DubaI Land resendential complex phase 2&3

TESTING AND COMMISSIONING CHECK LIST-ELECTRICAL SYSTEM

I. GENERAL DETAILS :

SI.No. DESCRIPTION DETAILS

1 Equip. Reference

2 Manufacturer

3 Location of Installation

4 Date of Testing

II. Pre commissioning CHECKS;

SI.No. DESCRIPTION YES NO REMARKS

1 Check lights for operation, burned out or missing bulbs LED's and covers

2 Check the wiring & termination for the light fittings is complete

3 Check the support system for the light fittings is complete and the alignment is done correctly

Ensure that the Light Fittings installation is complete and mechanical completion is approved & all
4
comments on the installation inspections are incorporated
Check the location & installation of the pole light fixtures are in line with the approved external lighting
5
layout

7 Check the field wiring is pretested for continuity before termination

Ensure that the grounding (earthing) of the light fixtures is carried out & is properly connected to the
8
earthing system

III.Commissioning Procedure for Light Fixtures

10 Ensure that all the pre-commissioning checks are carried out successfully

11 Upon availability of power supply to the lighting DB, switch On the breakers for the light circuit

12 Switch ON the individual core lighting circuits using the MCB provided in the respective electrical LSDB

13 Measure the lux level at various points, where necessary.

Record the readings as per approved formats. Take necessary corrective measures if the required lux
14
level is not achieved

15 Magic Gel Installation done on all junctionbox


• Insulation Tester
Requierement • Multimeter
• Lux meter

Checked by T&C Verified by Consultant Engineers comments

NAME

SIGNATURE

DATE

60019-MTS-H020000-EL-000002(1) TESTING COMMISSIONING OF ELECTRICAL SYSTEM Page 1 of 1