A51 201801 50.ig - TCC (Version 2) Instruction Guide For Power Installation at Self-Powered Bts Access Sites
A51 201801 50.ig - TCC (Version 2) Instruction Guide For Power Installation at Self-Powered Bts Access Sites
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50
9 /0
Ngày ban hành: 29/01/2018
h
42
nT
ye
7:1
gu
STT Người ký Đơn vị Thời gian ký Ý kiến
rN
_1
e
1 NGUYỄN THẾ Chief Technology 29/01/2018
ng
fic
NGHĨA Officer - Telecom 16:02:32
Of
Du
International
gy
Myanmar Co.,Ltd
olo
iet
2 NGUYỄN HUY Director of Center - 29/01/2018
hn
DŨNG Technical center - 15:05:36
cV
ec
Headquarters -
fT
Telecom
hu
ie
International
_K
Ch
Myanmar Co.,Ltd
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
ffic
iet
yO
cV
log
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 1 of 163
rN
_1
e
ng
TRACKING TABLE FOR AMENDMENTS
fic
Of
Du
No Page Modified content Effective date
gy
To replace for the Instruction Guide No. 28/IG-
olo
iet
1
TCC issued on 11/01/2018.
hn
cV
ec
2 Updated the content related to cable holes
fT
hu
3 Added some visual picture for reference
ie
_K
Ch
4 Added Table of Content
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
Ch
11
NGUYỄN ĐỨC
:32
TOÀN
:02
Signature
KHÚC VIỆT
16
18
DŨNG
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 2 of 163
rN
_1
e
ng
fic
PURPOSE
Of
Du
- To control installation quality of power equipment at self-built BTS access sites.
gy
- To list materials for installation.
olo
iet
hn
- To make detailed instruction guide to meet technical requirement.
cV
ec
OBJECTS AND SCOPE
fT
hu
- This instruction guide is applied for MyTel and MyTel's installation partners.
ie
_K
Ch
SAFETY AT WORK
80
- Human:
86
Must have good health, psychological stability.
2
2:3
11
- In construction:
6:0
Wear protective clothes, safety shoes - helmet - belt.
81
When working on tower, must arrange safety measures for lower affected area, not
01
1/2
allow people who have no duties to enter the construction area (accident prevention
8
01
Do not throw anything up or down. The man standing on the ground must wear safety
ky
9/0
Stop construction when the weather is bad (thunderstorms, thunder, unusual wind).
ia
42
gh
Make sure the power must be switched off while connecting power cables.
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 3 of 163
rN
_1
e
ng
fic
Of
TABLE OF CONTENT
Du
gy
PART 1 ........................................................................................................................................................... 6
olo
iet
PREPARATION OF TOOLS, MATERIALS AND EQUIPMENT ............................................................ 6
hn
cV
ec
1. Materials and Equipment ....................................................................................................................... 6
fT
hu
2. Tools ....................................................................................................................................................... 7
ie
_K
Ch
PART 2 ........................................................................................................................................................... 9
80
INSTALLATION ........................................................................................................................................... 9
86
2
1. Preparation ............................................................................................................................................. 9
2:3
11
2. Overview of equipment and accessories ............................................................................................... 9
6:0
81
2.1. ATS cabinet (ZTE) ......................................................................................................................... 9
01
2.2. IPS with or without solar module (ZTE) ..................................................................................... 11
1/2
8
2.3. VRLA Battery Minishelter (Thien Viet) ..................................................................................... 14
01
9/0
,2
2.4. Lithium Battery Minishelter (Thien Viet) ................................................................................... 17
1/2
ky
da
gh
uy
4. Installation ............................................................................................................................................ 32
Ng
Du
lo
hu
4.2. Install IPS, ATS, Lithium Battery Minishelter, VRLA Battery Minishelter .............................. 60
no
ch
_K
4.2.2. Requirement............................................................................................................................... 61
ief
86
Ch
5.1. Requirement.................................................................................................................................. 84
:02
16
18
6.2. Pin for RS485 of equipment for communication in Modbus RTU ............................................. 89
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 4 of 163
rN
_1
e
ng
6.3. Cabling .......................................................................................................................................... 90
fic
Of
Du
6.4. Single line diagram connection .................................................................................................... 92
gy
6.4.1. Good-grid site ............................................................................................................................ 92
olo
iet
hn
6.4.2. Bad grid site ............................................................................................................................... 99
cV
ec
6.4.3. Off grid site:............................................................................................................................. 105
fT
hu
ie
6.5. Connection .................................................................................................................................. 111
_K
Ch
6.5.1. From ATS to IPS ..................................................................................................................... 111
80
6.5.2. From ATS to Diesel Generator ............................................................................................... 112
86
2
2:3
6.5.3. From IPS to Diesel Generator (for off grid site) .................................................................... 117
11
6:0
6.5.4. From Battery Minishelter to IPS ............................................................................................. 118
81
6.5.5. IPS internal connection ........................................................................................................... 121
01
1/2
6.5.6. Grounding ................................................................................................................................ 122
8
01
9/0
6.6. Marking label for cables ............................................................................................................. 123
,2
1/2
da
Th
en
uy
Ng
er
Of
gy
lo
hu
no
Te
3. ATS..................................................................................................................................................... 140
80
ief
3.1. Change the switch module Socomec to auto mode ................................................................... 140
86
Ch
3.2. Turn switch to set the output of battery charger for genset battery .......................................... 141
11
3.3. Set the operatin mode and alarm thresholds of ATS ................................................................. 141
:32
3.3.3. Setting date and time: Change to real time ............................................................................. 144
18
/20
/20
/01
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 5 of 163
rN
_1
e
ng
2. Import parameter by using USB ........................................................................................................ 148
fic
Of
Du
3. Setting parameter after importing ...................................................................................................... 150
gy
3.1. Date & time: Set 2 items according to actual date and time. .................................................... 150
olo
iet
hn
3.2. Setting Local IP/Mask/GW ........................................................................................................ 150
cV
ec
3.3. DG/Mains Period Start ............................................................................................................... 152
fT
hu
ie
3.4. DG Forced Stop Enable/Time .................................................................................................... 152
_K
Ch
3.5. Setting parameter of genset on CSU .......................................................................................... 153
80
3.6. Set battery capacity .................................................................................................................... 154
86
2
2:3
3.7. Set BMU on CSU ....................................................................................................................... 154
11
6:0
3.8. Get CSU’s MAC information .................................................................................................... 154
81
PART 4 ....................................................................................................................................................... 156
01
1/2
COMMISSIONING.................................................................................................................................... 156
8
01
9/0
1. Check HEX (Heat exchanger), DC aircon ........................................................................................ 156
,2
1/2
da
Th
en
uy
Ng
er
Of
gy
lo
hu
no
4. Locking the door with lock cover to protect lock avoid rain, sunshine ........................................... 163
ch
_K
Te
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 6 of 163
rN
_1
e
ng
PART 1
fic
Of
PREPARATION OF TOOLS, MATERIALS AND EQUIPMENT
Du
gy
1. Materials and Equipment
olo
iet
a. Good grid site (where diesel genset can’t be placed such as rooftop site)
hn
cV
Note
ec
No Item Unit Q’ty
fT
hu
1 ATS cabinet included accessories Set 01
ie
_K
Ch
IPS (w/o solar) cabinet included The quantity of IPS, Rectifier
2 Set 01 or 02
materials (Rectifier) & accessories follows the call-off
80
Lithium battery Minishelter included
86
3 Set 01 or 02 The quantity follows the call-off
accessories
2
2:3
11
4 Lithium battery included accessories Pcs -- The quantity follows the call-off
6:0
b. Bad grid site
81
No Item Unit Q’ty Note
01
1 ATS cabinet included accessories Set 01
1/2
8
IPS (w/o solar) cabinet included The quantity of IPS, Rectifier,
01
gh
accessories
Th
en
uy
Of
1 Set 01 or 02
gy
lo
hu
Te
3 Lithium battery included accessories Pcs -- The quantity follows the call-off
80
ief
Ch
1 materials (Rectifier, Solar Charger) & Set 01 or 02 Solar Charger follows the call-
18
/20
accessories off
/20
accessories
29
29
3 Lithium battery included accessories Pcs -- The quantity follows the call-off
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 7 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Note
Of
Diesel generator 8/12kVA (single
Du
gy
4 phase) or 30kVA (3-phase) included Set 01
olo
iet
fuel tank and accessories
hn
cV
2. Tools
ec
No Description Unit Q’ty Purpose Image
fT
hu
I Tool
ie
_K
Ch
80
Drill and drill bits To fix cabinet, fuel tank on
1 Set 1
14 concrete foundation
86
2
2:3
11
6:0
Wrench / Torque
81
2 Set 1 To wrench bolts
wrench
01
1/2
8
01
9/0
Flat & crosshead
3 Set 1 To drive screws
,2
1/2
screw driver
ky
9/0
da
ia
42
gh
tube lugs
Th
_1
en
ng
uy
Ng
Du
Diagonal Pliers,
er
Of
Vi
gy
c
no
ch
_K
Te
80
Ch
11
current
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 8 of 163
rN
_1
e
Q’ty
ng
No Description Unit Purpose Image
fic
Of
Du
gy
10 Hacksaw Pcs 1
olo
iet
hn
cV
ec
fT
hu
To determine position of cabinet,
11 Tape rule Set 1
ie
fuel tank on the foundation
_K
Ch
80
86
2
12 Socket wrench Set 1 To turn a fastener
2:3
11
6:0
81
II Labor protection Each person is equipped one set
01
1/2
8
01
9/0
1 Safety helmet Pcs 1 To protect head
,2
1/2
ky
9/0
da
Th
_1
uy
Ng
Du
er
fic
electrical shocks
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 9 of 163
rN
_1
e
ng
PART 2
fic
Of
INSTALLATION
Du
gy
Installation procedure
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
1. Preparation ,2
- Inspect all materials and equipment in accordance with the list of supply for each site.
