Doors - Checklist
Doors - Checklist
NERIN
NRN-CON-DRS-CL-08
Revision Number / Date
QMS
00 / 16th July 2022
Page Number
DOORS INSTALLATION - CHECKLIST
Page 1 of 1
Client: Project:
Main Contractor: Project No.:
Sub-Contractor: Drawing No:
Scope: Specification:
CHECKLIST - DOORS CONTRACTOR NERIN
COMMENTS
YES NO YES NO
1) Check all doorframes for level, Square & Plumb.
2) Doors are in accordance with door schedule and specifications.
3) Door surface (Condition) before installation.
4) Sufficient gap between door and floor tiles / carpets.
5) Weather strip installed.
6) Even spacing’s between Door & Doorframe.
7) Hinges are the correct type, swing free & not bound.
8) All screws are in & the same type.
9) Overall condition & working condition of doors.
10) Doors clean (dust, paint & other scuff marks)
11) Fire doors (Ensure certificates available & included in Data Book)
12) Lead doors (Ensure certificates available & included in Data Book)
13) Correct signage displayed for above “special doors”
Sign:
Date: