Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MUNICPAL STAMPS

Mary Street

Municiple Water Meter


Verge/Servitude Eskom Electricty Meter
Municiple Main Sewer Line MH
30000

110 UPVC sewr Pipes Laid to Fall 1:40

5000
ERF120 Stuartstown

10000
5m Building Line # All Parking Bays are 2.5mx5m

5000
MH MH
PB1 PB2 PB3 PB4 PB5 PB6 PB6 PB7
RE

110 UPVC sewr Pipes Laid to Fall 1:40


PB8
IE

RE
PB9

4m Building Line
Proposed New Building PB10

45000

45000

30000
Lot 7 Lot 11
PB11

PB12

IE
IE
IE PB13
IE
IE
RE
4m Building Line

5000
4m Building Line
30000

North Elevation South Elevation


5000 20100 4900
1:100 1:100
Lot 10

Water Pipes Fom Water Meter


Site Plan
110 UPVC Sewer to connect
to Municiple Main 1:500
30000
30000 2100 100800 150 26550

6000 6000 6000 6000 6000

Man Hole
IE IE
RE

Fire Escape

ine
1500

ch
Ma
ing
Toilet

nd
Ve
2625
Waiting Area 7.88m2

Parts Center 536m2


1500

110 UPVC Sewer Pipes Laid to Fall 1:40


75

Bulk Shelving
Security Gates

Bulk Shelving
Bulk Shelving

Bulk Shelving
Bulk Shelving

Bulk Shelving

Bulk Shelving

Bulk Shelving
1500

Entrance(Roller Shutter)

Bulk Shelving

Bulk Shelving

Bulk Shelving

Bulk Shelving
Bulk Shelving

Bulk Shelving
Bulk Shelving
PROUDLY
10050

1500
SOUTH AFRICAN

Service Counter
11300

11300
Security Screen
7075

Bulk Shelving

Bulk Shelving

Bulk Shelving
Bulk Shelving

Bulk Shelving
Bulk Shelving
1500

Bulk Shelving
Bulk Shelving

Bulk Shelving
Bulk Shelving

Bulk Shelving

Bulk Shelving

Bulk Shelving
lIST OF REVISIONS

nO. dATE d.p.w.

Vending Machine
AMENDMENT

1500

16800
900 300 900
20100

20100

20100
150

110 UPVC Sewer Pipes Laid to Fall 1:40


Man Hole

Vending Machine

Service Entrance(roller Shutter)


150
1500
Vehicle Lift
Balance Machine Balance Machine

1500
Bulk Shelving
Tyre Machine Tyre Machine

General Notes

1500

Tool Racks
10050

9725
Vehicle Lift Vehicle Lift Vehicle Lift
Bulk Shelving

8350
8200
1500
1. BOUNDRY BEACONS TO BE EXPOSED AND DEMARKATED

Entrance(Roller Shutter)
2. SOIL POISONING IN ACCORDANCE WITHSABS 0124 REQUIRED

100 1100 150


3. DO NOT SCALE DRAWING, USE FIGURED DIMENSIONS ONLY
Staff Ablutions 15.46m2
1500
Fitment Center 212.27m2 4. ALL DIMENSIONS ARE, UNLESS OTHERWISE SPECIFIED, MEASURED
IN MILLIMETERS
5. ALL DIMENSIONS, ANGLES AND LEVELS TO BE CHECKED ON SITE
AND ANY DISCREPANCIESARE TO VERIFIED WITH ARCHITECT PRIOR TO

1500
Toilet Toilet Toilet Toilet Toilet Toilet
THE COMMENCEMENT OF WORK
1500

6. ALL SLABS, BEAMS, COLUMNS, STAIRS AND STRUCTURAL REINFORCED


CONCRETE AND STRUCTURAL STEEL WORK ACCORDING TO ENGINEERS
DETAILS
RE
7. THESE DRAWINGS ARE TO BR READ IN CONJUCTION WITH STRUCTURAL
Man Hole
110 UPVC Sewer Pipes Laid to Fall 1:40
Man Hole
110 UPVC Sewer Pipes Laid to Fall 1:40 IE IE IE IE IE IE CIVIL AND MECHANICAL ENGINEERS DETAILS
8. ALL BUILDING WORK TO COMPLY WITH SABS 0400 AND LOCAL
MUNICIPLE BY-LAWS
9. ALL GLAZING THICKNESS TO COMPLY WITH PART NN2
Steel Structure Layout Plan 23850 150 875 100 875 100 875 150 850 100 875 100 875 225
10. ALL SAFTY GLAZING TO COMPLY WITH PART NN3
11. PUBLIC SAFTY: ALL BALISTRADINGTO MINIMUM ONE METER HIGH AND
1:100 23850 6150 TO COMPLY WITH WITH THE REQUIRMENTS OF DD2 OF NBR
30000 12. ALL STAIRS TO COMPLY WITH PART M OF SABS 0400
13. ALL FACILITIES FOR DISABLED PERSONS TO COMPLYWITH PART S OF
SABS 0400 ( EXISTING AS ON SITE )
NOTE: CERTIFICATE OF STABILITY TO BE ISSUED ON COMPLETION
Floor Layout Plan NOTE: MECHANICAL VENTERLATION / LIGHTING TO BE BY PROFESSIONAL
ENGINEER. SEE APPOINTED ENGINEERS DRAWINGS FOR
1:100 SPECIFICATIONS