1/2
ky
da
Q’ty
7:1
en
ng
uy
Ng
Du
gy
c
lo
hu
no
ch
_K
Synchronized
Te
A.1
accessories
80
ief
86
Ch
11
18
/20
/20
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 10 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
To seal cable hole and two
hn
cV
3 Silicon Pcs 1 ends of each corrugated
ec
pipe
fT
hu
ie
_K
Ch
External
80
A.2
accessories
86
2
2:3
16~25sq.mm tube Tube lug for power cable
11
1 Pcs 12
cable lug from main grid, genset
6:0
81
01
Outdoor black To connect from terminal
1/2
8
3 cable 2-core M 5 12VDC of ATS to B+, B-
01
9/0
2x2.5mm2 ,2 dominos of genset
1/2
ky
9/0
da
4 M 18
gh
en
ng
uy
Ng
Yellow-green
5 M 6 bar of ATS to grouding bar
er
1×25mm2 Wire
at BTS site
fic
et
Of
Vi
gy
c
lo
hu
ief
Ch
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 11 of 163
rN
_1
e
ng
2.2. IPS with or without solar module (ZTE)
fic
Of
Du
No Item Unit Q’ty Image Purpose
gy
olo
iet
hn
cV
ec
fT
hu
ie
Is DC power cabinet as
_K
Ch
IPS with or well as the space to install
A without solar Set 1
80
BTS, Transmission
module
equipment
86
2
2:3
11
6:0
81
01
Synchronized
1/2
A.1
8
accessories
01
9/0
,2
1/2
ky
gh
eN
7:1
Th
2 Pcs 1
en
Board) connection
ng
uy
Ng
Du
er
fic
et
Of
Vi
3 M 2
c
no
ch
_K
Te
80
ief
86
Ch
concrete foundation
:32
:02
16
18
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 12 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
To buffer at 4 holes
olo
iet
between foundation and
hn
6 U-Shape Set 1
cV
IPS cabinet to make
ec
balance if necessary
fT
hu
ie
_K
Ch
80
86
7 Lock cover Pcs 1 To protect lock
2
2:3
11
6:0
81
01
1/2
8
8 Lifting ears Set 1 To lift when using crane
01
9/0
,2
1/2
ky
9/0
da
pipe
eN
7:1
Th
_1
en
ng
uy
Ng
Of
Vi
gy
c
lo
hu
no
To fix equipment on 19
ch
inch rack.
Te
80
ief
86
Ch
11
Redundancy for
12 door, smoke sensor Redundancy
cable
:32
:02
External
16
18
A.2
accessories
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 13 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
Only for the site has
olo
iet
VRLA battery: This sensor
hn
Battery temperature is sticked on VRLA battery
cV
1 M 10
ec
sensor and connected to IPS.
fT
hu
01 VRLA battery string
ie
need 01 kit (10m)
_K
Ch
80
86
2
Cable lug for grounding
2:3
35 sq.mm bare
11
2 Pcs 10 cable, positive cable of
connecting terminal
6:0
battery
81
01
1/2
8
01
9/0
,2
4×16 square meter Connect from AC input
1/2
CB of IPS to ”Load” CB of
ky
3 outdoor power M 18
9/0
da
cable ATS
ia
42
gh
eN
7:1
cable of battery.
ng
uy
Ng
Du
er
Of
5 M
corrugated pipe (10) ATS, IPS to grounding bar
gy
c
lo
of BTS site.
hu
no
ch
_K
Te
80
ief
86
Ch
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 14 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
Need to divide cable is two
gy
cables:
olo
iet
- For signal cable between
hn
cV
IPS and ATS (about 15m).
ec
(Not use 01 twisted pair
fT
hu
(Red + Blue). Use 01
ie
twisted pair (Orange +
_K
Ch
Green) to connect from
80
2 twisted pairs cable X9.1, X9.3 of UIB of IPS
7 M 20
(4-core) for Modbus to terminals 7-8 of ATS).
86
2
- For communication
2:3
11
between IPS and Battery
6:0
minishelter (about 5m) (01
81
twisted pair (Red for
RS485A, Blue for
01
RS485B). Not use 01
1/2
8
remaining twisted pair
01
ky
da
gh
eN
7:1
Th
_1
en
ng
uy
Ng
VRLA Battery
Du
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
Synchronized
A.1
80
accessories
ief
86
Ch
11
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 15 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
To connect from CB of
hn
M35 (35mm2) blue
cV
2 M 12 VRLA Battery Minishelter
ec
power cable
to Battery CB in IPS
fT
hu
ie
_K
Ch
80
To connect from 0VDC
86
M35 (35mm2) terminal of Battery No.1 in
2
3 M 12
2:3
11
black power cable VRLA Battery Minishelter
6:0
to GND bar in IPS
81
01
1/2
8
01
Minishelter to IPS.
9/0
da
ia
42
gh
eN
sensor.
ng
uy
5 Cable 2x1mm2 M 12
Use 7.5m of new cable
Ng
Du
2x0.75mm2 or 2x1mm2
er
gy
c
no
ief
Ch
11
:32
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 16 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
hn
8 Door lock Pcs 2 To lock the door
cV
ec
fT
hu
ie
_K
Ch
80
9 Lock cover Pcs 1 To proteck the lock
86
2
2:3
11
6:0
81
01
10 Plastic tie Kit 1 To fix cable
1/2
8
01
9/0
,2
1/2
ky
terminal
ia
42
gh
eN
7:1
Th
foundation
ng
uy
Ng
Du
er
fic
et
Of
Vi
lo
hu
no
ch
_K
Te
80
Ch
11
:32
:02
18
/20
/20
External
/01
/01
A.2
accessories
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 17 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
Cable 2x0.75mm2
iet
hn
1 or 2x1mm2 (white M 7.5 For smoke sensor
cV
ec
cover)
fT
hu
ie
_K
Ch
2.4. Lithium Battery Minishelter (Thien Viet)
80
No Item Unit Q’ty Image Purpose
86
2
2:3
11
6:0
81
01
1/2
8
Lithium Battery
01
9/0
A Set 1 To isnstall Lithium Battery
Minishelter ,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Synchronized
Th
A.1
accessories
_1
en
ng
uy
Ng
Du
gy
c
lo
hu
no
ch
_K
power cable
Battery CB in IPS
86
Ch
11
:32
M35 (35mm2)
3 M 6 of LiB Minishelter to GND
black power cable
16
18
bar in IPS
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 18 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
hn
cV
ec
For communication between
LAN cable
fT
4 M 6 DC aircon & IPS.
hu
(RS458/RJ45)
ie
_K
Ch
80
86
2
2:3
11
This cable is connected from
6:0
door sensor, smoke sensor to
UIB board of IPS (need to
81
5 Cable 2x1 M 12
divide into two cables with
01
same length from LiB
1/2
8
Minishelter to IPS)
01
9/0
,2
1/2
da
Th
_1
en
ng
uy
er
fic
et
Of
Vi
gy
c
lo
no
ch
_K
Te
80
ief
86
Ch
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 19 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
10 Supporting bar Set 1 To install battery on 19” rack
hn
cV
ec
fT
hu
ie
_K
Ch
To fix hanger of battery on
80
11 Anti-theft bolt Set 1
19” rack
86
2
2:3
11
6:0
81
To fix LiB Minishelter on
01
12 Steel anchor Set 1
concrete foundation
1/2
8
01
9/0
,2
1/2
External
A.2
ky
accessories
9/0
da
ia
42
gh
1 Set 1
(applied only for transfer to CSU of IPS
Th
_1
Shipment 1 & 2)
en
ng
uy
Ng
Du
er
fic
et
- Repeater Pcs 1
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
- Pcs 1
86
Ch
repeater
11
:32
:02
16
18
repeater
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 20 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
hn
cV
- 8-pin LAN cable Pcs 1 Redundancy
ec
fT
hu
ie
_K
Ch
80
2.5. Lithium Battery (ZTT and Coslight)
86
2
No Item Unit Q’ty Image Purpose
2:3
11
6:0
81
Lithium Battery
01
A Pcs 1
ZTT
1/2
8
01
9/0
,2
1/2
Synchronized
ky
A.1
accessories
9/0
da
ia
42
gh
stolen
Th
_1
en
ng
uy
Ng
use
et
Of
Vi
gy
c
lo
hu
no
3 Pcs 1
Te
70cm) battery
80
ief
86
Ch
11
/20
Minishelter
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 21 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
Not use. Use anti-thelf
Bolt and nut for 19”
hn
6 Set 1 bolts supplied in Battery
cV
rack installation
ec
Minishelter (Thien Viet)
fT
hu
ie
_K
Ch
80
Lithium Battery
86
B Pcs 1
Coslight
2
2:3
11
6:0
81
Synchronized
B.1
01
accessories
1/2
8
01
9/0
,2
1/2
ky
da
ia
42
gh
eN
7:1
Th
_1
en
uy
use
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
3 Pcs 1
80
70cm) battery
ief
86
Ch
11
:32
4 Pcs 1
100cm, 16mm2 48VDC bar of LiB
18
/20
Minishelter
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 22 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
To connect from positive
olo
iet
Black power cable terminal of battery to
hn
5 Pcs 1
cV
100cm, 16mm2 0VDC bar of LiB
ec
Minishelter
fT
hu
ie
_K
Ch
80
To protect negative,
86
6 Terminal cap Pcs 2 positive terminals of
2
2:3
11
battery
6:0
81
01
1/2
8
Not use. Using anti-thelf
01
9/0
Bolt and nut for 19”
7 Set 1 bolts supplied by Battery
,2
1/2
rack installation
Minishelter vendor
ky
9/0
da
ia
42
gh
Th
en
ng
uy
Ng
Du
VRLA Battery
er
fic
A Sacred Sun /
et
Of
Leoch
Vi
gy
c
lo
hu
no
Synchronized
ch
_K
A.1
Te
accessories
80
ief
86
Ch
11
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 23 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
hn
cV
ec
Plastic cover for bar
fT
hu
2 Set 1 To protect battery terminal
connector terminal
ie
_K
Ch
80
86
2
2:3
11
6:0
To connect in series two
81
3 Flexible connector Set 1 batteries of 2 different
01
rows
1/2
8
01
9/0
,2
1/2
ky
9/0
da
flexible connector
42
gh
eN
7:1
Th
_1
en
ng
uy
handle tool
fic
et
Of
Vi
gy
c
lo
hu
no
of battery
Te
80
ief
86
Ch
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 24 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
hn
cV
Diesel Generator
ec
A Set 1
KBI
fT
hu
ie
_K
Ch
80
External
86
A.1
accessories
2
2:3
11
6:0
To connect from L1/L2 of
81
Power cable generator to Gen CB of
01
Cu/PVC/PVC
1 M 15 ATS (on-grid site) or AC-
2x10mm2/
1/2
8
input CB of IPS (off- grid
2x16mm2
01
9/0 site)
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
en
ng
uy
Ng
Du
er
Grounding cable
fic
et
lo
hu
1x16mm2
no
ch
_K
4 M 20
1x18AWG - To connect from D+, D-
of Trans-485 of genset to
:32
RS485 of ATS
:02
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 25 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
Lengthened Exhaust
iet
hn
pipe 1.5m and 02
cV
5 Set 1
ec
stainless steel cable
fT
ties 25cm
hu
ie
_K
Ch
80
86
2
2:3
6 Fuel tank Set 1 To store fuel
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
concrete foundation
9/0
da
ia
42
gh
eN
7:1
Th
_1
8 Set 1
slip ring tank
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
lo
hu
Te
80
ief
86
Ch
Diesel generator
B
Yanmar
11
:32
CB of ATS
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 26 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
2 Fuel funnel Pcs 1 To fill fuel in the tank
ie
_K
Ch
80
86
2
2:3
11
6:0
81
To connect from grounding
01
M16 grounding
3 M 5 terminal of generator to
1/2
cable
8
MGB3
01
9/0
,2
1/2
ky
9/0
da
gh
ATS
_1
en
ng
uy
Ng
Du
1.5m Exhaust
er
Extension pipe,
5 Set 1
fic
et
lo
hu
no
ch
_K
Te
80
Ch
11
:32
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 27 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
hn
8 Anti-theft screw and
cV
Pcs 88 Not use
ec
driver M6
fT
hu
ie
_K
Ch
80
86
To pump fuel from external
2
9 External hand pump Pcs 1
2:3
11
fuel tank to genset by hand
6:0
81
01
1/2
8
External reverse
01
9/0
10 Pcs 1 To store coolant water
water tank ,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
To monitor gensent
11 GPS module Pcs 1
Th
position
_1
en
ng
uy
Ng
Du
er
fic
et
Of
To communicate between
Vi
USB to RS485
12 computer and genset
gy
module
c
lo
controller (CEM7)
hu
no
ch
_K
Te
80
ief
86
Ch
12VDC cable
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 28 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
hn
External fuel tank
cV
15 Pcs 1 To store fuel
ec
1000L
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
Accessory for
01
9/0
16 Set 1
external fuel tank
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
Of
Vi
gy
c
no
rubber gaskets
Te
80
ief
86
external tank
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 29 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
hn
cV
ec
To fix external fuel tank on
- Steel anchor ɸ12 Pcs 4
fT
hu
concrete foundation
ie
_K
Ch
80
86
Bolts M10x20 To fix genset on fuel tank
2
2:3
11
(include slip-ring but not use. To do it, use
- Pcs 8
6:0
washer and flat bolt, slip-ring washer of
washer) genset
81
01
1/2
8
01
-
Anti-thelf bolts
Pcs 8 9/0 To fix secure bar with
,2
1/2
da
ia
42
gh
eN
7:1
en
tank
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ief
86
Ch
11
:32
:02
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 30 of 163
rN
_1
e
ng
fic
No Item Unit Q’ty Image Purpose
Of
Du
gy
olo
iet
hn
cV
Already installed on the
ec
- Fuel level indicator Pcs 1
fuel tank
fT
hu
ie
_K
Ch
80
86
To fix fuel feed pipe
2
