NOTES

ING 1. ALL DIMENSIONS, CO-ORDINATES AND ELEVATIONS ARE IN MILLIMETERS (MM), UNLESS
VAIL OTHERWISE SPECIFIED.
PRE D
W IN 2. ALL ELEVATIONS ARE WITH REFERENCE TO PLANT H.P.P OF +100000MM.
PLANT 3. MAIN EARTH GRID CONDUCTORS SHALL GENERALLY BE LAID AT A DEPTH OF MINIMUM
NORTH TR
U
MATCHLINE N.301000 mm FOR CON'T 1000 MM BELOW THE GROUND LEVEL, WHERE THIS FOULS WITH OTHER UNDERGROUND
EN
OR SEE DWG NO. &AA-E-ZA 522.4.1C7101X.1001 (EN) FACILITIES, EARTH GRID SHALL BE INSTALLED DEEPER.
TH 4. EARTHING CONDUCTOR AND EARTH ELECTRODE LOCATIONS ARE TENTATIVE ONLY, FINAL
LOCATION SHALL BE SUIT TO SITE CONDITION.

CONNECTED TO
45.9
.5
7 5. THE INSTRUMENT JUNCTION BOXES SHALL BE LOOP EARTHED WITH 6 SQMM COPPER
21
CABLE AND CONNECTED TO JUNCTION BOX RACK. THE INSTRUMENT JUNCTION BOX RACK

MAIN GRID
REFER SHALL BE EARTHED TO MAIN GRID / EARTH BAR THROUGH 25SQMM CABLE.
1 6. ELECTRICAL CONTRACTOR SHALL MEASURE THE EARTH RESISTANCE OF THE GRID AFTER
DETAIL-A
25mm² SUCCESSFUL INSTALLATION. ADDITIONAL EARTH ELECTRODES SHALL BE INSTALLED IF
95mm² i NECESSARY TO ACHIEVE PLANT EARTH RESISTANCE OF LESS THAN 1 OHM.
7. CABLE TRAYS SHALL BE BONDED TOGETHER AND CONNECTED TO MAIN GRID / EARTH BAR
PR AT THE BATTERY LIMIT OF MODULE AND AT THE BOUNDARY BETWEEN HAZARDOUS
EV
WI AILI
02 AND NON-HAZARDOUS AREA.
8. ALL PIPELINES SHALL BE BONDED TOGETHER AND CONNECTED TO THE MAIN GRID /
ND NG 45.9
7 1 EARTH BAR AT THE BATTERY LIMIT OF MODULE AND AT THE BOUNDARY BETWEEN
EL+ 110500 HAZARDOUS AND NON-HAZARDOUS AREA.
STD 25mm² 9. THE CATHODIC PROTECTION EQUIPMENT (AJB, NJB, PDB, NDB, TEST STATIONS) LOCATIONS
02 E2QTB
ARE SHOWN IN VENDOR DRAWING 0012EP9510 E-ZA 4EF.0801.001 (EN), THOSE EQUIPMENT
SHALL BE EARTHED TO MAIN GRID / EARTH BAR THROUGH 25SQMM CABLE.
10. REMOVABLE FENCE AND GATE SHALL BE EARTHED USING 25SQMM CABLE FROM NEARBY
( TYP. 02 ) EARTH BAR / MAIN GRID AS PER INSTALLATION HOOKUP NO. EEC-E1QGC.

2
LEGEND
240mm² b 240 sq.mm BARE CU CABLE CONDUCTOR MAIN EARTHING GRID

240mm² i
240 sq.mm PVC INSULATED CU CABLE CONDUCTOR MAIN EARTHING GRID

95mm² i 95 sq.mm PVC INSULATED CU CABLE CONDUCTOR MAIN EARTHING GRID


STD DETAIL-A 95mm² b 95 sq.mm BARE CU CABLE CONDUCTOR MAIN EARTHING GRID

CONNECTED TO
B1RSB
TYP. DETAIL FOR CABLE TRAY EARTHING 25mm² 25 sq.mm PVC INSULATED CU CABLE EARTH CONDUCTOR
( TYP. 04 )

