Professional Documents
Culture Documents
Ikbe24 Skytta Installation Guide r1 en S
Ikbe24 Skytta Installation Guide r1 en S
Ikbe24 Skytta Installation Guide r1 en S
installation guide
IKBE24_SKYTTA_installation_guide_EN_R1
Chapter name
Installing your new SKYTTA system correctly You can do it yourself, but you don’t have to
This brochure is your guide to preparing and installing Although our SKYTTA system is designed to be as
the SKYTTA system by yourself. Inside you’ll find clear simple as possible for you to assemble and install it
steps to follow as well as useful tips and ideas. Use yourself, it is important to consider all different situ-
this guide along with your IKEA Assembly Instructions ations you might encounter based on the height of
to make sure your SKYTTA sliding doors are installed your ceiling.
in the right way.
In case your ceiling is too low or you install the doors
Before you begin in a room with a sloping ceiling, you you will need to
Go through this brochure in order to see what stages cut the door frames and panels. This step requires
are involved in the process and which tools you will more skill and experience than others and we strongly
need. To make sure you have everything, compare recommend you get the help of a professional carpen-
the packages and parts you have at home against ter who has the right tools.
the order list and the freight list. Remember that the
SKYTTA system is suitable for a reach-in or walk-in We can offer you services ranging from planning and
wardrobe or as a room divider. delivery to system installation. For more details see
the back page of this guide, the SKYTTA section of
www.IKEA.xx or contact your local IKEA store.
Table of contents
All homes, big and small, have their challenges. Made to run between the ceiling and floor and from
Maybe there’s a lack of storage, or all of everyday wall to wall, so no wardrobe frames are needed, and
living in the home needs. With SKYTTA sliding door suitable with any of our storage systems that suit your
system, you can use your square metres smarter and space. Or use them as a room divider. Choose a sleek,
create a home office in the living room or a spacious minimalistic door or an industrial looking glass door
walk-in wardrobe in the bedroom as if by magic. to set the style in your room.
Room divider
3
Tools
Basic tools
Carpenter’s rule Saw and Miter box Hacksaw Step ladder Electric drill
(or tape measure)
4
Before you start
In the buying process you have decided the number Two people are recommended to work with SKYTTA
of doors, door widths and door tracks that will suit system.
for your width and storage behind. You need to have
this layout with you in the assembly of the system as If any of above have been missed and you don’t have
you need to know how to place the doors. a layout or considered stop bar or storage behind,
you need to do this before continuing. Use SKYTTA
Make sure you have the space to cut the rails and as- planning tool.
semble the doors.
SKYTTA has been developed to work perfectly with
Check the room to see if you need to make any ad- other parts of IKEA storage offerings. If an existing
justments, e.g. floor, ceiling etc. solution is planned to be used outside of the IKEA
range, then please check all measurements carefully
Take into consideration electric outlets, cables, wires to ensure compatibility.
etc. and make sure they do not interfere with the
SKYTTA system.
5
Before you start
X3 _____________ mm
X1 _____________ mm
X1
Y1 X1
Y2 Y3
X1
X2 _____________ mm
6
SKYTTA parts
Since SKYTTA packages are picked together for each Main Assembly Instruction for the system is to be
system combination you will have some different found in the fitting package for the end doors.
packages. Below is an overview of the different pack- This main Assembly Instruction will refer to other
ages and parts. Make sure you have everything you Assembly Instructions when it is time for that step.
need before starting the assembly.
1
2 15
14
7 6
3
8 4
SKYTTA 1. Wood beam
2. Flange screws
3. Ceiling rail
4. Top cover
5. Floor rail
6. Soft close
13 10 7.
8.
Soft close activators
Guide pin FTC
9. Wheel fitting
7 8 10 12 14
9 11 13
16 17 18 19
(optional) 1
5
4
7 9 11
7
2. Flange Screews 11. Door Handle
3. Ceiling Rail
4. Top Rail Cover 12. Door Panels
To think about
Here are some general tips to have in mind before tips depending on the solution that is applicable to
you start assembling SKYTTA sliding doors. These your room, please see the following pages and the
tips are for all the solutions, and for more specific Assembly Instructions.
H H H
8
Door assembly Mount door/clean floor rail
Door has two symmetrical side rails, bottom rail and top rail, marked. Wheel fitting Clean the floor rail before mounting as dust can get stuck on the wheels. This
is placed in the bottom and guide fitting in the top. Click in the horizontal bars on should be done regularly to maintain a nice sliding of the doors. Follow the layout
the side rails and spared them out so they match the height just above the fillers. with activator/soft closing. Guide pins with wings shall be connected to activator/
Guide pins with wings shall be placed to match activator between doors. soft closing between doors.
DRAFT 1 2x
2 2x
9
Height options
10
The doors fit perfectly
If the SKYTTA doors fit your space perfectly, you as-
semble them normally. In this illustration, you can see
what the system would look like.
2039–2051 mm 2391–2403 mm
11
Height options
12
Height options
2075-2410 mm 2427-2762 mm
13
Height options
It’s possible to cut the door and panels to reduce the X/2 X/4
14
Height options
Sloped ceiling solution If you want to install SKYTTA sliding doors onto a
sloped ceiling, you need to leave extra wall space
SKYTTA ceiling rail must be mounted onto a flat which is wider than the width of the rail, and which
surface which is parallel with the floor. It cannot be creates a 90 degree angle with the wall.
mounted directly onto a sloped ceiling.
Sloped ceiling
Added wall
space
90° angle
15
Services