List of Properties booked for U/C by Building Department-II/KPZ w.e.f.

June-2023 to
Booking
S. No. Date Name of Owner/occupier Ward No. Address of the property
No.

A-10(Part)- (RHS), GTK Road


1 65 01.06.2023 Owner/Builder/Occupier 67
Indl. Area

A-33, (Back Part), Kamla


2 66 01.06.2023 Sunil Gupta/Occupier 69
Nagar

C-2/49 (Third Floor), Ashok


3 67 01.06.2023 Manohar Singh 65
Vihar-II

Flat No. 3-A, DDA, Janta


5 69 06.06.2023 Narender/Owner/Occupier 66 Flat, behind Lakshmibai
College,Ashok Vihar

6 70 09.06.2023 S.L. Yadav & Others 68 A-57, Derawal Nagar

7 71 09.06.2023 Vinod Malhotra & Others 68 B-58, Derawal Nagar

8 72 12.06.2023 Owner/Builder/Occupier 69 10-F, Kamla Nagar

9 73 12.06.2023 Rahul/Owner/Builder 62 H-128, Shakurpur, J.J.Colony

10 74 12.06.2023 J.P. Goel/Owner/Builder 62 G-439-440, Shakurpur


A-83/3, Wazirpur Indl. Area,
11 75 19.06.2023 Owner/Builder 64
Phase-I

12 76 19.06.2023 Owner/Builder 64 A-98, Wazirpur Indl. Area

13 77 19.06.2023 Owner/Builder 64 A-100, Wazirpur Indl. Area

14 78 19.06.2023 Owner/Builder 64 A-132, Wazirpur Indl. Area

15 79 19.06.2023 Sanyam Sachdeva and others 68 82, Gujranwala Town-II

16 80 19.06.2023 Owner/Builder 64 A-107, Wazirpur Indl. Area

Subhash Chander Uppal & Jatin


17 81 19.06.2023 67 A-78, GTK Road Indl. Area
Uppal & Others
A-85, Group, Wazirpur Indl.
18 82 19.06.2023 Owner/Builder 64
Area

Nitin Arora/ Sandeep Nayyar &


19 83 23.06.2023 67 B-117, GTK Road Indl. Area
Others

D-1/31, Model Town-II


20 84 26.06.2023 Builders/ Occupier 68
(Right side along lane)

21 85 26.06.2023 Mr. Nemi Jain & Others 68 B-237, Derawal Nagar

22 86 26.06.2023 Mr. Udai Khanijow 68 B-74, Gujranwala Town-1

B-75, Gujranwala Town-1,


23 87 26.06.2023 Vijay Kumar Arora 68
C.H. B & Ltd.

Naresh Kumar Garg, Renu Garg 1734/126, Shanti Nagar, Tri


24 88 07.07.2023 63
& Jyoti Rathore Nagar
Plot No. 5, Block No.
25 89 11.07.2023 Prem Lata Goel 69
17(LHS), Shakti Nagar

Flat No. 2-C, Krishna


26 90 14.07.2023 Lalit Chauhan 66 Enclave, Pocket-A, Ashok
Vihar-III

Viany Kanodia, Madh Kanodia & Plot No. 6, Block No.22 ,


27 91 20.07.2023 69
Kanika Kanodia Shakti Nagar (22/6)

Brij Mohan Gupta, Ram Avtar 4281/4, Jai Mata Market, Tri
28 92 25.07.2023 63
Sharma & Pawan Shukla Nagar