Blind flange and 6
2:3
D60:L400 with fuel tank
11
- bolt M6x20 (include Pcs 1
(Already installed on the
6:0
two flat washer, nut)
fuel tank)
81
01
1/2
8
Already installed on the
01
9/0
- Fuel level sensor Pcs 1 ,2 fuel tank
1/2
ky
9/0
da
support bar
gh
(inside)
eN
7:1
Th
_1
en
uy
(inside)
er
fic
et
Of
Vi
gy
c
2.8. PBMU
lo
hu
no
Te
80
ief
86
Ch
Cable grounding
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 31 of 163
rN
_1
e
ng
Q’ty
fic
No Item Unit Picture Purpose
Of
Du
gy
olo
PBMU V1.0 one
iet
To connect from battery
3 battery complete set Kit 1
hn
cV
terminal to PBMU
ec
of cable
fT
hu
ie
_K
Ch
To connect from RS485
80
terminal of PBMU to Pin
86
PBMU V1.0 RS485
4 Kit 1 1, 2 of domino terminal
2
extension cable
2:3
11
block in VRLA Battery
6:0
Minishelter
81
01
1/2
8
Cable, cable lug,
01
9/0
5 Kit 1 Redundancy
connector
,2
1/2
ky
9/0
da
3. Before installation
ia
42
- Front side of equipment is the side has door. For VRLA Battery Minishelter, the front side
7:1
Th
en
uy
- Cable lug: Make cable lug for all connections exept LAN cable for RS485 at domino
Ng
Du
terminal block (legs 1, 2) of Battery Minishelter. Choose proper size and type of cable lug
er
fic
Of
Vi
no
ief
86
Ch
11
:32
:02
16
18
18
/20
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 32 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
4. Installation
eN
7:1
en
No Image Implementation
ng
uy
Ng
Of
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 33 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
Fixing fuel tank on concrete foundation:
86
2
Locate position of fuel tank follow
2:3
11
layout drawing
6:0
Locate the hole to drill
81
Fix fuel tank on concrete foundation
01
1 Must add 1 big washer on each bolt (it is
1/2
8
taken when removing IPS from wood
01
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
ief
2 tank.
86
Ch
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 34 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
❖ Locate the position of 2 fuel hoses of the
hn
cV
fuel tank:
ec
Small hose (4mm): Fuel return hose
fT
hu
3 from engine to fuel tank.
ie
_K
Ch
Large hose (8mm): Fuel feed hose
80
from fuel tank to generator.
❖ Connect the connector to the sensor
86
2
2:3
11
6:0
81
01
1/2
8
The fuel hoses must pass through the box
01
4
9/0
with rubber seal hole
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
uy
Ng
hoses
Du
5
fic
Of
Vi
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
18
/20
/20
/01
B Genset installation
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 35 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
Move pallet at bottom of the generator
1
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
2
da
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
3 generator
80
Ch
generator
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 36 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
Note when mounting DG on the fuel tank:
_K
Ch
The front of DG and the side of fuel tank
80
4
that has the fuel drain are at the same
86
direction
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
uy
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 37 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
Tighten 4 bolts on the inner flange between
2:3
11
6
fuel tank and generator
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 38 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
Put the stopper Ø5-Ø9 to seal the fuel return
hn
cV
hose that has just been removed from engine
ec
position (the stopper Ø5-Ø9 is in the part list
fT
9
hu
bag and put inside generator / fuel tank).
ie
Note: Ø5 end of stopper is used at this step.
_K
Ch
Ø9 end is used at step B.11
80
86
2
2:3
11
6:0
81
01
1/2
8
Remove the fuel feed hose at crude fuel filter
01
9/0
10 ,2position. Maintain integrity of this fuel feed
hose at internal fuel tank position
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Of
gy
lo
hu
Te
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 39 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
4mm fuel return hose which was mentioned
12 at Step A.3 will be connected to fuel return
80
position of engine
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
da
filter position
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
14
ief
Ch
controller of genset.
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 40 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
Determine the power cable and signal cable
15
80
from Fuel Sensor
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
16
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
genset
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 41 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
Locate the position of RS485 terminal on
19
fT
hu
EMKO controller of genset
ie
_K
Ch
80
86
2
2:3
11
Connect the signal cable RS485 of Fuel
6:0
Sensor (which was mentioned at step B.15 -
81
2-core type) to EMKO controller:
❖ Signal wire (A+) from Fuel Sensor is
01
20
1/2
connected to Port 43 (A+) of controller
8
❖ Signal wire (B-) from Fuel Sensor is
01
ky
9/0
da
ia
42
gh
eN
7:1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
no
22
DG and IPS
ch
_K
Te
80
ief
86
Ch
11
:32
:02
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 42 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
Fix Trans-485 module on EMKO controller
hu
24
ie
by latch
_K
Ch
80
86
2
2:3
11
6:0
81
Fix Trans-485 module on EMKO controller
01
1/2
(the rear side of Trans-485 module can be
8
25
mounted easily on plastic rail which is ready
01
9/0
on surface of EMKO controller)
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 43 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
1) Switch CB to “OFF” for safety
hu
2) Switch the key to “ON”
ie
_K
Ch
3) Press to navigate Item “Ext. Fuel
Lv”. If the value is in the range 0% ÷
80
100% Connection is OK
86
28 4) Note: If it displays “!!!!” Connection
2
2:3
is not OK Re-check
11
6:0
5) After checking the connection between
fuel sensor and EMKO controller:
81
Switch key to “OFF” and disconnect
01
battery of generator if not use for safety
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
No Image Implementation
Th
_1
uy
A.1 Assembly internal exhaust pipe (if genset is not assembled this)
Ng
Du
er
fic
et
Of
Vi
gy
c
no
1 genset.
ch
_K
ief
86
Ch
11
:32
:02
16
18
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 44 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
Remove 4 anti-theft screws at exhaust pipe
ie
3
_K
position
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 45 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
6 Assemble the elbow with exhaust pipe
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
7
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 46 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
9 Tightening the belt
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
da
10
side of genset
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 47 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
Using drill screws to fix reverse water tank
2
support bar on genset cover (inside)
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 48 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
4 Connect the water pipe to reverse water tank
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
1 GPS module
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 49 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
3 Insert sim card
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 50 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
5 Remove two screws to open
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
6
9/0
module
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
36V”
c
lo
7
hu
BAT”
ch
_K
Te
80
ief
86
Ch
11
:32
:02
8 “1”
18
/20
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 51 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
If the LED of GPS module lights, it is OK. If
9
fT
hu
not, check the connection
ie
_K
Ch
80
86
2
B Install external fuel tank
2:3
11
6:0
81
01
Divide 3m length of rubber hose into 2
1/2
8
hoses:
01
9/0
1
+ One hose has length 1m
,2
1/2
da
ia
42
gh
eN
7:1
Th
en
fuel tank:
ng
uy
Of
tank to generator
Vi
2
gy
lo
no
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 52 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
Remove blind flange and 6
_K
Ch
3
bolts M6x20 (including two flat washer, nut)
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
er
fic
et
Of
Vi
gy
c
lo
no
layout drawing
Te
80
Ch
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 53 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
tank.
Th
en
uy
removing 8 bolts.
Du
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 54 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
Fixing genset with external fuel tank by 8
11
6:0
6 bolts that remove at step 5.
Bolts must be added black square washer.
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
7
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 55 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
Connect hand pump to the hose that has
80
length 1m.
86
This hose comes from external fuel tank.
2
8
2:3
11
Tighten the hose clamps
Note: The direction (→) of hand pump must
6:0
be from external fuel tank to crude filter
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
Of
9 tank position.
lo
hu
no
pump.
Te
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 56 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
Remove the fuel return hose at engine
_K
Ch
10
position
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
Connect the hose that has length 2m to fuel
,2
1/2
da
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
gaskets
gy
12
6 bolts M6x20 (include two flat washer, nut)
c
lo
hu
Te
80
ief
86
Ch
11
:32
:02
D60:L400
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 57 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
Install fuel supply pipe D60:L400 by 6 bolts
_K
Ch
14
M6x20
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 58 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
Take fuel level sensor cable through the
2:3
11
16
bottom hole
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
17
cable to fuse
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
18
terminal.
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 59 of 163
rN
_1
e
ng
fic
No Image Implementation
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
Connect “PWR-“ wire of fuel level sensor
_K
Ch
19
cable to negative terminal
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
20
da
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
“1”
Of
Vi
no
Te
80
ief
86
Ch
11
:32
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 60 of 163
rN
_1
e
ng
4.2. Install IPS, ATS, Lithium Battery Minishelter, VRLA Battery Minishelter
fic
Of
4.2.1. Steps of implementation
Du
gy
- Step 1: Locate the Cabinet / Minishelter according to the layout design.
olo
iet
- Step 2: Locate, mark the bolting position of equipment on the concrete foundation.
hn
cV
ec
- Step 3. Drilling and bolting.
fT
hu
- Step 4. Place the Cabinet / Minishelter in right position and tighten the bolts.
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
if necessary
er
fic
et
Of
gy
lo
hu
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 61 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
4.2.2. Requirement
1/2
- Right place, in accordance with design.
8
01
9/0
- Enough the quantity, right type of bolts, screws ... and ensure the balance of equipment.
