directly on the wall
of the tank. The beams are supported centrally by a column as shown.
Loading :
Let the thickness of the roof slab = 120 mm
Dead Load = 0.120 X 25 = 3 KN/sq.m
Live Load (Assume) = 2.00 KN/sq.m
Total 5 KN/sq.m

For the design of tank slab only one quarter portion shall be designed by
by considering it as a square pannel with two adjacent edges discontinuous.

Effective span Leff. = 4.15 m


Maximum Moment Coeff. As per IS:456-1978 = 0.047
Maximum B.M. = 4.047 KN-m
Thickness of slab required = (M/Qb)^0.5 = 68 mm
Provide slab of overall thickness 120 mm and effective thicknes as 95 mm
Steel required = M/Cst.j.d = 213 sq.mm
Minimum Steel required = 0.12 % = 144
Provide tor steel 213 sq.mm with bars of 8 mm dia @ 150 mm c/c.
STRUCTURAL DESIGN OF R.C.C. STORAGE TANK OF
27000 Lts.
Capacity of tank 27000.00 Lts.
Or 27.00 Cum.
Depth of tank (Assumed) ="H" 2.50 Mts.
Free board 0.30 Mts.
Area of the base of tank=Volume/Depth 10.80 Sqmt.
Let 'D' be the internal diameter of tank
D=(Area x 4/3.141) 1/2 3.71 Mts.
Say 3.70 Mts.
Approximate thickness of wall is given by the formula
t= 30 x H + 50 or 150 mm whichever is more. t= 125 mm
125 or 150 Adopt (Wall Thick.) 150 mm
Ratio (H 2/Dt) 11.26
Refer IS:3370 (Part IV)
Against ratio H /Dt
2
11.26 ,the maximum value of coefficient of hoop
tension = 0.66660 which occur at depth of
0.70 x H = 1.75 mts. From top.
Therefore Max. hoop tension =T (Coefficient)x w xH xD/2 = 30.83 Kn/m
Refer IS:3370 (Part IV)
Against ratio H2/Dt 11.26 ,maximum value of coefficient of
bending moment = 0.00230 which occur at depth of 0.80 X H = 2.00
mts. From top. The minus sign indicate tension on the inner face.
Therefore Max. Bending Moment=(Coefficient)x w xH^3) Kn-m 0.36 Kn-m
Refer IS:3370 (Part IV)
Against ratio H2/Dt 11.26 ,the coefficient of shear force 0.13500
Therefore Shear force (S.F.) = (Coefficient)x w xH^2 KN 8.44 KN
Design of wall thickness:-
Design constants for M-20 grade concrete.
s cbc = 7 N/mm 2 m = 13 j = 0.874
s st = 150 N/mm 2 k = 0.378 R = 1.16
d= ((M/R.b))^1/2 = 17.60 mm
Hence adopted total thickness of wall = 150 mm is in order from
B.M. consideration.
Design of Steel for maximum Bending Moment
Assuming a cover of 35 mm upto centre of Main bars, available effective thickness
of wall or d=(total thick.-35mm)= 115 mm

Ast =(M/j x d x sst) 23.84 mm 2


Area as per Min steel requirement = 0.24-0.10 (Wall Thick.-100)/350 0.22571 %
Area of reinforcement (A.O.R.) % age x wall thick. x 1000 / 100 338.57 mm 2
Spacing of steel used 8 mm dia (Af= 50.29 mm 2)
A f x 1000 / Ast 297.05 mm
Say 200 mm
Hence provide steel of 8 mm dia @ 200 mm c/c on both faces of the wall
with a clear cover of 25 mm upto top of the tank from base of floor slab. i/c F.B.
Also provide extra bars upto1.25 m height 8 mm dia @ 200 mm c/c

Design of Streel for maximum hoop tension:-


Max.hoop tension T= 30.83 KN/m
At= T/sst 205.54 mm 2

Area as per Min steel requirement = 0.24-0.10 (Wall Thick.-100)/350 0.22571 %


Area of reinforcement (A.O.R.) % age x wall thick. x 1000 / 100 338.57 mm 2
Lets us provide hoop reinforcement at both the faces. 169.29 mm 2
Spacing of steel used 8 mm dia (Af= 50.29 mm 2)
A f x 1000 / Ast 297.05 mm
Say 200 mm
Spacing of T/Steel 8 mm dia (Af= 50.29 mm 2)
A f x 1000 / Ast 251.43 mm
Say 200 mm
Total Ast acually provided = 2 (A f x 1000)Spacing 502.65 mm 2
Hence provide T/steel 8 mm dia. rings at 200 mm c/c on
both faces of the wall. The spacing will be kept constant up to total height
above the top of the floor slab & beyond this height, the spacing may be increased
Check for tensile stress in composite section:-
sct ((T/t x1000 +(m-1)Ast)) 0.1976 N/mm 2
which is less than 1.20 N/mm 2, hence safe.
Distribution reinforcement:-
Percentage of distribution bars = 0.24-0.10 (Wall Thick.-100)/350 0.22571 %
Area of reinforcement (A.O.R.) % age x wall thick. x 1000 / 100 338.57 mm 2
Area of reinforcement on each face = 1/2x A.O.R. 169.29 mm 2
Say 170 mm 2
Spacing of T/Steel 8 mm dia (Af= 50.29 mm 2)
A f x 1000 / Ast 295.80 mm
Say 200 mm
Hence provide steel of 8 mm dia.Bar @ 200 mm c/c as
distribution bars (Vertical) on external face of the wall only.On the inner face,
the vertical reinforcement provided for cantilever action will serve the function
of distribution bars and no additional reinforcement need be provided.
Curtailment of hoop reinforcement:-
At 1.50 Mts. below top,hoop tension =
T= (w x 1.70 x D)/2 31.45 KN
Area of steel 1.50 Mts.below top T / sst 209.67 mm 2
At on each face 104.83 mm 2
Say 140.00 mm 2
Hence minimum steel required on each face 170 mm 2
Spacing of T/Steel 8 mm dia (Af= 50.29 mm 2)
A f x 1000 / Ast 359.18 mm
Say 200 mm
At 1.00 Mts. below top,hoop tension =
T= (w x 1 x D)/2 18.50 KN
Area of steel 1.00 Mts.below top T / sst 123.33 mm 2
At on each face 61.67 mm 2
Say 82.00 mm 2
Hence minimum steel required on each face 170 mm 2
Spacing of T/Steel 8 mm dia (Af= 50.29 mm 2)
A f x 1000 / Ast 815.44 mm
Say 200 mm
Design of base slab:- Keeping in view the thickness of wall, provide
150 mm thick base slab.
Minimum aera of reinforcement = (0.24 x thick.of bse slab x1000)/100 360 mm 2
Area of reinforcement on each face 180 mm 2
Spacing of T/Steel 8 mm dia (Af= 50.29 mm 2)
A f x 1000 / Ast 279.37 mm
Say 250 mm
Hence provide steel of 8 mm dia. bars @ 250 mm c/c
both ways at top & bottom of the slab
Haunches reinforcement:-
Provide 150 x 150 mm haunches at the junction of wall &
the base slab. Provide 8 mm dia. bars @ 250 mm c/c, as haunch reinforcement.
Free Board:- 150mm F.B. shall be provided.

Design calculation for R.C.C.Dome Slab


Capacity of tank 27000 Lts.
Diameter of tank =(D) 3.70 Mts.
Let thickness of dome slab (t) 100 mm
Let rise of dome slab (h) 0.53 Mts.
Say 0.60 Mts.
Therefore the radius of dome 'R' 3.15 Mts.
Sinf = (D\2)R 0.587
f = 35.94 degree
Cosf = 0.809
Load/M^2 of dome slab
Dead Load= 0.1 x 1.00 x 1.00 x 25.00 2.50 KN/m 2
Live Load L.S. 1.00 KN/m 2
Other load of finishing & wind load L.S. 1.00 KN/m 2
Total Load(w) 4.50 KN/m 2
Max hoop stress at crown = (w xR/t) x 1/2 0.071 N/mm^2

Max meridinal stress at base of dome where f =


=(wR/t x1/(1+cosf) 0.078 N/mm^2
Since thr stresses are very small and within safe limits,hence provide nominal
reinforcement of 0.24 % of gross sectional area.
Therefore Ast = 0.24/100 x 100 x1000 240.00 mm 2
Spacing of T/Steel 8 mm dia (Af= 50.29 mm 2)
A f x 1000 / Ast 209.52 mm
Say 180 mm
Provide 8 mm dia. Bars @ 180 c/c both ways.
Design of ring beam:-
Hor.component of meridinal thrust 'p' = T x cosf
Therefore total tension tending to rupture the ring beam per meter
length of its circumference
Tt = p x D/2 = T x cosf x D/2
11735.24 N
Area of steel required= Tt/sst 78.23 mm 2
Provide 4 Nos. bars of Tor Steel
8 mm dia (Af= 50.29 mm 2)
Actual steel provided 201.14 mm 2 which is > 78.23 mm 2)
Size of ring beam:- A+(m-1) Astp A+ 13 x 201
Allowable sress in composite section = 1.20 1.20 N/mm^2
then, total tension/A+ (m-1)Astp =1.20
A= 7166.36 mm 2
Provide ring beam having size of 150 x 150 mm
Min.Shear reinforcement:-
Spacing Sv =2.50 x Asv x fy/b
Spacing of T/Steel 8 mm dia (Af= 50.29 mm 2)
Asv = 2 x 22/28 x8^2 100.57 mm 2
Sv = =2.50 x Asv x fy/b 419.05 mm
Say 300 mm
Provide 8 mm dia. 2-legged stripps @ 300 mm c/c

Design calculation for R.C.C.Flat Slab


Capacity of tank = 27000.00 Lts.
Diameter of tank =(D) = 3.70 Mts.
Design of roof slab :-
Effective span = 3.85 Mts.
Design constants for M-15 grade concrete. Dev.length of T/Steel(Ld) 68 f
s cbc = 7.00 N/mm 2 m = 13.00 j = 0.874
s st = 150 N/mm 2 k = 0.378 R = 1.16
Load Calculation:- Assuming 100 mm thick slab,the design load per sqm.
consisting of following:-
i) Self wt. of slab = Thickness of slab x 25000 = 2500.00 N/m 2
ii) Ceiling Plaster = LS = 1500.00 N/m 2
iii) Live load (Assumed) LS = 2000.00 N/m 2
Total 6000.00 N/m 2
or 6.00 KN/m 2
B.M.Calculation :- Max.+ve radial moment at centre(Mr)&+ve circumferential at the
centre (Mf) are each = +0.80x3/16 x w x r 2
or Mr = (Mf) = +0.80x3/16 x w x r 3 = 3.34 KN-m
Maximum +ve circuferential moment at edge:-
(Mf) = +0.80x2/16 x w x r 2 = 2.22 KN-m
Design of roof slab :-
The effective depth of slab from consideration of maximum B.M.
d= (M/R.b) 1/2 = 53.62 mm
Say 60.00 mm
Assuming a cover of 15 mm upto centre of main bars 10 mm,available effective
thickness of slab or "t"
= (effective depth + cover + dia.of bar/2) = 85.00 mm
Hence adopted total thick. of wall 100 mm is in order from B.M.consideration.
Hence available effective depth of slab for one layer of reinforcement 80 mm
Hence available effective depth of slab for other layer of reinforcement 70 mm
Therefore area of steel required for radial & circumferential reinforcement at centre
of the slab.
Ast =M / (j x d x s st ) = 317.99 mm 2 (i)
Area of steel in direction perpendicular to the above
Ast =M / (j x d x s st ) = 363.42 mm 2 (ii)
Spacing of steel used 10 mm dia.(A f = 78.57 mm 2 )
(A f x 1000 /Ast ) = 247.09 mm
Say 130 mm
Hence provide a mesh of Bars consisting of 10 mm dia.bars mutually at
130 mm c/c in each of the two layers placed at right angle to each other.
The edges of slab develop a max. +ve circumferential moment.
(M f ) = 0.80x2/16 x w x r 2 = 2.22 KN-m
Although the mesh of reinforcement provided at the centre will extend right upto the edge of the
slab, yet this mesh will not be able to take any tension near the edges of the slab.Since the bars
donot have proper anchorage & are free to slip.
This slipping tendency of the mesh bars can be prevented by providing the reinforcement reqd.
for max. +ve circumferential moment at the edges, in the forms of rings,placed in a width equal to
the development length of the bars in the mesh.
Assuming a cover of 15 mm upto centre of main bars,available effective thickness
of wall or "d"=(Total depth-cover-dia.-dia./2) & dia of bar 10 70 mm
Ast =M / (j x d x s st ) = 242.28 mm 2
Spacing of steel used 10 mm dia.(A f = 78.57 mm 2 )
(A f x 1000 /Ast ) = 324.30 mm
Say 160 mm
Since M f is 2/3,therefore the above reinforcement ( in the forms of rings,should be provided for
a length. (2/3 x Development length of using bars) = 453.34 mm
Therefore Nos. of bars for rings = 3.83 Nos.
or 4.00 Nos.
Check for shear:- Max S.F. at edge = V = 1/2 x Load x r 5.775 KN
T v =(Vx10^3)/1000xeffective depth of other layers,which is less than 0.083 N/mm 2
which is less than 0.84 N/mm 2 ,hence safe.
NAME OF WORK:- AUG.LWSS TO BHOTA TOWN IN TEHSIL & DISTT. HAMIRPUR (HP)
SUB HEAD:-STRUCTURAL DESIGN OF FILTER BED OF 17.14 m 2

Data:-
1) Capacity of Structure:-
2) Depth of tank:- 3.50 Mts.i/c free board.
3) Size of tank (LengthxBreadth) Length = 4.14 Mts. Breadth = 4.14 Mts.
4) Provde Free Board 0.15 Mts.
5) Design contant for M-20 Gr.Concrete.
i) sst = 150 N/mm^2 scbc = 7N/mm^2 K = 0.378 j = 0.874
R = 1.160
ii) sst = 190 N/mm^2 scbc = 7N/mm^2 K = 0.329 j = 0.890
R = 1.025

Capacity of tank 60000 Lts.


