No Nama Jabatan

1 BRAMANTYO PRIBADI QC Manager


2 WISNU MAULANA Project Engineer Coordinator
3 MUHAMMAD SANDY R.H. HSE Site
4 DWI AMALIA PRATIWI HSE Admin
5 AHMAD HAKIM MUZZAKY Quality Control
6 MADIH TAHTAL Project Engineer
7 DIARCI FATHUDZIKRI Quantity Surveyor
8 INTAN JUITA Admin Project
9 BAMBANG WIDIARTO Supervisior
10 NORMAN Quality Control
11 BUDI Surveyor
12 RIDWAN Asisten Surveyor
MONITORING - TAKEN BY

Pengambilan 1 Jmlh. Sat. Pengambilan 2 Jmlh. Sat. Pengambilan 3


Rompi 1 bh - - - -
Rompi 1 bh - - - -
Rompi 1 bh Safety Shoes 1 psg -
Rompi 1 bh - - - -
Safety Helmet - Putih 1 bh Rompi 1 bh Kacamata safety
Safety Helmet - Putih 1 bh Rompi 1 bh Safety Shoes
- - - - - - -
Safety shoes 1 psg Rompi 1 bh -
Safety Helmet - Putih 1 bh Rompi 1 bh Safety Shoes
Safety Helmet - Putih 1 bh Rompi 1 bh Safety Shoes
Safety Helmet - Putih 1 bh Rompi 1 bh Safety Shoes
Safety Helmet - Putih 2 bh Rompi 2 bh Safety Shoes
Jmlh. Sat. Pengambilan 4 Jmlh. Sat. Pengambilan 5 Jmlh. Sat. Keterangan
- - - - - - - -
- - - - - - - -
- - - - - - - - HT
- - - - - - - -
1 bh Sarung Tangan 1 psg - - - HT
1 psg Kacamata safety 1 bh Sarung Tangan 1 psg HT
- - - - - - - - HT
- - - - - - - -
1 psg Kacamata safety 1 bh Sarung Tangan 1 psg HT
1 psg Kacamata safety 1 bh Sarung Tangan 1 psg HT
1 psg Kacamata safety 1 bh Sarung Tangan 1 psg HT
2 psg Kacamata safety 2 bh Sarung Tangan 2 psg
No Nama Jabatan
1 WARSIDI Mandor
2 CASLADI Pekerja
3 DARMIN Pekerja
4 DARMIN Pekerja
5 SLAMET RIYANTO Pekerja
6 NARTO Pekerja
7 SUYONO Pekerja
8 AGUS SULIADI Pekerja
9 EDI TRIYANTO Pekerja
10 JONI IRAWAN Pekerja
11 M. MUHAROM Pekerja
12 MUHAMAD YANI Pekerja
13 SLAMET WIDODO Pekerja
14 SUTRISNO Pekerja
15 DARMADI Pekerja
16 MUHAMMAD IMRON Pekerja
17 SISWANTO Pekerja
18 MAHMUDI Pekerja
19 MUKHLISIN Pekerja
20 MUHAMMAD SYAIFUL RIYAL Pekerja
21 SUPRIYANTO Pekerja
22 SUTRISNO Harian Kantor
23 MUHAMAD SULKAN ARIF Harian Kantor
24 RAHMA DAYA PUTRA Harian Kantor
25 MISNAN DAMINIK Harian Kantor
MONITORING - TAKEN BY

Pengambilan 1 Jmlh. Sat. Pengambilan 2 Jmlh. Sat. Pengambilan 3


Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Safety Helmet - Kuning 1 bh Safety Boots 1 psg Kacamata safety
Jmlh. Sat. Pengambilan 4 Jmlh. Sat. Pengambilan 5 Jmlh. Sat. Keterangan
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
1 bh Rompi 1 bh Sarung Tangan 1 psg
MONITORING APD DI LAPANGAN
PT ZEKON INDONESIA
PROYEK WOOD PELLET MILL PLANT

TANGGAL
NO URAIAN JUMLAH
PEMERIKSAAN

1 Helm putih MSA 19-Apr-24 2 PCS

2 Helm kuning 19-Apr-24 13 PCS

3 Safety Shoes 19-Apr-24 2 PASANG

4 Helm Orange 19-Apr-24 2 PCS

5 Rompi orange 19-Apr-24 5 PCS

6 Rompi hijau 19-Apr-24 2 PCS

7 Kaos Tangan Bintik 19-Apr-24 3 PK

8 Kacama safety 19-Apr-24 10 PCS

9 Masker Bap 19-Apr-24 0 PCS

10 Kaos tangan las 19-Apr-24 1 PCS

11 Helm lass 19-Apr-24 2 PCS

12 Face Shield 19-Apr-24 1 PCS

13 Apron lass 19-Apr-24 2 PCS


14 Sepatu booth ukuran 40 19-Apr-24 0 PCS

15 Sepatu booth ukuran 41 19-Apr-24 0 PCS

16 Sepatu booth ukuran 42 19-Apr-24 0 PCS

17 Sepatu booth ukuran 43 19-Apr-24 4 PASANG

18 Safety Line 19-Apr-24 5 GULUNG

19 Jas Hujan 19-Apr-24 11 PCS


RENCANA KEBUTUHAN HSE

NO URAIAN JUMLAH KEBUTUHAN SATUAN HARGA SATUAN JUMLAH


1 Plastik sampah 10 pk Rp 35,000 Rp 350,000

2 Pembayaran pengambilan sampah bulanan 1 ls Rp 1,000,000 Rp 1,000,000

3 Sepatu booths 20 pasang Rp 195,000 Rp 3,900,000

Kebutuhan obat (ranitidin, flutamol, tetes


4 mata, minyak kayu putih, dan vitamin)
1 ls Rp 800,000 Rp 800,000
5 Rompi Orange 20 pcs Rp 20,000 Rp 400,000
6 Sarung Tangan 10 pk Rp 55,000 Rp 550,000
7 Jumat Sehat (susu milku/kacang hijau) 193 pcs Rp 3,000 Rp 579,000
8 Kacamata hitam / bening 20 pcs Rp 28,000 Rp 560,000
TOTAL Rp 8,139,000

Pemberian Jumat sehat


3 Mei 2024 25 ls Rp 3,000 Rp 75,000 Susu Milku
17 Mei 2024 25 ls Rp 3,000 Rp 75,000 Kacang Hijau
31 Mei 2024 43 ls Rp 3,000 Rp 129,000 Susu Milku Estimasi penambahan pekerja 18 orang
14 Juni 2024 50 ls Rp 3,000 Rp 150,000 Kacang Hijau Estimasi penambahan pekerja lokal
28 Juni 2024 50 ls Rp 3,000 Rp 150,000 Susu Milku Estimasi penambahan pekerja lokal
Jumlah 193 Rp 579,000 Estimasi penambahan pekerja lokal
ahan pekerja 18 orang