METODE OEE - Electric - 2024
METODE OEE - Electric - 2024
NO MONTH
AVAILABILITY PERFORMANCE AVAILABILITY PERFORMANCE
1 JANUARY 97.64% 98.60%
2 FEBRUARY 99.01% 99.16%
3 MARCH 99.29% 99.51%
4 APRIL
5 MAY
6 JUNE
7 JULY
8 AUGUST
9 SEPTEMBER
10 OCTOBER
11 NOVEMBER
12 DECEMBER
BA LINE 1 BA LINE 2
AVAILABILITY PERFORMANCE AVAILABILITY PERFORMANCE
99.95% 99.90%
99.96% 99.93%
99.98% 100.00%
JANUARY
MACHINE TOTAL (MINUTE)
TIME AVAILABLE DOWN TIME
(MINUTE)
RUNNING TIME
(MINUTE) AVAILABILITY DATE SHIFT DOWN TIME ELECTRIC 4 HI MILL TOTAL
4 HI MILL 44640 1053 43587 97.64% 1/6/2024 A PREPARE ALL SYSTEM 0:10:00
8 HI MILL 44640 626 44014 98.60% 1/6/2024 A LOCK MANDREL ETR ALARM 0:05:00
BA LINE 1 44640 21 44619 99.95% 1/8/2024 A LOCK MANDREL ETR ALARM 0:05:00
BA LINE 2 44640 44 44596 99.90% 1/8/2024 C DBC ERT TRIP 0:15:00
1/8/2024 C OIL MIST PROBLEM 0:20:00
1/8/2024 C INTERLOCK TOP W/R LOCK 0:10:00
1/9/2024 B MILL TRIP - POWER FAILURE 0:15:00
1/11/2024 A REPAIRING DBC PROBLEM BY ELECTRIC 0:45:00
1/11/2024 B DCB DTR BURNT AFTER PLN FLICKER, WAITING MAINTENANCE BY ELECTR 7:00:00
1/11/2024 C DCB DTR BURNT AFTER PLN FLICKER, WAITING MAINTENANCE BY ELECTR 2:25:00
1/14/2024 A CHECK OIL MIST SYSTEM 0:10:00
1/15/2024 B DBC DTR MOTOR TRIP 0:20:00
1/16/2024 B CRANE PROBLEM 0:30:00
1/18/2024 A RESTART X-RAY 0:10:00
1/19/2024 C DTR DRIVE DBC OPEN 0:50:00
1/19/2024 C DTR TENSION PROBLEM 0:50:00
1/20/2024 A PLN FLICKER 0:10:00
1/24/2024 B CAPASITOR BANK BURNT 1:25:00
1/24/2024 C CAPASITOR BANK BURNT 1:19:00
1/28/2024 C ETR X-RAY PROBLEM 0:09:00
1/30/2024 B THICKNESS GAUGE PROBLEM 0:10:00
TOTAL DOWN TIME 17:33:00