AEI SHE JSA 01 Job Safety Analysis

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

PROJECT COMPLETION REPORT

261/C-CL/2022
ELEKTRIKAL ASSESSMENT TERMINAL AKR NILAM UTARA
DI TERMINAL AKR NILAM UTARA

222019-AEI-SHE-JSA -01

JOB SAFETY ANALYSIS

PT. ASUKA ENGINEERING INDONESIA - 2022


PT. AKR CORPORINDO, TBK.
PT. ASUKA ENGINEERING INDONESIA
DOC NO. REVISION STATUS
222019-AEI-SHE-JSA -01 0 A

JOB SAFETY ANALYSIS

ELEKTRIKAL ASSESSMENT DI TERMINAL AKR NILAM UTARA

PT. AKR CORPORINDO, TBK.

TERMINAL AKR NILAM UTARA

RETURN CODE CLASS


APPROVED (AP)
APPROVED WITH NOTE (AN)
REVIEWED (RV)
REJECTED (RN)
DATE :

SIGN :

A0 30-08-2022 Issued For Reviewed ITW HM HM

PREPARED CHECK. APPR.


REV DATE DESCRIPTION
PT. ASUKA ENGINEERING INDONESIA
STATUSCODE: : A = Issued for reviewed – B = Issued for approval – C=As Build

TOTAL OR PARTIAL REPRODUCTION AND / OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN


WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER

You might also like