SL.NO DESCRIPTION OF WORK NOS LENGTH BREADTH HEIGHT
Boundary wall column foundation
1 earth dressing & Levelling 25 1.8 1.4
Boundary wall column foundation
2 earth dressing & Levelling 1 2 1.7
3 Boundary wall footing PCC 25 1.8 1.4 0.075
Boundary wall footing pcc 1 2 1.7 0.075
TOTAL PCC -
4 Boundary wall footing RCC raft 25 1.6 1.2 0.3
5 Boundary wall footing RCC raft 1 1.8 1.5 0.3
6 Boundary wall stool column casting 25 0.6 0.3 0.7
7 Boundary wall stool column casting 1 0.6 0.3 0.7
8 Boundary wall tie beam casting 1 50 0.25 0.3
TOTAL RCC -
9 2 NO Platform cc casting 1 83 2.5 0.1
10 2 NO Platform cc casting 1 11.8 2.5 0.1
11 2 NO Platform cc casting 1 14.1 1.9 0.1
12 2 NO Platform cc casting 1 7.15 1.15 0.1
13 2 NO Platform cc casting 1 14.3 2.5 0.1
TOTAL RCC -
SHUTTERING
NOS NO OF SIDE LENGTH HEIGHT
1 Shuttering pcc footing 25 2 1.8 0.075
2 Shuttering pcc footing 25 2 1.4 0.075
3 Shuttering pcc footing 1 2 2 0.075
4 Shuttering pcc footing 1 2 1.7 0.075
5 Shuttering Rcc footing 25 2 1.6 0.3
6 Shuttering Rcc footing 25 2 1.2 0.3
7 Shuttering Rcc footing 1 2 1.8 0.3
8 Shuttering Rcc footing 1 2 1.5 0.3
9 Shuttering STOOL COLUMN 25 2 0.6 0.7
10 Shuttering STOOL COLUMN 1 2 0.6 0.7
11 Shuttering TIE BEAM 1 2 50 0.3
TOTAL SHUTTERING -
NO
FOUNDATI
SL NO DESCRIPTION OF WORK ON SPACING NOS LENGTH
1 Boundary wall footing bottom bar 25.0 200.000 9 1.460
2 Boundary wall footing bottom bar 25 200.000 7 1.84
3 Boundary wall footing top bar 25 9 1.46
4 Boundary wall footing top bar 25 7 1.84
5 Boundary wall column vertical 25 4 3.648
6 Boundary wall column vertical 25 2 1.748
7 Boundary wall column STERRUP 25 17 1.024
8 Boundary wall footing bottom bar 2 9 2.04
9 Boundary wall footing TOP bar 2 10 1.76
10 Boundary wall column vertical 1 4 3.648
11 Boundary wall column vertical 1 2 1.748
OTY TOTAL QTY UNIT
63 M2
3.4 66.4 M2
4.725 M3
0.255 4.98 M3
4.98 M3
14.4 M3
0.81 M3
3.15 M3
0.126 M3
3.75 22.236 M3
22.236 M3
20.75 M3
2.95 M3
2.679 M3
0.82225 M3
3.575 M3
30.77625 M3
53.01225 M3
CUTTING DIA OF
COVER LAP LENGTH BAR Ø 8TOR 10TOR 16TOR
0.040 1.460 10 0 328.5 0
1.84 10 0 322 0
0.04 1.46 10 0 328.5 0
1.84 10 0 322 0
3.648 16 0 0 364.8
1.748 16 0 0 87.4
1.024 8 435.2 0 0
2.04 10 0 36.72 0
1.76 10 0 35.2 0
3.648 16 0 0 14.592
1.748 16 0 0 3.496
TOTAL LENGTH - 435.2 1372.92 470.288
UNIT WEIGHT/M - 0.39 0.62 1.58
TOTAL WEIGHT (KG) - 169.728 851.2104 743.055
OVERALL TOTAL WT (KG) - 1763.99344
KUMARDUBI STATION BUILDING
PAPU BHARTI (SUB CONTRACTOR)
2 PCC 1 4.98 M3
3 RCC 1 53.01225 M3
4 SHUTTERING 1 108.375 M2
5 REINFORCEMENT 1 1763.993 KG
AMOUNTS
1025105.00
1108890.00
2133995.00
CC CASTING
AMOUNTS