Construction of four lane highway from Ghazipur- Balliya-UP/Bihar state border (Greenfield) Section of NH-31 ; Package -03 (From

Pindari Km 78+150 to Rawalganj Bypass Km


AUTHORITY : NATIONAL HIGHWAYS AUTHORITY OF INDIA (Government of India)
AUTHORITY'S ENGINEER : DHRUV CONSULTANCY SERVICES LIMITED JOINT VENTURE WITH G-ENG ADVISORY SERVICES PVT-LTD-
Date: 09-06-2024
Date of Date of CHAINAGE Inspection
SL-No RFI NO- SIDE Description Remarks
Submission Inspection From To Time
RFI SUMMARY
1 08-06-2024 09-06-2024 STR/7537 114+852 RHS Checking for Plate load test of VUP 8:00 AM
2 08-06-2024 09-06-2024 STR/7538 91+240 Checking of Reinforcement for MNB plank -2 nos 8:30 AM
3 08-06-2024 09-06-2024 STR/7539 91+240 Checking of Shuttering and pouring of concrete m40 of MNB plank -2 nos 9:00 AM
4 08-06-2024 09-06-2024 STR/7540 85+600 BHS Checking of shutteriung and pouring of concrete of Curtainwall final lift of Box Culvert 9:30 AM
5 08-06-2024 09-06-2024 STR/7541 115+733 115+707 RHS Checking of Reinforcement for Boundary wall . 10:00 AM
6 08-06-2024 09-06-2024 STR/7542 115+733 115+707 RHS Checking of Shuttering and pouring of concrete For Boundary wall . 10:30 AM
7 08-06-2024 09-06-2024 STR/7543 115+950 116+000 LHS Checking of Reinforcement for Boundary wall . 11:00 AM
8 08-06-2024 09-06-2024 STR/7544 115+950 116+000 LHS Checking of Shuttering and pouring of concrete For Boundary wall . 11:30 AM
9 08-06-2024 09-06-2024 STR/7545 105+310 105+350 RHS Checking of Reinforcement for Boundary wall . 12:00 PM
10 08-06-2024 09-06-2024 STR/7546 105+310 105+350 RHS Checking of Shuttering and pouring of concrete For Boundary wall . 12:30 PM
11 08-06-2024 09-06-2024 STR/7547 101+905 101+872 LHS Checking of Reinforcement for Boundary wall . 1:00 PM
12 08-06-2024 09-06-2024 STR/7548 101+905 101+872 LHS Checking of Shuttering and pouring of concrete For Boundary wall . 2:00 PM
13 08-06-2024 09-06-2024 STR/7549 105+645 105+655 LHS Checking of Shuttering and pouring of concrete M15 For Toe Wall 1st Lift 2:30 PM
14 08-06-2024 09-06-2024 STR/7550 105+945 105+955 LHS Checking of Shuttering and pouring of concrete M15 For Toe Wall 1st Lift 3:00 PM
15 08-06-2024 09-06-2024 STR/7551 110+785 110+795 LHS Checking of Shuttering and pouring of concrete M15 For Toe Wall 1st Lift 3:30 PM
16 08-06-2024 09-06-2024 STR/7552 105+845 BHS Checking of Reinforcement for Box Culvert wing wall final lift 4:00 PM
17 08-06-2024 09-06-2024 STR/7553 105+845 BHS Checking of Shuttering & Pouring of Concrete Box Culvert wing wall final lift 4:30 PM
18 08-06-2024 09-06-2024 STR/7554 79+764 RHS Checking of Reinforcement of Abutment A2 wall final lift of VUP 5:00 PM
19 08-06-2024 09-06-2024 STR/7555 79+764 RHS Checking of Shuttering & Pouring of Concrete of Abutment A2 wall final lift of VUP 5:30 PM
20 08-06-2024 09-06-2024 HW/7556 79+720 79+750 BHS FDD Checking of EMB 1st Layer 8:00 AM
21 08-06-2024 09-06-2024 HW/7557 104+860 105+140 RHS Checking for Laying of WMM Top With Geogrid 8:30 AM
22 08-06-2024 09-06-2024 HW/7558 104+860 105+140 RHS FDD & level Checking of WMM Top 9:00 AM
23 08-06-2024 09-06-2024 HW/7559 106+700 106+920 LHS Checking of C & G 9:30 AM
24 08-06-2024 09-06-2024 HW/7560 106+700 106+920 LHS FDD Checking of OGL 10:00 AM
25 08-06-2024 09-06-2024 HW/7561 104+740 104+860 RHS FDD & Level Checking of GSB Top Layer 10:30 AM
26 08-06-2024 09-06-2024 HW/7562 103+850 104+000 LHS FDD Checking of EMB 1st Layer 11:00 AM
27 08-06-2024 09-06-2024 HW/7563 108+200 RHS Checking for Laying at Geo-Textile,Geocell and Concrete for Chute Drain 11:30 AM
28 08-06-2024 09-06-2024 HW/7564 111+700 112+100 LHS FDD Checking of EMB 4th Layer 12:00 PM
29 08-06-2024 09-06-2024 HW/7565 83+400 83+620 LHS FDD & level Checking of SG Top layer 12:30 PM
30 08-06-2024 09-06-2024 HW/7566 83+390 83+620 LHS FDD & level Checking of SG Top Truck Lay Bye 1:00 PM
31 08-06-2024 09-06-2024 HW/7567 91+900 92+000 BHS FDD Checking of EMB 4th Layer with Soil 2:00 PM
32 08-06-2024 09-06-2024 HW/7568 91+900 92+000 BHS FDD Checking of EMB 4th Layer with Pond Ash 2:30 PM
33 08-06-2024 09-06-2024 HW/7569 92+000 92+100 BHS FDD Checking of EMB 3rd Layer with Soil 3:00 PM
34 08-06-2024 09-06-2024 HW/7570 92+000 92+100 BHS FDD Checking of EMB 3rd Layer with Pond Ash 3:30 PM