109, Maharana Partap


29 93 26.07.2023 Kannta Devi Bansal 61
Enclave, Pitampura

Shambhu Flat No. 58-A, GF, Shivam


30 94 28.07.2023 65
Gupta/Owner/Occupier Apartments, Ashok Vihar-II

Shambhu Flat No. 58-B, FF, Shivam


31 95 28.07.2023 65
Gupta/Owner/Occupier Apartments, Ashok Vihar-II

32 96 31.07.2023 Surender Kumar Jain & Ors. 64 C-23, Ashok Vihar-I

Flat No. 50-A, GF, KD Block,


33 97 31.07.2023 Owner/Occupier 65
Ashok Vihar-I

G-439-440, Shakurpur,
34 98 01.08.2023 J.P. Goel/Owner 62
J.J.Colony

56, Samrat Enclave,


35 99 09.08.2023 Ajay Jain & Shikha Jain 61
Pitampura

36 100 14.08.2023 Tyagi/Owner/Builder 64 B-2/12-D, Keshav Puram


37 101 22.08.2023 Dhiraj Sehgal & Raj Kumar 66 74, Bharat Nagar

H-125-126, Shakurpur,
38 102 28.08.2023 Mohd. Akil 62
J.J.Colony

WZ-9421, Mahindra Park,


39 103 28.08.2023 Owner/Occupier 61
Shakur Basti

40 104 28.08.2023 Owner/Occupier 64 C-6/139, GF, Keshav Puram

C-6/139-A, FF, Keshav


41 105 28.08.2023 Owner/Occupier 64
Puram

C-6/139-B, SF, Keshav


42 106 28.08.2023 Owner/Occupier 64
Puram

43 107 28.08.2023 Owner/Occupier 64 C-6/140, GF, Keshav Puram

C-6/140-A, FF, Keshav


44 108 28.08.2023 Owner/Occupier 64
Puram

C-6/140-B, SF, Keshav


45 109 28.08.2023 Owner/Occupier 64
Puram

46 110 29.08.2023 Nancy Pandit & Ors. 65 A-55, Ashok Vihar-II


I/KPZ w.e.f. June-2023 to August-2023
Extent of unauthorized construction booked

U/c in the shape of partilally constructed Third Floor


and rear side portion on Mpl. Land (GF, FF, SF and
Third Floor front portion old and occupied)

U/c in the shape of erection of RCC Columns after


removing load bearing wall partially and installation of
MS gate and brick walls rear passage/staircase of
Ground Floor (First floor and Second Floor is Old)

U/C of two rooms and toilet at Fourth Floor as shown


in rough sketch (Stilt, GF, FF, SF, TF old and occupied)

Excess coverage/ addition alteration in the shape of


coverage of front and rear open area verandan &
alteration by removing internal partion all against
standard DDA Plan

SBP No. 10095677 dated 25.12.2022 Deviation/excess


coverage against SBP No. 10095677 at Basement, Stilt,
GF, FF,SF & TF. U/C in the shape of one room at Fourth
Floor as shown in rough Sketch.

SBP No. 10101249 dated 30.05.2022 Deviation/excess


coverage against SBP No. 10101249 at Basement, Stilt,
GF, FF,SF & TF.Including infringrmrnt of Front Set Back
in Basement as shown in rough Sketch.

U/C in the shape of Construction of Mezzanine floor at


GF at right Portion (Rest of the Portion i.e. Part GF, FF
and Second Floor is Old and Occupied)

In continuation of Previous Booking file No. 23/62/B-


II/UC/KPZ/2023 dated 24.02.2023 and U/C in the
shape of entire Third Floor & Fourth Floor with
Projection on Govt. Land.

U/C in the shape of amalgamate of Two Plots Bearing


No. G-439-440, at GF and U/C in the shape of
Violation/excess coverage against Standard Plan with
projection on Mpl. Land at GF & raising of wall &
column at First Floor.
In continuation of previous booking No.158 dt.
09.09.2013, U/c in the shape of entire S.F.(Old &
occupied) and T.F. With erection column over third
floor.

U/c in the shape of entire GF, FF and raising of walls &


Column and shuttering at SF.
U/c in the shape of entire GF, FF, SF, TF and part
construction at 4th floor.
U/c in the shape of entire Basement, GF, FF, SF and
columns with shuttering at third floor.

Deviation/ Excess coverage by way of infringment at


front set back with coverage projection on Mpl. land
as shown in rough sketch.

in continuation of previous booking 149 dt.


18/04/2016. U/c in the shape of entire SF(old) and
erection of walls and columns with shuttering at third
floor as shown in rough sketch.

Excess excavation deviation against SBP and erection


of columns at rear set back.
U/c in the shape of entire GF, FF, SF & TF(as shown in
rough sketch) left side.

SBP No.10108191 dt. 16.11.2022, In continuation to


earlier booking No.61/67/B-II/UC/KPZ/2023 dt.
19.05.2023, excess coverage/ deviation against SBP &
infringement at front and rear set back at third floor.

U/c in the shape of entire GF, FF and SF with


projection on Mpl. Land at roof of FF and SF as shown
in rough sketch.