Or 60.00 Cum
Since the depth of water is to be restricted 3.50 Mts., area of base required
= 17.14 m 2
Therefore one side of square base = 4.14 Mts.
Say 4.14 Mts.
Check for Max. pressure of soil:-
Total wt. OfTotal wt. Of water = 60000 N
Add 10 % due to to wt. of tank = 6000 N
Total = 66000 N
Pressure on soil = 3.85 N/m 2
Which is < bearing capacity of soil.Hence it is safe.
Let the wt. of soil = 17.00 KN/m 3 or 17000.00 N/mm 3
Wt.of water = 10.00 KN/m 3
or 10000.00 N/mm 3
Angle of Repose f = 30 Degrees
Then Ka = (1-sinf)/(1+sinf) = 1/3
Since L/B < 2,hence the walls are designed as hor. slab contineous between corner and subject
to triangular load due to water pressure varying from zero at top to a max.at a ht."h"=H/4 or 1.00
mts. whichever is more i.e. 0.875 mts. or 1.00 mts.Hence "h" = 1.00 Mts.
Therefore water pressure at a depth of 2.50 mts. from top is given by:-
Hence top = 2.50 Mts. Of wall act as horizontal slab (subjected to horizontal bending)
and the bottom 1.00 Mts. Will act as a cantilever slab fied at the base.
Water pressure at a depth of 2.50 Mts. From top is given by
P = w (H-h) = 25000.00 N/m 2
Since this is a case of square tank,the length & width are same.Hence only one wall
will be designed.
Let the thickness of the wall slab = 250.00 mm
Therefore effective span along length/width
(L/B + Thichness of wall) = 4.39 Mts.
B.M.at end of span = (p l ^2)/12 = 40150.21 N/m
Say = 40150.00 N/m
causing tension on water face.
B.M.at centre of span (p l ^2)/16 = 30112.66 N/m
Say = 30113.00 N/m
Direct tension or pull on long/short walls TL=TB =(Pa x side) = 51750.00 N
Say 51750.00 N
Design of wall section:-
Max. B.M. any where in the section (Mf) = 40150.00 N - m
Since this causes tension on water face
i) sst = 190 N/mm^2 scbc = 7N/mm^2 K = 0.329 j = 0.890
R = 1.025
Effective depth from consideration of max. B.M. is given by "d" =
Effective depth = ((M/R x b)) 0.5 198.00 mm
Say 200.00 mm
Total depth providing tor steel of 20 mm dia. main bar & clear cover 25
mm,then "t" =(d + dia.of bar /2 +25 235 mm Say 250.00 mm
Hence adopt overall depth = 250 mm
Then effective depth (d) by considering Tor steel bars of 215 mm
20 mm dia.
Reinforcement at corners of walls:-
(a) At corners, x = (d - t/2) = 90 mm
Area for steel for B.M.(Ast1) =(Mf -T x )/(j x d x sst) = 976.24 mm 2

Say 976.00 mm 2

Area of steel for direct tension = Ast 2=T/sst 272.37 mm 2

Say 272.00 mm 2

Total Ast (Ast 1 +Ast 2) = 1248.00 mm 2

Spacing using T/steel 20 mm dia. bars (A f = 314.29 mm 2


= (Af x 1000)/ Ast = 251.83 mm
Say 200 mm
Since the B.M. is proportional to the depth of water,area of reinforce
ment will vary linearly with depth of water. Hence spacing of bars can be
increased to double 400 mm c/c at 1.25 mts. from top. The bar
should extend by a distance of l/4 or ld, whichever is more the centre of span.
ld =(f x sst)/( 4 x t bd) = 1187.50 mm
Say 1188.00 mm
Or 1.20 Mts.
Side/4 =(Side + Wall Thickness)/4 1.10 = 1.10 Mts.
Hence extend the bars b 1.20 Mts. from centre of support.
Since the B.M. is proportional to the depth of water,area of reinforce
ment will reduce linearly with depth of water. Hence spacing of bars can be
increased to double 400 mm c/c at 1.25 mts. from top. The bar
should extend by a distance of l/4 or ld, whichever is more the centre of span.
(b) Reinforcement at centre of span:-
B.M.(M)= 30113.00 N m This causes tension on face away from water
(Since the thickness of wall is > than 225 mm below mentioned factors
are to be considered.
i) sst = 190 N/mm^2 scbc = 7N/mm^2 K = 0.329 j = 0.890
R = 1.025

Ast 1 = (M - TLx)/( j x d x sst ) = 700.16 mm


Say 700.20 mm
Ast 2 = TL/sst = 272.37 mm
Say 272.40 mm
Total steel required= 972.60 mm
Spacing using T/steel 20 mm dia. bars (A f = 314.29 mm 2
= (Af x 1000)/ Ast = 323.14 mm
Say 220 mm
Since the B.M. is proportional to the depth of water,area of reinforce
ment will vary linearly with depth of water. Hence spacing of bars can be
increased to double 440 mm c/c at 1.25 mts. from top. And
curtail 50 % of bars at a distance of 0.15 x side = 0.66 Mts Say
0.70 mts. from centre of suppots.

(3) Reinforcement for cantilever moment:-


Cantilever moment at base =( w x H x h 2)/6 5833.33 Nm
This moment causes tension on water face.
Ast = (Moment)/( j x d x sst ) = 160.45 mm 2

Say 160.40 mm 2

Distribution steel:-
= 0.30 -0.10 (Wall Thick. -100)/(450 -100)
= 0.12 %
Therefore area of steel = = 310.71 mm 2

Say 311.00 mm 2
Area of steel on each face = = 155.50 mm 2

Spacing using T/steel 8 mm dia. bars (A f = 50.29 mm 2


= (Af x 1000)/ Ast = 323.38 mm
Say 200 mm
However in order that the distribution reinforcement may also act as main reinforcement
may cantilever, provide area of steel of each face
Design of base slab:- Provide 200 mm bottom thickness of base slab
Area of steel reqd. (Ast) (0.30 x 200 x 1000)/100 = 600 mm 2

Area of steel on each face = 300 mm 2

Spacing using T/steel 10 mm dia. bars (A f = 78.57 mm 2

= (Af x 1000)/ Ast = 261.90 mm


Say 200 mm
Hence provide 10 mm dia. bar @ 200 mm c/c bothways at top and bottom of
base slab.
Splays Bars:- Provide 10 mm dia.bar @ 200 mm c/c as haunch
reinforcement.
Free Board:- Provide 150 mm as F.B.
NAME OF WORK:- AUG.LWSS TO BHOTA TOWN IN TEHSIL & DISTT. HAMIRPUR (HP)
SUB HEAD:-STRUCTURAL DESIGN OF FILTER BED OF 30.38
Data:-
1) Capacity of Structure:-
2) Depth of tank:- 3.30 Mts.i/c free board.
3) Size of tank (LengthxBreadth) Length = 6.75 Mts. Breadth = 4.50
4) Provde Free Board 0.15 Mts.
5) Design contant for M-20 Gr.Concrete.
i) sst = 150 N/mm 2 scbc = 7N/mm 2 K = 0.378 j=
R = 1.160
ii) sst = 190 N/mm 2 scbc = 7N/mm 2 K = 0.329 j=
R = 1.025
NOTE:- The outside soil is assumed to be 1.50 Mts. below the top of wall
(i.e.Hsoil= 1.50 )
Let the wt. of soil = 17.00 KN/m3 or 17000.00 N/mm 3
Wt.of water = 10.00 KN/m3 or 10000.00 N/mm 3
Angle of Repose f = 30 Degrees
Then Ka = (1-sinf)/(1+siof) = 1/3
Since L/B < 2,hence the walls are designed as hor. slab contineous between corner &
subject to triangular load due to water pressure varying from zero at top to a max.at
a ht."h"=H/4 or 1 mts.whichever is more i.e. 0.825 mts. or 1mts.Hence"h" 1.00 Mts.
(A) Tank empty with pressure of soil from outside:-
Pa = Ka Y' H + Y w H
Y'= Wt.of soil -Wt.of water
= 7000.00 N/mm 3
Yw= 10000.00 N/mm 3
Pa = 40701.54 N/m 2 Say 40702.00 N/m 2
Therefore water pressure at a depth of 2.30 mts. from top is given by:-
Pa = Ka Y' H + Y w (H-h) = 36036.00 N/m 2
Let the thickness of the wall slab = 400.00 mm
Therefore effective span along length
(L + Thichness of wall) "l" = 7.15 Mts.
Therefore effective span along breadth
(B + Thichness of wall) "b" = 4.90 Mts.
Therfore F.E.M. for long walls
(pa xL^2) = 4.26 pa N-m
Therfore F.E.M. for short walls
(pa xB^2) = 2.00 pa N-m
A 7.15
B

4.90

D C

As the frame is symmetrical about both axis, moment distribution is done for one quarter of
the tank only.
Consider joint A
s AB = 4EI/ l , s AD = 4EI/ b
Therfore sAB/sAD= b/ l Therfore distribution factors = b/(l+b) :
= 0.40 :
JOINT:- A
Member AB AD
Dis.Factor 0.40 0.60
F.E.M. (-) 4.26 pa (+) 2.00 pa
Balancing (+) 1.06 pa (+) 1.20 pa
Final moment(Mf) ( - ) 3.20 pa (+) 3.20 pa

Therfore final moment at supports ( M f) = 130280.32


(which causes tension on water face.) Say 130280.00
B.M. at centre of long span = (Pa x l^2)/8 - M f = 129818.50
(which causes tension in face away from water.) Say 129818.00
B.M. at centre of short span = (Pa xb^2)/8 - M f = -8123.1225
(which causes tension in water face.) Say -8123.00
Direct tension or pull on long walls = TL =(Pa x B)/2 = 91579.50
Say 91580.00
Direct tension or pull on short walls =TB =(Pa x L)/2 = 121621.50
Say 121622.00
Design of wall section:-
Max. B.M. any where in the section (Mf) = 130280.00
Since this causes tension on water face
i) sst = 190 N/mm 2 scbc = 7N/mm 2 K = 0.329 j=
R = 1.025
Effective depth from consideration of max. B.M. is given by "d" =
Effective depth = ((M/R x b)) 0.5 357.00 mm
Say 360.00 mm
Total depth providing tor steel of 20 mm dia. main bar & clear cover o 25
mm,then "t"=(d+dia.of bar +25 ) =
2
395 mm Say 400 mm
Hence adopt overall depth = 400 mm
Then effective depth (d) by considering Tor steel bars of 365 mm
20 mm dia.
Reinforcement for long walls:-
(a) At corners, x = (d - t/2) = 165 mm
Area for steel for B.M.(Ast1) =(Mf -TLx)/(j x d x sst) = 1865.95 mm 2
Say 1866.00 mm 2
Area of steel for direct tension = Ast 2=TL/sst 482.00 mm 2
Say 482.00 mm 2
Total Ast (Ast 1 +Ast 2) = 2348.00 mm 2
Spacing using T/steel 20 mm dia. bars (A f = 314.16 mm 2
= (A f x 1000)/ Ast = 133.80 mm
Say 120 mm
Since the B.M. is proportional to the depth of water,area of reinforce
ment will vary linearly with depth of water. Hence spacing of bars can be
increased to double 240 mm c/c at 1.15 mts. from top. The bar
should extend by a distance of l/4 or ld, whichever is more the centre of span.
ld =(f x sst)/(4 x tbd) = 1187.50 mm
Say 1188.00 mm
l/4 =(L + Wall Thickness)/4 = 1.79 Say 1.80 mm
Hence extend the bars by 1.80 Mts. from centre of span.
(b) Reinforcement at centre of span:-
B.M.(M)= 129818.00 N m This causes tension on face away from water
(Since the thickness of wall is > than 225 mm below mentioned factors
are to be considered.
i) sst = 190 N/mm 2 scbc = 7N/mm 2 K = 0.329 j=
R = 1.025

Ast 1 = (M - TLx)/( j x d x sst ) 1858.47 mm


1858.50 mm
Ast 2 = TL/sst 482.00 mm
482.00 mm
Total steel required= 2340.50 mm
Spacing using T/steel 20 mm dia. bars (A f = 314.16 mm 2
= (A f x 1000)/ Ast = 134.23 mm
Say 120 mm
Since the B.M. is proportional to the depth of water,area of reinforce
ment will vary linearly with depth of water. Hence spacing of bars can be
increased to double 240 mm c/c at 1.65 mts. from top. And
curtail 50 % of bars at a distance of 0.15 x l = 1.07 Mts say
1.00 Mts. from centre of suppots.
(2) Reinforcement for Short walls:-
(a) At corners,
Ast 1 = (M - TLx)/( j x d x sst ) = 1785.65 mm 2
Say 1786.00 mm 2
Ast 2 = TB/sst = 640.12 mm
Say 640.00 mm 2
Total steel required= 2426.00 mm
Spacing using T/steel 20 mm dia. bars (A f = 314.16 mm 2
= (A f x 1000)/ Ast = 129.50 mm
Say 120 mm
Since the B.M. is proportional to the depth of water,area of reinforce
ment will vary linearly with depth of water. Hence spacing of bars can be
increased to double 240 mm c/c at 1.15 mts. from top.
(b) Reinforcement for cantilever moment:-
In this case, the B.M. being -ve,it will will cause tension on water face.
The magnitude of bending moment being very small i.e. -8123.00
Nm, the normal reinforcement will be adequate to take care of the same,curtail
alternate bar of 20 mm dia. at corner so that T/seel 20
mm dia.@ 240 mm is provided as reinforcement at centre of span.
(3) Reinforcement for cantilever moment:-
Cantilever moment at base = 5500 Nm
This moment causes tension on water face.
Ast = (Moment)/( j x d x sst ) = 89.11 mm 2
Say 89.10 mm 2
Distribution steel:-
= 0.30 -0.10 (Wall Thick. -100)/(450 -100)
= 0.25 %
Therefore area of steel = = 994.29 mm 2
Say 994.00 mm 2
Area of steel on each face = = 497.00 mm 2
Spacing using T/steel 10 mm dia. bars (A f = 78.54 mm 2
= (A f x 1000)/ Ast = 158.03 mm
Say 120 mm
Since area pf distribution bars on each face is more than the
89.10 mm^2, it will also seve a tensile steel for cantilever moment.

