Existing Situation

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 18

KAILASH MANDIR CIRCUIT

LOCATIONS
EXISTING SITUATIONS EXISTING JUNCTIONS & FLYOVER
KAILASH MAHADEV MANDIR TO BALKESHWAR MAHADEV MANDIR (13km)

1. TRAFFIC SIGNAL NOT


WORKING
2.CONGESTION

3. PROBLEM IN CROSSING J1 T-JUNCTION


ROAD

SIKANDRA TIRAHA
1. FLYOVER (two way)
2.
UNDERPASS
3.
ENCROACHMENT ON F1 FLYOVER
ROAD( shops and vehicles)
both sides
KHANDARI CHAURAHA
1. Flyover( two way)
2.
ENCROACHMENT ON
ROAD( vehicles parked and
street vendors) F2 FLYOVER
3.
CONGESTION
4. UNDER PASS
BHAGWAN TALKIES
1. FlyOver(two way)
2. TRAFFIC
SIGNAL PROBLEM
3.
CONGESTION F3 FLYOVER
4. UNDER PASS

SULTAN GANJ KI PULIA

MUGHAL ROAD

BALKESHWAR MAHADEV MANDIR TO MAN KAMESHWAR MANDIR (4.5km)


1. SCHOOL IS JUST OPPOSITE
TO THE TEMPLE
2. TRAFFIC
PROBLEM (MOSTLY AT THE
TIME SCHOOL OFF)
3. ENCROACHMENT ON
ROAD AND JUNCTION J9 BALKESHWAR CHOWK T-JUNCTION
4. NO
PROPER JUNCTION

BALKESHWAR ROAD
FLYOVER( two way) AND
UNDER PASS

F4 FLYOVER

WATER WORKS CHAURAHA


1. TRAFFIC SIGNAL NOT
WORKING
2. ENCROACHMENT CAUSES
CONGESTION ( both sides
shops and vehicles) J10 X-JUNCTION

JIWANI MANDI CHAURAHA


1. MARKET AREA
2. HEAVY
ENCROACHMENT ON ROAD
3.
CONGESTED J11 X-JUNCTION

BELAN GANJ CHAURAHA


1. ENCROACHMENT
2. MOTOR VEHICLES
CAUSE CONGESTION
J12 T-JUNCTION

CHHATTA BAZAR

MAN KAMESHWAR MANDIR TO RAJESHWAR MAHADEV MANDIR (13km)


1. NO TRAFFIC SIGNAL
2. CROSSING IS
CLOSED TO MAN KAMESHWAR
MANDIR

J13 T-JUNCTION

HATHIGHAT

SHAMSHAN GHAT CHAURAHA

J14 ROUNDABOUT

VICTORIA PARK CHAURAHA

J15 ROUNDABOUT

PURANI MANDI
1. ON GOING CONSTRUCTION
OF METRO RAIL
2. PITS ON THE SIDES
OF ROAD
3. CONGESTED

J16 Y-JUNCTION

TAJ VIEW TIRAHA


1. ON GOING CONSTRUCTION
OF METRO RAIL
2. PITS ON THE SIDES
OF ROAD
3. CONGESTED

J17 T-JUNCTION

MUGHAL PULIA
1. CONDITION OF ROAD IS BAD

2. PITS ON ROAD
3.
ENCROACHMENT
4. DRAINAGE
PROBLEM

GOBAR CHOWKI

RAJESHWAR MANDIR

RAJESHWAR MAHADEV MANDIR TO PRITHVINATH MAHADEV MANDIR( 9.1km)


