BUSING RATIONALISATION
JUNE 2023
ASX/TSX: PRU | WWW.PERSEUSMINING.COM

PROJECT CHARTER

Key Notes:
1. 12workers busses in
operation based on
department, shift,
destination and rank.

2. Significant under
utilization of buses
supported by data.

3. Drive efficiency by
categorizing based on
shift and destination
as standard practice.

PERSEUS MINING PERSEUSMINING.C


OM
INITIAL DATA ANALYSIS
Key Notes:
Dunkwa snr Dunkwa Jnr Plant Supervisors
1. Boarding data gathered for 4
50 80 50
weeks; 2weeks as-is and 2weeks
40
60
40 without illegitimate boarders.
30 30
40
20 20

10
20
10
2. Significant opportunity to align
0
08-Jun-27 21-Jun-27 04-Jul-27 0
08-Jun-27 21-Jun-27 04-Jul-27 0
08-Jun-27 21-Jun-27 04-Jul-27
7/12 buses to shift and destination for
efficiency.
Out In Out In OUT IN OUT IN

Maintainance Processing Mining


3. Buses to be reviewed include
60 50 50
Dunkwa Snr, Dunkwa Jnr,
40 40 Processing, Plant Supervisors,
40
30 30 Mining, Maintenance and 6PM.
20 20
20
10 10
(Limited opportunity in Wassa
0
08-Jun-27 21-Jun-27 04-Jul-27 0
08-Jun-27 21-Jun-27 04-Jul-27 0
08-Jun-27 21-Jun-27 04-Jul-27
Akropong, Abenabena, Ayanfuri)
OUT IN OUT IN OUT IN OUT IN OUT IN OUT IN

PERSEUS MINING PERSEUSMINING.C


OM

NEXT STEPS

IMPROVE PHASE Destinatio


• Pilot new design based on shift and destination for 10 buses Pilot Plan Bus Capacity Expected Arrival n
instead of 12 As New Shift As- Shift
-is New Dsc Cap is New location
• Put in controls to restrict illegitimate boarders to remove
data noise
• Perform FMEA. 1 Dunkwa snr 47 N/A 7AM N/A Dunkwa

2 Dunkwa Jnr 47 Dunkwa1 58 7AM 7AM Dunkwa

3 Maintainance 47 Dunkwa2 30 6AM 6AM Dunkwa

CONTROL PHASE 4 Processing 30 Dunkwa3 47 6AM 6AM Dunkwa

• Re-PCA. Control Charts. 5 Plant Supervisors 30 N/A 6AM N/A Dunkwa

• SOPs. 6 Mining 30 Dunkwa4 30 6AM 6AM Dunkwa

7 6pm Bus 30 Dunkwa5 30 7AM 7AM Dunkwa


• Close
This
8 new system
Ayanfuri shiftof categorizing
33 buses and removing
Ayanfuri_1 33 all
6AM 6AM Ayanfuri
constraints except for shift and location cost GH¢5.9M
9 Ayanfuri straight day 30 Ayanfuri_2 30 7AM 7AM Ayanfuri
yearly (As-is GHS7.05M)
Abenaben
10 Abenabena 14 Abenabena 14 6AM 6AM a
Start Date:
WassaFriday 14.07.2023
Akropong
11 Straight 30 Wassa_1 30 7AM 7AM Wassa AK

12 Wassa Akropong shift 33 Wassa_1 33 6AM 6AM Wassa AK