(B) Tank full with water and no earth pressure


The value of "h" = Mts. (Earlier found)
Water pressure at a depth of (H - 1.00) = 2.30 Mts.
from top
Then pressure "P" = 10000 x h = 23000 N m
Final moment (Mf) = 130280.00
This will cause tension on water face
B.M.at centre of long span =(p x l^2)/8-Mf = 16697.1875 Nm
Say 16697.00 Nm
which causing tension in face away from water.
B.M.at centre of short span=(pxb^2)/8-Mf = -61251.25 Nm
which causing tension on water face.
Direct tension or pull on long walls = TL =(Pa x B)/2 = 56350.00 N
Say 56350.00 N
Direct tension or pull on short walls =TB =(Pa x L)/2 = 82225.00 N
Say 82225.00 N
Design of wall section:-
Max. B.M. any where in the section Mf 130280.00 N - m
Since this causes tension on water face
I) sst = 190 N/mm^2 scbc = 7N/mm^2 K = 0.329 j=
R = 1.025
Effective depth from consideration of max. B.M. is given by "d" =
Effective depth = ((M/R x b))^0.5 357.00 mm
Say 360.00 mm
Total depth providing tor steel of 20 mm dia.main bar & clear cover of 25
mm,then "t" = (d + #/2 +25 ) = 395 mm Say 400 mm
Hence adopt overall depth = 400 mm
Then effective depth (d) by considering Tor steel bars of 365 mm
20 mm dia.
Reinforcement for long walls:-
(a) At corners, x = (d - t/2) = 165 mm
Area for steel for B.M.(Ast1) =(Mf -TLx)/(j x d x sst) = 1960.13 mm 2
1960.00 mm 2
Area of steel for direct tension = Ast 2=TL/sst 296.58 mm 2
297.00 mm 2
Total Ast (Ast 1 +Ast 2) 2257.00 mm 2
Spacing using T/steel 20 mm dia. bars (A f = 314.16 mm 2
= (A f x 1000)/ Ast = 139.19 mm
Say 120 mm
Since the B.M. is proportional to the depth of water,area of reinforce
ment will vary linearly with depth of water. Hence spacing of bars can be
increased to double 240 mm c/c at 1.15 mts. from top. The bars
should extend by a distance of l/4 or ld, whichever is more the centre of span.
ld =(f x sst)/(4 x tbd) 1187.50 mm
1188.00 mm
l/4 =(L + Wall Thickness)/4 = 1.69 1.70 mm
Hence extend the bars by 1.70 Mts. from centre of span.
(b) Reinforcement at centre of span:-
B.M.(M)= 16697.00 N m This causes tension on face away from water
(Since the thickness of wall is > than 225 mm below mentioned factors
are to be considered.
i) sst = 190 N/mm 2 scbc = 7N/mm 2 K = 0.329 j=
R = 1.025
Ast 1 = (M - TLx)/( j x d x sst ) = 119.88 mm
Say 119.90 mm
Ast 2 = TL/sst = 296.58 mm
Say 296.60 mm
Total steel required= 416.50 mm
Spacing using T/steel 10 mm dia. bars (A f = 78.54 mm 2
= (A f x 1000)/ Ast = 188.57 mm
Say 120 mm
Since the B.M. is proportional to the depth of water,area of reinforce
ment will vary linearly with depth of water. Hence spacing of bars can be
increased to double 240 mm c/c at 1.15 mts. from top. And
curtail 50 % of bars at a distance of 0.15xl = 1.07 Mts say
1.10 Mts. from centre of suppots.
(2) Reinforcement for Short walls:-
(a) At corners, B.M. = 82225.00 N m
Ast 1 = (M - TLx)/( j x d x sst ) 1624.52 mm 2
1625.00 mm 2
Ast 2 = TB/sst 432.76 mm
433.00 mm 2
Total steel required= 2058.00 mm
Spacing using T/steel 20 mm dia. bars (A f = 314.16 mm 2
= (A f x 1000)/ Ast = 152.65 mm
Say 120 mm
Since the B.M. is proportional to the depth of water,area of reinforce
ment will vary linearly with depth of water. Hence spacing of bars can be
increased to double 240 mm c/c at 1.15 mts. from top.
(b)At centre of short span:-
In this case, the B.M. being -ve,it will will cause tension on water face.
The magnitude of bending moment being very small i.e. -61251.25
N m, the normal reinforcement will be adequate to take care of the same,curtail
alternate bar of 20 mm dia. at corner so that T/seel 20
mm dia.@ 240 mm is provided as reinforcement at centre of span.
(3) Reinforcement for cantilever moment & Distribution steel earlier found is to be
provided as under:-
Reinforcement for cantilever moment:-
Cantilever moment at base = 5500 Nm
This moment causes tension on water face.
Ast = (Moment)/( j x d x sst ) = 89.11 mm 2
Say 89.10 mm 2
Spacing using T/steel 10 mm dia. bars (A f = 78.54 mm 2
= (A f x 1000)/ Ast = 881.48 mm
Say 120 mm
Since area pf distribution bars on each face is more than the
89.10 mm^2, it will also seve a tensile steel for cantilever moment.
Hence provide10 mm dia.bars @ 120 mm c/c
Design of base slab:- Provide 200 mm bottom thickness of base slab.
Area of steel reqd. (Ast)= (0.30 x 200 x 1000)/100 = 600 mm 2
Area of steel on each face = 300 mm 2
Hence provide 10 mm dia. bar @ 250 mm c/c bothways at top and bottom of
base slab.
Splays Bars:- Provide 10 mm dia.bar @ 250 mm c/c as haunch
reinforcement.
Free Board:- Provide 150 mm as F.B.
m2

Mts.

0.874

0.890

N/mm 3
N/mm 3
l/(l+b)
0.60

N-m
N-m
N-m
N-m
N-m
N-m
N
N
N
N

N-m

0.890
0.890
0.890

0.890
ABSTRACT OF COST
NAME OF WORK:-PROV.LWSS TO PC HABITATION OF KOHLA
KALOOR & CHOA CHAKRALA IN TEHSIL NADAUN
DISTT. HAMIRPUR (HP)
(SUB HEAD:- W/E C/O CIVIL WORKS)
S.No. DESRIPTION OF ITEM REFERENCE AMOUNT
1) Main Storage tank of 238500 Annexure - I 484285.00
Lts.cap.at Node No.28
2) Collection Tank of 12600 Annexure - II 86079.00
at Node No.231
3) Storage tank of 36500 Lts. Annexure - III 230579.00
cap.at Node No.240
4) Main Storage tank of 141700 Annexure - IV 379296.00
Lts.cap.at Node No.1
5) Storage tank of 13200 Lts. Annexure - V 87320.00
cap.at Node No.105
6) Collection Tank of 79100 Annexure - VI 291038.00
at Node No.200
7) Storage tank of 7500 Lts. Annexure -VII 73287.00
cap.at Node No.202
8) Main Storage tank of 79100 Annexure - VIII 291038.00
Lts.cap.at Node No.147
9) Storage tank of 14200 Lts. Annexure - IX 90496.00
cap.at Node No.211
10) Storage tank of 17200 Lts. Annexure - X 101231.00
cap.at Node No.171
11) Storage tank of 12200 Lts. Annexure - XI 85071.00
cap.at Node No.145
12) C/O Pump House of size Annexure - XII 467872.00
4.50 x 3.00 Mtr. (2 No's)
13) C/O Pump House of size Annexure - XIII 451775.00
10.00 x 5.00 Mtr. (1No's)
TOTAL 3119367.00
Say Rs. 3119370.00
RCC TANK (With Dome Slab)
NAME OF WORK:-PROV.LWSS TO PC HABITATION OF KOHLA KALOOR
& CHOA CHAKRALA IN TEHSIL NADAUN DISTT. HAMIRPUR (HP)
(SUB HEAD:- C/O RCC STORAGE TANK OF 238500 Lts.)
S.No. Description of item
1) Tank below the ground 1.95 Mts.
2) Dimension of tank Dia. Length Breadth Ht./Depth
Outer 10.80 Mts.
Inner 10.10 Mts.
3) p 3.1416 Mts.
4) p/4 0.7854 Mts.
5) Scour pipe 6.00 Mts.
6) Size of trenches Aver. 0.65 0.98 Mts.
7) Thick.of Lean concrete 1:3:6 0.10 Mts.
8) Thick. of base floor 0.20 Mts.
9) Thick. of Wall Depth F.Board 0.15 Mts.
10) Internal depth i/c F.B. 3.00 0.15 3.15 Mts.
11) Long radius of dome (R ) 6.00 Mts.
12) Rise of dome (h) 1.50 Mts.
13) Width of ring beam 0.15 Mts.
14) Depth of ring beam 0.20 Mts.
15) Thick.of dome 0.10 Mts.
16) Inclined length of steel ladders 4.22 Mts.
17) Scour pipe 150 mm Rs. 683.10
18) Inlet,outlet pipe & overflow pipe.
125 mm Rs. 580.30
19) Size of man hole cover (Medium 500 mm
duty)
20) Cost of S/Valve' Chamber Rs. 5105.60
20) Cost of Sluice Valve 150 mm 11676.60
21) Cost of Sluice Valve 125 mm 10010.50

DETAIL OF MEASUREMENT
NAME OF WORK:-PROV.LWSS TO PC HABITATION OF KOHLA KALOOR
& CHOA CHAKRALA IN TEHSIL NADAUN DISTT. HAMIRPUR (HP)
(SUB HEAD:- C/O RCC STORAGE TANK OF 238500 Lts.)
S. Decription of item Nos. Dimension Qty.
No. L B H/D
1) Excavation in foundation & trenches
etc. in earth work in all kinds of soil
within all leads & lifts as per entire
satisfaction of Engineer in charge.
Tank p/4 10.80 10.80 1.95 178.64
Scour pipe 1.00 6.00 0.65 0.98 3.80
Total 182.44
2) P/L cement concrete1:3:6 (1Cement
:3Sand:6 graded stone aggregate 40
mm nominal size) & curing complete
Tank p/4 10.80 10.80 0.10 9.16
Total 9.16
3) P/L cement concrete1:1.5:3 (1Cement
:1.5 Sand:3graded stone aggregate 20
mm nominal size) & curing complete
excluding the cost of form work and
reinforcement for RCC work :-
(i) Base floor p/4 10.80 10.80 0.20 18.32
Total 18.32
(ii) Vertical wall p 10.25 0.15 3.15 15.22
Total 15.22
4) Prov.form work with steel shuttering
so as to give an fair finish complete
in all respect.
(i) Vertical wall Inside p 10.10 3.15 99.95
Outside p 10.40 3.15 102.92
Total 202.87
5) Prov.form work of ordinary timber so
as to give the rough finish complete
in all respect.
(i) Arches beyond 6.00 mts. Span. 2xp 6.00 1.50 56.55
Total (i) 56.55
Deduction of Man hole cover 2 x p/4 0.500 0.500 0.39
Total (ii) 0.39
Net Qty. (i -ii) 56.16
6) Prov.smooth finishing in cement
mortor 1:3 (1cement : 3 sand)
Inside p 10.10 3.15 99.95
Outside p 10.40 3.15 102.92
Total 202.87
7) Prov./ Laying c.concrete 1:2:4 (1Ce-
ment : 2 Sand : 4 Graded stone agg-
regate 20 mm nominal size) & curing
complete excluding the cost of form