MAIN GRID
Looking North 6mm² 6 Sq.mm PVC INSULATED CU CABLE EARTH CONDUCTOR
3 02
25mm² 95mm² Al
95 sq.mm ALUMINIUM CONDUCTOR FOR LIGHTNING CONNECTIONS
95mm² i
AIR TERMINAL
STD
STANDARD HOOK-UP DETAILS
XXX
INTERFACE TEST CLAMP
2 ( TYP. XX ) TYPICAL MULTIPLIER

CAD WELD CONNECTION IN EARTH PIT

DRAWING LIMIT E.23000 mm


UNDERGROUND EARTHING
General CONDUCTOR
CONDUCTOR DROPPER
CONDUCTOR RISER

4 EARTHING BAR (10 CONNECTIONS) EARTH ROD

LOCAL CONTROL STATION M MOTOR

DRAWING LIMIT E.31200 mm


JUNCTION BOX DISTRIBUTION BOARDS

WELDING SOCKET STREET LIGHT


STD
BOLTED CONNECTION DUCT BANK
B1TSB
REFERENCE DRAWINGS
CONNECTED TO

( TYP. 04 )
NO. DRAWING TITLE DRAWING NO.
MAIN GRID

General Comments 5 01. PLOT PLAN H2 PLANT &AA-L-ZP 1001 (EN)


1) Please provide the As-built drawing as-built symbol in this 25mm² 02. EARTHING & LIGHTNING PROTECTION SYSTEM INDEX PLAN &AA-E-ZA 522.1000 (EN)
drawing
95mm² i
2) No need to indicate the INSTALLATION HOOK-UP EARTHING AND LIGHTNING
03. &AA-E-ZH 502.1101 (EN)
PROTECTION
EARTHING, LIGHTNING PROTECTION & CATHODIC
04. &AA-E-PA 211.1002 (EN)
PROTECTION CONCEPT
3 SPLIT OF SUPPLY & MATERIAL TAKE OFF (MTO)
05. &AA-E-LB 152.1001 (EN)
- SI METRIC ELECTRICAL COMPONENTS FOR INSTALLATION

KEY PLAN
AILING
PREV G
WIND AILIN
PREV
WIND

42.42

21.5

PR
PR 25 EV
EV .05 AIL
AIL WI ING
WIN ING ND 46

SECTOR A&B SECTOR C&E

9502Y02
IG BACK-UP UNIT
(24m X 10m)

M
*

PRODUCTS
STD
02
*

**

E2QBP-1
CONNECTED TO

**

**
( TYP. 02 )
MAIN GRID

REFER
7 DETAIL-A
25mm²
95mm² i THIS DRAWING

H. PAL V. KAV D. BHATT


RE-IFC 02 09.09.20 RE-ISSUED FOR CONSTRUCTION /ENED /ENED /ENEE
H. PAL V. KAV T. TAL
IFC 01 19.03.20 ISSUED FOR CONSTRUCTION /ENED /ENED /ENEE
8 STATUS ISSUE DATE DESCRIPTION PREPARED CHECKED APPROVED

LINDE GAS SINGAPORE (LGS)


LINDE ENGINEERING (LE)
VALID ONLY FOR ELECTRICAL
EARTHING & LIGHTNING AND INSTALLATION ! Plant Description

A B New Pitch Gasification Plant


civil and/or process equipment arrangement
or size alterations NOT considered !
Title: LAYOUT & DESIGN DRAWING
MATCHLINE N.252600 mm FOR CON'T
SEE DWG NO. &AA-E-ZA 522.4.1C5901X.1002 (EN) THE EXACT LOCATION SHALL BE DEFINED EARTHING & LIGHTNING PROTECTION SYSTEM
DURING CONSTRUCTION PHASE ON SITE ! LOT 4-1C5901X STICK BUILT
LE Project No. LGS Project No.
2910BX58 SG718204
PLAN AT EL+ 100000 TO EL+ 105000
1000

2000

4000

6000

8000

10000
LE Project Code LGS Project Code
Singapore SLUP
Looking Plan LE Doc. No. LGS Doc. No.
&AA-E-ZA 522.4.1C5901X.1001 (EN) -

SCALE 1:100 Scale: 1:100 Size: A1 Sheet 01 of 01 Issue 02

You might also like