Plot no: 76/A, 76/B, Jubilee Garden,

Kondapur, Hyderabad, Pin:500084


Mobile: +91 7675990025
email: aeroesinfra@gmail.com

Quotation
To Quote No: AIQ062402
Mr. Achyuth, Location: Construction of Date: 09-06-2024
Kolluru, commercila complex at Kolluru PO No:
Hyderabad, PAN: AAOCA5537F
GSTIN : 36AAOCA5537F1ZJ Item: Civil Work
Due Date:

S.No. Description Qty Units Rate Net Amout

1 Excavation for 2 Cellars 15,050 C.mtr 225 33,86,250.00


Total depth for 2 cellars: 24 feet.
Excavation Volume = 22,138 sq ft × 24 ft =
531,312 cubic feet.
1 cubic meter = 35.3147 cubic feet
Volume in cubic meters = 531,312 / 35.3147 ≈
15,050 cubic meters

2 Retaining Wall (Approxmately)


Perimeter: 150 feet × 150 feet (assuming) 14,400 Sq.feet 795 1,14,48,000.00
Total perimeter = 4 × 150 feet = 600 feet
Retaining wall area = 600 feet × 24 feet =
14,400 square feet

3 Construction of Structure for 4 Floors + 2


Cellars & Final Finishings
Built-Up Area for 6 Levels (4 Floors + 2 Cellars):
1,32,830 Sq.feet 2,200.00 29,22,26,000.00
Total built-up area = 132,830 sq ft

₹ 30,70,60,250.00
Note:
1. Excavation: Costs can vary based on soil conditions/rock base, groundwater presence, and local regulations.
2. Retaining Wall: This cost includes concrete, reinforcement, formwork, and labor.
3. Construction Costs (Structure Only): Includes costs for concrete, steel, formwork, and labor for constructing the structural
framework and finishing, MEP (Mechanical, Electrical, and Plumbing), and other ancillary costs.
Additional Considerations:
4. Contingency: Adding a contingency of 5-10% to cover unforeseen costs is advisable.
5. Legal Fees: Costs for obtaining necessary permits and licenses.
6. Project Management: Costs for hiring project managers and consultants.
7. Utilities and Site Preparation: Costs for providing temporary utilities and preparing the construction site.