SIARAN KHAS

Special Release 2
SEMENANJUNG MALAYSIA
PENINSULAR MALAYSIA

(UNTUK KERJA-KERJA PEMBINAAN BANGUNAN


DAN STRUKTUR)
(For Building and Structural Works)

DISEMBER
DECEMBER 2017

JABATAN PERANGKAAN MALAYSIA


DEPARTMENT OF STATISTICS, MALAYSIA

Tarikh: 10 Januari 2018


Date: 10 January 2018
KANDUNGAN
CONTENTS

Muka Surat
Page

Ringkasan penemuan iii


Summary of findings

Jadual 1A : Indeks kos bahan binaan bangunan (Julai 2012=100) mengikut kategori 1
bangunan dan kawasan (tanpa bar keluli)
Table 1A : Building materials cost index (July 2012=100) by category of building
and region (without steel bars)

Jadual 1B : Indeks kos bahan binaan bangunan (Julai 2012=100) mengikut kategori 5
bangunan dan kawasan (termasuk bar keluli)
Table 1B : Building materials cost index (July 2012=100) by category of building
and region (with steel bars)

Jadual 2 : Indeks harga seunit bagi: 9


Table 2 : Unit price index for:
- Batu bata & dinding/Bricks & wall
- Kaca/Glass
- Batu baur/Aggregates
- Bahan siling/Ceiling materials
- Bahan bumbung/Roofing materials
- Kayu/Timber
- Papan lapis/Plywood
- Lengkapan kebersihan/Sanitary fittings
- Jubin lantai & dinding/Floor & wall tiles
- Bahan kerja paip/Plumbing materials
- Keratan keluli & logam/Steel & metal sections
- Pasir/Sand
- Cat/Paints

Jadual 3 : Indeks harga seunit bagi: 14


Table 3 : Unit price index for:
- Cerucuk keping jenis 'U'/'U' type sheet piles
- Keratan geronggang segiempat sama/Square hollow sections
- Keratan geronggang segiempat tepat/Rectangular hollow sections
- Rasuk semesta/Universal beams
- Gelegar keluli guling/Rolled steel joists
- Sesiku sama/Equal angles
- Sesiku tak sama/Unequal angles
- Sesalur 'U'/'U' channels
- Sesalur bibir/Lipped channels

Lampiran A Jadual faktor pelarasan (indeks tanpa bar keluli) 17


Appendix A Adjustment factor table (index without steel bars)

Lampiran B Jadual faktor pelarasan (indeks termasuk bar keluli) 18


Appendix B Adjustment factor table (index with steel bars)

Lampiran C Contoh mengira indeks lama IKB (Julai 2008=100) dengan 19


menggunakan indeks baru IKB (Julai 2012=100)
Appendix C Example for calculating the old BCI (July 2008=100) using the
new index BCI (July 2012=100)

Nota teknikal 21
Technical notes

Jadual tarikh pengeluaran Siaran Khas 2 (Untuk Kerja-kerja Pembinaan Bangunan 23


dan Struktur), Semenanjung Malaysia, Januari-Disember 2017
Schedule of release dates for Special Release 2 (For Building and Structural Works),
Peninsular Malaysia, January-December 2017

-i-
RINGKASAN PENEMUAN
SUMMARY OF FINDINGS
Indeks Kos Bahan Binaan Bangunan Building Material Cost Index
Semenanjung Malaysia Peninsular Malaysia
Disember 2017 December 2017

Indeks Kos Bahan Binaan Bangunan (IKB) (tanpa The Building Material Cost Index (BCI) (without
bar keluli dan termasuk bar keluli) bagi semua steel bars and with steel bars) for all category of
kategori bangunan di semua kawasan building in all regions showed increases except
menunjukkan peningkatan pada Disember 2017 for (R.C.) piling in region F showed a decrease
kecuali cerucuk (K.T.) di kawasan F menunjukkan on December 2017 as compared to the previous
penurunan berbanding bulan sebelumnya. month. (Table 1A & 1B)
(Jadual 1A & 1B)

Indeks harga seunit bahan binaan yang The unit price indices of building materials that
menunjukkan perubahan pada Disember 2017 showed changes in December 2017 were
adalah simen di kawasan A (-1.5 mata); besi di cement in region A (-1.5 points); steel in region
kawasan A (0.8 mata), B (1.4 mata), C (2.2 mata) A (0.8 points), B (1.4 points), C (2.2 points) and
dan F (-0.9 mata); pasir di kawasan B (3.5 mata); F (-0.9 points); sand in region B (3.5 points);
batu bata & dinding di kawasan A (0.1 mata), bricks & wall in region A (0.1 points),
C (-0.3 mata) dan F (0.6 mata); kayu di semua C (-0.3 points) and F (0.6 points); timber in all
kawasan (2.9 mata); bahan siling di kawasan regions (2.9 points); ceiling materials in region
C (-0.2 mata) dan E (4.4 mata); keratan keluli & C (-0.2 points) and E (4.4 points); steel & metal
logam di kawasan A (-0.7 mata), C (0.1 mata) dan sections in region A (-0.7 points), C (0.1 points)
E (1.4 mata); bahan kerja paip di kawasan and E (1.4 points); plumbing materials in region
A (0.3 mata) dan F (0.5 mata); cat di kawasan A (0.3 points) and F (0.5 points); paints in region
C (-0.1 mata) dan papan lapis di semua kawasan C (-0.1 points) and plywood in all regions
(-1.3 mata). (Jadual 2) (-1.3 points). (Table 2)

Indeks harga seunit bagi keluli struktur di The unit price indices for structural steel in

Selangor dan Wilayah Persekutuan Kuala Lumpur Selangor and Wilayah Persekutuan Kuala

mencatatkan peningkatan bagi keratan Lumpur recorded increases for square hollow

geronggang segi empat sama, keratan sections, rectangular hollow, equal angels,

geronggang segi empat tepat, sesiku sama, unequal angles, U channels and lipped channels

sesiku tak sama, sesalur U dan sesalur bibir pada in December 2017. In contrast, U type sheet

Disember 2017. Sebaliknya, cerucuk keping piles, universal beams and rolled steel joists

jenis U, rasuk semesta dan gelegar keluli guling showed decreases as compared to the previous

menunjukkan penurunan berbanding bulan month. (Table 3)

sebelumnya. (Jadual 3)

iii
INDEKS KOS BAHAN BINAAN BANGUNAN
(JULAI 2012=100)
SEMENANJUNG MALAYSIA

BUILDING MATERIALS COST INDEX


(JULY 2012=100)
PENINSULAR MALAYSIA

(INDEKS TANPA BAR KELULI)


(INDEX WITHOUT STEEL BARS)
Jadual 1A: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan
(tanpa bar keluli)
Table 1A: Building materials cost index by category of building and region (without steel bars)

(Julai 2012=100)
(July 2012=100)

