Professional Documents
Culture Documents
Khuluma Motor Spares
Khuluma Motor Spares
Mary Street
5000
ERF120 Stuartstown
10000
5m Building Line # All Parking Bays are 2.5mx5m
5000
MH MH
PB1 PB2 PB3 PB4 PB5 PB6 PB6 PB7
RE
RE
PB9
4m Building Line
Proposed New Building PB10
45000
45000
30000
Lot 7 Lot 11
PB11
PB12
IE
IE
IE PB13
IE
IE
RE
4m Building Line
5000
4m Building Line
30000
Man Hole
IE IE
RE
Fire Escape
ine
1500
ch
Ma
ing
Toilet
nd
Ve
2625
Waiting Area 7.88m2
Bulk Shelving
Security Gates
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
1500
Entrance(Roller Shutter)
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
PROUDLY
10050
1500
SOUTH AFRICAN
Service Counter
11300
11300
Security Screen
7075
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
1500
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
Bulk Shelving
lIST OF REVISIONS
Vending Machine
AMENDMENT
1500
16800
900 300 900
20100
20100
20100
150
Vending Machine
1500
Bulk Shelving
Tyre Machine Tyre Machine
General Notes
1500
Tool Racks
10050
9725
Vehicle Lift Vehicle Lift Vehicle Lift
Bulk Shelving
8350
8200
1500
1. BOUNDRY BEACONS TO BE EXPOSED AND DEMARKATED
Entrance(Roller Shutter)
2. SOIL POISONING IN ACCORDANCE WITHSABS 0124 REQUIRED
1500
Toilet Toilet Toilet Toilet Toilet Toilet
THE COMMENCEMENT OF WORK
1500
DRAUGHTMANS SIGNATURE
Neville Ogle
______________________________
Lipped Channel
Roof Ridging
F/Bar Cleat
IBR Sheeting Lipped Channel
IBR Sheeting
F/Bar Cleat
HT Bolt& Nuts 200 IPE Rafter
HT Bolt& Nuts N P Draughting
Figure 1 200 IPE
1:50
Figure 2
1:50
11680
Neville Ogle
2025
Roof Notes
7400
0.4mm IBR roof sheetings fixed with tek screws and bonded washers
Sisolation installed under IBR sheeting
150mm Galvanized lipped channels with bolt and nut onto mounting brackets West Elevation East Elevation
5700
1:100 1:100
Floor Note
25 MPA concrete for concrete slab
Client Information
REF 195 steel mesh in concrete
Min 250 micron underlay ground sheet
Certified ant poison to be sprayed on well compacted fill Mr Yacoob Essop
Sort board jointing strips between stub column and floor
Flexi seal in expantion joints on floor
Ixopo
CONTACT : (073 678 6087)
PROJECT TITLE
PROPOSED CONSTRUCTION OF Spares
Electrical Legend Foundation Notes Floor Construction Wall Construction Roof Construction Ceiling Construction Sewer Window and Door Schedule Schedule of Areas and Fitment center
W1-900X550 Aluminim Window ERF Size 1394m2 ERF 120 Stuartstown
glazed with 3mm glass Proposed Building 603m2
1. 700x200mm thick strip footing foundations for 1. Floor finishes according to floor plan on 1. Clay common bricks / Blockwork to be used 1. 0.4 IBR sheeting laid on 150 lipped channel purlins 1. 6mm thick rhino board ceiling to all new rooms 1. New sewer pipes = 110mm D3-800x2000 Hollow Core Caterfoil
1200 Double fluorescent light point 140mm thick load bearing walls 150mm thick power floated concrete slabs, where plaster to done bolted on 100x6 steel cleats, welded onto 305 IPE rafters paint to clients specification New Soil Pipes = 110mm
Single door Total New work 603m2
laid to fall on well compacted selected fill. 2. Corobrik Engineering bricks below ground in bolted together to form trusses to be bolted onto 2. Fix ceiling to 38x38mm SA pine brandering New Waste Pipes = 50mm Permisable Coverage 80% - 1115.2m2
Ceiling mounted light 2. 450x150mm thick concrete strip footing foundations for
100mm thick non load bearing walls
SABSapproved damp proof membrane on
compacted soil treated with anti termite
foundation walls
3. Brick force to all courses from window head to underside
200 IPE Stantions, secured onto conctrete bases. nailed to the underside of rafters , all done
acording to manufacturers specifications
2. All Swer system must comply with
Permisable FAR 1.0
DRAWING TITLE
National Building Regulations as
Wall mounted light 2300 above ffl poison by specialist wall plates Specified on SABS 0400
3. Stub column and concrete base design and steel must be 4. Galvanized crimped wire wall ties (7 per square meters
Total Coverage 603m2
FLOOR PLAN, ELEVATIONS, SITE
15A Double socket plug point 300 above ffl as per structural engineers details and specifications laid staggered) D2-800x2000 Meranti timber RD 1 - 4000x3500 Galvanized roller door Zoning Commercial
PLAN AND SECTIONS
5. SABS approved pre-cast concrete lintols above openings
15A Single socket plug point 6. 12mm thick cement plaster to be applied internally and
Note: Colour Legend Single door
W2-2000X900 Aluminim Window
* Sisolation or suitable insulation must be installed glazed with 3mm glass
* ALL CONSTRUCTION WORK TO BE DONE IN externally and paint - colour ti clients choice Window construction
DB * ALL CONSTRUCTION WORK TO BE DONE IN
Distribution board ACCORDANCE WITH NATIONAL ACCORDANCE WITH NATIONAL
BUILDING REGULATIONS Water Pipes
BUILDING REGULATIONS
G 150ltr Geyser with isolating switch Total FAR 603 / 1394 = 0.43
* ALL CONSTRUCTION WORK TO BE DONE IN Sewer Pipes
One way light switch ACCORDANCE WITH NATIONAL New wall plates
BUILDING REGULATIONS * ALL CONSTRUCTION WORK TO BE DONE IN Jan 2023 Scale:
Drawn By Neville Ogle 1:50
Electricl power supply ACCORDANCE WITH NATIONAL Existing Wall Plates
BUILDING REGULATIONS
Timber Construction
Checked By Mr Essop Feb 2023 1:100
Approved By Client Mr. Essop 1:500
New Concrete Work
Plan No. 2023 / 01 / 0001