work & reinforcement for RCC work


(i) Ring beam p 10.25 0.15 0.20 0.966
Total 0.966
(ii) Dome slab 2xp 6.00 1.50 0.10 5.655
Total (i) 5.655
Deduction of Man hole cover 2 x p/4 0.500 0.500 0.10 0.039
Total (ii) 0.039
Net Qty. (i -ii) 5.616
8) Prov.T.Steel for RCC work complete
in all respect.
Qty.as per item No.3(i) 18.32 Cum @ 70.00 Kg/Cum 1282.53
Qty.as per item No.3(ii) 15.22 Cum @ 90.00 Kg/Cum 1369.36
Qty.as per item No.7 5.65 Cum @ 80.00 Kg/Cum 452.39
Total 3104.28
9) Steel work welded in built up sections,
trusses and framed work i/c cutting,
hoisting,fixing in position compete
In grating,framed guards & ladders etc.
L 40 x 40 x 5 mm for main V.Member 2.00 4.22 8.44 Rmt
8.44 Rmt. @ 3.00 Kg/Rmt 25.32
L 25 x 25 x4 mm for Horiz.Member 10.00 0.50 5.00 Rmt
5.00 Rmt. @ 1.40 Kg/Rmt 7.00
Total 32.32
10) Prov. & laying GMS/MS pipe for scour,
inlet,outlet & overflow pipe etc.:-
Scour pipe 150 mm 1.00 6.00 6.00
Inlet,outlet pipe & overflow pipe. Total 6.00
125 mm 3.00 5.00 15.00
Total 15.00
11) Prov. & fixing C.I. Sluice valve (Class
PN 1.00) of Leader/Kartar make as
per IS : 780-1984 & IS:2906-1984
complete in all respect.
Scour pipe 150 mm 1.00 1.00
Inlet,outlet pipe & overflow pipe. Total 1.00
125 mm 3.00 3.00
Total 3.00
12) Constructing chamber 600x600x750
mm size for sluice valve,with CI sur-
face box 100 mm top dia.,160 mm
bottom dia.,& 180 mm deep with
chained lid & RCC top slab in 150
mm thick. RCC walls in c.conc.1:2:4
2.00 2.00
Total 2.00
13) Prov. & fixing CI Man hole cover with
frame having frames size of 500 mm
internal dia. (Medium duty) The weight
of cover & frame should not be less
than 116 kg 2.00 2.00
Total 2.00
ABSTRACT OF COST
NAME OF WORK:-PROV.LWSS TO PC HABITATION OF KOHLA KALOOR
& CHOA CHAKRALA IN TEHSIL NADAUN DISTT. HAMIRPUR (HP)
(SUB HEAD:- C/O RCC STORAGE TANK OF 238500 Lts.)
S.No. Desription of item Qty. Rate Unit Amount
1) Excavation in foundations,trenches etc., in 182.44 125.30 Cum 22860.00
earth work, lift upto 1.50 mts. Stacking the
excavated soil not more than 3 mts. Clear
from the edge of the excavation & then retur-
ning the stacked soil in 15 cms. Layers,when
required into plinths sides of foundation etc.,
consolidating each deposited layers by ramm-
ing & watering & then disposing of all surplus
excavated earth as dierected within all leads
& lifts as per entire satisfaction of Engineer in
charge.
2) Providing & laying cement concrete 1:3:6 (1 9.16 2373.00 Cum 21739.00
cement : 3 sand : 6 graded stone aggregate
40 mm nominal size) excluding the cost of
centring & shuttering in Foundation & plinth.
3) Providing & laying cement concrete1:1.5:3 (1
cement :1.5 sand : 3 graded stone aggregate
20 mm nominal size) & curing complete
excluding the cost of form work & reinforcem-
ent for reinforced concrete work in :-
(i) Foundation,footing,bases of columns and 18.32 2923.30 Cum 53560.00
the like & mass concrete.
(ii) Wall (any thickness but not less than 0.10 15.22 2975.90 Cum 45279.00
mts.Thickness)attached pillasters,buttresses
plinth,& string courses etc.from top of found.
level upto floor two level
4) Prov.form work with steel plates 3.15 mm thi-
ck welded with angle iron in frame 30x30x5
mm,so as to give a fair finish i/c centring
shuttering,strutting & propping etc. with woo-
den battens & ballies,ht. of propping & centri-
ng below supporting floor to ceiling not excee-
ding 4.00 mts. & removal of the same for in
situ-reinforced concrete & plain concrete
work :-
Vertical surfaces such as wall (any thick.) 202.87 128.80 Sqm. 26130.00
partitions & the like i/c attached pillasters,
buttresses,plinth & string courses & the like.
5) Prov.form work of ordinary timber plankings
so as to give a rough finish i/c centring,
shuttering,strutting & propping etc. ht.of prop-
ping & centring below supporting floor to ceili-
ng not exceeding 4 mts. & removal of the
same for insitu-reinforced concrete & plain
concrete work in :-
Arches beyond 6.00 mts.span 56.16 1756.40 Sqm. 98633.00
6) Prov. In RCC work smooth finishing of the
exposed surface with cement mortor 1:3 (1
cement : 3 sand ) 202.87 41.70 Sqm. 8460.00
7) Providing & laying cement concrete1:2:4 (1
cement :2 sand : 4 graded stone aggregate
20 mm nominal size) & curing complete
excluding the cost of form work & reinforcem-
ent for RC work in :-
(i) Suspended floor,roofs,landing & shelves 0.966 2750.10 Cum 2657.00
& their support balconies,beams,girders,bre-
ssumers & cantilever upto floor level.
(ii) Arches upto floor two level. 5.616 2894.80 Cum 16256.00
8) Providing Tor steel reinforcement for RCC 3104.28 37.20 Kg 115479.00
work i/c bending,binding & placing complete
upto floor two level.
9) Steel work welded in built up sections,trusses 32.32 54.90 Kg 1774.00
& framed work,i/c cutting,hoisting & fixing
in position & applying a priming coat of red
paint :- In grating, framed ,guards,bars,
ladders, railing, brackets & similar works.
10) Providing & laying in trenches GMS/MS Tubes
(L/M class) tube fitting (Earth work in trenches
to be measured & paid for separatly)
i) 150 mm 6.00 683.10 Rmt. 4099.00
ii) 125 mm 15.00 580.30 Rmt. 8705.00
11) Providing & fixing CI Sluice valve (with hand
wheel) as per IS : 780-1984 class-I upto 300
mm dia.(i/c brass spindle & as per 2906-1984
class-II for dia.> 300 mm) complete with bolts
nuts,rubber insertion etc.,(the tail piece if req-
uired shall be measured & paid for separatly)
i) 150 mm 1.00 11676.60 Each 11677.00
ii) 125 mm 3.00 10010.50 Each 30032.00
12) Constructing chamber for sluice valve, with CI
surface box 100 mm top dia.,160 mm bottom
dia. & 180 mm deep(inside) with chained lid
RCC top 1:2:4 mix (1 cement :2 sand :4 grad-
ed stone aggregate 20 mm nominal size) 100
mm thick foundation concrete 1:5:10 mix (1
cement : 5 sand : 10 graded stone aggregate
40 mm nominal size) & inside plastering with
cement mortor 1 :3 (1 cement : 3 sand) finish-
ed with a floating coat of neat cement i/c
curing complete.
600 x 600 x 750 mm inside syze
With 150 mm thick walls of RCC 1:2 :4 (1 ce- 2.00 5105.60 Each 10211.00
ment :2 sand :4 graded stone aggregate 20
mm nominal size) complete with form work
& reinforcement with 6 mm bars at not excee-
ding 150 mm centres both ways.
13) Prov. & fixing CI Man hole cover with frame 2.00 3367.00 Each 6734.00
having frames size of 500 mm internal dia.
(Medium duty). The weight of cover & frame
should not be less than 116 kg
TOTAL 484285.00
RCC TANK (With Flat Slab)
NAME OF WORK:- PROV.LWSS TO PC HABITATION OF KOHLA KALOOR & CHOA
CHAKRALA IN TEHSIL NADAUN DISTT. HAMIRPUR (HP)
(SUB HEAD:- C/O RCC STORAGE TANK OF 12200 LTS. WITH FLAT SLAB)
S.No. Description of item
1) Tank below the ground 0.70 Mts.
2) Dimension of tank Dia. Length Breadth Ht./Depth
Outer 3.60 Mts.
Inner 3.00 Mts.
3) p 3.1416 Mts.
4) p/4 0.7854 Mts.
5) Scour pipe 6.00 Mts.
6) Size of trenches Aver. 0.65 0.35 Mts.
7) Thick.of Lean concrete 1:3:6 0.10 Mts.
8) Thick. of base floor 0.20 Mts.
9) Thick. of Wall Depth F.Board 0.15 Mts.
10) Internal depth i/c F.B. 1.75 0.15 1.90 Mts.
11) Long radius of dome (R ) 6.00 Mts.
12) Rise of dome (h) 0.00 Mts.
13) Width of ring beam 0.00 Mts.
14) Depth of ring beam 0.00 Mts.
15) Thick.of Slab 0.10 Mts.
16) Inclined length of steel ladders 2.15 Mts.
17) Scour pipe 50 mm Rs. 134.90
18) Inlet,outlet pipe & overflow pipe.
50 mm Rs. 134.90
19) Size of man hole cover (Medium 500 mm
duty)
20) Cost of S/Valve' Chamber Rs. 5105.60
20) Cost of Sluice Valve 50 mm 4568.00
21) Cost of Sluice Valve 50 mm 4568.00

DETAIL OF MEASUREMENT
NAME OF WORK:- PROV.LWSS TO PC HABITATION OF KOHLA KALOOR & CHOA
CHAKRALA IN TEHSIL NADAUN DISTT. HAMIRPUR (HP)
(SUB HEAD:- C/O RCC STORAGE TANK OF 12200 LTS. WITH FLAT SLAB)
S.No. Decription of item Nos. Dimension Qty.
Length Breadth Ht/Depth
1) Excavation in foundation & trenches
etc. in earth work in all kinds of soil
within all leads & lifts as per entire
satisfaction of Engineer in charge.
Tank p/4 3.60 3.60 0.70 7.13
Scour pipe 1.00 6.00 0.65 0.35 1.37
Total 8.49
2) P/L cement concrete1:3:6 (1Cement
:3Sand:6 graded stone aggregate 40
mm nominal size) & curing complete
Tank p/4 3.60 3.60 0.10 1.02
Total 1.02
3) P/L cement concrete1:1.5:3 (1Cement
:1.5 Sand:3graded stone aggregate 20
mm nominal size) & curing complete
excluding the cost of form work and
reinforcement for RCC work :-
(i) Base floor p/4 3.60 3.60 0.20 2.04
Total 2.04
(ii) Vertical wall p 3.15 0.15 1.90 2.82
Total 2.82
4) Prov.form work with steel shuttering
so as to give an fair finish complete
in all respect.
(i) Vertical wall Inside p 3.00 1.90 17.91
Outside p 3.30 1.90 19.70
(ii) Flat surfaces such as soffits of Total 37.60
suspended floors, roofs,landing and
the like.
Tank p/4 3.00 3.00 7.07
Total (i) 7.07
Deduction of Man hole cover 2 x p/4 0.500 0.500 0.39
Total (ii) 0.39
Net Qty. (i -ii) 6.68
5) Prov.smooth finishing in cement
mortor 1:3 (1cement : 3 sand)
Inside p 3.00 1.90 17.91
Outside p 3.30 1.90 19.70
Total 37.60
6) Prov./ Laying c.concrete 1:2:4 (1Ce-
ment : 2 Sand : 4 Graded stone agg-
regate 20 mm nominal size) & curing
complete excluding the cost of form
work & reinforcement for RCC work
(i) Flat slab p/4 3.60 3.60 0.10 1.02
Total (i) 1.02
Deduction of Man hole cover 2 xp/4 0.500 0.500 0.10 0.04
Total (ii) 0.04
Net Qty. (i -ii) 0.98

7) Prov.T.Steel for RCC work complete


in all respect.
Qty.as per item No.3(i) 2.04 Cum @ 70.00 Kg/Cum 142.50
Qty.as per item No.3(ii) 2.82 Cum @ 90.00 Kg/Cum 253.83
Qty.as per item No.7 1.02 Cum @ 80.00 Kg/Cum 81.43
Total 477.77
8) Steel work welded in built up sections,
trusses and framed work i/c cutting,
hoisting,fixing in position compete
In grating,framed guards & ladders
etc.
L 40 x 40 x 5 mm for main V.Member 2.00 2.15 4.29 Rmt
4.29 Rmt. @ 3.00 Kg/Rmt 12.88
L 25 x 25 x4 mm for Horiz.Member 4.00 0.50 2.00 Rmt
2.00 Rmt. @ 1.40 Kg/Rmt 2.80
Total 15.68
9) Prov. & laying GMS/MS pipe for scour,
inlet,outlet & overflow pipe etc.:-
Scour pipe 50 mm 1.00 6.00 6.00
Inlet,outlet pipe & overflow pipe. Total 6.00
50 mm 3.00 5.00 15.00
Total 15.00
10) Prov. & fixing C.I. Sluice valve (Class
PN 1.00) of Leader/Kartar make as
per IS : 780-1984 & IS:2906-1984
complete in all respect.
Scour pipe 50 mm 1.00 1.00
Inlet,outlet pipe & overflow pipe. Total 1.00
50 mm 3.00 3.00
Total 3.00
11) Constructing chamber 600x600x750
mm size for sluice valve,with CI sur-
face box 100 mm top dia.,160 mm
bottom dia.,& 180 mm deep with
chained lid & RCC top slab in 150
mm thick. RCC walls in c.conc.1:2:4
2.00 2.00
Total 2.00
12) Prov. & fixing CI Man hole cover with
frame having frames size of 500 mm
internal dia. (Medium duty) The weight
of cover & frame should not be less
than 116 kg 2.00 2.00
Total 2.00