,2
1/2
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 62 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
Step 1: Locate the hole position for the first Step 2: Locate the hole position for the 2nd battery
1/2
8
battery supporting bar (the hole number 5, 6 supporting bar (space of 9 blank holes). Do the
01
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
Requirement: Asembly full 20 battery supporting bars with 4 caged nuts and 4 bolts per one
11
supporting bar.
b. Install battery caged nuts and anti-thelf bolts at position of battery supporting bar
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 63 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
Step 1: Locate the position to install the first Step 2: The second hole is the number 9 from the
ia
gh
Th
Requirement: Assembly full caged nuts & bolts for all Lithium Batteries that equipped for site.
_1
en
uy
❖ ZTT Lithium Battery: Because 04 shipments of ZTT battery are different from each other
er
Of
• Shipment 1 & 2 (Cylindrical cell packaging, W482 x D460 x H132 mm): Need repeater
gy
c
lo
no
• Shipment 3 (Cylindrical cell packaging, W482 x D460 x H132 mm): No need repeater.
ch
_K
• Shipment 4 (Prismatic cell packaging, W482 x D400 x H132 mm): No need repeater.
ief
86
Ch
Have white mark on the box cover and batteries. On the white mark of batteries of
Shipment 4, extra with character “P”.
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 64 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
One more sign to differentiate shipments: Based on the Number of Packages:
11
6:0
Shipment Code Equipment Number of Packages
81
1 1000
01
2 Lithium-ion Battery 1500
ZTT-4850
1/2
3 (48V-50Ah) 2000
8
01
9/0
4 ,2 2800
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
❖ COSLIGHT Lithium Battery: Check the outside battery boxes. Notice the yellow labels
11
“A” and “C” in red circle as below picture (“A” means Class A, “C” means Class C).
:32
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 65 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
d. Assembly
❖ Step 1: Fix the hanger on battery:
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
❖ Step 2: Fix the hanger on poosition of anti-thef bolts which mentined at Item 4.2.3.b. Tighten
Ng
Du
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 66 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
Requirement: Install enough anti-thelf bolts for the supporting bars of batteries.
,2
1/2
ky
❖ Step 1: Connect Blue Cable from Negative terminal of battery to -48VDC Bar of Battery
da
ia
Minishelter (on the left of cabinet). Must follow the cable rule as below:
42
gh
Note
7:1
1 1
_1
en
2 2
ng
uy
3 3
Ng
4 4
Du
5 5
er
fic
et
lo
hu
6 8
no
7 9
ch
_K
8 10
Te
80
9 11
ief
10 12
86
Ch
❖ Step 2: After finishing connection from negative battery terminal to -48VDC bar for all
11
batteries, then connect Positive terminal of battery to 0V Bar of Battery Minishelter (on the
right of cabinet) using Black Cable.
:32
Note: The cable is threaded through the battery drawer, and connect to terminal battery from the
:02
top down.
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 67 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
Requirement:
:32
- The cable is neat and tidy. Using plastic tie to fix cable.
16
18
18
- Plastic cover is ensured for 02 Bars of Battery Minishelter and each terminal of battery.
/20
/20
/01
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 68 of 163
rN
_1
e
ng
fic
From To
Cable Label
Of
Du
Equipment Terminal Equipment Terminal
gy
1 (A) Domino 1 (RS485_A)
olo
AIRCON COM.OUT LAN RS_AIR
iet
2 (B) terminal block 2 (RS485_B)
hn
cV
Step 1: Connect LAN cable to COM.OUT of DC aircon
ec
fT
Step 2: Measure the length of RS485 (LAN) cable from DC aircon to domino terminal block.
hu
ie
Step 3: Cut LAN cable for enough length which was measured from Step 2 (normally is
_K
Ch
1.5m).
80
Step 4: Determine 2 wires: Pin 1 for RS485_A, Pin 2 for RS485_B of LAN cable (the wire
86
color of Pin 1, Pin 2 of LAN cable might be different due to different cable brands. Example
2
2:3
11
here is White-Orange for RS485_A and Orange for RS485_B). Cut 6 other wires left because
6:0
of unneccesary.
81
Step 5: Connect this cut end of cable (with only 2 wires for Pin 1, Pin 2) to domino terminal
01
block.
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 69 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
en
Coslight LiB: Connecting LAN cable of one Battery to each other must be straight:
ng
uy
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 70 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
therefore:
/20
/20
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 71 of 163
rN
_1
e
✓ 01 repeater can manage 12 pcs of Lithium Battery. But because Battery
ng
fic
Of
Minishelter just contains maximum 10 pcs Use 01 repeater for 01 Battery
Du
gy
Minishelter (applied only for Shipment 1 & 2 of ZTT LiB).
olo
iet
✓ Connect RS485 from ZTT LiB (Shipment 1&2) to Repeater as below:
hn
cV
ec
fT
hu
Display
RS485
ie
2 ADD
10
_K
Ch
1
80
Display
9
86
RS485
1 ADD
2
2:3
2
11
6:0
Display
RS485
81
8 2 ADD
1
01
1/2
8
Display
01
9/0
7 RS485
2 ADD ,2
1
1/2
ky
9/0
da
Display
CH 1 CH 2 CH 3 CH 4 OUT PWR
RS485
ia
42
6 2 ADD
gh
1
eN
7:1
Th
RS485 Display
5
_1
1 ADD
en
2
ng
uy
Ng
Du
RS485 Display
er
2 ADD
4
fic
1
et
Of
Vi
Display
gy
RS485
c
2 ADD
lo
3
hu
1
no
4
ch
_K
Display
Te
RS485
80
2 1 ADD 3
ief
2
86
Ch
2
Display
11
RS485
1 2 ADD 1
1
:32
:02
- Connect RS485 for Lithium Battery from Shipment 3&4: Similar to Coslight Lithium
16
18
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 72 of 163
rN
_1
e
ng
fic
From To
Cable Label
Of
Du
Equipment Terminal Equipment Terminal
gy
ZTT Battery No.1 RS485 1,8 (B) Domino 2 (B)
olo
LAN RS_LIB
iet
(from Shipment 3, 4) Port 2 2,7 (A) Terminal Block 1 (A)
hn
cV
1,8 (B) 2 (B)
ec
Repeater for ZTT_LIB Domino
Port OUT LAN RS_LIB
fT
(from Shipment 1, 2) 2,7 (A) Terminal Block 1 (A)
hu
ie
3,4 (B) 2 (B)
_K
Ch
RS485 Domino
Coslight Battery No.1 LAN RS_LIB
Port 2 1,2 (A) Terminal Block 1 (A)
80
Note: 1,8 (B) means combine 2 wires No.1 and No.8 together for RS485_B. Similar to others.
86
2
- Perform step by step, similar to Connect RS485 cable from DC aircon to domino
2:3
11
terminal block:
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
lo
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
Because the Cable 2x1mm2 (mentioned in Part 1, Section 2.3, Item A.1.5) is now looped for both
/20
smoke sensor and door open sensor but this cable is just enough for door open sensor remove
/01
/01
this cable from smoke sensor and use it only for door open sensor. External accessories of VRLA
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 73 of 163
rN
_1
e
ng
Battery Minishelter included new cable 2x0.75mm2 or 2x1mm2 white cover (mentioned in Part
fic
Of
1, Section 2.3, Item A.2.1). Steps are as below:
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
Step 1: Locate the position of smoke sensor Step 2: Open smoke sensor and use screwdriver
01
(ceiling of Battery Minishelter) to remove cable lugs of Cable 2x1mm2
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Step 3: Use nipper to cut these 2 cable lugs Step 4: Pull this cable out of smoke sensor. Use
Ng
Du
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
Step 5: Insert new cable 2x0.75mm2 or 2x1mm2 Step 6: Make cable lug for new white cable 2-
:32
white cover for smoke sensor alarm (white cable, core (Blue/Brown)
:02
2-core (Blue/Brown))
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 74 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
Step 7: Connect new cable to Pin 3, 4 (not Step 8: Close the cover for smoke sensor
6:0
differentiate polarity)
81
01
c. Install PBMU (Pricise Battery Monitoring Unit)
1/2
8
- Step 1: Locate the position of PBMU in VRLA Battery Minishelter.
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 75 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
Before After
42
gh
eN
Th
Address table:
_1
en
No Object Note
uy
Of
Steps to set:
Vi
gy
Note: Bit 1 is switch to select battery type (ON: 12V VRLA, OFF: 2V VRLA).
c
lo
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 76 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
❖ Turn on/off the switch for battery group following the address table as above.
da
- Step 4: Mount (easily) PBMU on its position(s) using bolt Φ8 (additional material that is
ia
42
gh
signed raising memorandum with installation team). One string of battery need one
eN
7:1
PBMU. Start from the Front Door (with DC aircon) first for installation (PBMU-1). The
Th
_1
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
- Step 1: Install the plastic seperators on the support frame of each layer (total 8 layers) to
:02
separate batteries on same layer as well as to separate bateries between front side and
16
18
back side.
18
/20
Odd layer: Negative terminal (-) of battery is on the left, Positive termianl (+) of
/01
/01
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 77 of 163
rN
_1
e
ng
Even layer: Positive terminal (+) of battery is on the left, Negative terminal (-) of
fic
Of
battery is on the right.
Du
gy
Repeat until the end.
olo
iet
- Step 3: Label for batteries.
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
Requirement:
/01
/01
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 78 of 163
rN
_1
e
ng
- Insert plastic separator for all batteries (to separate batteries next to each other and
fic
Of
separate batteries between front side and rear side).
Du
gy
- Marking full labels for batteries.
olo
iet
❖ Connection
hn
cV
- Rule: Positve terminal of Battery No. 24 connect to negative terminal of battery No.23,
ec
fT
positve terminal of battery No. 23 connect to negative terminal of battery No.22,...
hu
ie
- Perform:
_K
Ch
Step 1: Connect 2 batteries on same layer by hard connector.
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
Step 2: Connect power cable of PBMU to [Terminal (+) of Batt No.1 of String,
ky
9/0
Terminal (-) of Batt No. 24 of String and Grounding Bar in Battery Minishelter].
da
gh
of Battery Minishelter
eN
7:1
+ 1 - + 2 - + 24 -
Th
_1
en
ng
uy
Ng
Du
er
PBMU-1
fic
et
Of
Vi
gy
c
lo
1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2
hu
no
X1 X2 ... X5 X6
ch
_K
Te
80
PBMU-2
ief
86
Ch
X1 X2 ... X5 X6
11
1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2
:32
:02
18
/20
/20
/01
of Battery Minishelter
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 79 of 163
rN
_1
e
ng
Step 3: Connect signal wires from PBMU to negative terminals of batteries. Only
fic
Of
Terminal (+) of Batt No. 1 is used to connect to PBMU as a voltage reference point
Du
gy
for whole String.
olo
iet
hn
cV
ec
fT
hu
ie
+ 1 - + 2 - + 3 -
PBMU-1
_K
Ch
1 2 3 4
X1
80
86
2
- 6 + - 5 + - 4 +
2:3
11
6:0
1 2 3 4 5 6
X2
81
01
1/2
8
01
9/0
+ 7 - + 8 - + 9 - ,2
1/2
ky
1 2 3 4 5 6
9/0
da
X3
- 12 + - 11 + - 10 +
ia
42
gh
eN
7:1
Th
_1
en
1 2 3 4 5 6
ng
uy
+ 13 - + 14 - + 15 -
X4
Ng
Du
er
fic
et
Of
Vi
- 18 + - 17 + - 16 +
gy
c
lo
hu
no
1 2 3 4 5 6
ch
_K
X5
Te
80
ief
86
Ch
+ 19 - + 20 - + 21 -
11
:32
X6
1 2
:02
- 24 + - 23 + - 22 +
16
18
18
/20
/20
/01
/01
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 80 of 163
rN
_1
e
ng
Summarize for Step 2 & Step 3:
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
Connect to X1 Connect to X2 Connect to X3 Connect to X4
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
From To
Of
Vi
Label
gy
lo
no
1
Minishelter per above drawing)
ch
_K
Ch
/20
/01
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 81 of 163
rN
_1
e
ng
Step 4: Connect 2 batteries in different layers using soft connector. Note: Red plastic
fic
Of
cover is used to protect for Positive Terminal.
