Professional Documents
Culture Documents
Ajayi Samuel (Mechanical Engineering) Prem Page
Ajayi Samuel (Mechanical Engineering) Prem Page
Ajayi Samuel (Mechanical Engineering) Prem Page
AT
AJAYI SAMUEL
FPN/S04/2019/2020/ND/MET/1853
SUBMITTED TO
OCTOBER, 2021
i
Letter of Transmittal
P.M.B. 001,
Nasarawa State
Nasarawa State.
Through:
Nasarawa State.
Sir,
According to the laid down policy of the institution (Federal Polytechnic Nasarawa) that
students, on their completion of their industrial training programme should give in details the
technical report on the experience acquired.
By this I hereby present this report based on the various activities, experience, I had
throughout my four-month SIWES with A.B Welding and Construction company Ltd,
Zariagi Kabba Junction, Kogi State Nigeria.
Yours Faithfully
AJAYI SAMUEL
FPN/S04/2019/2020/ND/MET/1853
CIRCULATION OF INFORMATION
ii
The report is submitted to the circulation as well as necessary and record of the following
people.
Nasarawa State.
Nasarawa state.
The Librarian,
Nasarawa State.
DEDICATION
iii
This technical report is dedicated to the Almighty God who made all things possible, and also
to the great contribution of my parents for their immense prayers towards my success.
ACKNLEDGEMENT
iv
The completion of this undertaking could not have been possible without the participation
and assistance of so many people whose name may not all be enumerated .their contributions
are sincerely appreciated and gratefully acknowledged.
To my parents Mr and Mrs Abraham Ajayi, all relatives, friends and others who in one way
or another shared their support, either morally, financially and physically, Thank You
Above all, to the Great Almighty the author of knowledge and wisdom for his countless love
I Thank You.
v
ABSTRACT
The students’ Industrial Work Experience Scheme (SIWES) is an effort to prepare students
who are ready to face the challenge and practical aspect in understanding the various
principles and basic skills, to improve on the practical of his/her profession. The report
entails all the activities carried out at A.B Welding and Construction Company
Table of Contents
vi
Title page…………………………………………………………….…………………..i
Letter of Transmittal……………………………………………………………..……...ii
Circulation of Information……………………………………………………………...iii
Dedication……………………………………………………………………………....iv
Acknowledgement……………………………………………………………………....v
Abstract………………………………………………………………………………....vi
Table of contents……………………………………………………………….……....vii
CHAPTER ONE
1.0 Introduction………………………………………………………………..1
CHAPTER TWO
CHAPTER THREE
3.2 Recommendation………………………………………………………….7
References……………………………………………………...…………………8
Appendices………………………………………………………………………..9
vii