SBP No.10100653 dt. 19.04.2023, deviation/ excess


coverage against SBP No.10100653 at stilt, GF, FF & SF
and TF as shown in rough sketch.

Deviation/ excess coverage against SBP No.10093783


dt. 22.11.2021 at stilt, GF, FF, SF and TF as shown in
rough sketch.

Deviation/ excess coverage against SBP No.10095775


dt. 30.12.2021 at stilt, GF, FF, SF and TF as shown in
rough sketch.

U/c in the shape of deviation/excess Coverage against


online ID No. 10091375 at stilt, GF, FF & SF and TF of
projection on Gvt. Land. (Resident only Occupied)
Excess coverage/Deviation against Online SBP and
Projection on Mpl. Land

Excess coverage/Extension of flat beyond Standard


DDA Plan as shown in rough Sketch and U/C in the
shape of Additional Floors marked as 2-D & 2-E on
terrace of flat no. 2-C and projection on Mpl. Land as
shown in rough sketch.

Excess coverage/Deviation against Online SBP No.


10094109 dated 23.12.2021 Stilt to Third Floor and
Projection on Mpl. Land at Front Side and rear Side

U/c in the shape of deviation/excess Coverage against


SBP Online ID No. 10082546 at stilt, GF, FF & SF and TF
with projection on Govt. Land. & entire 4th Floor Partly
Constructed

Excess coverage/Deviation against SBP No. 10081481


dated 22.12.2020 Stilt to Third Floor and Ms frame
projection on Mpl. service land from Stilt to Third Floor

U/C of coverage of Courtyard in Front Portion at


Ground Floor.(As per rough sketch)

U/C of extersion of plot in Front Portion at First Floor.


(As per rough sketch)

Deviation/ excess coverage against SBP No.10110743


at stilt, GF, FF, SF and TF as shown in rough sketch.

U/C of extension of plot by way of construction of


room in Front Courtyard and sidelane on Ground
Floor.(As shown in rough sketch)

In continuation of Previous Booking file No. 74/62/B-


II/UC/KPZ/2023 dated 12.06.2023 and Entire First
Floor in the amalgamated Plot No. G-439-440 with
Projection on Govt. Land.

Excess coverage/Deviation against SBP No. 10075034


dated 01.06.2020 from Basement, Stilt to Third Floor
and Unauthorised Construction of room at Fourth
Floor.

No SBP No. Unauthorized extension of flat of room in


front and U/C of entire floor Third Floor and Fourth
Floor on terrace of Flat No. B-2/11-D
Addition alteration against SBP No. 5/B/89-06/01/89
dated 13.02.89 at Ground Floor to Third Floor and
Complete U/C in the shape of Two rooms at Third
Floor.

U/c in the shape of amalgamation of Two Plots


bearing No. H-125-126 at GF to SF & deviation/excess
coverage against Standard Buiding Plan at GF & FF
with projection on Govt. Land & U/c in the shape of
entire SF with projection on Govt. Land.

SBP No. 10111201 dated 24.01.2023 excess coverage/


deviation against SBP and projection on Mpl. Land at
Front Side from Stilt to Third Floor and projection on
Mpl. Land at rear side from First Floor to Third Floor.

No SBP Shown at site DDA Standard Plan extension of


flat from front side by way of eraction of walls and
columns with roof at GF as shown in rough sketch.

No SBP Shown at site (DDA Standard Plan) Extension of


flat from front side by way of erection of walls and
columns with roof at First Floor as shown in rough
sketch.

Extension of flat from front side by way of eraction of


walls and columns at SF.

No SBP Shown at site (DDA Standard Plan) Extension of


flat from front side by way of erection of walls and
columns with roof and projection on Mpl. Land at GF
as shown in rough sketch.

Extension of flat from front side and right side(towards


staircase) by way of erection of walls and columns with
roof and projection on Mpl. Land at FF as shown in
rough sketch.

Extension of flat from front side by way of eraction of


walls and columns with shuttering and projection on
Mpl. Land at SF as shown in rough sketch.

SBP No. 1011681 dated 17.03.2023 U/C in the shape


of deviation/excess coverage against SBP No.
10110681 by way of infringment of front set back at
Basement, Stilt, GF, FF, SF and TF as shown in rough
sketch.