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
Soft connector and plastic cover for 2 batteries in different layers
01
Note: Keep one connector not to connect for 2 batteries to ensure safety. Make sure no short
1/2
8
circuit accident when pull cable from Battery Minishelter to IPS Cabinet (use plastic cover)
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
Keep one connector do not connect to ensure Use plastic cover to make sure no short-circuit
fic
et
Step 5: After finishing cable run, connection of negative cable of batteries to Battery
gy
c
lo
no
batteries GND Bar in IPS Connect the last connector for 2 batteries which was
ch
_K
Te
mentioned as above.
80
ief
Step 6: Re-check the tightening of all connectors and mount all plastic covers for
86
Ch
terminals of batteries.
11
Step 7: Install Battery Secure Bars: At the Layer 1 (the lowest layer) install screw
at Position 2. At layers 2 ÷ 8, install screw at Position 1.
:32
Must install enough 16 Secure Bars for both 2 sides even in the case the rear side
:02
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 82 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
Secure Bar At Layer 1: Install Secure Bar at Position 2
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
After installing secure bar for Layer 1 From Layers 2 ÷ 8: Install secure bar at
Th
Position 1
_1
en
Requirement: Batteries are connected in correct order and follow the rule. Install full 04 screws
ng
uy
e. Connecting RS485
er
Of
gy
From To
c
lo
Cable Label
hu
no
ief
Ch
Step 2: Measure the length of RS485 (LAN) cable from DC aircon to domino terminal block.
11
Step 3: Cut LAN cable for enough length which was measured from Step 2 (normally is
1.5m).
:32
Step 4: Determine 2 wires: Pin 1 for RS485_A, Pin 2 for RS485_B of LAN cable (the wire
:02
color of Pin 1, Pin 2 of LAN cable might be different due to different cable brands. Example
16
18
here is White-Orange for RS485_A and Orange for RS485_B). Cut 6 other wires left because
18
/20
/20
of unneccesary.
/01
/01
Step 5: Connect this cut end of cable (with only 2 wires for Pin 1, Pin 2) to domino terminal
29
block.
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 83 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
❖ Connect signal cable RS485 from PBMU to Domino Terminal Block of Battery
:02
Minishelter
16
18
From To
18
Cable Label
/20
1 (A) 1 (A)
/01
Domino
/01
PBMU-1 X6 RS_PBMU1
2 (B) Terminal Block 2 (B)
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 84 of 163
rN
_1
e
ng
fic
From To
Cable Label
Of
Du
Equipment Terminal Equipment Terminal
gy
1 (A) 1 (A)
olo
PBMU-2 X6 RS_PBMU2
iet
2 (B) 2 (B)
hn
cV
Domino Terminal Block of Battery Minishelter
ec
fT
hu
ie
1
2
3
4
_K
Ch
80
86
2
2:3
11
PBMU-1
6:0
X1 X2 X... X5 X6
81
1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2
01
1/2
8
01
9/0
,2
1/2
ky
PBMU-2
9/0
da
X1 X2 X... X5 X6
ia
42
1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2
gh
eN
7:1
5. Cabling
Th
_1
5.1. Requirement
en
ng
- The cables must be put in the corrugated pipe and on the cable ladder OR put in the HDPE
Du
er
- Position of cable entry in Minishelter, IPS must be followed the rule which was mentioned
Of
Vi
before.
gy
c
lo
- The curvature of the cable at bending points is not less than 4 times the cable diameter.
hu
no
Regulates the direction of the incoming / outgoing cable in the hole of minishelter.
Te
80
Ch
- Step 2. Mark the cable with colored tape as specified to avoid some mistake.
11
cable and bundle the cable ends that put in the same tube.
:02
- Step 5. Pull the cable into the tube, push and pull the cable into the cabinet.
16
18
- Step 6. Pull the cables from the outside into the cabinet through the correct cable holes to
18
/20
/01
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 85 of 163
rN
_1
e
ng
- Step 9: Make cable lug and connection
fic
Of
- Step 10: Fix the cable on outdoor with plastic tie.
Du
gy
5.2. Cable hole definition
olo
iet
a) Cable hole for ME, transmission and radio equipment
hn
cV
ec
IPS MINISHELTER
COAXIAL CABLE FOR ACCESS MW COAXIAL CABLE FOR BACKBONE
fT
hu
FIBER OPTICAL CABLE RRU OPTICAL CABLE
ie
_K
Ch
SIGNAL CABLE FROM BATTERY
MINISHELTER RRU POWER CABLE
80
GROUNDING CABLE
86
1 10
2
2:3
CABLE FROM ATS/GENSET RRU POWER CABLE
11
2 9
6:0
3 4 5 6 7 8
81
BATTERY POWER CABLE FROM
FIBER OPTICAL CABLE
BATTERY MINISHELTER NO.1
01
1/2
8
POWER CABLE FROM BATTERY POWER CABLE FROM
01
9/0
SOLAR JUNCTION BOX BATTERY MINISHELTER NO.2
,2
1/2
gh
eN
7:1
uy
(incoming)
Ng
Du
ATS
No.5: Power cable (outgoing to IPS)
er
Of
genset)
gy
c
lo
hu
no
ch
_K
Te
ief
Ch
Minishelter
No.3: Power cable and signal cable
11
/20
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 86 of 163
rN
_1
e
ng
fic
Item Cable hole numerical order Regulation for cable hole
Of
Du
gy
olo
iet
hn
cV
ec
No.1: Negative battery cable
fT
hu
(outgoing)
ie
LIB
_K
Ch
No.2: Positive battery cable
Mini-
(outgoing)
80
shelter
No.3: Signal cable (outgoing)
86
No.4: Grounding cable (outgoing)
2
2:3
11
6:0
81
01
No.1: Positive battery cable
1/2
8
(outgoing) - string 1
01
(outgoing) - string 1
ky
da
Battery
gh
cable (outgoing)
_1
uy
(outgoing) - string 2
Ng
(outgoing) - string 2
er
fic
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
Genset
Cable hole for RS485 signal
KBI
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 87 of 163
rN
_1
e
ng
fic
Item Cable hole numerical order Regulation for cable hole
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
Cable hole for AC power cable,
_K
Ch
remote control cable, 12VDC power
80
cable
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
Genset
_1
Yanmar
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 88 of 163
rN
_1
e
ng
6. Connection between equipments
fic
Of
6.1. Make cable lug and LAN terminal
Du
gy
a. For ring lug
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
c. Make LAN terminal RJ45 (for connection between CSU and site router) - straight LAN cable
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 89 of 163
rN
_1
e
ng
6.2. Pin for RS485 of equipment for communication in Modbus RTU
fic
Of
Du
Position for
Signal
gy
No Equipment RS485 Type Pin Note
definition
olo
iet
connection
hn
cV
ec
fT
hu
1 RS485_A
ie
_K
Ch
COM.OUT
1 DC aircon RJ45
on aircon
80
86
2 RS485_B
2
2:3
11
6:0
1,8
81
Repeater for RS485_B
Lithium combine
01
Port OUT on
2 Battery ZTT RJ45
1/2
repeater
8
of Shipment 2,7
01
9/0
1, 2 RS485_A
combine
,2
1/2
ky
9/0
1,8
da
Lithium RS485_B
RS485 combine
ia
42
Battery ZTT
gh
3 Port_2 on RJ45
of Shipment
eN
Battery No.1
7:1
3, 4 2,7
RS485_A
Th
combine
_1
en
ng
uy
1,2
Ng
RS485_A
Du
3,4
Vi
RS485_B
combine
gy
c
lo
hu
no
X6.1 RS485_A
ch
_K
PBMU for
Te
X6 on
4 2V VRLA
80
PBMU
ief
Battery
86
X6.2 RS485_B
Ch
11
:32
3 RS485_A
:02
Domino
Terminal
16
18
5 ATS access
Block in
18
/20
ATS cabinet
/20
4 RS485_B
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 90 of 163
rN
_1
e
ng
fic
Position for
Signal
Of
No Equipment RS485 Type Pin Note
Du
definition
gy
connection
olo
iet
hn
cV
D+ D+
ec
Port RS485
fT
hu
6 Genset KBI on Trans-485
ie
_K
module
Ch
D- D-
80
86
2
2:3
11
RX- and
6:0
TX- RS485_B
looping
81
CCrs
Genset
01
7 Modbus
Yanmar
1/2
Module
8
RX+ and
01
TX+ 9/0
RS485_A
,2
1/2
looping
ky
9/0
da
ia
42
gh
1 RS485_A
eN
7:1
Th
Domino
_1
Battery
en
8 Terminal
Minishelter
ng
uy
Block
Ng
Du
er
2 RS485_B
fic
et
Of
Vi
gy
c
6.3. Cabling
lo
hu
no
- Cable from ATS to IPS, Grid to ATS is not put in manhole. The cabling option is as
Ch
follows:
11
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 91 of 163
rN
_1
e
ng
fic
IF GRID POLE NEAR ATS
Of
Du
gy
olo
iet
D62 PIPE FOR
hn
D62 PIPE FOR
cV
CABLE FROM ATS IPS
CABLE FROM
ec
GRID TO ATS
ATS TO IPS
fT
hu
ie
_K
Ch
80
86
PIPE STRAP
2
2:3
11
6:0
81
01
1/2
8
01
ky
9/0
da
gh
Th
_1
uy
er
fic
et
Of
Vi
gy
c
PIPE STRAP
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
Layout:
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 92 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
MAN HOLE
1
hn
BATTERY BATTERY
cV
IPS SPARE
ec
MINISHELTER MINISHELTER
fT
2 1
hu
ie
_K
Ch
80
PVC PIPE
86
2
NEW 2 x D62 PIPES
2:3
11
FOR CABLE FROM
6:0
ATS TO IPS, FROM
81
GRID TO ATS
01
GENSET
1/2
8
ATS MAN HOLE
01
9/0
,2 2
1/2
ky
9/0
da
ia
42
gh
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 93 of 163
8
01
9/0
,2
- Power cable:
1/2
ky
POWER CABLE CONNECTION FOR GOOD GRID SITE
9/0
da
Plug
IPS ATS
ia
42 Batt1
Batt2
Batt3
Batt4
gh
MAIN GEN Load-1 Load-2 N
eN
7:1
N N
Th
_1
N
en
ng
uy
GRID
Ng
Du
Of
cV
Cable 2x10/2x16
gy
1x35mm2 Blue
GEN
lo
hu
noINPUT
LIB Minishelter
AC
ch
_K
+ 0V
DC
Te
80
- LIB48V +
ief
86
Ch
- LIB48V + MGB03
11
-48V
+0V
DC
DC
N
2
Cable 1x35 Y/G 02:3
18 4x16
-48VDC - LIB48V +
:
16
18
PE
Cable
- LIB48V +
/20
/01
29
29
ATS.PWR
,
ky
MGB01 +0VDC
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 94 of 163
8
01
9/0
- Cabling: Put cable in HDPE/corrugated pipe for cabling from cablinet to cabinet. Measure the length for cabling and cut enoug h for
,2
1/2
ky
connection. Make cable lugs before connecting.