ABSTRACT OF COST
NAME OF WORK:- PROV.LWSS TO PC HABITATION OF KOHLA KALOOR & CHOA
CHAKRALA IN TEHSIL NADAUN DISTT. HAMIRPUR (HP)
(SUB HEAD:- C/O RCC STORAGE TANK OF 12200 LTS. WITH FLAT SLAB)
S.No. Desription of item Qty. Rate Unit Amount
1) Excavation in foundations,trenches etc., in 8.49 125.30 Cum 1064.00
earth work, lift upto 1.50 mts. Stacking the
excavated soil not more than 3 mts. Clear
from the edge of the excavation & then retur-
ning the stacked soil in 15 cms. Layers,when
required into plinths sides of foundation etc.,
consolidating each deposited layers by ramm-
ing & watering & then disposing of all surplus
excavated earth as dierected within all leads
& lifts as per entire satisfaction of Engineer in
charge.
2) Providing & laying cement concrete 1:3:6 (1 1.02 2373.00 Cum 2415.00
cement : 3 sand : 6 graded stone aggregate
40 mm nominal size) excluding the cost of
centring & shuttering in Foundation & plinth.
3) Providing & laying cement concrete1:1.5:3 (1
cement :1.5 sand : 3 graded stone aggregate
20 mm nominal size) & curing complete
excluding the cost of form work & reinforcem-
ent for reinforced concrete work in :-
(i) Foundation,footing,bases of columns and 2.04 2923.30 Cum 5951.00
the like & mass concrete.
(ii) Wall (any thickness but not less than 0.10 2.82 2975.90 Cum 8393.00
mts.Thickness)attached pillasters,buttresses
plinth,& string courses etc.from top of found.
level upto floor two level
4) Prov.form work with steel plates 3.15 mm thi-
ck welded with angle iron in frame 30x30x5
mm,so as to give a fair finish i/c centring
shuttering,strutting & propping etc. with woo-
den battens & ballies,ht. of propping & centri-
ng below supporting floor to ceiling not excee-
ding 4.00 mts. & removal of the same for in
situ-reinforced concrete & plain concrete
work :-
(i) Vertical surfaces such as wall (any thick.) 37.60 128.80 Sqm. 4844.00
partitions & the like i/c attached pillasters,
buttresses,plinth & string courses & the like.
(ii) Flat surfaces such as soffits of suspended 6.68 218.80 Sqm. 1461.00
floor,roofs, landing & the like.
5) Prov. In RCC work smooth finishing of the 37.60 41.70 Sqm. 1568.00
exposed surface with cement mortor 1:3 (1
cement : 3 sand )
6) Providing & laying cement concrete1:2:4 (1
cement :2 sand : 4 graded stone aggregate
20 mm nominal size) & curing complete
excluding the cost of form work & reinforcem-
ent for RC work in :-
(i) Suspended floor,roofs,landing & shelves 0.98 2750.10 Cum 2691.00
& their support balconies,beams,girders,bre-
ssumers & cantilever upto floor level.
7) Providing Tor steel reinforcement for RCC 477.77 37.20 Kg 17773.00
work i/c bending,binding & placing complete
upto floor two level.
8) Steel work welded in built up sections,trusses
& framed work,i/c cutting,hoisting & fixing
in position & applying a priming coat of red
paint :- In grating, framed ,guards,bars, 15.68 54.90 Kg 861.00
ladders, railing, brackets & similar works.
9) Providing & laying in trenches GMS/MS Tubes
(L/M class) tube fitting (Earth work in trenches
to be measured & paid for separatly)
i) 50 mm 6.00 134.90 Rmt. 809.00
ii) 50 mm 15.00 134.90 Rmt. 2024.00
10) Providing & fixing CI Sluice valve (with hand
wheel) as per IS : 780-1984 class-I upto 300
mm dia.(i/c brass spindle & as per 2906-1984
class-II for dia.> 300 mm) complete with bolts
nuts,rubber insertion etc.,(the tail piece if req-
uired shall be measured & paid for separatly)
i) 50 mm 1.00 4568.00 Each 4568.00
ii) 50 mm 3.00 4568.00 Each 13704.00
11) Constructing chamber for sluice valve, with CI
surface box 100 mm top dia.,160 mm bottom
dia. & 180 mm deep(inside) with chained lid
RCC top 1:2:4 mix (1 cement :2 sand :4 grad-
ed stone aggregate 20 mm nominal size) 100
mm thick foundation concrete 1:5:10 mix (1
cement : 5 sand : 10 graded stone aggregate
40 mm nominal size) & inside plastering with
cement mortor 1 :3 (1 cement : 3 sand) finish-
ed with a floating coat of neat cement i/c
curing complete.
600 x 600 x 750 mm inside syze
With 150 mm thick walls of RCC 1:2 :4 (1 ce- 2.00 5105.60 Each 10211.00
ment :2 sand :4 graded stone aggregate 20
mm nominal size) complete with form work
& reinforcement with 6 mm bars at not excee-
ding 150 mm centres both ways.
12) Prov. & fixing CI Man hole cover with frame 2.00 3367.00 Each 6734.00
having frames size of 500 mm internal dia.
(Medium duty). The weight of cover & frame
should not be less than 116 kg
Total 85071.00

SEDIMENTATION TANK RCC TANK


NAME OF WORK:-
(SUB HEAD:-C/O SEDIMENTATION TANK OF 60000
S.No. Description of item
1) Tank below the ground 1.20 Mts.
2) Dimension of tank Length Breadth Ht./Depth
Outer 6.70 3.60 3.30 Mts.
Inner Mts.
3) p 3.1416 Mts.
4) p/4 0.7854 Mts.
5) Scour pipe 6.00 Mts.
6) Size of trenches Aver. 0.65 0.60 Mts.
7) Thick.of Lean concrete 1:3:6 0.10 Mts.
8) Thick. of base floor 0.20 Mts.
9) Thick. of Wall Depth F.Board 0.15 Mts.
10) Internal depth i/c F.B. 3.00 0.30 3.30 Mts.
11) Length of the tank 6.00 Mts.
12) Breadth of the tank 2.90 Mts.
15) Thick.of Slab 0.10 Mts.
16) Inclined length of steel ladders 3.51 Mts.
17) Scour pipe 100 mm
18) Inlet,outlet pipe & overflow pipe.
80 mm
19) RCC Baffle wall 2.45 0.10 3.15 Mts.
20) Nos.of walls 2.00 Nos.
21) Depth of inlet/outlet channels 0.40 Mts.
DETAIL OF MEASUREMENT
NAME OF WORK:-
(SUB HEAD:-C/O SEDIMENTATION TANK OF 0 60000
S.No. Decription of item Nos. Dimension Qty.
Length Breadth Ht/Depth
1) Excavation in foundation & trenches
etc. in earth work in all kinds of soil
within all leads & lifts as per entire
satisfaction of Engineer in charge.
Tank 1.00 6.70 3.60 1.20 22.73
Scour pipe 1.00 6.00 0.65 0.60 2.34
Total 25.07
2) P/L cement concrete1:3:6 (1Cement
:3Sand:6 graded stone aggregate 40
mm nominal size) & curing complete
Tank 1.00 6.70 3.60 0.10 1.89
Total 1.89
3) P/L cement concrete1:1.5:3 (1Cement
:1.5 Sand:3graded stone aggregate 20
mm nominal size) & curing complete
excluding the cost of form work and
reinforcement for RCC work :-
(i) Base floor 1.00 6.70 3.60 0.20 3.79
Total 3.79
(ii) Vertical surface Long walls 2.00 6.30 0.15 3.30 9.80
Short walls 2.00 3.20 0.15 3.30 1.24
Baffle walls 2.00 2.45 0.10 3.15 1.54
Channel (inlet/outlet)
side long walls 2.00 3.20 0.10 0.30 0.19
side short walls 4.00 0.30 0.10 0.30 0.04
side long walls Total 12.81
4) Prov.form work with steel shuttering
so as to give an fair finish complete
in all respect.
(a) Vertical Surface
(i)Wall Inner side
Long walls 2.00 6.00 3.30 39.60
Short walls 2.00 2.90 3.30 19.14
Baffle walls 4.00 2.45 3.15 30.87
Outer side
Long walls 2.00 6.70 3.30 44.22
Short walls 2.00 3.60 3.30 23.76
(ii) Inlet channel Long walls(Outer) 1.00 3.20 0.40 1.28
Long walls(Inner) 1.00 2.90 0.30 0.87
Short walls(Outer) 2.00 0.40 0.40 0.32
Short walls(Inner) 2.00 0.30 0.30 0.18
(iii) Outlet channel Long walls(Outer) 1.00 3.20 0.40 1.28
Long walls(Inner) 1.00 2.90 0.30 0.87
Short walls(Outer) 2.00 0.40 0.40 0.32
Short walls(Inner) 2.00 0.30 0.30 0.18
(b) Suspended floors,roofs,landing and Total 162.89
soffits of beams etc.
Inlet/Outlet Channels 2.00 3.20 0.40 2.56
Total 2.56

5) Prov.smooth finishing in cement


mortor 1:3 (1cement : 3 sand)
Qty.same as per item No.4(a) 162.89
Qty.same as per item No.4(b) 2.56
Total 165.45
6) Prov.T.Steel for RCC work complete
in all respect.
Qty.as per item No.3(i) 3.79 Cum @ 70.00 Kg/Cum 265.21
Qty.as per item No.3(ii) 12.81 Cum @ 90.00 Kg/Cum 1153.14
Total 1418.35
8) Steel work welded in built up sections,
trusses and framed work i/c cutting,
hoisting,fixing in position compete
In grating,framed guards & ladders
etc.
L 40 x 40 x 5 mm for main V.Member 2.00 3.51 7.02 Rmt
7.02 Rmt. @ 3.00 Kg/Rmt 21.07
L 25 x 25 x4 mm for Horiz.Member 8.00 0.50 4.00 Rmt
4.00 Rmt. @ 1.40 Kg/Rmt 5.60
Total 26.67
9) Prov. & laying GMS/MS pipe for scour,
inlet,outlet & overflow pipe etc.:-
Scour pipe 100 mm 1.00 6.00 6.00
Inlet,outlet pipe & overflow pipe. Total 6.00
80 mm 3.00 5.00 15.00
Total 15.00
10) Prov. & fixing C.I. Sluice valve (Class
PN 1.00) of Leader/Kartar make as
per IS : 780-1984 & IS:2906-1984
complete in all respect.
100 mm 1.00 1.00
Inlet,outlet pipe & overflow pipe. Total 1.00
80 mm 3.00 3.00
Total 3.00
11) Constructing chamber 600x600x750
mm size for sluice valve,with CI sur-
face box 100 mm top dia.,160 mm
bottom dia.,& 180 mm deep with
chained lid & RCC top slab in 150
mm thick. RCC walls in c.conc.1:2:4
2.00 2.00
Total 2.00

ABSTRACT OF COST
NAME OF WORK:-
(SUB HEAD:-C/O SEDIMENTATION TANK OF 0 Lts.)
S.No. Desription of item Qty. Rate Unit Amount
1) Excavation in foundations,trenches etc., in 25.07 90.00 Cum 2257.00
earth work, lift upto 1.50 mts. Stacking the
excavated soil not more than 3 mts. Clear
from the edge of the excavation & then retur-
ning the stacked soil in 15 cms. Layers,when
required into plinths sides of foundation etc.,
consolidating each deposited layers by ramm-
ing & watering & then disposing of all surplus
excavated earth as dierected within all leads
& lifts as per entire satisfaction of Engineer in
charge.
2) Providing & laying cement concrete 1:3:6 (1 1.89 1650.00 Cum 3126.00
cement : 3 sand : 6 graded stone aggregate
40 mm nominal size) excluding the cost of
centring & shuttering in Foundation & plinth.
3) Providing & laying cement concrete1:1.5:3 (1
cement :1.5 sand : 3 graded stone aggregate
20 mm nominal size) & curing complete
excluding the cost of form work & reinforcem-
ent for reinforced concrete work in :-
(i) Foundation,footing,bases of columns and 3.79 2450.00 Cum 9282.00
the like & mass concrete.
(ii) Wall (any thickness but not less than 0.10 12.81 2600.00 Cum 33313.00
mts.Thickness)attached pillasters,buttresses
plinth,& string courses etc.from top of found.
level upto floor two level
4) Prov.form work with steel plates 3.15 mm thi-
ck welded with angle iron in frame 30x30x5
mm,so as to give a fair finish i/c centring
shuttering,strutting & propping etc. with woo-
den battens & ballies,ht. of propping & centri-
ng below supporting floor to ceiling not excee-
ding 4.00 mts. & removal of the same for in
situ-reinforced concrete & plain concrete
work :-
(i) Vertical surfaces such as wall (any thick.) 162.89 125.00 Sqm. 20361.00
partitions & the like i/c attached pillasters,
buttresses,plinth & string courses & the like.
(ii) Flat surfaces such as soffits of suspended 2.56 215.00 Sqm. 550.00
floor,roofs, landing & the like.
5) Prov. In RCC work smooth finishing of the 165.45 45.00 Sqm. 7445.00
exposed surface with cement mortor 1:3 (1
cement : 3 sand )
6) Providing Tor steel reinforcement for RCC 1418.35 4.00 Kg 5673.00
work i/c bending,binding & placing complete
upto floor two level.
7) Steel work welded in built up sections,trusses
& framed work,i/c cutting,hoisting & fixing
in position & applying a priming coat of red
paint :- In grating, framed ,guards,bars, 26.67 3500.00 Qtl. 93340.00
ladders, railing, brackets & similar works.

