May 2022
ut oe
Spécifications et MEtrés 4. thorized Document
- 3rd & 4th Year
Its required to define the Bill of Quantities (80Q) and estimate the cost of construting the
following Villa.
———-80Q.and Cost shall cover the following Items: —
1. Reinforced Concrete, for the different house items, including footings, floor, columns
and Slab.
/ fl Footings: Assume al footings are isolated, dimension 1.5x1.5x0.4 m3. Pricing
shall not cover the excavation work 7
uv, Columns: 40x40 cm, distributed as per the house plan
Ug. Floor solid slab of 12 cm and roof solid slab of 20 cm
Walls:concrete blocks, quter wall thickness are 15 cm and inners 12 cm
& Plastering
4. Painting -
Tiles 4
dows and Door *
The floor height is 3 meter
Provide table showing the BOQ and Price of the different items
Assume any missing values
a2
Scanned with CamScanner\ssayou Soxs'0 Gn)
seew cot @®
&
@
®
xoou cleo
Jsmeu zz60 @
sxiu cant) (a)
a
uwinjoy~
suauingoa poauownny
7207 AeW
4894 Yap — IND IH UBD 9p) 9HINIeS
Scanned with CamScanner