Its required to define the Bill of


Quantities (BO0) and estimate the cost of construting the
following Villa.
BOQ and Cost shall cover the
1.
following Items:
Reinforced Concrete, for the different house items, including footings,
and Slab. floor, columns
a. Footings: Assume all footings are isolated,
shall not cover the excavation work dimension 1.5x1.5x0.4 m3. Pricing
b Columns: 40x40 cm, distributed as per the house plan
t! Floor solid slab of 12 cm and roof
solid slab of 20
Walls: concrete blocks, outer wall thickness are 15 cm cm
and inners 12 cm
Plastering
Painting
Tiles
6.) Windows and Door

The floor height is 3 meters


Provide table showing the BOQ and Price of the
different items
Assume any missing values

1|2
1.8*1.5m
W4:1.8*1.5
W3:
1*11.5*1.5
WZ:
m W1:
m m
Outer
Inner

door:door:
B (C
0.8*2.21*2.2

Faculté
m
m
[384
de
Génie
[4.92'1 1,5n)
W3
l|
Civil

4th
Year

LivingRm
|12.792) 9m3 Bed
Spécifications
Métrés et

(26.241
28]|3 wh

w/d
[13.448'I (13.4sw3
4.5m
4.lrm
Kitchen WC
Closet
2Tm Authorized
DOcument

2022
July

0.
W
W1
Column

1.2m
(3.936] 6m
2 St [19.68]