Kawasan*
Kategori Bangunan Tempoh Region
Category of Building Period
A B C D E F

(1) Bangunan (K.T.) 2016 Dis 114.9 115.6 115.5 115.1 119.0 115.6
Satu Tingkat 2017 Jan 115.0 115.7 115.5 115.1 119.0 115.6
Single - Storey (R.C.) Feb 115.4 116.0 115.5 115.1 119.0 115.7
Building Mac 115.5 116.1 115.6 115.1 119.1 115.9
Apr 115.6 116.2 115.6 115.1 119.1 115.9
Mei 116.0 116.6 115.9 115.5 119.4 116.2
Jun 115.8 116.3 115.8 115.4 119.3 116.1
Jul 115.8 116.3 115.7 115.4 119.4 116.1
Ogos 114.4 114.9 114.6 113.9 117.9 114.9
Sept 112.4 112.8 112.2 111.4 115.5 112.7
Okt 111.0 111.3 110.9 109.9 113.8 111.1
Nov 111.0 111.4 110.9 110.0 113.9 111.2
Dis 112.5 113.0 112.4 111.6 115.6 112.7

(2) Bangunan (K.T.) 2016 Dis 111.9 112.8 113.1 112.9 117.1 112.8
2−4 Tingkat 2017 Jan 112.1 112.9 113.2 112.9 117.1 112.8
(Berbumbung Rata) Feb 112.6 113.3 113.3 112.9 117.1 112.9
2−4 Storey (R.C.) Mac 112.7 113.4 113.3 112.9 117.2 113.2
Building (Flat Roof) Apr 112.7 113.6 113.4 112.9 117.2 113.2
Mei 113.1 114.0 113.7 113.2 117.5 113.5
Jun 112.8 113.5 113.5 113.1 117.4 113.5
Jul 112.8 113.6 113.4 113.1 117.5 113.4
Ogos 111.6 112.3 112.4 111.7 116.0 112.3
Sept 110.2 110.7 110.4 109.5 113.9 110.4
Okt 108.8 109.2 109.2 108.1 112.1 108.7
Nov 108.7 109.2 109.1 108.2 112.2 108.8
Dis 109.9 110.5 110.2 109.4 113.6 109.8

(3) Bangunan (K.T.) 2016 Dis 112.8 113.9 114.1 113.8 117.7 113.7
2−4 Tingkat 2017 Jan 113.1 114.0 114.1 113.8 117.7 113.7
(Berbumbung Curam) Feb 113.5 114.3 114.2 113.9 117.8 113.8
2−4 Storey (R.C.) Mac 113.6 114.4 114.3 113.9 117.8 114.0
Building (Pitched Roof) Apr 113.7 114.6 114.3 113.9 117.8 114.1
Mei 114.0 115.0 114.6 114.2 118.1 114.4
Jun 113.7 114.5 114.4 114.1 118.0 114.3
Jul 113.8 114.5 114.4 114.1 118.1 114.2
Ogos 112.6 113.3 113.4 112.7 116.7 113.2
Sept 111.1 111.7 111.4 110.5 114.6 111.4
Okt 109.8 110.1 110.2 109.1 112.8 109.8
Nov 109.7 110.2 110.1 109.2 112.9 109.8
Dis 111.0 111.6 111.3 110.5 114.4 110.9

Nota/Note :
K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
* Lihat nota kaki di hujung Jadual 1A/See footnotes at end of Table 1A

-1-
Jadual 1A: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan
(tanpa bar keluli) (samb.)
Table 1A: Building materials cost index by category of building and region (without steel bars) (cont'd)

(Julai 2012=100)
(July 2012=100)

Kawasan*
Kategori Bangunan Tempoh Region
Category of Building Period
A B C D E F

(4) Bangunan (K.T.) 2016 Dis 111.4 113.0 112.9 112.7 115.9 112.3
5 Tingkat dan Lebih 2017 Jan 111.7 113.1 112.9 112.7 115.9 112.3
(Untuk Penginapan) Feb 112.3 113.4 112.9 112.8 115.9 112.4
5 Storey and Above Mac 112.4 113.5 113.0 112.8 115.9 112.7
(R.C.) Building Apr 112.5 113.7 113.1 112.8 115.9 112.7
(For Accommodation) Mei 112.8 114.0 113.3 113.0 116.2 113.0
Jun 112.6 113.6 113.1 112.9 116.1 112.9
Jul 112.6 113.6 113.1 112.9 116.2 112.9
Ogos 111.6 112.4 112.2 111.7 114.9 112.0
Sept 110.5 111.1 110.5 109.8 113.1 110.5
Okt 109.4 109.8 109.4 108.6 111.5 109.0
Nov 109.3 109.8 109.3 108.7 111.5 109.0
Dis 110.3 111.0 110.2 109.8 112.8 110.0

(5) Bangunan (K.T.) 2016 Dis 111.3 112.3 112.7 112.7 118.8 112.4
5 Tingkat dan Lebih 2017 Jan 111.6 112.4 112.8 112.7 118.8 112.4
(Untuk Pejabat) Feb 112.1 112.9 112.9 112.7 118.8 112.6
5 Storey and Above Mac 112.2 113.1 113.0 112.7 118.8 113.0
(R.C.) Building Apr 112.3 113.3 113.0 112.7 118.8 113.0
(For Office) Mei 112.6 113.7 113.3 112.9 119.1 113.3
Jun 112.3 113.2 113.1 112.9 119.0 113.2
Jul 112.4 113.2 113.1 112.9 119.1 113.1
Ogos 111.3 112.1 112.3 111.6 117.8 112.4
Sept 110.3 111.0 110.6 109.7 115.9 110.8
Okt 109.2 109.5 109.6 108.4 114.2 109.3
Nov 109.0 109.6 109.5 108.5 114.3 109.2
Dis 110.1 110.7 110.4 109.6 115.7 110.1

(6) Bangunan Kayu 2016 Dis 119.3 119.5 119.4 119.4 120.7 119.4
Timber Building 2017 Jan 119.3 119.5 119.4 119.4 120.7 119.4
Feb 119.4 119.6 119.4 119.4 120.7 119.4
Mac 119.4 119.6 119.5 119.4 120.8 119.5
Apr 119.4 119.7 119.5 119.4 120.8 119.5
Mei 119.9 120.2 120.0 119.9 121.2 120.0
Jun 119.8 120.0 119.8 119.7 121.1 119.9
Jul 119.8 120.0 119.8 119.7 121.1 119.9
Ogos 117.6 117.8 117.7 117.5 118.9 117.7
Sept 114.0 114.1 114.0 113.8 115.2 114.1
Okt 111.8 112.0 111.8 111.6 113.0 111.9
Nov 111.9 112.1 112.0 111.8 113.1 112.1
Dis 114.3 114.5 114.4 114.2 115.6 114.5

Nota/Note :
K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
* Lihat nota kaki di hujung Jadual 1A/See footnotes at end of Table 1A

-2-
Jadual 1A: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan
(tanpa bar keluli) (samb.)
Table 1A: Building materials cost index by category of building and region (without steel bars) (cont'd)

(Julai 2012=100)
(July 2012=100)

Kawasan*
Kategori Bangunan Tempoh Region
Category of Building Period
A B C D E F

(7) Cerucuk Kayu 2016 Dis 122.2 122.2 122.2 122.2 122.2 122.2
Timber Piling 2017 Jan 122.2 122.2 122.2 122.2 122.2 122.2
Feb 122.2 122.2 122.2 122.2 122.2 122.2
Mac 122.2 122.2 122.2 122.2 122.2 122.2
Apr 122.2 122.2 122.2 122.2 122.2 122.2
Mei 122.8 122.8 122.8 122.8 122.8 122.8
Jun 122.6 122.6 122.6 122.6 122.6 122.6
Jul 122.6 122.6 122.6 122.6 122.6 122.6
Ogos 120.1 120.1 120.1 120.1 120.1 120.1
Sept 115.7 115.7 115.7 115.7 115.7 115.7
Okt 113.3 113.3 113.3 113.3 113.3 113.3
Nov 113.4 113.4 113.4 113.4 113.4 113.4
Dis 116.3 116.3 116.3 116.3 116.3 116.3

