Partiel S.E.M 21-22

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
May 2022 ut oe Spécifications et MEtrés 4. thorized Document - 3rd & 4th Year Its required to define the Bill of Quantities (80Q) and estimate the cost of construting the following Villa. ———-80Q.and Cost shall cover the following Items: — 1. Reinforced Concrete, for the different house items, including footings, floor, columns and Slab. / fl Footings: Assume al footings are isolated, dimension 1.5x1.5x0.4 m3. Pricing shall not cover the excavation work 7 uv, Columns: 40x40 cm, distributed as per the house plan Ug. Floor solid slab of 12 cm and roof solid slab of 20 cm Walls:concrete blocks, quter wall thickness are 15 cm and inners 12 cm & Plastering 4. Painting - Tiles 4 dows and Door * The floor height is 3 meter Provide table showing the BOQ and Price of the different items Assume any missing values a2 Scanned with CamScanner \ssayou Soxs'0 Gn) seew cot @® & @ ® xoou cleo Jsmeu zz60 @ sxiu cant) (a) a uwinjoy~ suauingoa poauownny 7207 AeW 4894 Yap — IND IH UBD 9p) 9HINIeS Scanned with CamScanner

You might also like