Quotation
To Quote No: AIQ062402
Mr. Achyuth, Location: Construction of Date: 09-06-2024
Kolluru, commercila complex at Kolluru PO No:
Hyderabad, PAN: AAOCA5537F
GSTIN : 36AAOCA5537F1ZJ Item: Civil Work
Due Date:
₹ 30,70,60,250.00
Note:
1. Excavation: Costs can vary based on soil conditions/rock base, groundwater presence, and local regulations.
2. Retaining Wall: This cost includes concrete, reinforcement, formwork, and labor.
3. Construction Costs (Structure Only): Includes costs for concrete, steel, formwork, and labor for constructing the structural
framework and finishing, MEP (Mechanical, Electrical, and Plumbing), and other ancillary costs.
Additional Considerations:
4. Contingency: Adding a contingency of 5-10% to cover unforeseen costs is advisable.
5. Legal Fees: Costs for obtaining necessary permits and licenses.
6. Project Management: Costs for hiring project managers and consultants.
7. Utilities and Site Preparation: Costs for providing temporary utilities and preparing the construction site.