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
iet
Of
cV
gy
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 95 of 163
8
01
9/0
,2
1/2
POWER CABLES RUN ON THE RIGHT SIDE OF
ky
LADDER, VIEW FROM TOWER
9/0
da
ia
42
gh
MAN HOLE MAN HOLE
eN
7:1
3 1
Th
_1
LIB Minishelter
HDPE
IPS
en
ng HDPE PIPE PIPE FOR GRID
CABLE TO ATS IF
uy
GRID POLE COME
Ng
Du
PVC PIPE
Of
cV
gy
1 10
lo
hu
no
1 2 2 9 PIPE FOR
3 4 CABLE FROM
ch
_K
3 4 ATS TO IPS
Te
5 6 7 8
80
ief
86
Ch
ATS
11
HDPE/PVC
10 12 8 6 4 2
:32
1 MAN HOLE
:02
9 11 7 5 3 2
16
18
Note:
18
/20
- D62/D42 PVC pipe for power cable and signal cable (M&E)
HDPE/PVC
/20
/01
29
29
- Signal cable:
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 96 of 163
8
01
9/0
,2
1/2
MONITORING AND CONTROL SIGNALS FOR GOOD GRID SITE
ky
9/0
da
CSU510B UIB
ia
RS485 X7. Out_RL7,8
42
gh
X13. TB1 X14. TB2 X15. TB3 X16.TB4
B0 A0 B1 A1 RS232 RJ45 1 2 3 4 5 6
1 1 1 2 1 2
eN
2 2
1 1 2
7:1
2
NO7 COM7 NC7 NO8 COM8 NC8 TB1 +5V TB2 +5V TB3 +5V TB4 +5V
B A
Th
-48V +0V 1
_1
en
4 3 X9. IN_RL X10.EX_RL X12. TE
RS_ATS
X11. Door ALM
RS_BAT1
ng
uy
1 2 3 4 5 6 1 2 3 4 5 6 1 2 1 2
Ng
Du
er 19 S1 S2 48VP S3 S4 48VP ES1 ES2 48VP ES3 ES4 48VP Door 48V TE +5V
IPS 20
fic
iet
COM NC
Of
E_ START
M_FAIL
cV
48VDC-ATS
LIB
gy
TE
CABINET DC AIR
lo
RJ45 MINISHELTER
hu
48VDC-BATT
no
IN OUT DR_SW
ch
_K
RS_AIR
SMOKE
Te
80
1 2
86
TEMP1
Ch
SMOKE
11
1 2
16
18
1 2
/20
/01
-48V
/01
4
B 3 +0V
29
2
29
1 1 2 3 4 5 6 7 8 13 14 19 20
A
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 97 of 163
8
01
9/0
- Cabling description and labelling:
,2
1/2
ky
Power cable:
9/0
da
From To
Cable Label Cable is supplied from
ia
42
Equipment Terminal Cable hole Equipment Terminal Cable hole
gh
eN
Main Grid CB 2 Main Grid - - 4x16mm2 GRID
7:1
Th
2x10/16mm2 (1P)
Generator CB 3 Generator - - GEN
_1
Or 4x16mm2 (3P)
en
ATS ng
Load-1 CB 5 IPS AC input 3 4x16mm2 ATS.PWR IPS
uy
Ng
Du
gy
Earthing bar
no
Grounding Bar at site - LIB_ BAT cabinet 1 PE Bar 4 1x35mm2 (y/g) Battery Minishelter
MGB02
ch
_K
Signal cable:
Te
80
ief
From To Cable is
86
Ch
2-twisted-
cable: Red wire
:02
RS485_B
/20
/20
48VDC_ATS
Block +0V 19 (+0V input)
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 98 of 163
8
01
9/0
,2
1/2
From To Cable is
ky
Cable Cable Cable Label supplied Note
9/0
Equipment Terminal Equipment Terminal
da
hole hole from
ia
X7-1 Use the
42
gh
5 (Emergency start)
(NO7) remaining
eN
2-twisted-
7:1
twisted pair of
UIB_X7 3 9 pair cable E_START ATS
Th
X7-2 4-core cable:
6 (Emergency start) (4-core)
_1
(COM7) Orange and
en
green wires
ng
uy
1 (S1) 7 (Main failure) 01 twisted pair
Ng
Du
2 twisted
of 4-core cable
UIB_X9 3 9 pairs cable IPS
3
er M_FAIL
8 (Main failure) (Orange +
fic
iet
Use 01 twisted
gy
Domino 2-twisted-
hu
RS_BAT.
RS485 2 Terminal 3 pair cable MINISHELTER 1
IPS
for RS485_A,
ch
_K
RS485_B
ief
2 (ES2)
86
Ch
LIB_BAT Battery
3 2 Door Door switch 3 2x1mm2 DOOR_SW
11
Cabinet Minishelter
(48VP)
UIB_X10
4 (ES3) COM
Battery
:32
(48VP)
16
-48Vdc Domino
18
MINISHELTER 1
/20
/01
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 99 of 163
8
01
9/0
6.4.2. Bad grid site
,2
1/2
ky
- Power cable:
9/0
da
POWER CABLE CONNECTION FOR BAD GRID SITE
ia
42
gh
PLUG
IPS ATS
BAT4
BAT2
BAT3
BAT1
eN
7:1
MAIN GENERATOR LOAD_1 LOAD_2 N
Th
N N
_1
en
N
ng
uy
Ng
Du
er GRID
1x35mm2 Y/G
fic
iet
SPD
Of
cV
Cable 2x10/2x16mm2
gy
GEN
lo
GEN
1x35mm2 Blue
hu
no
AC
+ 0V DC
+
Te
+ 1 - + 2 - + 3 -
80
ief
1x35mm2 Black
86
- 4 + - 5 + - 6 +
Ch
MGB03
11
N
:32
+0VDC
+ 19 - + 20 - + 21 -
4x16mm2
:02
-48VDC
-
16
18
1x35mm2 Y/G
- 24 + - 23 + - 22 +
125A
CB
18
/20
PE MGB02
/20
/01
/01
1x35mm2 Y/G
ATS.PWR
29
29
MGB01
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 100 of 163
8
01
9/0
- Cabling: Put cable in HDPE/corrugated pipe for cabling from cablinet to cabinet. Measure the length for cabling and cut enough for
,2
1/2
ky
connection. Make cable lugs before connecting.
9/0
da
POWER CABLES RUN ON THE RIGHT
ia
SIDE OF LADDER, VIEW FROM TOWER
42
h
MAN HOLE MAN HOLE
Ng
3 1
7:1
he
nT
_1
IPS
HDPE
ye
4.1 3.1 2.1 1.1
ng
gu
PIPE FOR GRID
Du
rN
CABLE TO ATS IF
gy Battery
PVC PIPE
Minishelter
ice
FROM MAN HOLE
iet
CORRUGATED PIPE
f
1 OR 3
Of
1 10
cV
VRLA
2 9
lo
hu
3 4
no
5 6 7 8
ch
_K
PIPE FOR
Te
1 2 3 4 CABLE FROM
80
ATS TO IPS
ief
86
Ch
GND
11
L2
:32
Trans-485
Diesel
L1
Generator
:02
ATS
HDPE/PVC
16
18
2
PVC 10 12 8 6 4
18
/20
MAN HOLE
/20
PIPE 2
/01
9 11 7 5 3 1
/01
Note: STRAP
- D62/D42 PVC pipe for power cable and signal cable (M&E)
29
29
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 101 of 163
8
01
9/0
- Signal cable:
,2
1/2
ky
MONITORING AND CONTROL SIGNALS FOR BAD GRID SITE
9/0
da
CSU510B UIB
ia
RS485 X7. Out_RL7,8 COM8
42
X13. TB1 X14.TB2 X15.TB3 X16.TB4
RJ45
gh
B0 A0 B1 A1 RS232 1 2 3 4 5 6 1 2 1 2 1 2 1 2
1 2 1 2
eN
7:1
NO7 COM7 NC7 NO8 NC8 TB1 +5V TB2 +5V TB3 +5V TB4 +5V
B A
Th
+0V
_1
-48V X9. IN_RL X10.EX_RL X11.Door ALM X12. TE
en
RS_ATS
ng 4 3 1 2 3 4 5 6 1 2 3 4 5 6 1 2 1 2
uy
RS_BAT1
S1 S2 48VP S3 S4 48VP ES1 ES2 48VP ES3 ES4 48VP Door +5V TE +5V
Ng
20 19
Du
IPS
er
E_ START
M_FAIL
48VDC-ATS
fic
iet
VRLA BAT
48VDC-BAT.MINISHELTER
Of
CABINET DC AIR
cV
RJ45
TE
TB2
TB1
gy
1234 123456 123456 123456 1 2
IN OUT
DR_SW
X6
lo
SMOKE
hu
no
G1_START
ch
_K
RS_GEN
24
X5
TEMP1
RS_AIR1
Te
12V_DG
80
23
SMOKE
ief
DETECTOR
2V-VRLA
86
Ch
X...