(8) Cerucuk K.T. 2016 Dis 106.2 111.3 111.8 111.6 112.8 106.8
R.C. Piling 2017 Jan 106.6 111.3 111.8 111.6 112.8 106.8
Feb 107.0 111.3 111.8 111.6 112.8 106.8
Mac 107.1 111.3 111.8 111.6 112.8 107.1
Apr 107.1 111.3 111.8 111.6 112.8 107.1
Mei 107.1 111.4 111.9 111.7 112.9 107.3
Jun 106.5 110.5 111.8 111.7 112.9 107.3
Jul 106.6 110.5 111.8 111.7 112.9 107.0
Ogos 106.4 109.7 111.4 110.8 112.0 107.0
Sept 106.5 109.6 110.8 109.9 111.1 106.7
Okt 105.7 108.0 109.9 109.0 109.2 104.9
Nov 105.2 108.0 109.0 109.0 109.2 104.7
Dis 105.6 108.7 109.0 109.4 109.6 104.4

Nota/Note :
K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete

* Kawasan/Region
A = Pulau Pinang, Kedah dan Perlis
B = Perak
C = Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan dan Selangor
D = Johor
E = Pahang
F = Kelantan dan Terengganu

-3-
INDEKS KOS BAHAN BINAAN BANGUNAN
(JULAI 2012=100)
SEMENANJUNG MALAYSIA

BUILDING MATERIALS COST INDEX


(JULY 2012=100)
PENINSULAR MALAYSIA

(INDEKS TERMASUK BAR KELULI)


(INDEX WITH STEEL BARS)
Jadual 1B: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan
(termasuk bar keluli)
Table 1B: Building materials cost index by category of building and region (with steel bars)

(Julai 2012=100)
(July 2012=100)

Kawasan*
Kategori bangunan Tempoh Region
Category of building Period
A B C D E F

(1) Bangunan (K.T.) 2016 Dis 113.9 113.8 114.5 113.9 118.3 114.5
Satu Tingkat 2017 Jan 114.3 114.2 114.5 113.9 118.3 114.6
Single - Storey (R.C.) Feb 114.7 114.7 114.7 113.9 118.3 114.8
Building Mac 114.8 114.9 114.8 113.9 118.4 115.0
Apr 114.8 115.0 114.8 113.9 118.4 115.0
Mei 115.1 115.5 115.1 114.2 118.7 115.3
Jun 114.9 115.2 114.8 114.1 118.6 115.2
Jul 114.9 115.3 114.8 114.1 118.7 115.2
Ogos 113.8 114.2 113.9 112.7 117.3 114.1
Sept 112.1 112.5 111.7 110.4 115.0 112.3
Okt 110.8 111.1 110.5 109.0 113.4 110.8
Nov 110.7 111.0 110.7 109.1 113.5 110.9
Dis 112.2 112.6 112.2 110.6 115.1 112.2

(2) Bangunan (K.T.) 2016 Dis 110.3 109.7 111.5 110.8 116.0 111.0
2−4 Tingkat 2017 Jan 110.9 110.2 111.6 110.8 116.0 111.2
(Berbumbung Rata) Feb 111.4 111.0 111.8 110.8 116.0 111.5
2−4 Storey (R.C.) Mac 111.5 111.3 111.9 110.8 116.0 111.7
Building (Flat Roof) Apr 111.6 111.5 112.0 110.8 116.0 111.9
Mei 111.8 112.0 112.2 111.1 116.3 112.1
Jun 111.4 111.7 112.0 111.0 116.2 112.0
Jul 111.4 111.7 111.9 111.0 116.3 111.9
Ogos 110.6 111.2 111.2 109.7 115.0 111.2
Sept 109.8 110.3 109.6 107.8 113.1 109.8
Okt 108.6 108.9 108.5 106.5 111.5 108.5
Nov 108.3 108.7 108.8 106.5 111.6 108.3
Dis 109.5 110.0 110.0 107.7 112.8 109.2

(3) Bangunan (K.T.) 2016 Dis 111.4 111.2 112.6 112.0 116.7 112.1
2−4 Tingkat 2017 Jan 111.9 111.7 112.7 112.0 116.7 112.3
(Berbumbung Curam) Feb 112.4 112.3 112.9 112.0 116.7 112.5
2−4 Storey (R.C.) Mac 112.5 112.6 113.0 112.0 116.8 112.7
Building (Pitched Roof) Apr 112.6 112.7 113.0 112.0 116.8 112.9
Mei 112.8 113.2 113.3 112.3 117.1 113.1
Jun 112.4 112.9 113.0 112.2 117.0 113.0
Jul 112.5 112.9 113.0 112.2 117.1 112.9
Ogos 111.7 112.3 112.3 110.9 115.8 112.2
Sept 110.7 111.2 110.6 109.0 113.8 110.8
Okt 109.5 109.8 109.5 107.7 112.2 109.5
Nov 109.3 109.7 109.8 107.8 112.3 109.3
Dis 110.6 111.0 111.0 108.9 113.6 110.3

Nota/Note :
K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
* Lihat nota kaki di hujung Jadual 1B/See footnotes at end of Table 1B

-5-
Jadual 1B: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan
(termasuk bar keluli) (samb.)
Table 1B: Building materials cost index by category of building and region (with steel bars) (cont'd)

(Julai 2012=100)
(July 2012=100)

Kawasan*
Kategori bangunan Tempoh Region
Category of building Period
A B C D E F

(4) Bangunan (K.T.) 2016 Dis 109.6 109.3 110.9 110.2 114.7 110.3
5 Tingkat dan Lebih 2017 Jan 110.3 109.9 111.0 110.2 114.7 110.5
(Untuk Penginapan) Feb 110.9 110.7 111.3 110.3 114.7 110.7
5 Storey and Above Mac 111.1 111.0 111.4 110.3 114.7 111.0
(R.C.) Building Apr 111.2 111.2 111.4 110.3 114.7 111.2
(For Accommodation) Mei 111.3 111.7 111.6 110.5 114.9 111.4
Jun 110.9 111.4 111.3 110.4 114.9 111.3
Jul 110.9 111.4 111.3 110.4 114.9 111.2
Ogos 110.4 111.2 110.8 109.4 113.8 110.7
Sept 110.0 110.6 109.5 107.7 112.2 109.8
Okt 109.0 109.4 108.6 106.6 110.8 108.7
Nov 108.7 109.1 108.9 106.7 110.9 108.5
Dis 109.8 110.3 110.0 107.7 111.9 109.2

