Lead Time Forecast

Effective June 15th, 2024


Please Note:
Factory lead times provided are typical/standard lead times from the
factory in Pewaukee, WI. Orders received after this effective date will
be acknowledged using these published lead times unless otherwise
agreed to by Dynex.
Expedited lead times provided are typical/standard lead times from
the warehouse in Ashland, MA.
If a customer needs delivery in a time frame sooner than the
typical lead time, please consult the factory for best possible time.

CURRENT ESTIMATED LEAD TIMES


Product Group Factory Lead Time Expedited Lead Time②
6***-HP03-EPW Valves 20 Weeks 20 days or less
6***-HP03 Valves 20 Weeks 20 days or less
6***-HP05H Valves ① N/A
61**-D03 Valves ① 20 days or less
61**-D05 Valves ① 20 days or less
61**-D08 Valves 14 Weeks 20 days or less
65**-D03-EPW Valves 20 Weeks 20 days or less
65**-D03 Valves 20 Weeks 20 days or less
65**-D05 Valves 20 Weeks 20 days or less
66**-D08 Valves 24 Weeks 20 days or less
66/68/69**-D05H Valves 30 Weeks 20 days or less
66/68/69**-D08H Valves 26 Weeks 20 days or less
68**-D05 Valves 20 Weeks 20 days or less
68/69**-D03 Valves 20 Weeks 20 days or less
68/69**-D08 Valves 24 Weeks 20 days or less
69**-D05 Valves 20 Weeks 20 days or less
88**-With Check Valve ① 20 days or less
88**-Without Check 26 Weeks 20 days or less
8819/39-03/06 Valves 18 Weeks 20 days or less
8820-01/02 Valves 6 Weeks 20 days or less
H8819, MH8819 Valves 20 Weeks N/A
MF5000 Motors ① N/A
P88**-With Check ① 20 days or less
P88**-Without Check Valve 32 Weeks 20 days or less
① Please consult factory for current lead time.
② Lead Times for Expedited Delivery from our Ashland, MA facility will vary. Some items are "In Stock" and ready for dispatch, and other items
will require conversion from on hand inventory. Items that require conversion will be quoted at 4 Weeks. Please consult Pewaukee, WI or
Ashland, MA facility to determine availability.
➂ Please consult Dynex/Rivett Inc. in Ashland, MA for current lead time.
CURRENT ESTIMATED LEAD TIMES

Product Group Factory Lead Time Expedited Lead Time②


PF1000-10 Pumps 28 Weeks ①

PF1300 Pumps 32 Weeks N/A


PF2000-10 Pumps 28 Weeks ①

PF2006 Pumps 24 Weeks 20 days or less


PF3000-10 Pumps 26 Weeks ①

PF4000-30 Pumps 30 Weeks ①

PF4200 Pumps 32 Weeks N/A


PF4300 Pumps 32 Weeks 20 days or less
PF500 Pumps 14 Weeks 20 days or less
PF6000-10 Pumps 20 Weeks N/A
PV4000-11 Pumps - Press Comp MVIP 40 Weeks N/A
PV6000 Pumps - Non-Comp HVIP 40 Weeks N/A
RPA Actuators 16 Weeks N/A
Sandwich Valves - Dynex ➂ 20 days or less
Sandwich Valves - HP03 24 Weeks 20 days or less
VHR/VHD/VHU 16 Weeks N/A
VM*106 Poppet Valves 12 Weeks N/A
VST-HP03 Vent Valves 16 Weeks 20 days or less
Service Kits and Parts ① ➂

① Please consult factory for current lead time.


② Lead Times for Expedited Delivery from our Ashland, MA facility will vary. Some items are "In Stock" and ready for dispatch, and other items will
require conversion from on hand inventory. Items that require conversion will be quoted at 4 Weeks. Please consult Pewaukee, WI or Ashland,
MA facility to determine availability.
➂ Please consult Dynex/Rivett Inc. in Ashland, MA for current lead time.
USA Headquarters Power Units & Systems
770 Capitol Drive 54 Nickerson Road
Pewaukee, WI 53072 Ashland, MA 01721
Tel: +1 (262) 691-0300 Tel: +1 (508) 881-5110
Fax: +1 (262) 691-0312 ashland@dynexhydraulics.com
sales@dynexhydraulics.com

European Sales Middle East Sales


Unit C5 Steel Close, Little End Road, JAFZA 1, Tower A, 11th Floor
Eaton Socon, St Neots, Jebel Ali Freezone
Cambs. PE19 8TT United Kingdom Dubai, UAE
Tel: +44 (0) 1480 213980 Tel: +971 547422353
Fax: +44 (0) 01480 405662 UAEsales@dynexhydraulics.com
sales@dynexhydraulics.co.uk

Specifications shown were in effect when published. Since


errors or omissions are possible, contact your Dynex
Sales representative or the Dynex Sales department for
the most current specifications before ordering. Dynex
reserves the right to discontinue products or change
designs at any time without incurring any obligation.

www.dynexhydraulics.com
Copyright © Dynex/Rivett Inc. Printed in U.S.A. June 2024