INSERT YOUR COMPANY LOGO/NAME HERE

F-730-001-A
Design Plan

Project Name: Project Number:

Purpose: Date:

Project Manager:

TEAM MEMBERS:
(List the team members and the roles/responsibilities of each. Eg: Joe – PM – Manages the entire project)

1.
2.
3.
4.
5.

ORGANIZATION AND TECHNICAL INTERFACES:


(Identify other departments or functions that must be kept informed of design progress, consulted
or included in design review meetings. Identify how communication with these functions will be
handled. Identify any approvals required in addition to the project manager and engineering
manager)

Design Stage Review Verification Validation Design


Transfer

Page 1 of 3
INSERT YOUR COMPANY LOGO/NAME HERE
F-730-001-A
Design Plan

DESIGN INPUT:
(Identify design inputs. You may put these on attachments and reference the attachments here.)

DESIGN REVIEW PLAN:


(Identify the stages of this design or time intervals at which design review meetings will be held. Identify
who will be included in these meetings)

VERIFICATION PLAN:
(Identify how you will verify design output against design input, use attachments as necessary and identify
them here.)

Page 2 of 3
INSERT YOUR COMPANY LOGO/NAME HERE
F-730-001-A
Design Plan

VALIDATION PLAN:
(Identify how the team will ensure that the resulting product is capable of meeting requirements for the
specified application or use. Use attachments as necessary and reference the attachments here.)

APPROVALS:
(Signature and date of all required approvers: Project Manager, Engineering Manager, others as required
in Technical Interfaces)

Plan approved by:

Project Manager: Date: __________

Engineering Manager: Date: ____

(Other) Date: ____