DRAUGHTMANS SIGNATURE
Neville Ogle
______________________________

Lipped Channel

Roof Ridging
F/Bar Cleat
IBR Sheeting Lipped Channel
IBR Sheeting

F/Bar Cleat
HT Bolt& Nuts 200 IPE Rafter
HT Bolt& Nuts N P Draughting
Figure 1 200 IPE
1:50
Figure 2
1:50

11680

Neville Ogle
2025

073 0432 860


200

Roof Notes
7400

0.4mm IBR roof sheetings fixed with tek screws and bonded washers
Sisolation installed under IBR sheeting
150mm Galvanized lipped channels with bolt and nut onto mounting brackets West Elevation East Elevation
5700

10 Degree roof pitch

1:100 1:100
Floor Note
25 MPA concrete for concrete slab
Client Information
REF 195 steel mesh in concrete
Min 250 micron underlay ground sheet
Certified ant poison to be sprayed on well compacted fill Mr Yacoob Essop
Sort board jointing strips between stub column and floor
Flexi seal in expantion joints on floor
Ixopo
CONTACT : (073 678 6087)

PROJECT TITLE
PROPOSED CONSTRUCTION OF Spares
Electrical Legend Foundation Notes Floor Construction Wall Construction Roof Construction Ceiling Construction Sewer Window and Door Schedule Schedule of Areas and Fitment center
W1-900X550 Aluminim Window ERF Size 1394m2 ERF 120 Stuartstown
glazed with 3mm glass Proposed Building 603m2
1. 700x200mm thick strip footing foundations for 1. Floor finishes according to floor plan on 1. Clay common bricks / Blockwork to be used 1. 0.4 IBR sheeting laid on 150 lipped channel purlins 1. 6mm thick rhino board ceiling to all new rooms 1. New sewer pipes = 110mm D3-800x2000 Hollow Core Caterfoil
1200 Double fluorescent light point 140mm thick load bearing walls 150mm thick power floated concrete slabs, where plaster to done bolted on 100x6 steel cleats, welded onto 305 IPE rafters paint to clients specification New Soil Pipes = 110mm
Single door Total New work 603m2
laid to fall on well compacted selected fill. 2. Corobrik Engineering bricks below ground in bolted together to form trusses to be bolted onto 2. Fix ceiling to 38x38mm SA pine brandering New Waste Pipes = 50mm Permisable Coverage 80% - 1115.2m2
Ceiling mounted light 2. 450x150mm thick concrete strip footing foundations for
100mm thick non load bearing walls
SABSapproved damp proof membrane on
compacted soil treated with anti termite
foundation walls
3. Brick force to all courses from window head to underside
200 IPE Stantions, secured onto conctrete bases. nailed to the underside of rafters , all done
acording to manufacturers specifications
2. All Swer system must comply with
Permisable FAR 1.0
DRAWING TITLE
National Building Regulations as
Wall mounted light 2300 above ffl poison by specialist wall plates Specified on SABS 0400
3. Stub column and concrete base design and steel must be 4. Galvanized crimped wire wall ties (7 per square meters
Total Coverage 603m2
FLOOR PLAN, ELEVATIONS, SITE
15A Double socket plug point 300 above ffl as per structural engineers details and specifications laid staggered) D2-800x2000 Meranti timber RD 1 - 4000x3500 Galvanized roller door Zoning Commercial
PLAN AND SECTIONS
5. SABS approved pre-cast concrete lintols above openings
15A Single socket plug point 6. 12mm thick cement plaster to be applied internally and
Note: Colour Legend Single door
W2-2000X900 Aluminim Window
* Sisolation or suitable insulation must be installed glazed with 3mm glass
* ALL CONSTRUCTION WORK TO BE DONE IN externally and paint - colour ti clients choice Window construction
DB * ALL CONSTRUCTION WORK TO BE DONE IN
Distribution board ACCORDANCE WITH NATIONAL ACCORDANCE WITH NATIONAL
BUILDING REGULATIONS Water Pipes
BUILDING REGULATIONS
G 150ltr Geyser with isolating switch Total FAR 603 / 1394 = 0.43
* ALL CONSTRUCTION WORK TO BE DONE IN Sewer Pipes
One way light switch ACCORDANCE WITH NATIONAL New wall plates
BUILDING REGULATIONS * ALL CONSTRUCTION WORK TO BE DONE IN Jan 2023 Scale:
Drawn By Neville Ogle 1:50
Electricl power supply ACCORDANCE WITH NATIONAL Existing Wall Plates
BUILDING REGULATIONS
Timber Construction
Checked By Mr Essop Feb 2023 1:100
Approved By Client Mr. Essop 1:500
New Concrete Work
Plan No. 2023 / 01 / 0001