Materials Reconciliation up to 31.04.

2024 - GGHW
Drawing Actual Saving
S.No. Description Units Receipts Closing
Quantity Quantity (+)
1 Concrete
a1 M30 (Pile foundation) 619 598
1146
a M30 745 3335 728 3318 16
b M25 1992 1970 1992
M3
c M10 110 147 110 37

2 Gravel 1541 1510 1541 -14

3 Steel
a Pile Foundation 71.20 71.20 0
MT 536.89 34.093
Structure up to (IV rd
b 465.69 466.44 20.24
floor Column)
4 M Sand M3 514 578 460 54
5 Fly Ash Bricks Nos 343500 10000 333500 323500 9750
W
In
Percentage Remarks

1 3138.25

27
Champ work used for Entrance
-1 Pipelaying and Site Clearance

0
4
9
3
Abstract Estimation upto Fourth floor roof slab reinforcement and Fourth floor colu
Actual work done Quantity
Concrete in M3
S.No Description
Steel in MT M10 M25
RMC Manual RMC
1 Pile Foundation 71.20
2 Below Ground level
a Pile Cap 46.68 21.00 21.25
b Grade Beam 22.89
c Lift Wall 1.69 3.50
d Column up to Basement Level 28.54 43.29
e Structural slab 5.50 121.00 101.00
3 Ground floor
a Column 35.84 112.58
b Ramp 3.14 28.01
c Staircase 1.92 1.50 17.45
d Roof Slab 44.97 247.00
e Lintel and Sunshade 1.75
4 First floor
a Column 29.69 112.58
b Ramp 3.14 27.31
c Staircase 1.41 12.66
d Roof Slab 43.13 264.88
e Lintel and Sunshade 1.50
5 Second floor
a Column 24.05 112.58
b Ramp 3.14 27.31
c Staircase 1.41 12.66
d Roof Slab 43.56 264.88
e Lintel and Sunshade 1.25
6 Third floor
a Column 18.87 112.58
b Ramp 3.14 27.31
c Staircase 1.41 9.66
d Roof Slab 42.95 264.88
e Lintel and Sunshade
7 Fourth floor
a Column 18.87 112.58
b Ramp 1.50 21.00
c Staircase 0.75
d Roof Slab 33.00
e Lintel and Sunshade
Drawing total Quantity work done on
536.89 147.00 21.25 1932.20
30.04.2024
Consumed 503.08 122.25 3138.25
Materials Received 537.17 101.00 21.25 1954.25
Closing Stock 34.09
Department Measurement Up to VI th 63.37 2172.44
416.87
Part Bill / IV rd floor Column 210.81 2513.09
Pile Foundation Consumed 71.20 523.32 274.18 598
Work done IV th floor roof (Bill not
35.25 35
submitted)
Difference (Drawing vs Consumed) 20.24 46.00 7.84
Difference (Department vs Consumed) 20.24 151.93 7.84
orcement and Fourth floor column concrete
work done Quantity
Remarks
ncrete in M3 Brick work
M25 M30 230 mm 115 mm
Manual
598.00

728.00 228.00

14.00
239.70
112.00

9.00 Manual Concrete

215.15
151.00

9.00 Manual Concrete

193.20
74.00

66 m3 Bill
8.00
summitted
38.00 1326.00 876.05 337.00 876.05
3138.25 333500.00
38.00 1146.00 343500.00
10000.00
2172.44 340.65
1136.89 230 mm wall
2513.09
598 688.05 1136.89 115 mm wall
3146.09
35
7.84 12500.00
7.84 12500.00
Details of Received materials 0n 31.04.2024
S.No Materials description Quantities Units Remarks
1 Cement 2810.00 Bags
2 Concrete
M30 1146.00 M3
M25 1954.25 M3
M10 110.00 M3
3 Gravel 54380.00 1540.95 Cft/M3
4 M sand 20176.00 571.72 Cft/M3
5 P sand 1250.00 35.42 Cft/M3
6 Blue Metal 20 mm 1900.00 53.84 Cft/M3
7 Bricks 343500.00 Nos
8 Steel 537.17 Mt