8) Providing & laying in trenches GMS/MS Tubes


(L/M class) tube fitting (Earth work in trenches
to be measured & paid for separatly)
i) 100 mm 6.00 650.00 Rmt. 3900.00
ii) 80 mm 15.00 450.00 Rmt. 6750.00
9) Providing & fixing CI Sluice valve (with hand
wheel) as per IS : 780-1984 class-I upto 300
mm dia.(i/c brass spindle & as per 2906-1984
class-II for dia.> 300 mm) complete with bolts
nuts,rubber insertion etc.,(the tail piece if req-
uired shall be measured & paid for separatly)
i) 100 mm 1.00 8500.00 Each 8500.00
ii) 80 mm 3.00 5500.00 Each 16500.00
10) Constructing chamber for sluice valve, with CI
surface box 100 mm top dia.,160 mm bottom
dia. & 180 mm deep(inside) with chained lid
RCC top 1:2:4 mix (1 cement :2 sand :4 grad-
ed stone aggregate 20 mm nominal size) 100
mm thick foundation concrete 1:5:10 mix (1
cement : 5 sand : 10 graded stone aggregate
40 mm nominal size) & inside plastering with
cement mortor 1 :3 (1 cement : 3 sand) finish-
ed with a floating coat of neat cement i/c
curing complete.
600 x 600 x 750 mm inside syze
With 150 mm thick walls of RCC 1:2 :4 (1 ce- 2.00 3000.00 Each 6000.00
ment :2 sand :4 graded stone aggregate 20
mm nominal size) complete with form work
& reinforcement with 6 mm bars at not excee-
ding 150 mm centres both ways.
11) Prov. & fixing CI Man hole cover with frame 2.00 3200.00 Each 6400.00
having frames size of 500 mm internal dia.
(Medium duty). The weight of cover & frame
should not be less than 116 kg
Total 223397.00

RCC TANK FILTER BED


NAME OF WORK:-
(SUB HEAD:-C/O FILTER BED OF 44.55 mm 2 )
S.No. Description of item
Tank below the ground Mts. 1.20
Nos. of units Each 3.00
Depth of tank Mts 2.70
Free Board Mts 0.15
Internal depth i/c F.B. Mts 2.85
Dimension of tank (Inner) of one unit
Length Mts 5.50
Breadth Mts 2.70
Thick.of Lean concrete 1:3:6 mm 100.00
Thick. of base floor mm 200.00
Thick. of Wall mm 250.00
Scour pipe Rmt 6.00
Size of trenches m2 0.65
Outer size of tank i/c all unit
Length Mts 9.50
Breadth Mts 6.40
Thick.of Slab for chamber mm 100.00
Dimension of Chamber
Thickness of wall mm 150.00
Length Mts 1.00
Breadth Mts 0.90
depth Mts 3.15
Centre baffle wall
Breadth Mts 0.90
depth Mts 2.15
Inclined length of steel ladders Mts 3.18
Scour pipe 100 mm
Inlet,outlet pipe & overflow pipe.
80 mm
Filter Media:-
Bottom layer :(Broken stone 50 mm
to 75 mm) mm 150.00
IVth layer : Bazri 20 mm to 25 mm mm 100.00
IIIrd layer : Bazri 6 mm to 20 mm mm 100.00
IInd layer : Coarse sand 3mm to 6 mm mm 300.00
Top layer : Fine sand .20mm to .40mm mm 750.00
Ht.of Lateral drains mm 100.00
Width of Lateral drains mm 75.00
Spacing of Lateral drains mm 200.00
Centre spacing of Lateral drains mm 275.00

DETAIL OF MEASUREMENT
NAME OF WORK:-
(SUB HEAD:-C/O FILTER BED OF 44.55 mm 2 ) Lts.)
S.No. Decription of item Nos. Dimension Qty.
S.No. Decription of item Nos. Qty.
Length Breadth Ht/Depth
1) Excavation in foundation & trenches
etc. in earth work in all kinds of soil
within all leads & lifts as per entire
satisfaction of Engineer in charge.
Tank 1.00 9.50 6.40 1.20 72.96
Chamber 3.00 1.30 1.20 1.20 5.62
Scour pipe 3.00 6.00 0.65 0.60 7.02
Total 85.60
2) P/L cement concrete1:3:6 (1Cement
:3Sand:6 graded stone aggregate 40
mm nominal size) & curing complete
Tank 1.00 9.50 6.40 0.10 6.08
Chamber 3.00 1.30 1.20 1.20 5.62
Total 11.70
3) P/L cement concrete1:1.5:3 (1Cement
:1.5 Sand:3graded stone aggregate 20
mm nominal size) & curing complete
excluding the cost of form work and
reinforcement for RCC work :-
(i) Base floor Tank 1.00 9.50 6.40 0.20 12.16
Chamber 3.00 1.30 1.20 0.20 0.94
Total 13.10
(ii)Vertical surface Long walls 2.00 9.50 0.25 2.85 13.54
Short walls 2.00 5.50 0.25 2.85 7.84
Centre walls 2.00 5.50 0.25 2.85 7.84
Chamber
Front walls 3.00 1.20 0.15 3.15 1.70
Side short walls 6.00 1.15 0.15 3.15 3.26
Baffle wall 3.00 0.90 0.15 2.15 0.87
Total 35.04
4) Prov.form work with steel shuttering
so as to give an fair finish complete
in all respect.
(a) Vertical Surface
(i)Wall Inner side
Side of long wall 6.00 5.50 2.85 94.05
Sides of short wall 6.00 2.70 2.85 46.17
Side baffle walls 4.00 5.50 2.85 62.70
Chamber
Side front walls 3.00 0.90 3.15 8.50
Side short walls 6.00 1.00 3.15 18.90
Baffle wall 3.00 0.90 2.15 5.81
Outer side
Side of long wall 2.00 9.50 2.85 54.15
Sides of short wall 2.00 6.40 2.85 36.48
Chamber
Side front walls 3.00 1.20 3.15 11.34
Side short walls 6.00 1.15 3.15 21.74
(b) Suspended floors,roofs,landing and Total 359.84
soffits of beams etc.
Slab over chamber 3.00 1.00 0.90 2.70
Deduction of MH cover (M.Duty) 3.00 P/4X( 0.50)2 0.59
Net Qty. 2.11
5) Prov.smooth finishing in cement
mortor 1:3 (1cement : 3 sand)
Qty.same as per item No.4(a) 359.84
Qty.same as per item No.4(b) 2.11
Total 361.95
6) P/L cement concrete1:2:4 (1Cement
:2 Sand :4 graded stone aggregate 20
mm nominal size) & curing complete
excluding the cost of form work and
reinforcement for RCC work :-
Suspended floor,roofs,landing,balconi-
es,beams etc.
Slab over chamber 3.00 1.20 1.30 0.10 0.47
Deduction of MH cover (M.Duty) 3.00 P/4X( 0.50)2 0.10 0.06
Net Qty. 0.41
7) Prov.T.Steel for RCC work complete
in all respect.
Qty.as per item No.3(i) 13.10 Cum @ 70.00 Kg/Cum 916.72
Qty.as per item No.3(ii) 35.04 Cum @ 90.00 Kg/Cum 3154.01
Qty.as per item No.6 0.41 Cum @ 90.00 Kg/Cum 36.82
8) Steel work welded in built up sections, Total 4107.54
trusses and framed work i/c cutting,
hoisting,fixing in position compete
In grating,framed guards & ladders
etc.
L 40 x 40 x 5 mm for main V.Member 2.00 3.18 6.35 Rmt
6.35 Rmt. @ 3.00 Kg/Rmt 19.05
L 25 x 25 x4 mm for Horiz.Member 7.00 0.50 3.50 Rmt
3.50 Rmt. @ 1.40 Kg/Rmt 4.90
Total 23.95
9) Prov. & laying GMS/MS pipe for scour,
inlet,outlet & overflow pipe etc.:-
Scour pipe 100 mm 1.00 6.00 6.00
Inlet,outlet pipe & overflow pipe. Total 6.00
80 mm 3.00 5.00 15.00
Total 15.00
10) Prov. & fixing C.I. Sluice valve (Class
PN 1.00) of Leader/Kartar make as
per IS : 780-1984 & IS:2906-1984
complete in all respect.
Scour Pipe 100 mm 1.00 1.00
Inlet,outlet pipe & overflow pipe. Total 1.00
80 mm 3.00 3.00
Total 3.00
11) Constructing chamber 600x600x750
mm size for sluice valve,with CI sur-
face box 100 mm top dia.,160 mm
bottom dia.,& 180 mm deep with
chained lid & RCC top slab in 150
mm thick. RCC walls in c.conc.1:2:4
6.00 6.00
Total 6.00
12) Prov. & fixing CI Man hole cover with
frame having frames size of 500 mm
internal dia. (Medium duty) The weight
of cover & frame should not be less
than 116 kg 6.00 6.00
13) P/L cement concrete1:1.5:3 (1Cement Total 6.00
:1.5 Sand:3graded stone aggregate 20
mm nominal size) & curing complete
excluding the cost of form work :-
(a) Foundation & plinth. 120 2.40 0.075 0.10 2.16
Total 2.16
14) Precast concrete block masonry in
partitions walls 10 cm. thick with solid
blocks of approved size i/c quion block
closer etc. made of cement concrete
1:3:6( 1cement : 3 sand : 6 graded stone
aggregate 40 mm nominal & down gau-
ged) in CM 1:3 (1 cement : 3 Sand)
Slab over lateral drains 3.00 5.50 2.70 44.55
Total 44.55
15) Prov. & placing in horizontal layers of
filtering media duly graded, screened,
washed& cleaned as specified by the
Engineer-in-Charge:-
a) Top layer : Fine sand ( Eff.size 0.20 6.00 5.50 2.70 0.75 66.83
mm to 0.40 mm & uniformity coefficient
2.00 to 3.00)
b) Second layer :Coarse sand 3mm to 6.00 5.50 2.70 0.30 26.73
6 mm
c) Third layer : Bazri 20 mm to 25 mm 6.00 5.50 2.70 0.10 8.91
d) Fourth layer : Bazri 6 mm to 20 mm 6.00 5.50 2.70 0.10 8.91
e) Bottom layer:Broken stone 50 mm 6.00 5.50 2.70 0.15 13.37
to 75 mm
ABSTRACT OF COST
NAME OF WORK:-
(SUB HEAD:-C/O FILTER BED OF mm 2 ) Lts.)
S.No. Desription of item Qty. Rate Unit Amount
1) Excavation in foundations,trenches etc., in 85.60 90.00 Cum 7704.00
earth work, lift upto 1.50 mts. Stacking the
excavated soil not more than 3 mts. Clear
from the edge of the excavation & then retur-
ning the stacked soil in 15 cms. Layers,when
required into plinths sides of foundation etc.,
consolidating each deposited layers by ramm-
ing & watering & then disposing of all surplus
excavated earth as dierected within all leads
& lifts as per entire satisfaction of Engineer in
charge.
2) Providing & laying cement concrete 1:3:6 (1 11.70 1650.00 Cum 19298.00
cement : 3 sand : 6 graded stone aggregate
40 mm nominal size) excluding the cost of
centring & shuttering in Foundation & plinth.
3) Providing & laying cement concrete1:1.5:3 (1
cement :1.5 sand : 3 graded stone aggregate
20 mm nominal size) & curing complete
excluding the cost of form work & reinforcem-
ent for reinforced concrete work in :-
(i) Foundation,footing,bases of columns and 0.94 2450.00 Cum 2293.00
the like & mass concrete.
(ii) Wall (any thickness but not less than 0.10 35.04 2600.00 Cum 91116.00
mts.Thickness)attached pillasters,buttresses
plinth,& string courses etc.from top of found.
level upto floor two level
4) Prov.form work with steel plates 3.15 mm thi-
ck welded with angle iron in frame 30x30x5
mm,so as to give a fair finish i/c centring
shuttering,strutting & propping etc. with woo-
den battens & ballies,ht. of propping & centri-
ng below supporting floor to ceiling not excee-
ding 4.00 mts. & removal of the same for in
situ-reinforced concrete & plain concrete work
(i) Vertical surfaces such as wall (any thick.) 359.84 125.00 Sqm. 44979.00
partitions & the like i/c attached pillasters,
buttresses,plinth & string courses & the like.
(ii) Flat surfaces such as soffits of suspended 2.11 215.00 Sqm. 454.00
floor,roofs, landing & the like.
5) Prov. In RCC work smooth finishing of the 361.95 45.00 Sqm. 16288.00
exposed surface with cement mortor 1:3 (1
cement : 3 sand )
6) P/L cement concrete1:2:4 (1Cement
:2 Sand :4 graded stone aggregate 20
mm nominal size) & curing complete
excluding the cost of form work and
reinforcement for RCC work :-
Suspended floor,roofs,landing,balconi-
es,beams etc.
7) Providing Tor steel reinforcement for RCC 4107.54 4.00 Kg 16430.00
work i/c bending,binding & placing complete
upto floor two level.

8) Steel work welded in built up sections,trusses


& framed work,i/c cutting,hoisting & fixing
in position & applying a priming coat of red
paint :- In grating, framed ,guards,bars, 23.95 3500.00 Qtl. 83831.00
ladders, railing, brackets & similar works.
9) Providing & laying in trenches GMS/MS Tubes
(L/M class) tube fitting (Earth work in trenches
to be measured & paid for separatly)
i) 100 mm 6.00 650.00 Rmt. 3900.00
ii) 80 mm 15.00 450.00 Rmt. 6750.00

10) Providing & fixing CI Sluice valve (with hand


wheel) as per IS : 780-1984 class-I upto 300
mm dia.(i/c brass spindle & as per 2906-1984
class-II for dia.> 300 mm) complete with bolts
nuts,rubber insertion etc.,(the tail piece if req-
uired shall be measured & paid for separatly)
i) 100 mm 1.00 8500.00 Each 8500.00
ii) 80 mm 3.00 5500.00 Each 16500.00

11) Constructing chamber for sluice valve, with CI


surface box 100 mm top dia.,160 mm bottom
dia. & 180 mm deep(inside) with chained lid
RCC top 1:2:4 mix (1 cement :2 sand :4 grad-
ed stone aggregate 20 mm nominal size) 100
mm thick foundation concrete 1:5:10 mix (1
cement : 5 sand : 10 graded stone aggregate
40 mm nominal size) & inside plastering with
cement mortor 1 :3 (1 cement : 3 sand) finish-
ed with a floating coat of neat cement i/c
curing complete.
600 x 600 x 750 mm inside syze
With 150 mm thick walls of RCC 1:2 :4 (1 ce- 6.00 3000.00 Each 18000.00
ment :2 sand :4 graded stone aggregate 20
mm nominal size) complete with form work
& reinforcement with 6 mm bars at not excee-
ding 150 mm centres both ways.

