Design Plan
Purpose: Date:
Project Manager:
TEAM MEMBERS:
(List the team members and the roles/responsibilities of each. Eg: Joe – PM – Manages the entire project)
1.
2.
3.
4.
5.
Page 1 of 3
INSERT YOUR COMPANY LOGO/NAME HERE
F-730-001-A
Design Plan
DESIGN INPUT:
(Identify design inputs. You may put these on attachments and reference the attachments here.)
VERIFICATION PLAN:
(Identify how you will verify design output against design input, use attachments as necessary and identify
them here.)
Page 2 of 3
INSERT YOUR COMPANY LOGO/NAME HERE
F-730-001-A
Design Plan
VALIDATION PLAN:
(Identify how the team will ensure that the resulting product is capable of meeting requirements for the
specified application or use. Use attachments as necessary and reference the attachments here.)
APPROVALS:
(Signature and date of all required approvers: Project Manager, Engineering Manager, others as required
in Technical Interfaces)