ENCROACHMENT ON ROAD

J18 X-JUNCTION

RAJPUR CHUNGI

J19 ROUNDABOUT

PHOOL SAYAD CHAURAHA


NO TRAFFIC SIGNAL

SUBHASH CHANDRA BOSE


MURTI CHAURAHA
BALU GANJ POLICE CHOWKI 1. NO PROPER JUNCTION
2. NO
TRAFFIC SIGNAL

J20 Y-JUNCTION
1. MARKET AREA
2. CONGESTED
3. HEAVY
ENCROACHMENT ON ROAD
4. NO
PROPER JUNCTION
J21 X-JUNCTION

BALU GANJ CHAURAHA


1. MARKET AREA
2. CONGESTED
3. HEAVY
ENCROACHMENT ON ROAD

J22 X-JUNCTION

CHHIPITOLA CHAURAHA
ENCROACHMENT ON ROAD
TOWARDS SBI

J23 Y-JUNCTION

SBI TIRAHA
1. FLYOVER
2. CONGESTED

J24 Y JUNCTION (FLUOVER)

COLLECTRATE TIRAHA
1.ENCROACHMENT
2. PARKING ON ROADS

J25 T-JUNCTION

TEHSIL CHAURAHA
1. CONGESTED
2. MARKET AREA
3. HEAVY
ENCROACHMENT
4.NO PROPER JUNCTION

J26 CROSS ROAD JUNCTION

RUI KI MANDI CHAURAHA


1. HEAVY ENCROACHMENT
2.
CONGESTED
3. ROAD
CONDITON IS BAD

J27 Y-JUNCTION

BHOGIPURA CHAURAHA
1. CONGESTED
2. CROSSING PROBLEM

J8 T-JUNCTION

PRITHVI NATH FATAK

PRITHVINATH MAHADEV MANDIR TO KAILASH MAHADEV MANDIR( 12km)


1. ENCROACHMENT ON
ROAD( commercial both sides)
2.
CONGESTED
3. DRAINAGE WATER
ON ROAD( both sides)
J7 Y-JUNCTION

SHANKAR GARH KI PULIA


1. NO PROPER JUNCTION
2. TRAFFIC
PROBLEM
3. ENCROACHMENT(STREET
VENDORS)

J6 X-JUNCTION

RAM NAGAR KI PULIA


TRAFFIC PROBLEM

J5 CROSS ROAD JUNCTION

MARUTI ESTATE CHAURAHA


1. NO PROPER JUNCTION
2. CONGESTED
3.
ENCROACHMENT(STREET
VENDORS)

J4 CROSS ROAD JUNCTION

BODLA CHAURAHA
J3 Y-JUNCTION

EINT KI MANDI TIRAHA


1. ENCROACHMENT ON ROAD
2.
CONGESTED

J2 T-JUNCTION

KARGIL PETROL PUMP TIRAHA


1. FLYOVER(two way) AND
UNDERPASS
2. DRAINAGE PROBLEM

KAILASH MOD
PROPOSALS
ANDIR (13km)

Provide circle at Sikandra


Tiraha

Traffic signal at crossing and


clear encroachment by
providing footpath

Traffic signal at crossing and


clear encroachment by
providing footpath

Traffic signal at crossing and


clear encroachment by
providing footpath

NDIR (4.5km)
Path for cycle rickshaws and
pedestrians
Divert routes of
motor vehicles to major roads

Path for cycle rickshaws and


pedestrians
Divert routes of
motor vehicles to major roads

NDIR (13km)
Proposal for parking at
hathighat empty space at
opposite side of the Man
Kameshwar Mandir Gate
Reconstruction of road

Pulia should be closed as


placed on the middle of the
road as pedestrian use pulia to
cross which causes accident
cases

Road should be constructed


with footpath

MANDIR( 9.1km)
Circle on Junction

Traffic signal

Circle on Junction
Path for cycle rickshaws and
pedestrians
Divert routes of
motor vehicles to major roads

Path for cycle rickshaws and


pedestrians
Divert routes of
motor vehicles to major roads

Traffic signal
Tehsil parking within the
premises

Path for cycle rickshaws and


pedestrians
Divert routes of
motor vehicles to major roads

Traffic signal

New road and junction improvement

One way railway crossing


flyover

ANDIR( 12km)
Circle on junction

Traffic signal and junction


improvement

Underpass or circle on junction


with traffic signal
Underpass and footpath

Parking at the empty space


near kailash mandir

You might also like