12) Prov. & fixing CI Man hole cover with frame 6.00 3200.00 Each 19200.00
having frames size of 500 mm internal dia.
(Medium duty). The weight of cover & frame
should not be less than 116 kg

13) P/L cement concrete1:1.5:3 (1Cement 2.16 3100 Cum 6696.00


:1.5 Sand:3graded stone aggregate 20
mm nominal size) & curing complete
excluding the cost of form work :-
(a) Foundation & plinth.

14) Precast concrete block masonry in 44.55 220.00 Sqm. 9801.00


partitions walls 10 cm. thick with solid
blocks of approved size i/c quion block
closer etc. made of cement concrete
1:3:6( 1cement : 3 sand : 6 graded stone
aggregate 40 mm nominal & down gau-
ged) in CM 1:3 (1 cement : 3 Sand)

15) Prov. & placing in horizontal layers of


filtering media duly graded, screened,
washed& cleaned as specified by the
Engineer-in-Charge:-

a) Top layer : Fine sand ( Eff.size 0.20 66.83 220.00 Cum 14702.00
mm to 0.40 mm & uniformity coefficient
2.00 to 3.00)

b) 2nd layer :Coarse sand 3mm to 6 mm 26.73 220.00 Cum 5881.00

c) Third layer : Bazri 20 mm to 25 mm 8.91 220.00 Cum 1960.00

d) Fourth layer : Bazri 6 mm to 20 mm 8.91 220.00 Cum 1960.00

e) Bottom layer:Broken stone 50 mm 13.37 220.00 Cum 2940.00


Total 399183.00

RCC RAW WATER TANK


NAME OF WORK:-PROV.LWSS TO PC HABITATION OF KOHLA KALOOR
& CHOA CHAKRALA IN TEHSIL NADAUN DISTT. HAMIRPUR (HP)
(SUB HEAD:- C/O RCC RAW WATER TANK 79100 Lts.)
S.No. Description of item
1) Tank below the ground 1.95 Mts.
2) Dimension of tank Dia. Length Breadth Ht./Depth
Outer 6.49 Mts.
Inner 5.79 Mts.
3) p 3.1416 Mts.
4) p/4 0.7854 Mts.
5) Scour pipe 6.00 Mts.
6) Size of trenches Aver. 0.65 0.98 Mts.
7) Thick.of Lean concrete 1:3:6 0.10 Mts.
8) Thick. of base floor 0.20 Mts.
9) Thick. of Wall Depth F.Board 0.15 Mts.
10) Internal depth i/c F.B. 3.00 0.15 3.15 Mts.
11) Long radius of dome (R ) 6.00 Mts.
12) Rise of dome (h) 1.50 Mts.
13) Width of ring beam 0.15 Mts.
14) Depth of ring beam 0.20 Mts.
15) Thick.of dome 0.10 Mts.
16) Inclined length of steel ladders 4.22 Mts.
17) Scour pipe 100 mm Rs. 348.00
18) Inlet,outlet pipe & overflow pipe.
80 mm Rs. 236.30
19) Size of man hole cover (Medium 500 mm
duty)
20) Cost of S/Valve' Chamber Rs. 5105.60
20) Cost of Sluice Valve 100 mm 7902.00
21) Cost of Sluice Valve 80 mm 5936.00

DETAIL OF MEASUREMENT
NAME OF WORK:-PROV.LWSS TO PC HABITATION OF KOHLA KALOOR
& CHOA CHAKRALA IN TEHSIL NADAUN DISTT. HAMIRPUR (HP)
(SUB HEAD:- C/O RCC RAW WATER TANK 79100 Lts.)
S. Decription of item Nos. Dimension Qty.
No. L B H/D
1) Excavation in foundation & trenches
etc. in earth work in all kinds of soil
within all leads & lifts as per entire
satisfaction of Engineer in charge.
Tank p/4 6.49 6.49 1.95 64.51
Scour pipe 1.00 6.00 0.65 0.98 3.80
Total 68.31
2) P/L cement concrete1:3:6 (1Cement
:3Sand:6 graded stone aggregate 40
mm nominal size) & curing complete
Tank p/4 6.49 6.49 0.10 3.31
Total 3.31
3) P/L cement concrete1:1.5:3 (1Cement
:1.5 Sand:3graded stone aggregate 20
mm nominal size) & curing complete
excluding the cost of form work and
reinforcement for RCC work :-
(i) Base floor p/4 6.49 6.49 0.20 6.62
Total 6.62
(ii) Vertical wall p 5.94 0.15 3.15 8.82
Total 8.82
4) Prov.form work with steel shuttering
so as to give an fair finish complete
in all respect.
(i) Vertical wall Inside p 5.79 3.15 57.30
Outside p 6.09 3.15 60.27
Total 117.56
5) Prov.smooth finishing in cement
mortor 1:3 (1cement : 3 sand)
Inside p 5.79 3.15 57.30
Outside p 6.09 3.15 60.27
Total 117.56
6) Prov.T.Steel for RCC work complete
in all respect.
Qty.as per item No.3(i) 6.62 Cum @ 70.00 Kg/Cum 463.14
Qty.as per item No.3(ii) 8.82 Cum @ 90.00 Kg/Cum 793.56
Total 1256.70
7) Steel work welded in built up sections,
trusses and framed work i/c cutting,
hoisting,fixing in position compete
In grating,framed guards & ladders etc.
L 40 x 40 x 5 mm for main V.Member 2.00 4.22 8.44 Rmt
8.44 Rmt. @ 3.00 Kg/Rmt 25.32
L 25 x 25 x4 mm for Horiz.Member 10.00 0.50 5.00 Rmt
5.00 Rmt. @ 1.40 Kg/Rmt 7.00
Total 32.32
8) Prov. & laying GMS/MS pipe for scour,
inlet,outlet & overflow pipe etc.:-
Scour pipe 100 mm 1.00 6.00 6.00
Inlet,outlet pipe & overflow pipe. Total 6.00
80 mm 3.00 5.00 15.00
Total 15.00
9) Prov. & fixing C.I. Sluice valve (Class
PN 1.00) of Leader/Kartar make as
per IS : 780-1984 & IS:2906-1984
complete in all respect.
Scour pipe 100 mm 1.00 1.00
Inlet,outlet pipe & overflow pipe. Total 1.00
80 mm 3.00 3.00
Total 3.00
10) Constructing chamber 600x600x750
mm size for sluice valve,with CI sur-
face box 100 mm top dia.,160 mm
bottom dia.,& 180 mm deep with
chained lid & RCC top slab in 150
mm thick. RCC walls in c.conc.1:2:4
2.00 2.00

ABSTRACT OF COST
NAME OF WORK:-PROV.LWSS TO PC HABITATION OF KOHLA KALOOR
& CHOA CHAKRALA IN TEHSIL NADAUN DISTT. HAMIRPUR (HP)
(SUB HEAD:- C/O RCC RAW WATER TANK 79100 Lts.)
S.No. Desription of item Qty. Rate Unit Amount
1) Excavation in foundations,trenches etc., in 68.31 125.30 Cum 8559.00
earth work, lift upto 1.50 mts. Stacking the
excavated soil not more than 3 mts. Clear
from the edge of the excavation & then retur-
ning the stacked soil in 15 cms. Layers,when
required into plinths sides of foundation etc.,
consolidating each deposited layers by ramm-
ing & watering & then disposing of all surplus
excavated earth as dierected within all leads
& lifts as per entire satisfaction of Engineer in
charge.
2) Providing & laying cement concrete 1:3:6 (1 3.31 2373.00 Cum 7850.00
cement : 3 sand : 6 graded stone aggregate
40 mm nominal size) excluding the cost of
centring & shuttering in Foundation & plinth.
3) Providing & laying cement concrete1:1.5:3 (1
cement :1.5 sand : 3 graded stone aggregate
20 mm nominal size) & curing complete
excluding the cost of form work & reinforcem-
ent for reinforced concrete work in :-
(i) Foundation,footing,bases of columns and 6.62 2923.30 Cum 19341.00
the like & mass concrete.
(ii) Wall (any thickness but not less than 0.10 8.82 2975.90 Cum 26240.00
mts.Thickness)attached pillasters,buttresses
plinth,& string courses etc.from top of found.
level upto floor two level
4) Prov.form work with steel plates 3.15 mm thi-
ck welded with angle iron in frame 30x30x5
mm,so as to give a fair finish i/c centring
shuttering,strutting & propping etc. with woo-
den battens & ballies,ht. of propping & centri-
ng below supporting floor to ceiling not excee-
ding 4.00 mts. & removal of the same for in
situ-reinforced concrete & plain concrete
work :-
Vertical surfaces such as wall (any thick.) 117.56 128.80 Sqm. 15142.00
partitions & the like i/c attached pillasters,
buttresses,plinth & string courses & the like.
5) Prov. In RCC work smooth finishing of the
exposed surface with cement mortor 1:3 (1
cement : 3 sand ) 117.56 41.70 Sqm. 4902.00
6) Providing Tor steel reinforcement for RCC 1256.70 37.20 Kg 46749.00
work i/c bending,binding & placing complete
upto floor two level.
7) Steel work welded in built up sections,trusses 32.32 54.90 Kg 1774.00
& framed work,i/c cutting,hoisting & fixing
in position & applying a priming coat of red
paint :- In grating, framed ,guards,bars,
ladders, railing, brackets & similar works.
8) Providing & laying in trenches GMS/MS Tubes
(L/M class) tube fitting (Earth work in trenches
to be measured & paid for separatly)
i) 100 mm 6.00 683.10 Rmt. 4099.00
ii) 80 mm 15.00 580.30 Rmt. 8705.00
9) Providing & fixing CI Sluice valve (with hand
wheel) as per IS : 780-1984 class-I upto 300
mm dia.(i/c brass spindle & as per 2906-1984
class-II for dia.> 300 mm) complete with bolts
nuts,rubber insertion etc.,(the tail piece if req-
uired shall be measured & paid for separatly)
i) 100 mm 1.00 11676.60 Each 11677.00
ii) 80 mm 3.00 10010.50 Each 30032.00
10) Constructing chamber for sluice valve, with CI
surface box 100 mm top dia.,160 mm bottom
dia. & 180 mm deep(inside) with chained lid
RCC top 1:2:4 mix (1 cement :2 sand :4 grad-
ed stone aggregate 20 mm nominal size) 100
mm thick foundation concrete 1:5:10 mix (1
cement : 5 sand : 10 graded stone aggregate
40 mm nominal size) & inside plastering with
cement mortor 1 :3 (1 cement : 3 sand) finish-
ed with a floating coat of neat cement i/c
curing complete.
600 x 600 x 750 mm inside syze
With 150 mm thick walls of RCC 1:2 :4 (1 ce- 2.00 5105.60 Each 10211.00
ment :2 sand :4 graded stone aggregate 20
mm nominal size) complete with form work
& reinforcement with 6 mm bars at not excee-
ding 150 mm centres both ways.
TOTAL 195281.00
UNIT

Cum
Cum
Cum

Cum
Cum

Cum
Cum
Cum
Cum

Sqm.
Sqm.
Sqm.

Sqm.
Sqm.
Sqm.
Sqm.
Sqm.

Sqm.
Sqm.
Sqm.

Cum
Cum
Cum
Cum
Cum
Cum
Cum

Kg
Kg
Kg
Kg

Kg

Kg
Kg

Rmt
Rmt
Rmt
Rmt.

No.
No.
No's.
No's.

No's.
No's.

No's.
No's.
Amount
22860.00
21739.00

53560.00

45279.00

26130.00

98633.00

8460.00

2657.00

16256.00
115479.00

1774.00

4099.00
8705.00

11677.00
30032.00

10211.00

6734.00

484285.00
H FLAT SLAB)
H FLAT SLAB)
UNIT

Cum
Cum
Cum

Cum
Cum
Cum
Cum
Cum
Cum

Sqm.
Sqm.
Sqm.

Sqm.
Sqm.
Sqm.
Sqm.
Sqm.

Sqm.
Sqm.
Sqm.
Cum
Cum
Cum
Cum
Cum

Kg
Kg
Kg
Kg

Kg

Kg
Kg

Rmt
Rmt
Rmt
Rmt.

No.
Nos.
Nos.
Nos.
Nos.
Nos.

Nos.
Nos.
H FLAT SLAB)
Amount
1064.00

2415.00

5951.00

8393.00

4844.00

1461.00
1568.00

2691.00

17773.00

861.00

809.00
2024.00

4568.00
13704.00
10211.00

6734.00

85071.00

Lts.)
UNIT

Cum
Cum
Cum

Cum
Cum

Cum
Cum
Cum
Cum
Cum

Cum
Cum
Cum

Sqm.
Sqm.
Sqm.

Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.
Sqm.

Sqm.
Sqm.

Sqm.
Sqm.
Sqm.

Kg
Kg
Kg

Kg

Kg
Kg

Rmt
Rmt
Rmt
Rmt.

No.
No.
Nos.
Nos.
Nos.
Nos.

Amount
2257.00
3126.00

9282.00

33313.00

20361.00

550.00

7445.00
5673.00

93340.00

3900.00
6750.00

8500.00
16500.00

6000.00

6400.00

223397.00
UNIT
UNIT

Cum
Cum
Cum
Cum

Cum
Cum
Cum

Cum
Cum
Cum
Cum
Cum
Cum

Cum
Cum
Cum
Cum

Sqm.
Sqm.
Sqm.

Sqm.
Sqm.
Sqm.
Sqm.
Sqm.

