Professional Documents
Culture Documents
Existing Situation
Existing Situation
Existing Situation
LOCATIONS
EXISTING SITUATIONS EXISTING JUNCTIONS & FLYOVER
KAILASH MAHADEV MANDIR TO BALKESHWAR MAHADEV MANDIR (13km)
SIKANDRA TIRAHA
1. FLYOVER (two way)
2.
UNDERPASS
3.
ENCROACHMENT ON F1 FLYOVER
ROAD( shops and vehicles)
both sides
KHANDARI CHAURAHA
1. Flyover( two way)
2.
ENCROACHMENT ON
ROAD( vehicles parked and
street vendors) F2 FLYOVER
3.
CONGESTION
4. UNDER PASS
BHAGWAN TALKIES
1. FlyOver(two way)
2. TRAFFIC
SIGNAL PROBLEM
3.
CONGESTION F3 FLYOVER
4. UNDER PASS
MUGHAL ROAD
BALKESHWAR ROAD
FLYOVER( two way) AND
UNDER PASS
F4 FLYOVER
CHHATTA BAZAR
J13 T-JUNCTION
HATHIGHAT
J14 ROUNDABOUT
J15 ROUNDABOUT
PURANI MANDI
1. ON GOING CONSTRUCTION
OF METRO RAIL
2. PITS ON THE SIDES
OF ROAD
3. CONGESTED
J16 Y-JUNCTION
J17 T-JUNCTION
MUGHAL PULIA
1. CONDITION OF ROAD IS BAD
2. PITS ON ROAD
3.
ENCROACHMENT
4. DRAINAGE
PROBLEM
GOBAR CHOWKI
RAJESHWAR MANDIR
J18 X-JUNCTION
RAJPUR CHUNGI
J19 ROUNDABOUT
J20 Y-JUNCTION
1. MARKET AREA
2. CONGESTED
3. HEAVY
ENCROACHMENT ON ROAD
4. NO
PROPER JUNCTION
J21 X-JUNCTION
J22 X-JUNCTION
CHHIPITOLA CHAURAHA
ENCROACHMENT ON ROAD
TOWARDS SBI
J23 Y-JUNCTION
SBI TIRAHA
1. FLYOVER
2. CONGESTED
COLLECTRATE TIRAHA
1.ENCROACHMENT
2. PARKING ON ROADS
J25 T-JUNCTION
TEHSIL CHAURAHA
1. CONGESTED
2. MARKET AREA
3. HEAVY
ENCROACHMENT
4.NO PROPER JUNCTION
J27 Y-JUNCTION
BHOGIPURA CHAURAHA
1. CONGESTED
2. CROSSING PROBLEM
J8 T-JUNCTION
J6 X-JUNCTION
BODLA CHAURAHA
J3 Y-JUNCTION
J2 T-JUNCTION
KAILASH MOD
PROPOSALS
ANDIR (13km)
NDIR (4.5km)
Path for cycle rickshaws and
pedestrians
Divert routes of
motor vehicles to major roads
NDIR (13km)
Proposal for parking at
hathighat empty space at
opposite side of the Man
Kameshwar Mandir Gate
Reconstruction of road
MANDIR( 9.1km)
Circle on Junction
Traffic signal
Circle on Junction
Path for cycle rickshaws and
pedestrians
Divert routes of
motor vehicles to major roads
Traffic signal
Tehsil parking within the
premises
Traffic signal
ANDIR( 12km)
Circle on junction