DG
11
DOOR
ATS
4
SWITCH
+ -
3
A B + - A B
-48VDC
:32
X2
2
:02
PBMU
1
16
18
X1
4 -48V
3 +0V 1 2 3 4 5 6
B
18
2
/20
/01
BATT.TEMP2
29
BATT.TEMP1
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 102 of 163
8
01
9/0
- Cabling description and labelling:
,2
1/2
ky
Power cable:
9/0
da
From To
ia
Cable Cable Cable Label Cable is supplied from
42
Equipment Terminal Equipment Terminal
gh
hole hole
eN
7:1
Main Grid CB 2 GRID - - 4x16mm2 GRID
Th
Generator CB 3 Generator Out - 2x10/2x16mm2 or 4x16mm2 GEN Genset
_1
en
ATS
Load-1 CB ng 5 IPS AC input 3 4x16mm2 ATS.PWR IPS
uy
Ng
PE Bar 1 Earthing Bar MGB03 - - 1x35mm2 (y/g) ATS
Du
er
CB1 7 CB125 2 1x35mm2 (blue) -48V.BAT1 Battery Minishelter
fic
iet
(+) of
Of
VRLA_BAT cabinet 1
gy
no
(+) of
GND Bar 7 1.1 1x35mm2 (black) +0V.BAT2 Battery Minishelter
ch
_K
Batt.No24
Te
ief
Earthing bar MGB02 - VRLA_BAT cabinet 1 PE Bar 4.1 1x35mm2 (y/g) Battery Minishelter
86
Ch
PE
Earthing bar MGB03 Generator - 1x10/2x16mm2 (y/g) Genset
11
- Terminal
Signal cable:
:32
From To Cable is
:02
hole hole
18
Use 01 twisted
18
/20
/01
A0 3 (A)
29
RS485_B
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 103 of 163
8
01
9/0
,2
From To
1/2
Cable is
ky
Cable Cable Cable Label supplied Note
Equipment Terminal Equipment Terminal
9/0
da
hole hole from
ia
-48Vdc 20 (-48V
42
-48V
gh
Terminal 3 input) 9 2x1 mm2 48VDC_ATS ATS
eN
7:1
Block +0V 19 (+0V input)
Th
X7-1 5 (Emergent
_1
Use 01 twisted
en
(NO7)
ng start) 2 twisted pairs pair of 4-core
UIB_X7 3 9 E_START ATS
uy
X7-2 6 (Emergent cable (4-core) cable (Orange +
Ng
Du
1 (S1)
failure)
Of
3 (48VP)
failure) Green)
lo
hu
no
Use 01 twisted
ch
_K
RS_BAT.
2-twisted-pair cable: Red wire
80
Ch
UIB BAT
X15 2 VRLA 3 Temp. sensor 4 - TB3 IPS
:02
Cabinet
X16 2 VRLA 4 Temp. sensor 4 - TB4 IPS
16
18
2 (ES2) Battery
18
/20
UIB_X10
/01
4 (ES3) COM
/01
2x1/2x0.75 Battery
2 Smoke 3 SMOKE
6 (48VP) NC mm2 Minishelter
29
29
+ 0V 2 3 (+0V) 3 2x1.5mm2
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 104 of 163
8
01
9/0
,2
From To
1/2
Cable is
ky
Cable Cable Cable Label supplied Note
Equipment Terminal Equipment Terminal
9/0
da
hole hole from
ia
-48Vdc Domino 48VDC_BAT.
42
Battery
gh
Terminal -48 V Terminal 4 (-48V) MINISHELTER
Minishelter
eN
Block Block 1
7:1
Site router: Installation Need 2m length
Th
_1
Site FE 0/2/20 LAN cable team with molded
en
CSU RJ45 Port - IPS_MONITOR
ng router Microwave: CAT6 (accept for patch at 2
uy
Port 3 raising cost) terminals
Ng
Du
1
B+
er
(+12VDG) Domino
fic
iet
2 Block
cV
B-
(-12VDG)
lo gy
White wire:
hu
3
no
(RS485_A)
D+ Connect to “D+”
ch
_K
4
ief
(RS485_B)
D- connect to “D-“
86
Ch
pin
11
13
Domino B-
(G1.Start) RS485 cable
11 Terminal G1_START Genset
14 1x18AWG
:32
Block 92
(G1.Start)
:02
1
12VDC (+)
16
18
(+12VDG)
11 battery 2x 2.5 mm2 12V_DG ATS
2
18
/20
ATS
Block Yanmar
/01
/01
White wire:
3 CCrs RS485 cable
11 TX+, RX+ RS_GEN Genset Connect to “TX+,
29
RX+” pins.
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 105 of 163
8
01
9/0
,2
From To
1/2
Cable is
ky
Cable Cable Cable Label supplied Note
Equipment Terminal Equipment Terminal
9/0
da
hole hole from
ia
Black wire:
42
4
gh
TX-, RX- connect to “TX-,
(RS485_B)
eN
RX-“ pins
7:1
13
Th
Domino Pin 5
_1
(G1.Start) RS485 cable
en
11 Terminal RS_GEN Genset
14
ng Negative 1x18AWG
uy
Block
(G1.Start) terminal
Ng
Du
Of
cV
gy
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 106 of 163
8
01
9/0
,2
1/2
PLUG
IPS
ky
POWER CABLE CONNECTION FOR OFF GRID SITE
9/0
BAT BAT BAT BAT
da
1 2 3 4
ia
42
NEUTRAL
gh
eN
7:1
4x16mm2
GENERATOR
Th
GEN
_1
en
ng
uy
Ng
SPD
Du
er
fic
iet
Of
1X35mm2 Y/G
cV
1x35mm2 Blue
gy
AC INPUT
LITHIUM
lo
hu
CABINET
+ 0V DC
no
ch
_K
- LITHIUM 48V +
Te
80
ief
Ch
- 48V DC
+ 0V DC
11
NEUTRAL
:32
- LITHIUM 48V +
4x16mm2
:02
- 48VDC
1X35mm2 Y/G16
18
- LITHIUM 48V +
GND
18
/20
1X35mm2 Y/G
/20
/01
/01
29
29
GEN.PWR
,
ky
MBG01
1x35mm2 Black
:14
MBG02
da
+0VDC
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 107 of 163
8
01
9/0
- Cabling: Put cable in HDPE/corrugated pipe for cabling from cablinet to cabinet. Measure the length for cabling and cut enough for connection.
,2
1/2
ky
Make cable lugs before connecting.
9/0
da
POWER CABLES RUN ON THE RIGHT
ia
42
SIDE OF LADDER, VIEW FROM TOWER
gh
eN
7:1
MAN HOLE MAN HOLE
Th
3 1
_1
en
ng
LIB minishelter IPS
uy
CORRUGATED PIPE
Ng
HDPE
Du
er
PIPE FOR GRID
fic
iet
HDPE
CABLE TO ATS
Of
cV
IF GRID POLE
gy
COME FROM
PVC PIPE
lo
hu
MAN HOLE 1 OR
no
1 10 3
ch
_K
1 2 3 4 2 9
Te
80
3
ief
4 5 6 7 8
86
Ch
PIPE FOR
11
CABLE FROM
GND
ATS TO IPS
L1 L2
:32
DIESEL
:02
Trans-485
GND
GENERATOR
16
18
D-
D+
18
/20
/20
/01
(M&E)
29
- D110 PVC pipe for fiber optical cable (Transmission) PIPE STRAP
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 108 of 163
8
01
9/0
- Signal cable:
,2
1/2
ky
MONITORING AND CONTROL SIGNALS FOR OFF GRID SITE
9/0
da
CSU510B UIB
ia
42
gh
RS485 X7. Out_RL7,8
X13. TB1 X14.TB2 X15.TB3 X16.TB4
B0 A0 B1 A1 RS232 RJ45
eN
1 2 3 4 5 6 1 1 1 2 1 2
2 2
7:1
1 2 1 2
NO7 COM7 NC7 NO8 COM8 NC8 TB1 +5V TB2 +5V TB3 +5V TB4 +5V
Th
B A
_1
1
en
+0V X9. IN_RL
ng -48V X10.EX_RL X11. Door ALM X12. TE
RS_BAT1
uy
4 3 1 2 3 4 5 6 1 2 3 4 5 6 1 2 1 2
Ng
Du
S1 S2 48VP S3 S4 48VP ES1 ES2 48VP ES3 ES4 48VP Door 48V TE +5V
er
IPS
fic
iet
Of
E_ START
cV
TE
LIB CABINET
gy
DC AIR
lo
MINISHELTER
RJ45
48VDC-BATT
hu
no
IN OUT DR_SW
ch
_K
SMOKE
RS_AIR
G1_START
Te
RS485 RS_GEN
ief
1 2
86
Ch
SMOKE
LIB ADD: 0100 DETECTOR
DG
11
RS485
1 2
+ - AB
LIB ADD: 1000 DOOR
:32
RS485 SWITCH
1 2
:02
LIB
16
ADD: 0000
18
RS485
1 2
18
1 2 3 4 5 6
/20
-48V
4
/01
/01
3
B +0V
2
A
1
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 109 of 163
8
01
9/0
- Cabling description and labelling:
,2
1/2
ky
Power cable:
9/0
da
From To
ia
42
Cable Label Cable is supplied from
gh
Equipment Terminal Cable hole Equipment Terminal Cable hole
eN
7:1
Th
AC input 3 Generator Out - 4x16mm2 GEN IPS
_1
en
CB1 ng 7 -48V bar 1 1x35mm2 (blue) -48V.BAT1 Battery Minishelter
LIB_BAT cabinet 1
uy
IPS
GND Bar 7 +0V bar 2 1x35mm2 (black) +0V.BAT1 Battery Minishelter
Ng
Du
Earthing bar MGB02 - LIB_BAT cabinet 1 PE bar 4 1x35mm2 (y/g) Battery Minishelter
Of
Grounding
cV
bar at site PE
gy
no
Signal cable:
ch
_K
From To
Te
Cable is
80
Ch
of 4-core cable:
B0 2 (B) Red wire for
:32
/01
2 (ES2)
Battery
29
Minishelter
(48VP)
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC
2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
2:3
Số văn bản: 50
11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
6:0
INSTRUCTION GUIDE FOR POWER Expiry date:
81
INSTALLATION AT Issued time: 02
01
SELF-POWERED BTS ACCESS SITES
1/2
Page: 110 of 163
8
01
9/0
,2
1/2
From To
Cable is
ky
Cable Cable Cable Label Note
supplied from
9/0
Equipment Terminal Equipment Terminal
da
hole hole
ia
42
4 (ES3) COM
gh
Battery
6 2 Smoke 3 2x1 mm2 SMOKE
eN
NC Minishelter
7:1
(48VP)
Th
-48Vdc + 0V Domino 3 (+0V)
_1
48VDC_BAT. Battery
en
Terminal 2 terminal 3 2x1.5mm2 MINISHELTER 1
-48 V 4 (-48V) Minishelter
ng
uy
Block block
Ng
Use 01 twisted pair
Du
B0 D- - 2 twisted
er Trans- of 4-core cable:
RS485 pairs cable RS_GEN IPS
fic
485 Red for RS485_A,
iet
A0 D+ - (4-core)
Of
3 Genset KBI
X7-1 Use twisted pair of
gy
Domino B- - 2 twisted
(NO7)
lo
4-core cable:
hu
(COM7) wires
Te
Ch
Block (4-core)
(COM7) terminal wires
16
18
Port 3 cost)
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 111 of 163
rN
_1
e
ng
6.5. Connection
fic
Of
6.5.1. From ATS to IPS
Du
gy
- Connect AC power cable:
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
N
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
Picture shows the input CBs (Mains, Gens) and output Picture shows the position of AC input in IPS
ng
uy
Note:
er
Of
lo
hu
Te
ief
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 112 of 163
rN
_1
e
ng
fic
Of
IPS
Du
gy
olo
iet
hn
cV
ec
fT
hu
UIB
ie
X9. IN_RL
_K
Ch
1 2 3 4 5 6
80
S1 S2 48VP S3 S4 48VP
86
2
2:3
11
UIB
6:0
X7. Out_RL7,8
81
1 2 3 4 5 6
01
NO7 COM7 NC7 NO8 COM8 NC8
Emergent /2
8
1
01
9/0
48VDC
Failure
RS485
failure
Alarm
ky G1 12
Mode
ATS
Start
Start
SPD
start
CSU510B
,2
1/2
G1
G1
G2
M
RS485 1 2 3 4 5 6 7 8 9 10 1112 1314 1516 1718 1920
+ - + -
9/0
RS232 RJ45
da
B0 A0 B1 A1
1 2 1 2
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
er
Picture Note
fic
et
Of
Vi
gy
c
lo
hu
no
2x10/2x16mm2
Te
80
ief
86
Ch
11
:32
:02
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 113 of 163
rN
_1
e
ng
fic
Picture Note
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
D+, D- on Trans-485: To connect RS485.