(5) Bangunan (K.T.) 2016 Dis 109.5 108.7 110.8 110.2 117.2 110.5
5 Tingkat dan Lebih 2017 Jan 110.2 109.4 110.9 110.2 117.2 110.7
(Untuk Pejabat) Feb 110.8 110.3 111.2 110.3 117.3 110.0
5 Storey and Above Mac 111.0 110.7 111.4 110.3 117.3 111.3
(R.C.) Building Apr 111.1 110.9 111.4 110.3 117.3 111.5
(For Office) Mei 111.2 111.4 111.6 110.5 117.6 111.7
Jun 110.7 111.0 111.4 110.4 117.5 111.6
Jul 110.8 111.0 111.3 110.4 117.5 111.5
Ogos 110.2 110.9 111.0 109.3 116.4 111.0
Sept 109.9 110.4 109.6 107.6 114.7 110.1
Okt 108.9 109.2 108.7 106.5 113.3 108.9
Nov 108.6 108.9 109.1 106.6 113.3 108.7
Dis 109.6 110.1 110.2 107.6 114.5 109.3

(6) Bangunan Kayu 2016 Dis 119.3 119.5 119.4 119.4 120.7 119.4
Timber Building 2017 Jan 119.3 119.5 119.4 119.4 120.7 119.4
Feb 119.4 119.6 119.4 119.4 120.7 119.4
Mac 119.4 119.6 119.5 119.4 120.8 119.5
Apr 119.4 119.7 119.5 119.4 120.8 119.5
Mei 119.9 120.2 120.0 119.9 121.2 120.0
Jun 119.8 120.0 119.8 119.7 121.1 119.9
Jul 119.8 120.0 119.8 119.7 121.1 119.9
Ogos 117.6 117.8 117.7 117.5 118.9 117.7
Sept 114.0 114.1 114.0 113.8 115.2 114.1
Okt 111.8 112.0 111.8 111.6 113.0 111.9
Nov 111.9 112.1 112.0 111.8 113.1 112.1
Dis 114.3 114.5 114.4 114.2 115.6 114.5

Nota/Note :
K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
* Lihat nota kaki di hujung Jadual 1B/See footnotes at end of Table 1B

-6-
Jadual 1B: Indeks kos bahan binaan bangunan mengikut kategori bangunan dan kawasan
(termasuk bar keluli) (samb.)
Table 1B: Building materials cost index by category of building and region (with steel bars) (cont'd)

(Julai 2012=100)
(July 2012=100)

Kawasan*
Kategori bangunan Tempoh Region
Category of building Period
A B C D E F

(7) Cerucuk Kayu 2016 Dis 122.2 122.2 122.2 122.2 122.2 122.2
Timber Piling 2017 Jan 122.2 122.2 122.2 122.2 122.2 122.2
Feb 122.2 122.2 122.2 122.2 122.2 122.2
Mac 122.2 122.2 122.2 122.2 122.2 122.2
Apr 122.2 122.2 122.2 122.2 122.2 122.2
Mei 122.8 122.8 122.8 122.8 122.8 122.8
Jun 122.6 122.6 122.6 122.6 122.6 122.6
Jul 122.6 122.6 122.6 122.6 122.6 122.6
Ogos 120.1 120.1 120.1 120.1 120.1 120.1
Sept 115.7 115.7 115.7 115.7 115.7 115.7
Okt 113.3 113.3 113.3 113.3 113.3 113.3
Nov 113.4 113.4 113.4 113.4 113.4 113.4
Dis 116.3 116.3 116.3 116.3 116.3 116.3

(8) Cerucuk K.T. 2016 Dis 103.1 102.1 106.9 105.5 110.6 103.3
R.C. Piling 2017 Jan 104.5 103.5 107.2 105.5 110.6 103.9
Feb 105.1 105.0 107.8 105.5 110.6 104.2
Mac 105.3 105.5 107.9 105.5 110.6 104.5
Apr 105.3 105.5 107.9 105.5 110.6 104.8
Mei 105.0 106.1 107.9 105.6 110.7 104.8
Jun 104.0 105.7 107.6 105.6 110.7 104.6
Jul 104.1 105.7 107.6 105.6 110.7 104.4
Ogos 104.9 107.2 108.1 105.0 110.1 105.1
Sept 106.5 108.6 108.2 104.3 109.5 106.0
Okt 105.9 107.5 107.6 103.7 108.1 105.4
Nov 105.1 106.7 108.2 103.7 108.1 104.6
Dis 105.7 107.6 108.8 104.0 108.4 104.1

Nota/Note :
K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete
* Kawasan/Region
A = Pulau Pinang, Kedah dan Perlis
B = Perak
C = Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan dan Selangor
D = Johor
E = Pahang
F = Kelantan dan Terengganu

-7-
INDEKS HARGA SEUNIT
BAHAN BINAAN BANGUNAN
(JULAI 2012=100)
SEMENANJUNG MALAYSIA

UNIT PRICE INDEX FOR


BUILDING MATERIALS
(JULY 2012=100)
PENINSULAR MALAYSIA
Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,
kayu, papan lapis, lengkapan kebersihan, jubin lantai & dinding, bahan kerja paip, keratan
keluli & logam, pasir dan cat
Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, timber, plywood,
sanitary fittings, floor & wall tiles, plumbing materials, steel & metal sections, sand and paints

(Julai 2012=100)
(July 2012=100)
Kawasan*
Tempoh Region
Item
Period
A B C D E F

Bahan Binaan
Building Materials
(1) Batu Bata & 2016 Dis 105.8 109.4 103.9 105.1 99.4 111.5
Dinding 2017 Jan 106.1 109.4 103.9 105.1 99.4 111.5
Bricks & Wall Feb 106.2 109.4 103.9 105.2 99.4 111.3
Mac 106.2 109.4 103.9 105.2 99.4 111.3
Apr 106.2 109.4 104.1 105.2 99.4 111.4
Mei 106.2 109.4 104.1 105.3 99.4 111.2
Jun 106.2 109.4 102.7 105.3 99.4 111.2
Jul 106.0 109.4 101.9 105.3 98.6 111.2
Ogos 106.0 109.4 101.8 105.3 98.6 110.6
Sept 106.2 109.0 101.8 105.2 98.6 110.6
Okt 106.2 109.6 101.8 105.2 98.6 111.0
Nov 106.2 109.6 101.9 105.2 98.6 113.1
Dis 106.3 109.6 101.6 105.2 98.6 113.7

(2) Kaca 2016 Dis 111.9 112.7 115.7 110.8 109.8 111.9
Glass 2017 Jan 111.9 113.9 115.9 110.8 109.8 112.7
Feb 111.9 113.9 115.9 110.8 109.8 112.7
Mac 111.9 113.9 115.9 110.8 109.8 112.7
Apr 113.1 113.9 115.9 110.8 109.8 112.7
Mei 114.3 113.9 115.9 110.8 109.8 112.7
Jun 114.3 113.9 115.9 110.8 109.8 112.7
Jul 114.3 113.9 115.9 110.8 109.8 112.7
Ogos 114.3 113.9 115.9 110.8 109.8 112.7
Sept 114.3 113.9 115.9 110.8 109.8 112.7
Okt 114.3 113.9 115.9 110.8 109.8 112.7
Nov 114.3 113.9 115.9 110.8 109.8 112.7
Dis 114.3 113.9 115.9 110.8 109.8 112.7

