Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

BEAM SUPPORT MID

A B C D E F G H J
3-#12

A1 #8@0.15 m C\C #8@0.20 m C\C

A3 A3 A3 A3 A3 A3
1

3-#16 3-#16
S1 S1 S1 S1
SLAB TK-0.15m SLAB TK-0.15m SLAB TK-0.15m SLAB TK-0.15m
S2
A2 #8@0.15 m C\C #8@0.20 m C\C

A1

S3
A4 A4 A4 A4 A4 A4 2-#16 2-#16
2
S4 S4 S4 S4 S4 S4 A3 #8@0.15 m C\C #8@0.20 m C\C
3 A3 A3 A3 A3 A3 A3

3-#16 3-#16

A4 #8@0.15 m C\C #8@0.20 m C\C

SLAB DETAILS
SHORTER SPAN LONGER SPAN SLAB
SLAB MARK BOUNDARY
SPACING THICKNESS REMARKS
CONDITION DIA DIA SPACING
C/C (M) (M)
C/C (M) BEAM
S1 TWO WAY #10 0.10 #10 0.15 0.15

S2 TWO WAY #10 0.10 #10 0.15 0.150 SUNK BY 0.25m

S3 ONE WAY #10 0.20 #10 0.20 0.150 DOUBLE MAT STIRRUPS AS
STIRRUPS AS INTERMEDIATE INTERMEDIATE
PER SCHEDULE PER SCHEDULE COLUMN COLUMN
S4 TWO WAY #10 0.20 #10 0.20 0.150 DOUBLE MAT

NOTE: END COLUMN

1.ALL TOP RODS TO BE TIED WITH DISTRIBUTOR 8# @ 0.2MC/C NOT SHOWN FOR CLARITY
2.EDGE ROD AS PER TABLE
3.PASSAGE SUNKEN BY 0.075M TYPICAL BEAM AND COLUMN JUNCTION DETAILS

GENERAL NOTES: TECHNICAL NOTES: DESIGN LIVE LOAD: PROJECT: DETAILED : I.S F
1.GRADE OF CONCRETE : M 35 - (AS PER IS 456-2000) PROPOSED CONSTRUCTION OF CHENNAI
1. DIMENSIONS TO BE CHECKED AS PER THE SITE CONDITION
2.GRADE OF STEEL Fe 500D (AS PER IS 1786-2008) 1.FOR FLOOR SLAB LOAD = 3 KN/SQM PRIMARY SCHOOL AT VANUMPET NEW STREET DESIGNED : I.S F
2.ALL DIMENSIONS ARE IN FEET & INCHES UNLESS MENTIONED ANTI COROSION PAINT- EPOXY PAINT (OR) 2.FOR ROOF SLAB LOAD = 1.5 KN/SQM (SOUTH ) DIV -165 , UNIT -37 ZONE - 12
FUSION BONDED EPOXY COTED (OR) CON CARE ADMIXTURE CHECKED : GCJ
3.CLEAR COVERS 3.FOR STAIRCASE LOAD = 4 KN/SQM
3.DRAWINGS TO BE READ AND NOT TO BE SCALED
3.1 FOR GRADE / PLINTH BEAM 40 MM ( 1 21" ) 4.FOR CORRIDOR = 4 KN/SQM JOB TITLE: APPROVED : INFRA - TL
3.2 FOR FOOTING BOTTOM 75 MM (3" )
4.ANY DISCREPANCY IN DRAWING SHALL BE NOTIFIED TO FIRST FLOOR BEAM AND ROOF DETAIL
THE STRUCTURAL CONSULTANT BEFORE STARTING THE WORK 3.3 FOR COLUMN 40 MM ( 1 21" ) SCALE N.T.S
3.4 FOR FOOTING SIDE 100 MM ( 4" ) S.NO DESCRIPTION MATERIAL

5.READ THE DRAWING ALONG WITH ARCHITECTURAL DRAWING 3.5 FOR ALL ROOF BEAM 40 MM ( 1 21" ) SIZE A3 02.06.2023
1 OUTER WALL BRICK WALL DATE
3.6 FOR ALL ROOF SLAB BOTTOM 25 MM ( 1 " )
6.STABILITY OF THE FORMWORK IS THE RESPONSIBILTY OF THE 3.7 FOR ALL ROOF SLAB SIDE 40 MM ( 1 21" ) 2 INNER WALL BRICK WALL
CONTRACTOR.
4.REMOVAL OF FORM WORKS
4.1 FOR COLUMNS 24 HRS AFTER CASTING 3 STAIRCASE BRICK WALL
DWG .NO. 04 JOB .NO. 165-04 REV .NO. R0
4.2 FOR ROOF BEAM SIDE 24 HRS AFTER CASTING
4
REFERENCE : 4.3 FOR ROOF BEAM BOTTOM PARAPET WALL BRICK WALL
VELCITI CONSULTING ENGINEERS PVT. LTD
4.3.1. CLEAR SPAN LESS THAN 6M : 14 DAY AFTER CASTING
5 BASEMENT WALL BRICK WALL NO.9B, 18TH STREET, TANSI NAGAR EXTN,
SL.NO DWG.NO DESCRIPTION DATE 4.3.2. CLEAR SPAN MORE THAN 6M : 21 DAY AFTER CASTING R0 02.06.23 FOR DISCUSSION VELACHERY,
CHENNAI - 600 042
5. DESIGNED FOR GROUND + TWO STORE Y ONLY Contact :044-43235659
E-mail: info@velciti.com
6. SEISMIC DESIGN AS FOR IS 1893 www.velciti.com
REV.NO DATE DESCRIPTION

You might also like