KUMARDUBI STATION BUILDING SUB CONTRACTOR BILL

NANE - PAPU BHARTI DATE 5/20/2024

SL.NO DESCRIPTION OF WORK NOS LENGTH BREADTH OTY


1 Ground Floor slab 1 108.322 37.556 4068.141
Stair 32.28
Ground floor Total - 4100.421

2 First Floor Slab 1 112.34 39.196 4403.279


Stair 32.28
First floor Total - 4435.559
GROUND FLOOR BRICK WORK
SL.NO DESCRIPTION OF WORK NOS LENGTH BREADTH HEIGHT OTY
250mm BRICK WORK
Brickwork A line 1to 10
1 1 30.625 0.25 2.4 18.375
Direction
2 1 no 10 no line A -D Direction 2 9.65 0.25 2.4 11.58
3 D line 5-6 1 4.9 0.25 2.4 2.94
4 D line 1-2 1 3.825 0.25 2.4 2.295
5 C line 2 to 5 1 11.35 0.25 2.4 6.81
6 D line 1 - 11 1 17.475 0.25 0.7 3.058125
6 no & 9 no A-D direction (BC
7 1 1.875 0.25 2.4 1.125
mid)
Total - 45.05813
8 (-) Deduction W1 11 1.5 0.25 1.65 6.80625
9 (-) Deduction W2 4 1 0.25 1.65 1.65
10 (-) Deduction W3 6 0.6 0.25 0.75 0.675
11 (-) Deduction D1 3 1.2 0.25 2.4 2.16
12 (-) Deduction D2 2 1 0.25 2.4 1.2
Total Deduction - 12.49125
Total Brick work Ground floor (250mm) - 32.56687

125mm BRICK WORK GROUND FLOOR


SL.NO DESCRIPTION OF WORK NOS LENGTH HEIGHT OTY UNIT
1 2 NO &5 NO LINE A -C direction 1 7.5 2.25 16.875 M2
2 A B mid 3 3.825 2.25 25.81875 M2
A B mid W/c bath Short wall (1
3 to 10 direction) 2 1.5 2.25 6.75 M2
A B mid W/c bath Short wall (1
4 to 10 direction) 1 1.875 2.25 4.21875 M2
5 6 no line A to B direction 1 4.475 2.25 10.06875 M2
6 6-9 no wall near electrical room 1 5.05 2.25 11.3625 M2
7 6-9 no wall near electrical room 1 2.5 2.25 5.625 M2
8 6-9 no wall near electrical room 1 1.6 2.25 3.6 M2
Total - 84.31875 M2
9 (-) Deduction D2 2 1 2.4 4.8 M2
10 (-) Deduction D3 1 0.9 2.1 1.89 M2
11 (-) Deduction Column 1 0.675 2.25 1.51875
Total Deduction - 6.69 M2
Total Brick work (125mm) - 77.62875 M2

FIRST FLOOR BRICK WORK


SL.NO DESCRIPTION OF WORK NOS LENGTH BREADTH HEIGHT OTY
250mm BRICK WORK
first floor Brick work A line 1to
1 1 15.175 0.25 2.4 9.105
5
2 6 no 10 no A line 1 11.4 0.25 2.4 6.84
3 A-D 1 no 1 10.1 0.25 2.4 6.06
4 6no line 1 9.725 0.25 2.4 5.835
5 C line 1 to 5 1 15.175 0.25 2.4 9.105
Total - 36.945
8 (-) Deduction W1 8 1.5 0.25 1.65 4.95
10 (-) Deduction W3 5 0.6 0.25 0.75 0.5625
11 (-) Deduction D1 2 1.2 0.25 2.4 1.44
Total Deduction - 6.9525
Total Brick work first floor (250mm) - 29.9925
BILL
5/20/2024

UNIT
sqft
sqft
sqft

sqft
sqft
sqft

UNIT
M3

M3

M3
M3
M3
M3
M3

M3

M3
M3
M3
M3
M3
M3
M3
M3 32.5669
77.6288

UNIT

M3

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3 29.9925
SL.NO DESCRIPTION OF WORK NOS LENGTH BREADTH HEIGHT
Boundary wall column foundation
1 earth dressing & Levelling 25 1.8 1.4
Boundary wall column foundation
2 earth dressing & Levelling 1 2 1.7
3 Boundary wall footing PCC 25 1.8 1.4 0.075
Boundary wall footing pcc 1 2 1.7 0.075
TOTAL PCC -
4 Boundary wall footing RCC raft 25 1.6 1.2 0.3
5 Boundary wall footing RCC raft 1 1.8 1.5 0.3
6 Boundary wall stool column casting 25 0.6 0.3 0.7
7 Boundary wall stool column casting 1 0.6 0.3 0.7
8 Boundary wall tie beam casting 1 50 0.25 0.3
TOTAL RCC -
9 2 NO Platform cc casting 1 83 2.5 0.1
10 2 NO Platform cc casting 1 11.8 2.5 0.1
11 2 NO Platform cc casting 1 14.1 1.9 0.1
12 2 NO Platform cc casting 1 7.15 1.15 0.1
13 2 NO Platform cc casting 1 14.3 2.5 0.1