(3) Batu Baur 2016 Dis 109.9 109.3 125.5 111.9 108.8 99.6
Aggregates 2017 Jan 110.3 109.3 125.5 111.9 108.8 99.6
Feb 110.3 109.3 125.5 111.9 108.8 99.6
Mac 110.7 109.3 125.5 111.9 108.8 99.6
Apr 110.7 109.3 125.5 111.9 108.8 99.6
Mei 110.3 109.3 125.6 111.9 108.8 99.8
Jun 110.3 109.3 125.1 111.9 108.8 100.0
Jul 110.3 109.3 125.9 111.9 108.8 100.0
Ogos 110.3 109.3 125.9 111.9 108.8 98.0
Sept 110.3 109.3 126.1 111.9 108.8 98.0
Okt 110.3 109.3 126.1 111.9 108.8 98.0
Nov 110.3 109.3 126.1 111.5 108.8 98.0
Dis 110.3 109.3 126.1 111.5 108.8 98.0

* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

-9-
Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,
kayu, papan lapis, lengkapan kebersihan, jubin lantai & dinding, bahan kerja paip, keratan
keluli & logam, pasir dan cat
Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, timber, plywood,
sanitary fittings, floor & wall tiles, plumbing materials, steel & metal sections, sand and paints

(Julai 2012=100)
(July 2012=100)
Kawasan*
Tempoh Region
Item
Period
A B C D E F

Bahan Binaan
Building Materials
(4) Bahan Siling 2016 Dis 103.2 107.5 108.4 110.3 155.6 103.5
Ceiling Materials 2017 Jan 103.4 107.5 108.6 110.3 155.6 103.5
Feb 103.9 107.5 108.6 110.3 155.6 103.5
Mac 103.9 107.5 108.6 110.6 155.6 103.5
Apr 103.9 107.5 108.6 110.6 155.6 103.9
Mei 103.9 107.7 108.6 110.2 155.6 105.0
Jun 103.9 107.7 108.6 110.2 155.6 105.0
Jul 103.9 107.7 108.6 110.2 155.6 105.0
Ogos 104.0 107.7 108.4 110.2 155.6 105.0
Sept 104.0 107.3 108.6 110.2 155.6 105.0
Okt 104.0 107.4 108.6 110.2 155.6 105.0
Nov 104.0 107.4 108.6 110.2 155.6 105.0
Dis 104.0 107.4 108.4 110.2 160.0 105.0

(5) Bahan Bumbung 2016 Dis 108.6 105.9 107.4 107.3 107.6 108.7
Roofing Materials 2017 Jan 108.6 105.9 107.4 107.3 107.6 108.7
Feb 108.6 105.9 107.4 107.3 107.6 108.7
Mac 108.6 105.9 107.4 107.3 107.6 108.7
Apr 108.6 105.9 107.4 107.3 107.6 108.7
Mei 108.7 105.9 107.5 107.3 107.6 108.7
Jun 108.7 105.9 107.0 107.3 107.6 108.7
Jul 108.7 105.9 107.3 107.3 107.6 108.7
Ogos 108.7 105.9 109.7 107.3 107.6 108.8
Sept 108.7 105.9 109.9 107.3 107.6 112.8
Okt 108.7 106.1 111.2 107.3 107.6 112.8
Nov 108.7 106.1 111.2 107.3 107.6 112.8
Dis 108.7 106.1 111.2 107.3 107.6 112.8

(6a) Kayu 2016 Dis 122.2 122.2 122.2 122.2 122.2 122.2
Timber 2017 Jan 122.2 122.2 122.2 122.2 122.2 122.2
Feb 122.2 122.2 122.2 122.2 122.2 122.2
Mac 122.2 122.2 122.2 122.2 122.2 122.2
Apr 122.2 122.2 122.2 122.2 122.2 122.2
Mei 122.8 122.8 122.8 122.8 122.8 122.8
Jun 122.6 122.6 122.6 122.6 122.6 122.6
Jul 122.6 122.6 122.6 122.6 122.6 122.6
Ogos 120.1 120.1 120.1 120.1 120.1 120.1
Sept 115.7 115.7 115.7 115.7 115.7 115.7
Okt 113.3 113.3 113.3 113.3 113.3 113.3
Nov 113.4 113.4 113.4 113.4 113.4 113.4
Dis 116.3 116.3 116.3 116.3 116.3 116.3

* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

-10-
Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,
kayu, papan lapis, lengkapan kebersihan, jubin lantai & dinding, bahan kerja paip, keratan
keluli & logam, pasir dan cat
Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, timber, plywood,
sanitary fittings, floor & wall tiles, plumbing materials, steel & metal sections, sand and paints

(Julai 2012=100)
(July 2012=100)
Kawasan*
Tempoh Region
Item
Period
A B C D E F

Bahan Binaan
Building Materials
(6b) Papan Lapis 2016 Dis 85.6 85.6 85.6 85.6 85.6 85.6
Plywood 2017 Jan 85.6 85.6 85.6 85.6 85.6 85.6
Feb 85.6 85.6 85.6 85.6 85.6 85.6
Mac 85.6 85.6 85.6 85.6 85.6 85.6
Apr 85.6 85.6 85.6 85.6 85.6 85.6
Mei 85.6 85.6 85.6 85.6 85.6 85.6
Jun 85.6 85.6 85.6 85.6 85.6 85.6
Jul 85.6 85.6 85.6 85.6 85.6 85.6
Ogos 83.0 83.0 83.0 83.0 83.0 83.0
Sept 83.0 83.0 83.0 83.0 83.0 83.0
Okt 80.3 80.3 80.3 80.3 80.3 80.3
Nov 80.3 80.3 80.3 80.3 80.3 80.3
Dis 79.0 79.0 79.0 79.0 79.0 79.0

(7) Lengkapan 2016 Dis 108.6 123.3 114.8 106.8 112.1 111.4
Kebersihan 2017 Jan 108.6 124.4 114.7 106.8 112.1 111.4
Sanitary Fittings Feb 110.0 129.1 114.7 106.8 112.1 111.4
Mac 110.2 131.6 114.7 106.8 112.1 111.4
Apr 110.2 134.0 114.7 106.8 112.1 111.4
Mei 110.3 134.0 114.7 106.8 112.1 111.4
Jun 110.3 134.0 114.7 106.8 112.1 111.4
Jul 110.3 134.4 114.7 106.8 114.0 111.4
Ogos 110.3 134.4 114.7 106.8 114.0 112.4
Sept 110.3 134.4 114.7 106.8 114.0 112.4
Okt 110.3 134.4 114.7 106.8 114.0 112.6
Nov 110.3 134.4 114.9 106.8 114.0 112.6
Dis 110.3 134.4 114.9 106.8 114.0 112.6

(8) Jubin Lantai 2016 Dis 116.9 114.3 114.7 105.7 136.6 118.3
& Dinding 2017 Jan 116.9 113.9 114.7 105.7 136.6 118.3
Floor & Feb 116.9 114.0 114.7 105.7 137.3 118.3
Wall Tiles Mac 116.9 114.0 114.7 105.7 137.7 118.3
Apr 116.9 114.0 114.7 105.7 137.7 118.3
Mei 116.9 114.0 114.7 105.7 138.8 118.3
Jun 116.9 114.0 114.7 105.7 138.8 118.3
Jul 116.9 114.0 114.7 105.7 139.4 118.3
Ogos 116.9 114.0 115.2 105.7 139.4 118.3
Sept 116.9 114.0 115.2 105.7 139.4 118.3
Okt 116.9 114.4 115.2 105.7 139.4 118.3
Nov 116.9 114.7 115.2 105.7 139.4 118.3
Dis 116.9 114.7 115.2 105.7 139.4 118.3

* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

-11-
Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,
kayu, papan lapis, lengkapan kebersihan, jubin lantai & dinding, bahan kerja paip, keratan
keluli & logam, pasir dan cat
Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, timber, plywood,
sanitary fittings, floor & wall tiles, plumbing materials, steel & metal sections, sand and paints

(Julai 2012=100)
(July 2012=100)
Kawasan*
Tempoh Region
Item
Period
A B C D E F

Bahan Binaan
Building Materials
(9) Bahan Kerja Paip 2016 Dis 110.5 112.7 104.6 107.0 110.3 108.2
Plumbing Materials 2017 Jan 111.8 113.0 104.6 107.0 110.3 108.2
Feb 115.2 113.0 104.6 107.4 110.3 108.2
Mac 116.0 113.0 104.6 107.4 110.3 108.2
Apr 116.6 113.0 104.7 107.4 110.3 108.6
Mei 117.4 113.0 104.7 107.4 110.3 108.6
Jun 117.4 113.0 104.7 107.4 110.3 108.6
Jul 117.4 113.0 104.6 107.4 110.2 108.7
Ogos 117.4 113.0 104.7 107.4 110.2 108.7
Sept 119.1 113.0 104.6 107.4 110.2 108.7
Okt 119.6 113.6 104.6 107.4 110.2 109.2
Nov 119.8 113.8 105.2 107.4 110.2 109.3
Dis 120.1 113.8 105.2 107.4 110.2 109.8

(10) Keratan Keluli & 2016 Dis 102.8 89.7 94.7 99.7 131.9 108.6
Logam 2017 Jan 103.9 91.4 95.1 99.7 131.9 108.6
Steel & Metal Feb 107.1 95.5 96.2 99.7 131.9 110.6
Sections Mac 107.8 97.3 97.2 99.7 131.9 112.9
Apr 108.7 99.3 97.5 99.7 131.9 112.9
Mei 108.7 100.5 97.5 99.8 131.9 112.9
Jun 108.7 99.2 97.0 99.8 131.9 112.9
Jul 108.7 99.2 96.9 99.8 131.9 112.9
Ogos 108.7 101.6 100.2 99.8 131.9 114.4
Sept 112.9 105.8 101.0 99.8 131.9 115.2
Okt 114.3 106.7 103.4 99.8 131.9 115.2
Nov 113.7 106.0 104.6 99.8 131.9 115.2
Dis 113.0 106.0 104.7 99.8 133.3 115.2

(11) Pasir 2016 Dis 123.4 119.9 108.6 120.9 117.5 111.3
Sand 2017 Jan 123.4 119.9 108.7 120.9 117.5 111.3
Feb 127.4 119.9 108.7 120.9 117.5 111.3
Mac 127.6 119.9 108.7 120.9 117.5 111.3
Apr 127.6 119.9 108.7 120.9 117.5 111.3
Mei 127.6 119.9 108.9 121.2 117.5 111.3
Jun 127.6 119.9 108.9 121.2 117.5 111.3
Jul 127.6 119.9 108.9 121.2 117.5 111.3
Ogos 128.0 119.9 109.4 121.2 117.5 111.3
Sept 128.0 119.9 111.1 121.2 117.5 111.3
Okt 128.0 119.9 111.1 121.2 117.5 111.3
Nov 128.0 119.9 111.3 121.2 117.5 111.3
Dis 128.0 123.4 111.3 121.2 117.5 111.3

* Lihat nota kaki di hujung Jadual 2/See footnotes at end of Table 2

-12-
Jadual 2: Indeks harga seunit bagi batu bata & dinding, kaca, batu baur, bahan siling, bahan bumbung,
kayu, papan lapis, lengkapan kebersihan, jubin lantai & dinding, bahan kerja paip, keratan
keluli & logam, pasir dan cat
Table 2: Unit price index for bricks & wall, glass, aggregates, ceiling materials, roofing materials, timber, plywood,
sanitary fittings, floor & wall tiles, plumbing materials, steel & metal sections, sand and paints

(Julai 2012=100)
(July 2012=100)
Kawasan*
Tempoh Region
Item
Period
A B C D E F

Bahan Binaan
Building Materials
(12) Cat 2016 Dis 107.4 108.0 111.4 106.8 105.6 108.8
Paints 2017 Jan 107.2 108.0 111.4 106.8 105.6 108.8
Feb 107.2 108.0 111.4 107.3 105.6 108.8
Mac 107.3 108.0 111.8 107.3 106.4 109.8
Apr 107.3 108.0 111.8 107.3 106.4 109.8
Mei 107.8 108.2 111.8 107.4 106.4 109.8
Jun 107.9 108.2 111.8 107.4 106.4 110.0
Jul 108.4 108.2 112.0 107.4 107.9 110.5
Ogos 108.7 108.2 112.0 107.4 107.9 111.0
Sept 109.0 108.9 112.1 107.4 107.9 110.9
Okt 109.0 109.4 112.6 107.4 107.9 111.2
Nov 109.0 109.4 112.9 107.8 107.9 111.2
Dis 109.0 109.4 112.8 107.8 107.9 111.2

Nota/Note :

* Kawasan/Region
A = Pulau Pinang, Kedah dan Perlis
B = Perak
C = Wilayah Persekutuan Kuala Lumpur, Melaka, Negeri Sembilan dan Selangor
D = Johor
E = Pahang
F = Kelantan dan Terengganu

-13-
INDEKS HARGA SEUNIT
BAHAN BINAAN BANGUNAN
(JULAI 2012=100)
SEMENANJUNG MALAYSIA

UNIT PRICE INDEX FOR


BUILDING MATERIALS
(JULY 2012=100)
PENINSULAR MALAYSIA
Jadual 3: Indeks harga seunit bagi cerucuk keping jenis 'U', keratan geronggang, segi empat sama,
keratan geronggang segi empat tepat, rasuk semesta, gelegar keluli, guling, sesiku sama,
sesiku tak sama, sesalur 'U' dan sesalur bibir
Table 3: Unit price index for 'U' type sheet piles, square hollow sections, rectangular hollow sections,
universal beams, rolled steel joists, equal angles, unequal angles, 'U' channels and lipped channels

(Julai 2012=100)
(July 2012=100)

Tempoh
Item Selangor dan Wilayah Persekutuan Kuala Lumpur
Period
Keluli Struktur
Structural Steel
(1) Cerucuk Keping 2016 Dis 94.5
Jenis 'U' 2017 Jan 94.6
U' Type Sheet Piles Feb 94.7
Mac 94.8
Apr 95.9
Mei 96.1
Jun 95.3
Jul 95.8
Ogos 98.9
Sept 99.1
Okt 108.0
Nov 108.0
Dis 106.9

(2) Keratan Geronggang 2016 Dis 93.5


Segi Empat Sama 2017 Jan 94.0
Square Hollow Feb 96.2
Sections Mac 97.3
Apr 97.4
Mei 97.1
Jun 95.8
Jul 96.2
Ogos 99.9
Sept 100.4
Okt 102.3
Nov 102.9
Dis 103.9

