Professional Documents
Culture Documents
Control Chart
Control Chart
5:
Solution Example 6.5:
𝑚𝑚 = 12, 𝑛𝑛 = 5
∑ 𝑋𝑋� 409.9
𝑋𝑋� = = = 34.1583
𝑚𝑚 12
∑ 𝑅𝑅 53
𝑅𝑅� = = = 4.4167
𝑚𝑚 12
𝐷𝐷3 = 0
𝐷𝐷4 = 2.114
𝐴𝐴2 = 0.577
R-chart
∴None of the points falls outside the limit, the process variability is in
control.
R chart
10.0000
UCL
9.0000
8.0000
7.0000
6.0000
5.0000
R
CL
4.0000
3.0000
2.0000
1.0000
LCL
0.0000
1 2 3 4 5 6 7 8 9 10 11 12
Sample Number
� chart
𝑋𝑋-
𝐿𝐿𝐿𝐿𝐿𝐿 = 𝑋𝑋� − 𝐴𝐴2 𝑅𝑅� = 34.1583 − 0.577 4.4167 = 31.6099
Since sample number 3 is beyond the 𝑈𝑈𝑈𝑈𝑈𝑈, the process mean is not in
control. Assume assignable cause found and remove the point.
X-bar chart
38.0000
37.0000 UCL
36.0000
35.0000
CL
34.0000
X-bar
33.0000
32.0000 LCL
31.0000
30.0000
29.0000
28.0000
1 2 3 4 5 6 7 8 9 10 11 12
Sample Number
R-chart
∑ 𝑅𝑅 48
𝑅𝑅� = = = 4.3636
𝑚𝑚 11
4.0000
3.0000
2.0000
1.0000
LCL
0.0000
1 2 3 4 5 6 7 8 9 10 11
Sample Number
� chart
𝑋𝑋-
∑ 𝑋𝑋� 372.8
𝑋𝑋� = = = 33.8909
𝑚𝑚 11
33.0000
X-bar
32.0000 LCL
31.0000
30.0000
29.0000
28.0000
1 2 3 4 5 6 7 8 9 10 11
Sample Number
Example 6.6:
Solution Example 6.6:
∑ 𝑝𝑝 0.00375
𝑝𝑝̅ = = = 0.0002885
𝑚𝑚 13
Since all the points are within the control limits, the process is in control.
p chart
0.0005000
UCL
0.0004500
0.0004000
0.0003500
0.0003000 CL
0.0002500
p
0.0002000
0.0001500 LCL
0.0001000
0.0000500
0.0000000
1 2 3 4 5 6 7 8 9 10 11 12 13
Sample Number