JADUAL PEMBAHAGIAN BAHAN PENGAJARAN (PELAN MENGAJAR-TEORI)

IT-030-3:2013 COMPUTER NETWORK SERVICES


CU3 : NETWORK CABLE INSTALLATION
KSK3014 : NETWORK CABLING INSTALLATION
RP/ Pelan Mengajar Kertas Penerangan Kertas Tugasan
Kompetensi
(NamaTajuk) (NamaTajuk) (NamaTajuk)
3. Carry Out Network Cable KSK3014/P (1/9) PM KSK3014/P (1/9) KSK3014/T (1/9)
Installation Kriteria Pemasangan Kabel Rangkaian Kriteria Pemasangan Kabel Rangkaian Kriteria Pemasangan Kabel Rangkaian
(Network Cable Installation Criteria) (Network Cable Installation Criteria) (Network Cable Installation Criteria)

KSK3014/P (2/9) PM KSK3014/P (2/9) KSK3014/T (2/9)


Tugas Pra-pemasangan kabel Tugas Pra-pemasangan kabel Tugas Pra-pemasangan kabel
rangkaian rangkaian rangkaian
(Pre-network cable installation tasks) (Pre-network cable installation tasks) (Pre-network cable installation tasks)

KSK3014/P (3/9) PM KSK3014/P (3/9) KSK3014/T (3/9)


Memasang dan Menarik Kabel Memasang dan Menarik Kabel Memasang dan Menarik Kabel
Rangkaian Rangkaian Rangkaian
(Network cable laying and pulling) (Network cable laying and pulling) (Network cable laying and pulling)

KSK3014/P (4/9) PM KSK3014/P (4/9) KSK3014/T (4/9)


Penamatan Kabel Rangkaian Penamatan Kabel Rangkaian Penamatan Kabel Rangkaian
(Network cable termination) (Network cable termination) (Network cable termination)

KSK3014/P (5/9) PM KSK3014/P (5/9) KSK3014/T (5/9)


Sambungan Kabel Rangkaian Sambungan Kabel Rangkaian Sambungan Kabel Rangkaian
(Network cable connection) (Network cable connection) (Network cable connection)

KSK3014/P (6/9) PM KSK3014/P (6/9) KSK3014/T (6/9)


Pengujian Penyambungan Kabel Pengujian Penyambungan Kabel Pengujian Penyambungan Kabel
Rangkaian Rangkaian Rangkaian
(Network cable connectivity test) (Network cable connectivity test) (Network cable connectivity test)
KSK3014/P (7/9) PM KSK3014/P (7/9) KSK3014/T (7/9)
Pengurusan Kabel Rangkaian Pengurusan Kabel Rangkaian Pengurusan Kabel Rangkaian
(Network cable management) (Network cable management) (Network cable management)

KSK3014/P (8/9) PM KSK3014/P (8/9) KSK3014/T (8/9)


Pengujian Penerimaan Pengguna Pengujian Penerimaan Pengguna Pengujian Penerimaan Pengguna
(User Acceptance Test (UAT)) (User Acceptance Test (UAT)) (User Acceptance Test (UAT))

KSK3014/P (9/9) PM KSK3014/P (9/9) KSK3014/T (9/9)


4. Prepare Network Cable Laporan Pemasangan Kabel Laporan Pemasangan Kabel Laporan Pemasangan Kabel
Installation Report Rangkaian Rangkaian Rangkaian
(Network Cable Installation Report) (Network Cable Installation Report) (Network Cable Installation Report)
JADUAL PEMBAHAGIAN BAHAN PENGAJARAN (PELAN MENGAJAR-AMALI)
IT-030-3:2013 COMPUTER NETWORK SERVICES
CU3 : NETWORK CABLE INSTALLATION
KSK3014 : NETWORK CABLING INSTALLATION
RP/ Lesson Plan Amali Kertas Kerja
Kompetensi
(NamaTajuk) (NamaTajuk)
KSK3014/K (1/7) PM KSK3014/K (1/7)
Identify Network Cabling Environment Identify Network Cabling Environment

KSK3014/K (2/7) PM KSK3014/K (2/7)


Pre-Network Cable Installation Tasks Pre-Network Cable Installation Tasks

KSK3014/K (3/7) PM KSK3014/K (3/7)


Network Cable Laying And Pulling Network Cable Laying And Pulling
3. Carry Out Network Cable Installation
KSK3014/K (4/7) PM KSK3014/K (4/7)
Network Cable Termination Network Cable Termination

KSK3014/K (5/7) PM KSK3014/K (5/7)


Network Cable Connection, Network Cable Connection,
Test Connectivity And Cable Management Test Connectivity And Cable Management

KSK3014/K (6/7) PM KSK3014/K (6/7)


Perform Network User Acceptance Test (UAT) Perform Network User Acceptance Test (UAT)
4. Prepare Network Cable Installation KSK3014/K (7/7) PM KSK3014/K (7/7)
Report Network Cable Installation Report Network Cable Installation Report
JADUAL PEMBAHAGIAN PENILAIAN BERTERUSAN
IT-030-3:2013 COMPUTER NETWORK SERVICES
CU3 : NETWORK CABLE INSTALLATION
KSK3014 : NETWORK CABLING INSTALLATION

Kompetensi Penilaian Pengetahuan (KA) Penilaian Prestasi (PA)


KSK3014/KA (1/4)
Network cable installation criteria
Pre - network cable installation tasks

KSK3014/KA (2/4)
Network cable laying and pulling
Network cable termination
3. Carry Out Network Cable Installation KSK3014/PA (1/2)
KSK3014/KA (3/4)
Network cable connection
Network cable connectivity test
Cable Management
User Acceptance Test (UAT)

4. Prepare Network Cable Installation Report KSK3014/KA (4/4) KSK3014/PA (2/2)