Sqm.
Sqm.
Sqm.

Sqm.
Sqm.
Sqm.

Sqm.
Sqm.
Sqm.

Cum
Cum
Cum

Kg
Kg
Kg
Kg

Kg

Kg
Kg

Rmt
Rmt
Rmt
Rmt.
No.
No.
Nos.
Nos.

Nos.
Nos.

No.
No.

Cum
Cum

Sqm
Sqm

Cum

Cum

Cum
Cum
Cum
Amount
7704.00

19298.00

2293.00

91116.00

44979.00

454.00

16288.00

16430.00
83831.00

3900.00
6750.00

8500.00
16500.00

18000.00

19200.00

6696.00

9801.00
14702.00

5881.00

1960.00

1960.00

2940.00
399183.00
UNIT
Cum
Cum
Cum

Cum
Cum

Cum
Cum
Cum
Cum

Sqm.
Sqm.
Sqm.

Sqm.
Sqm.
Sqm.

Kg
Kg
Kg

Kg

Kg
Kg
Rmt
Rmt
Rmt
Rmt.

No.
No.
Nos.
Nos.

No.
Amount
8559.00

7850.00

19341.00

26240.00

15142.00

4902.00
46749.00

1774.00
4099.00
8705.00

11677.00
30032.00

10211.00

195281.00
NAME OF WORK:- AUG.LWSS TO BHOTA TOWN IN TEHSIL & DISTT. HAMIRPUR (HP)
(SUB HEAD:- STRUCTURAL DESIGN OF FILTER BED 51.00 M 2
Data:-
1) Capacity of Structure:-
2) Depth of tank:- 2.70 Mts.i/c free board.
3) Size of tank (Length x Breadth) Length = 10.20 Mts. Breadth = 5.00 Mts.
4) Provde Free Board 0.2 Mts.
5) Design contant for M-20 Gr.Concrete.
i) sst = 150 7N/mm 2 scbc = 7N/mm 2 K = 0.378 j = 0.874
R = 1.160
ii) sst = 190 7N/mm 2 scbc = 7N/mm 2 K = 0.329 j = 0.890
R = 1.025
NOTE:- The outside soil is assumed to be 1.50 Mts. below the top of wall
(i.e.Hsoil= 1.50 )
Let the wt. of soil = 17.00 KN/m 3 or 17000.00 N/mm 3
Wt.of water = 10.00 KN/m or 3
10000.00 N/mm 3
Angle of Repose f = 30 Degrees
Then Ka = (1-sinf)/(1+siof) = 1/3
Since L/B>2,hence the walls will be designed as cantilever & short wall upto 1Mts.
(h>H/4) be designed as cantilevers & top portion as slab supported by long walls.
(A) DESIGN OF LONG WALLS:-
a) Tank full with water i.e. no earth pressure:-
Bending Moment = w x H 3/6
Considering the provision of splasys at junctions of walls & base slab,the
cantilever effect of the long walls is considered to be effective from the top of splays.
Then effective height (Heff) = (H -.15)= 2.50 Mts.
B.M. (Max.) M = (w x (Heff) 3)/6 26041.67 N-m
Say 26042 N-m
Effective depth = ((M/R x b)) 0.5 150.00 mm
Total depth using tor steel of 16 mm dia. 183 mm
Hence adopt overall depth = 200 mm
Then effective depth (d) by using T/Steel bars of 16 167 mm
Ast required = M x 10 3/(j xd x sst) 1189.47 mm 2
Say 1189.00 mm 2
Spacing of Tor steel used 16 mm dia = 150.00 mm
Say 130 mm
Provide Tor steel of dia. 16 mm dia. bars @ 130 mm
c/c vertically on inner face of long walls.
Curtailment of reinforcement:-
Area of steel required at depth of "h"
Ast h/Ast= h 3/H 3 =
h=((Ast h/Ast) x H)) 1/3
H = 2.70 Mts.
"h" be the depth from top where 1/2 the steel can be curtialed.
"h" = (1/2) 1/3 xH 2.14 Mts.
Ht. from base = 0.56 Mts. However as per code requirements, the
bars are to continue further for a distance of 12 times of bars 16
mm dia = 192 mm or d(= 167 mm) whichever is more,
beyond this point. Hence curtail half the bars at 0.75 mts. or
1.00 mts.from base.
Similarly depth where only 1/4th reinforcement is required is
Mts. from base.
"h" = H (1/4)^0.3334 = 1.7 Mts.
Height from base = 1.00 Mts.However as per requiremen,the bars are to
continue further for a distance of 12 Times of dia. = 192 mm or d =
167 mm), whichever is more,beyond this point.Hence curtail 3/4th of bars at a
distance of 1.192 mts. Say 1.50 mts.from base.

Minimum %age of steel = 0.30 -0.10 x (Wall Thick.-100) / (450 -100)


= 0.2714 %
Min.Ast = 542.86 mm 2
This is more than 1/4th of Ast at the bottom. Hence the above curtailment is not
permissible. Hence the reinforcement will be provided as under :-
At base:- 16 mm dia bars @ 130 mm c/c
At 1.00 Mts. above base:-
16 mm dia bars @ 260 mm c/c upto top
Distribution steel:-
Percentage of distribution of steel 0.30 -0.10 x (Wall Thick.-100) / (450 -100)
= 0.2714 %
Astd = 0.2714 /100 X 200 X 1000 = 542.86 mm 2
Minimum Area to be provided on each face = 271.43 mm 2
Spacing of Tor steel used 10 mm on (A f = 78.57 mm 2)
inner face. = 289.47 mm
Say 220 mm
Actual Ast d provided= (1xA f x1000)/Spacing = 357.14 mm 2
Direct tension in Long wall:-
Since the top portion of short wall act as slab supported on long walls,the water
pressure acting on short walls will cause tension in long walls.
PL = p x B/2 , where p = 17000 N/m 2,at 1.00 Mts.above base.
PL = 42500.00 N-m
Ast = 283.33 mm^2
Area of steel (distribution) provided in horizontal direction = 357.14
mm 2
on each face.
Spacing of Tor steel used 10 mm (A f = 78.57mm 2)
= 220.00 mm
Say 200 mm
Hence the distribution steel on inner face be provided in accordance with
direct tension so that it can take direct tension also.So provide tor steel of
10 mm dia. 200 mm c/c on inner face.
b) Tank is empty :-Only earth pressure acting from outside & no water pressure
from outside.
Then p=10000xHsoil+(17000-10000)xHsoil x 1/3 = 18500.70 N/m 2
Bending Moment = pxH/2 x H/3 22478.35 N-m
Effective depth = ((B.M. x 10 3)/ (R x 1000))0.5 = 139.20 mm
Hence adopt overall depth = 200 mm, which is in order.
Ast required = M x 10 3/(j xd x sst) 1026.70 mm 2
Say 1026.70 mm 2
Spacing of Tor steel used 16 mm dia. (A f = 201.14 mm 2)
= 195.91 mm
Say 180 mm
At base:- 16 mm dia. bars @ 180 mm
At 1.00 Mts. above base:-
16 mm dia bars @ 360 mm c/c upto top
Distribution steel:-
Minimum Area to be provided on each face = 271.43 mm 2

Spacing of Tor steel used 10 mm on (A f = 78.57 mm 2)


inner face. = 289.47 mm
Say 220 mm
Actual Ast d provided= (1xA f x1000)/Spacing = 357.14 mm 2

Direct compression in Long walls:- The earth pressure acting on


short walls will cause compression in long walls, because top portion of short
walls act as slab supported on long walls.
At h = 1.00 Mts.(>H/4) above the base of short walls.
Pa = 1/3(Wt. of soil - Wt. of water) x (Hsoil - h) x +Wt.of water
x (Hsoil- h) = 6166.90 N/m 2
PLC Pa x B/2 = 15417.25 N
This will be well taken by distribution steel & wall section
(B) Design of short walls:-
Tank full with water and no earth fill outside:-
i) Top portion :- The bottom portion "h" = 1.00 mt(>H/4) act as a cantilever while the
remaing as slab supported on long wall.
At "h" =1.00 mts.(>H/4) above the base of short wall.
p= Wt. of water x ( H - h) = 17000.00 N/m 2
Mf (at supports) = (p x B^2)/12 = 35416.67 N-m
(Causing tension at inside face)
Mf (at centre) = (p x B^2)/24 = 17708.33 N-m
(Causing tension at outside face)
Direct tension in short walls due to water pressure on the end one meter width of long walls.
PB = Wt.of water (H - h ) x h = 17000 N
Effective depth for horizontal steel = 167 mm
Distance x = d-T/2 = 67 mm
At inside face ( end of short wall)
Ast I = (M-PB x)/(sst x j x d) = 1565.64 mm
Ast 2 = PB /sst = 113.33 mm
Therefore total Ast I + Ast 2 = 1678.97 mm
Minimum Area to be provided on each face = 271.43 mm 2
Spacing of Tor steel used 16 mm on (A f = 201.14 mm 2)
= 119.80 mm
Say 110.00 mm
Provide Tor steel of dia. 16 mm dia. bars @ 110 mm
c/c on inner face of long walls.
These bars will extend L/4 = 2.55 mts. from centre of support. The spacing can be increa-
sed to double 220 mm c/c in top 1.00 mts. ht.
At outside face (Middle of short wall
Ast I = (Mc-PB x)/(sst x j x d) = 808.06 mm 2
Ast 2 = PB /sst = 113.3333 mm 2
Therefore total Ast I + Ast 2 = 921.39 mm 2
Minimum Area to be provided on each face = 271.43 mm 2
Spacing of Tor steel used 16 mm on (A f = 201.14 mm 2)
= 218.30 mm
Say 180.00 mm
Provide Tor steel of dia. 16 mm dia. bars @ 180 mm
c/c on outer face of long walls & the spacing can be double i.e 360 mm
in top 1.00 mts. ht.
ii) Bottom Portion:- The bottom 1.00 Mts. will act as cantilever.

p(at bottom)=wt.of water x (H - 0.15 as F.B.) = 25000 N/m 2


M= (p/2) x 1/3 ) or (pL^3)/6 = 4166.67 N-m
(where L= 1.00 Mts.) (with tension at inside face)
Ast = (M x 10^3)/(sst x j x d) = 190.31 mm 2
Minimum Area to be provided on each face = 271.43 mm 2
Spacing of Tor steel used 10 mm on (A f = 78.57 mm 2)
= 289.47 mm
Say 220.00 mm
Provide Tor steel of dia. 10 mm dia. bars @ 220 mm
c/c on inner face in vertical direction for bottom 1.00 mts. ht. & the spacing can be twice
440 mm for upper portion.
b) Tank empty with pressure of saturated soil from outside
i)Top portion:- The bottom 1Mts.(>H/4) acts as cantilever, while
the remaining act as slab supported on long walls.
At h = 1.00 Mts.(>H/4) above the base of short wall.
Pa = 1/3(wt.of soil - wt.of water) x (Hsoil - h)+wt of water x (Hsoil - 1.00)
= 6166.90 N/m 2
Mf (at supports) = (Pa x B 2)/12 12847.71 N-m
(Causing tension outside)
Mc (at centre) = (Pa x B 2)/24 = 6423.85 N-m
(Causing tension inside)
Ast (at supports) Mf/(sst x j x d) = 586.82 mm 2
Minimum Area to be provided on each face= 293.41 mm 2 mm 2
Spacing of Tor steel used 10 mm on (A f = 78.57 mm 2)
= 133.89 mm
Say 130.00 mm
Provide Tor steel of dia. 10 mm dia. bars @ 130 mm
c/c on outer face 2.00 mts.below the top & these bars will extend L/4 or 2.00 mts. from centre
of support & the spacing can be increased 260 mm c/c in top 1.00 mts. ht.
At mid span = Mc/(sst x j x d) = 293.41 mm 2
Minimum Area to be provided on each face = 271.43 mm 2
Spacing of Tor steel used 10 mm on (A f = 78.57 mm 2)
= 267.79 mm
Say 220.00 mm
Provide Tor steel of dia. 10 mm dia. bars @ 220 mm
c/c on inner face & the spacing can be increased 440 mm c/c in top 1.00 mts.
Bottom Portion:- The bottom 1.00 Mts. will act as cantilever.
p= wt.of water x Hsoil +(wt. of soil - wt. of water) x Hsoil / 3
= 18500.07 N/m 2
M = (p x1.00)/6 = 3083.35 N-m
(with tension at outer face)
Ast = M/(sst x j x d) = 140.83 mm 2
Minimum Area to be provided on each face = 271.43 mm 2
Spacing of Tor steel used 10 mm on (A f = 78.57 mm 2)
= 289.47 mm
Say 220.00 mm
Provide Tor steel of dia. 10 mm dia. bars @ 220 mm
c/c on outer face in vertical direction for bottom 1.00 mts. ht. & the spacing can be twice
440 mm for upper portion.
Direct compression in short walls:- Though the long wall bend as cantilever,
it is observed that end one mts width of long walls contributes to push in short walls,
due to earth pressure and its magniude is given by
PBC = Pa x1.00 = 6166.90 N
(It is quite small ,hence its effect is not considered)
Design of base slab:- Provide 200 mm bottom thickness of base slab
Area of steel reqd. (Ast)= (0.30 x 200 x 1000)/100 = 600 mm 2
Area of steel on each face = 300 mm 2
Spacing of Tor steel used 10 mm on (A f = 78.57
mm 2)
= 261.90 mm
Say 250.00 mm
Hence provide 10 mm dia. bar @ 250 mm c/c bothways at top and bottom of
base slab.
Splays Bars:- Provide 10 mm dia.bar @ 250 mm c/c as haunch reinforcement.
Free Board :- Provide 150 mm