TOTAL RCC -
SHUTTERING
NOS NO OF SIDE LENGTH HEIGHT
1 Shuttering pcc footing 25 2 1.8 0.075
2 Shuttering pcc footing 25 2 1.4 0.075
3 Shuttering pcc footing 1 2 2 0.075
4 Shuttering pcc footing 1 2 1.7 0.075
5 Shuttering Rcc footing 25 2 1.6 0.3
6 Shuttering Rcc footing 25 2 1.2 0.3
7 Shuttering Rcc footing 1 2 1.8 0.3
8 Shuttering Rcc footing 1 2 1.5 0.3
9 Shuttering STOOL COLUMN 25 2 0.6 0.7
10 Shuttering STOOL COLUMN 1 2 0.6 0.7
11 Shuttering TIE BEAM 1 2 50 0.3
TOTAL SHUTTERING -

NO
FOUNDATI
SL NO DESCRIPTION OF WORK ON SPACING NOS LENGTH
1 Boundary wall footing bottom bar 25.0 200.000 9 1.460
2 Boundary wall footing bottom bar 25 200.000 7 1.84
3 Boundary wall footing top bar 25 9 1.46
4 Boundary wall footing top bar 25 7 1.84
5 Boundary wall column vertical 25 4 3.648
6 Boundary wall column vertical 25 2 1.748
7 Boundary wall column STERRUP 25 17 1.024
8 Boundary wall footing bottom bar 2 9 2.04
9 Boundary wall footing TOP bar 2 10 1.76
10 Boundary wall column vertical 1 4 3.648
11 Boundary wall column vertical 1 2 1.748
OTY TOTAL QTY UNIT

63 M2

3.4 66.4 M2
4.725 M3
0.255 4.98 M3
4.98 M3
14.4 M3
0.81 M3
3.15 M3
0.126 M3
3.75 22.236 M3
22.236 M3
20.75 M3
2.95 M3
2.679 M3
0.82225 M3
3.575 M3
30.77625 M3
53.01225 M3

QTY TOTAL QTY UNIT


6.75 M2
5.25 M2
0.3 M2
0.255 M2
24 M2
18 M2
1.08 M2
0.9 M2
21 M2
0.84 M2
30 M2
108.375 M2

CUTTING DIA OF
COVER LAP LENGTH BAR Ø 8TOR 10TOR 16TOR
0.040 1.460 10 0 328.5 0
1.84 10 0 322 0
0.04 1.46 10 0 328.5 0
1.84 10 0 322 0
3.648 16 0 0 364.8
1.748 16 0 0 87.4
1.024 8 435.2 0 0
2.04 10 0 36.72 0
1.76 10 0 35.2 0
3.648 16 0 0 14.592
1.748 16 0 0 3.496
TOTAL LENGTH - 435.2 1372.92 470.288
UNIT WEIGHT/M - 0.39 0.62 1.58
TOTAL WEIGHT (KG) - 169.728 851.2104 743.055
OVERALL TOTAL WT (KG) - 1763.99344
KUMARDUBI STATION BUILDING
PAPU BHARTI (SUB CONTRACTOR)

SL.NO DESCRIPTION OF ITEM NOS QTY UNIT RATE


1 GROUND FLOOR SLAB 1 4100.42 SQFT 250.00
2 1ST FLOOR SLAB 1 4435.56 SQFT 250.00
TOTAL -
GROUND FLOOR BRICK WORK
3 (250MM) 1 32.5669 M3
GROUND FLOOR BRICK WORK
4 (125MM) 1 77.6288 M2
1STFLOOR BRICK WORK
5 (250MM) 1 29.9925 M3

BOUNDARY WALL FOUNDATION 2 NO PLATFORM CC CASTING

SL.NO DESCRIPTION OF ITEM NOS QTY UNIT RATE


1 DRESSING & LEVELLING 1 66.4 M 2

2 PCC 1 4.98 M3
3 RCC 1 53.01225 M3
4 SHUTTERING 1 108.375 M2
5 REINFORCEMENT 1 1763.993 KG
AMOUNTS
1025105.00
1108890.00
2133995.00

CC CASTING

AMOUNTS