(3) Keratan Geronggang 2016 Dis 92.1


Segi Empat Tepat 2017 Jan 93.3
Rectangular Hollow Feb 95.5
Sections Mac 96.9
Apr 97.1
Mei 96.7
Jun 95.1
Jul 94.9
Ogos 98.0
Sept 99.5
Okt 99.7
Nov 101.2
Dis 102.4

-14-
Jadual 3: Indeks harga seunit bagi cerucuk keping jenis 'U', keratan geronggang, segi empat sama,
keratan geronggang segi empat tepat, rasuk semesta, gelegar keluli, guling, sesiku sama,
sesiku tak sama, sesalur 'U' dan sesalur bibir
Table 3: Unit price index for 'U' type sheet piles, square hollow sections, rectangular hollow sections,
universal beams, rolled steel joists, equal angles, unequal angles, 'U' channels and lipped channels

(Julai 2012=100)
(July 2012=100)

Tempoh
Item Selangor dan Wilayah Persekutuan Kuala Lumpur
Period
Keluli Struktur
Structural Steel
(4) Rasuk Semesta 2016 Dis 89.6
Universal Beams 2017 Jan 89.7
Feb 90.3
Mac 91.5
Apr 93.4
Mei 93.7
Jun 93.4
Jul 97.3
Ogos 100.5
Sept 102.6
Okt 102.7
Nov 103.9
Dis 101.8

(5) Gelegar Keluli 2016 Dis 106.0


Guling 2017 Jan 106.0
Rolled Steel Joists Feb 106.0
Mac 106.0
Apr 106.0
Mei 106.0
Jun 106.0
Jul 106.0
Ogos 118.8
Sept 118.8
Okt 118.8
Nov 118.8
Dis 116.6

(6) Sesiku Sama 2016 Dis 83.8


Equal Angles 2017 Jan 84.8
Feb 87.7
Mac 89.4
Apr 90.6
Mei 89.9
Jun 89.4
Jul 89.2
Ogos 91.8
Sept 94.7
Okt 97.6
Nov 100.1
Dis 101.8

-15-
Jadual 3: Indeks harga seunit bagi cerucuk keping jenis 'U', keratan geronggang, segi empat sama,
keratan geronggang segi empat tepat, rasuk semesta, gelegar keluli, guling, sesiku sama,
sesiku tak sama, sesalur 'U' dan sesalur bibir
Table 3: Unit price index for 'U' type sheet piles, square hollow sections, rectangular hollow sections,
universal beams, rolled steel joists, equal angles, unequal angles, 'U' channels and lipped channels

(Julai 2012=100)
(July 2012=100)

Tempoh
Item Selangor dan Wilayah Persekutuan Kuala Lumpur
Period
Keluli Struktur
Structural Steel
(7) Sesiku Tak Sama 2016 Dis 87.1
Unequal Angles 2017 Jan 87.9
Feb 88.6
Mac 88.9
Apr 89.3
Mei 89.7
Jun 89.3
Jul 88.9
Ogos 90.7
Sept 91.1
Okt 95.4
Nov 95.9
Dis 96.7

(8) Sesalur U 2016 Dis 87.6


U Channels 2017 Jan 87.9
Feb 89.4
Mac 91.1
Apr 91.4
Mei 91.3
Jun 90.8
Jul 90.5
Ogos 91.9
Sept 92.2
Okt 95.7
Nov 97.2
Dis 98.7

(9) Sesalur Bibir 2016 Dis 93.4


Lipped Channels 2017 Jan 93.7
Feb 94.0
Mac 95.1
Apr 95.4
Mei 95.8
Jun 95.4
Jul 95.1
Ogos 96.6
Sept 97.0
Okt 100.8
Nov 100.8
Dis 102.4

-16-
LAMPIRAN
APPENDIX
Lampiran A
Appendix A

Jadual faktor pelarasan (Indeks tanpa bar keluli)


Adjustment factor table (Index without steel bars)

Faktor pelarasan mengikut kawasan


Kategori Adjustment factor by region
Category
A B C D E F

1. Bangunan (K.T.) Satu Tingkat 1.5045 1.4621 1.4916 1.4593 1.5190 1.4933
Single Storey (R.C.) Building

2. Bangunan (K.T.) 2−4 Tingkat 1.4673 1.4088 1.4347 1.4106 1.4624 1.4571
(Berbumbung Rata)
2−4 Storey (R.C.) Building (Flat Roof)

3. Bangunan (K.T.) 2−4 Tingkat 1.4579 1.3780 1.4032 1.3754 1.4253 1.4161
(Berbumbung Curam)
2−4 Storey (R.C.) Building
(Pitched Roof)

4. Bangunan (K.T.) 5 Tingkat 1.3978 1.3554 1.3731 1.3474 1.3924 1.3923


dan Lebih (Untuk Penginapan)
5 Storey and Above (R.C.) Building
(For Accommodation)

5. Bangunan (K.T.) 5 Tingkat 1.4013 1.3081 1.3436 1.3131 1.3977 1.3631


dan Lebih (Untuk Pejabat)
5 Storey and Above
(R.C.) Building (for Office)

6. Bangunan Kayu 1.8667 1.8667 1.8839 1.8667 1.9244 1.8741


Timber Building

7. Cerucuk Kayu 2.1136 2.1136 2.1136 2.1136 2.1136 2.1136


Timber Piling

8. Cerucuk (K.T.) 1.3122 1.2301 1.2160 1.1990 1.1582 1.2400


(R.C.) Piling

Nota/Note : K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete

-17-
Lampiran B
Appendix B

Jadual faktor pelarasan (Indeks termasuk bar keluli)


Adjustment factor table (Index with steel bars)

Faktor pelarasan mengikut kawasan


Kategori Adjustment factor by region
Category
A B C D E F

1. Bangunan (K.T.) Satu Tingkat 1.4113 1.3937 1.4226 1.3966 1.4582 1.4291
Single Storey (R.C.) Building

2. Bangunan (K.T.) 2−4 Tingkat 1.2954 1.2637 1.2910 1.2742 1.3330 1.3131
(Berbumbung Rata)
2−4 Storey (R.C) Building (flat roof)

3. Bangunan (K.T.) 2−4 Tingkat 1.3007 1.2731 1.2992 1.2792 1.3359 1.3161
(Berbumbung Curam)
2−4 Storey (R.C.) Building (Pitched Roof)

4. Bangunan (K.T.) 5 Tingkat dan 1.2245 1.2039 1.2254 1.2092 1.2604 1.2470
Lebih (Untuk Penginapan)
5 Storey and Above (R.C.) Building
(For Accommodation)

5. Bangunan (K.T) 5 tingkat dan 1.2187 1.1782 1.2141 1.1921 1.2768 1.2359
lebih (untuk pejabat)
5 Storey and above (R.C) Building
(for office)

6. Bangunan Kayu 1.8667 1.8667 1.8839 1.8667 1.9244 1.8741


Timber Building

7. Cerucuk Kayu 2.1136 2.1136 2.1136 2.1136 2.1136 2.1136


Timber Piling

8. Cerucuk (K.T) 0.9738 0.9518 0.9469 0.9532 0.9749 0.9755


(R.C.) Piling

Nota/Note : K.T. = Konkrit Bertetulang/R.C. = Reinforced Concrete

-18-
Lampiran C
Appendix C

Contoh pengiraan indeks lama IKB Example for calculating the old BCI
(Julai 2008=100) dengan menggunakan (July 2008=100) using the new index
indeks baru IKB (Julai 2012=100) BCI (July 2012=100)

