Document Number

NERIN
NRN-CON-DRS-CL-08
Revision Number / Date
QMS
00 / 16th July 2022

Page Number
DOORS INSTALLATION - CHECKLIST
Page 1 of 1

Client: Project:
Main Contractor: Project No.:
Sub-Contractor: Drawing No:

Scope: Specification:
CHECKLIST - DOORS CONTRACTOR NERIN
COMMENTS
YES NO YES NO
1) Check all doorframes for level, Square & Plumb.
2) Doors are in accordance with door schedule and specifications.
3) Door surface (Condition) before installation.
4) Sufficient gap between door and floor tiles / carpets.
5) Weather strip installed.
6) Even spacing’s between Door & Doorframe.
7) Hinges are the correct type, swing free & not bound.
8) All screws are in & the same type.
9) Overall condition & working condition of doors.
10) Doors clean (dust, paint & other scuff marks)
11) Fire doors (Ensure certificates available & included in Data Book)
12) Lead doors (Ensure certificates available & included in Data Book)
13) Correct signage displayed for above “special doors”

CHECKLIST - IRONMONGERY SUB CONTRACTOR NERIN


COMMENTS
YES NO YES NO
1) Correct Ironmongery, Size, Type and Designation.
2) Door Closer fixed firmly and working.
3) Handles installed correctly, undamaged and mechanically sound.
4) Thumb turns and ring pulls correctly installed.
5) Lock system-key/thumb turn workable and mechanically sound.
6) Striker plates, screws and covers present, undamaged and adjusted.
7) All signage, push & kick-plates level & secure.
8) Doorstops in correct positions.
9) Key list completed.
Approval
Contractor Inspector Contractor Supervisor NERIN Supervisor
Name:
Surname:

Sign:

Date: