Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Project report: BDC Phase 3

System provider: Customer:


Company: ECOGREEN INTERNATION SDN BHD TE ASSOCIATES SDN BHD
Address: Bukit Jalil, 57000 Kuala Lumpur Johor Bahru, 81100 Malaysia
Town:
Phone:

Comment:

NFPA 72 compliant possible reasons


Yes

Project name: BDC Phase 3


Project build date: 21/3/2023 5:01:34 PM
Fan level: IV
Ambient temperature [°C] 20
Ambient pressure [hPa] 950.0

Tube network I Tube network II


Maximum smoke sensor sensitivity according NFPA72 0.217 --
Maximum transport time [s] 56 --
Overall sampling tube length [ m ] 53.00 --
Number of sampling points 12 --

ASD CDU Corridor 1-4.report.pdf / 17/4/2023 2:33:57 AM / ASD PipeFlow 2.7.0.7 - Page 1-
Sketch of tube network:

C:\Users\User\Desktop\MY06 BDC PHASE 3\ASD Pipe Flow Calculation (BDC3) - REV 01\ASD CDU Corridor 1-4.report.gif

ASD CDU Corridor 1-4.report.pdf / 17/4/2023 2:33:57 AM / ASD PipeFlow 2.7.0.7 - Page 2-
Part Description RL TL S P Fl ø t L-cap SP-cap Comment:
(ASD) ASD 535 0.00 1.38 0
A1 (TU 25 ABSRED) Sampling tube D=25 mm ABS red, l=3 m 0.20 0.20 315 1.38 0
A2 (DFU 911) Dust Filter Unit D=25 mm 0.70
A3 (TU 25 ABSRED) Sampling tube D=25 mm ABS red, l=3 m 0.20 0.90
A4 (BE 25 ABSRED) Bend 90° D=25 mm ABS red 0.90
A5 (TU 25 ABSRED) Sampling tube D=25 mm ABS red, l=3 m 0.40 1.30
A6 (BE 25 ABSRED) Bend 90° D=25 mm ABS red 1.30
A7 (TU 25 ABSRED) Sampling tube D=25 mm ABS red, l=3 m 4.00 5.30
A8 (BE 25 ABSRED) Bend 90° D=25 mm ABS red 5.30
A9 (TU 25 ABSRED) Sampling tube D=25 mm ABS red, l=3 m 1.00 6.30
A10 (BE 25 ABSRED) Bend 90° D=25 mm ABS red 6.30
A11 (TU 25 ABSRED) Sampling tube D=25 mm ABS red, l=3 m 0.70 7.00
A12 (BE 25 ABSRED) Bend 90° D=25 mm ABS red 7.00
A13 (TU 25 ABSRED) Sampling tube D=25 mm ABS red, l=3 m 46.00 53.00
A13 - 1 -1- Sampling point / drilled 1.00 8.00 3.020 232 0.15 3.00 3
A13 - 2 -2- Sampling point / drilled 4.00 12.00 3.218 204 0.14 3.00 4
A13 - 3 -3- Sampling point / drilled 4.00 16.00 3.412 182 0.13 3.00 5
A13 - 4 -4- Sampling point / drilled 4.00 20.00 3.596 164 0.12 3.00 7
A13 - 5 -5- Sampling point / drilled 4.00 24.00 3.765 149 0.12 3.00 8
A13 - 6 -6- Sampling point / drilled 4.00 28.00 3.912 138 0.11 3.00 10
A13 - 7 -7- Sampling point / drilled 4.00 32.00 4.035 130 0.11 3.00 13
A13 - 8 -8- Sampling point / drilled 4.00 36.00 4.131 124 0.11 3.00 16
A13 - 9 -9- Sampling point / drilled 4.00 40.00 4.199 120 0.11 3.00 20
A13 - 10 -10- Sampling point / drilled 4.00 44.00 4.241 118 0.11 3.00 25
A13 - 11 -11- Sampling point / drilled 4.00 48.00 4.263 117 0.11 3.00 34
A13 - 12 -12- Sampling point / drilled 4.00 52.00 6.671 117 0.07 3.00 56
RL: Relative length of this part (distance to previous SP or bend) [m]
TL: Total length of the part end to the ASD [m]
S: Smoke sensitivity [%/m] for this sampling hole, when the smoke sensor alarm level is chosen as proposed in this report.
P: Pressure [Pa]
Fl: Airflow [Liter/s] of this sampling point
ø: Diameter [mm]
t: Transport time to the ASD [s]
L-cap: Length of the capillary / stub [ m ]
SP-cap: Samplingpoint of the capillary

ASD CDU Corridor 1-4.report.pdf / 17/4/2023 2:33:57 AM / ASD PipeFlow 2.7.0.7 - Page 3-
Material list:
Part Number Length [ m ] Rod length [ m ] Number of rods Comment:
(ASD) ASD 535 1
(TU 25 ABSRED) Sampling tube D=25 mm ABS red, l=3 m 7 52.50 3.00 18
(SO 25 ABSRED) Socket D=25 mm ABS red 14
(DFU 911) Dust Filter Unit D=25 mm 1
(BE 25 ABSRED) Bend 90° D=25 mm ABS red 5
(EC 25 ABSRED) End cap D=25 mm ABS red 1
(PC 25 PP) Pipe clamp type Goema halogen-free 53

ASD CDU Corridor 1-4.report.pdf / 17/4/2023 2:33:57 AM / ASD PipeFlow 2.7.0.7 - Page 4-

You might also like