(i) Contoh mengira indeks lama (tanpa bar (i) Example for calculating the old index
keluli) bagi bulan Januari 2013 untuk (without steel bars) for the month of
kategori Bangunan (K.T) Satu Tingkat bagi January 2013 for Single Storey (R.C)
kawasan A adalah seperti berikut: Building in region A is as follows:

j
I lama Januari 2013 = FP (seperti di Old j I for January 2013 = AF (as in
Lampiran A) x j I baru Januari 2013 Appendix A) x new j I for January 2013
iaitu, indeks lama Januari 2013 i.e. old index for January 2013
= 1.5045 x 85.5 = 1.5045 x 85.5
= 128.6347 = 128.6347
= 128.6 = 128.6

(ii) Contoh mengira indeks lama (termasuk (ii) Example for calculating the old index
bar keluli) bagi bulan Januari 2013 untuk (with steel bars) for the month of January
kategori Bangunan Kayu bagi kawasan F 2013 for Timber Building in region F is
adalah seperti berikut: as follows:

j
I lama Januari 2013 = FP (seperti di Old j I for January 2013 = AF (as in
Lampiran B) x j I baru Januari 2013 Appendix B) x new j I for January 2013
iaitu, indeks lama Januari 2013 i.e. old index for January 2013
= 1.8741 x 78.1 = 1.8741 x 78.1
= 146.3672 = 146.3672
= 146.4 = 146.4

di mana, where,
FP = Faktor Pelarasan AF = Adjustment Factor
j
j
I = Indeks bagi kategori bangunan j I = Index for building category j
j = 1, ……… 8 j = 1,…..… 8

19
NOTA TEKNIKAL
TECHNICAL NOTES
Nota teknikal Indeks Kos Bahan Binaan Technical notes on Building Materials
Bangunan Semenanjung Malaysia Cost Index for Peninsular Malaysia
(Julai 2012=100) (July 2012=100)

Indeks Kos Bahan Binaan Bangunan (IKB) The Building Materials Cost Index (BCI) is
adalah suatu indeks yang dibentuk untuk an index designed to measure the average
mengukur kadar perubahan purata harga 15 rate of change in prices for 15 selected
bahan binaan terpilih yang digunakan dalam 8 building materials utilized in 8 building
kategori bangunan untuk 6 kawasan di categories for 6 regions in Peninsular
Semenanjung Malaysia. IKB dibentuk Malaysia. The BCI is based on the
berasaskan formula Laspeyres. Laspeyres formula.

IKB digunakan dalam Pelaksanaan Syarat The BCI is used in Special Provisions to the
Perubahan Harga dalam kontrak-kontrak kerja Conditions of Contract (Variation of Price) in
bangunan kerajaan sahaja. Spesifikasi dan government building contracts only. The
pemberat untuk 15 bahan binaan terpilih specifications and weightage for 15 selected
mengikut 8 kategori bangunan disediakan oleh building materials in 8 building categories
Jabatan Kerja Raya (JKR). are provided by Public Works Department
(JKR).

Anggaran 3200 sebutharga dipungut setiap Approximately 3200 price quotations are
bulan daripada lebih kurang 545 outlet untuk collected monthly from 545 outlets for 164
164 jenis spesifikasi bahan binaan terpilih. selected building material specifications.

Bermula penerbitan Januari 2013, indeks ini Starting from January 2013 publication, the
berasaskan kepada tahun asas yang ditukar series is based on the revised base year
daripada (Julai 2008=100) kepada which has been changed from
(Julai 2012=100) serta pemilihan spesifikasi (July 2008=100) to (July 2012=100) as well
bahan binaan dan pemberat yang dikemaskini as the selection of new building material
oleh JKR. specifications and weightage updated by
JKR.

Bagi kontrak-kontrak yang telah For contracts signed before January 2013,
ditandatangani sebelum Januari 2013, sila please refer to the ‘Adjustment factor table’
lihat ‘Jadual faktor pelarasan’ (Lampiran A dan (Appendix A and B) and the ‘Example for
B) dan ‘Contoh mengira Indeks Lama Kos calculating the Old Building Materials Cost
Bahan Binaan Bangunan’ (Lampiran C) untuk Index’ (Appendix C) for the implementation
panduan dalam Pelaksanaan Syarat of the Variation of Price. For contracts
Perubahan Harga. Bagi kontrak-kontrak mulai commencing January 2013 and thereafter,
Januari 2013 dan seterusnya, indeks baru the new index is to be used without any
hendaklah digunakan terus tanpa sebarang further adjustment.
pelarasan.

21
Pengiraan perubahan indeks Index change calculation

IKB mengukur perubahan harga dari suatu The BCI measures price changes from a
tempoh rujukan yang ditetapkan, iaitu designated period, i.e. (July 2012=100).
(Julai 2012=100).

Pergerakan IKB dari satu bulan ke satu bulan Movements of the BCI from one month to
yang lain dinyatakan sebagai perubahan another are expressed as percentage
peratus dan bukan perubahan mata indeks changes rather than changes in index points
(index points) kerana perubahan mata indeks because index point changes are affected
dipengaruhi oleh aras indeks yang berkaitan by the level of the index in relation to its
dengan tempoh asasnya, manakala base period while percentage changes are
perubahan peratus tidak mempunyai pengaruh not. The following example illustrates the
sedemikian. Contoh berikut menunjukkan cara computation of index point and percentage
pengiraan perubahan peratus mata indeks changes.
dan perubahan peratus.

Perubahan Mata Indeks Index Point Change

Indeks Kos Bahan Binaan Bangunan 130.5 Building Materials Cost Index 130.5
Tolak indeks sebelumnya 129.3 Less previous index 129.3
1.2 1.2

Perubahan Peratus Percentage Change


Perubahan mata indeks dibahagi dengan Index point difference divided by the
indeks sebelumnya, didarab dengan 100. previous index, multiplied by 100.

130.5 – 129.3 x 100 = 0.9% 130.5 – 129.3 x 100 = 0.9%


129.3 129.3

22
Jadual Tarikh Pengeluaran Siaran Khas 2
(Untuk Kerja-Kerja Pembinaan Bangunan Dan Struktur), Semenanjung Malaysia
Januari - Disember 2017
Schedule Of Release Dates For Special Release 2
(For Building And Structural Works), Peninsular Malaysia
January - December 2017

Bulan Rujukan Tarikh


Reference Month Date

Januari 2017 10 Februari 2017


January 2017 10 February 2017

Februari 2017 10 Mac 2017


February 2017 10 March 2017

Mac 2017 10 April 2017


March 2017 10 April 2017

April 2017 09 Mei 2017


April 2017 09 May 2017

Mei 2017 09 Jun 2017


May 2017 09 June 2017

Jun 2017 10 Julai 2017


June 2017 10 July 2017

Julai 2017 10 Ogos 2017


July 2017 10 August 2017

Ogos 2017 11 September 2017


August 2017 11 September 2017

September 2017 10 Oktober 2017


September 2017 10 October 2017

Oktober 2017 10 November 2017


October 2017 10 November 2017

November 2017 11 Disember 2017


November 2017 11 December 2017

Disember 2017 10 Januari 2018


December 2017 10 January 2018