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 114 of 163
rN
_1
e
ng
fic
Picture Note
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
Cable hole for genset cable
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
hia
42
Ng
7:1
he
nT
_1
ye
ng
gu
Du
rN
ice
Trans-485
et
Mode Off
Remote
12VDC
Vi
Emergent
G1 Start
G2 Start
48VDC
noFailure
RS485
Alarm
failure
G1 12
start
SPD
ATS
log
Mc
hustart
ch G1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 92 B- B- B+ D+ D-
-
_K
+- +
Te
80
ief
86
Ch
11
:32
:02
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 115 of 163
rN
_1
e
ng
fic
Picture Note
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
L1, L2, L3, N: To connect power cable
86
4x16mm2
2
Must be same sequence at ATS and Genset
2:3
11
terminal:
6:0
L1: Yellow
81
L2: Green
01
L3: Red
1/2
8
N: Blue
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
no
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 116 of 163
rN
_1
e
ng
fic
Picture Note
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
TX+, RX+ and TX-, RX- on CCrs module:
,2
1/2
To connect RS485
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 117 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86 Remote
12VDC
module
Battery
2
CCrs
2:3
start
11
Emergent
48VDC
Alarm
SPD
RS485
Failure
failure
G1 12
6:0
Mode
Start
ATS
Start
start
G1
G2
G1
81
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
01
+ - + -
1/2
8
01
9/0
,2
1/2
ky
9/0
IPS
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
UIB
X9. IN_RL
er
fic
et
1 2 3 4 5 6
Of
Vi
S1 S2 48VP S3 S4 48VP
gy
c
lo
hu
no
UIB
ch
_K
X7. Out_RL7,8
Te
1 2 3 4 5 6
80
ief
Ch
11
CSU510B
Remote
12VDC
:32
Trans-
RS485
start
485
:02
B0 A0 B1 A1 RS232 RJ45
92 B- B- B+ D+ D-
16
18
1 2 1 2
18
/20
/20
/01
/01
Using only one twisted pair cable (04 core) to connect (KBI generator)
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 118 of 163
rN
_1
e
ng
fic
IPS
Of
Du
gy
olo
iet
hn
cV
ec
UIB
X9. IN_RL
fT
hu
1 2 3 4 5 6
ie
_K
Ch
S1 S2 48VP S3 S4 48VP
80
CCrs module
UIB
X7. Out_RL7,8
86 Remote
1 2 3 4 5 6
2
2:3
start
11
NO7 COM7 NC7 NO8 COM8 NC8
6:0
Negative
Pin 5 TX+, RX+ TX-, RX-
terminal
81
CSU510B
RS485
01
B0 A0 B1 A1 RS232 RJ45
1/2
1 2 1 2
8
01
9/0
,2
1/2
ky
Using only one twisted pair cable (04 core) to connect (Yanmar generator)
9/0
da
- Connect battery power cable (reference picture is for Lithium Battery cable connection.
gh
eN
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 119 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
- Door open sensor and smoke sensor connection:
01
1/2
DOOR OPEN SENSOR CONNECTION
8
01
Rear Rear
9/0
,2
1/2
ky
ES2
9/0
da
ia
42
48VP
gh
eN
7:1
Front Front
Th
_1
en
ng
uy
Ng
Du
er
ES3
fic
et
Of
Vi
gy
48VP
c
lo
hu
no
ch
_K
ief
- Connect -48VDC cable, RS485 cable (RS485 cable connection between two battery
86
Ch
cabinets uses twisted pair 4-core cable: Red for RS485_A, Blue for RS485_B. If the
11
twisted pair 4-core cable is not enough length, can use RS485 cable of genset).
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 120 of 163
rN
_1
e
ng
fic
BATTERY CABINET 2 BATTERY CABINET 1
Of
Du
gy
olo
iet
48V connection
hn
cV
terminal
ec
fT
hu
ie
_K
Ch
Grounding busbar
80
in IPS Cabinet
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
4 4
3 3
,2
1/2
2 2
1 1
ky
9/0
da
ia
42
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
lo
UIB
hu
no
X7. Out_RL7,8
X13. TB1 X14.TB2 X15.TB3 X16.TB4
ch
_K
1 2 3 4 5 6 1 2 1 2 1 2 1 2
Te
80
NO7 COM7 NC7 NO8 COM8 NC8 TB1 +5V TB2 +5V TB3 +5V TB4 +5V
ief
86
Ch
11
S1 S2 48VP S3 S4 48VP ES1 ES2 48VP ES3 ES4 48VP Door +5V TE +5V
:02
16
18
TE
Environment
18
/20
BATT.TEMP2 TB1
/01
/01
TB2
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 121 of 163
rN
_1
e
ng
6.5.5. IPS internal connection
fic
Of
- Connect environment temperature sensor to monitor temperature in IPS:
Du
gy
olo
UIB
iet
hn
X14.TB2 X15.TB3 X16.TB4
cV
ec
1 2 1 2 1 2
fT
hu
TB2 +5V TB3 +5V TB4 +5V
ie
_K
Ch
80
X11. Door ALM X12. TE
86
2
1 2 1 2
2:3
11
Door 48V TE +5V
6:0
Environment temperature sensor (2m)
81
TEMP1
01
TE
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
lo
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 122 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
Site router Huawei ATN910B-B port FE 0/2/20
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
Microwave iPasolink VR2 port 3
1/2
8
6.5.6. Grounding
01
9/0
- Connect from grounding bar of equipment to grounding bar of BTS site.
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 123 of 163
rN
_1
e
ng
6.6. Marking label for cables
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
Requirement:
ia
- Marking full labels for all wires that connected to the equipment (power cable, signal
42
gh
- Easy to observe.
en
ng
uy
er
- Using multimeter: Turn the knob of multimetter to buzzer scale to check short-circuit.
fic
et
- Points must be checked: Negative vs Positive, Negative vs GND, line vs line, line vs
Of
Vi
gy
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 124 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Requirement: The buzzer does not sound. If buzzer sounds, must check to locate short-circuit
Of
Vi
lo
no
- Install rectifier:
ch
_K
Te
80
1 2
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
Requirement: Must be assembled consecutively from left to right, upper row to lower row (solar
/01
/01
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 125 of 163
rN
_1
e
ng
6.9. Power on
fic
Of
Note: All CBs at ATS, IPS, Output CB of genset must be at OFF position.
Du
gy
Tighten the 48VDC domino terminal, RJ45 of HEX controller module in IPS cabinet, to make
olo
iet
sure no loose point.
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
On the left side of IPS On the right side of IPS
01
1/2
6.9.1. For on-grid site
8
❖ Step 1: Check voltage and turn on Main CB at EPC power box
01
9/0
,2
1/2
Requirement:
ky
Range
9/0
measurement
ia
42
Main CB at Electric
gh
Main CB at Electric
Th
en
Note: (*) depend on the AC voltage of grid (normally is in the range 180-230VAC)
ng
uy
Requirement:
Of
Vi
Range
gy
measurement
lo
hu
1 ATS – Main CB
no
2 ATS – Main CB L1-N, L2-N, L3-N 400 VAC 220 VAC (*)
Te
Note: (*) depend on the AC voltage of grid (normally is in the range 180-230VAC)
80
ief
If the voltage is in the range, turn ON Main CB at ATS. If not, checking and reconnect.
86
Ch
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 126 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
Tool
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
/20
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 127 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
Check line voltage L-L, phase voltage L-N of CB. The voltage must follow Table
ky
9/0
da
bellow:
ia
Range
42
measurement
eN
7:1
IPS – AC input
1 L1-L2, L2-L3, L3-L1 400 VAC 380 VAC
Th
CB
_1
IPS – AC input
en
uy
CB
Ng
Du
Note: (*) depend on the AC voltage of grid (normally is in the range 180-230VAC)
er
Of
gy
lo
hu
ief
86
Ch
11
:32
:02
Measure the AC, DC voltage. Required: DC voltage is in the range -48 ÷ -56 VDC.
16
18
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 128 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
KBI genset:
ky
da
- To make sure that genset is good and available to work: Press “Start” to start genset.
ia
42
gh
- After warming-up time (about 3 minute). Check the output voltage (at terminal) of genset,
eN
7:1
and at Gen CB of ATS, the voltage must be in the range 220-230 VAC.
Th
Range
_1
measurement
ng
uy
1 ATS – Gen CB L1-N, L2-N, L3-N 400 VAC 220 VAC (*)
Ng
Du
gy
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
Note: 32: Start; 33: Stop; 10, 11, 12,13, 14: LED shows the mode/function of genset.
/20
/01
/01
Yanmar genset:
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 129 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
-
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
- Press “Auto”, when the LED on “Auto” button off, it has ben changed to Manual mode.
To make sure that genset is good and available to work: Press “Start” to start genset.
:32
-
:02
- After warming-up time. Check the output voltage (at terminal) of genset and at Gen CB
16
18
of ATS, the voltage must be in the range 220-230 VAC for phase to neutral/ 380-400 VAC
18
/20
/01
ATS – Gen CB
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 130 of 163
rN
_1
e
Then press “Stop” to stop genset.
ng
-
fic
Of
Press “Auto”, when the led on Auto button on, it has been changed to Auto mode.
Du
-
gy
- Measure the voltage after power-on:
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
VAC range (600) DC range (60)
1/2
8
01
- VRLA battery:
ky
9/0
gh
en
uy
Ng
er
- Lithium battery:
fic
et
lo
no
ZTT lithium battery: Press ”Reset” key. Coslight lithium battery: Press ”On/Off” button.
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 131 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
Coslight lithium battery
80
Check the voltage of battery. The voltage must be in the range:
86
2
2:3
11
No Position Point to Point Range measurement Requirement
6:0
1 Batt Minishelter Positive vs negative bar 60 VDC 48-56 VDC
81
01
2 Batt Minishelter Terminal 3, 4 at Domino Terminal Block 60 VDC 48-56 VDC
1/2
8
❖ Step 7: Change ATS to auto mode
01
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
Press button ”Auto”. If LED lights on the ”Auto” button, it is in auto mode.
11
:32
:02
16
18
18
/20
/20
/01
❖ Step 1: Genset
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 132 of 163
rN
_1
e
Switch key to “ON” position.
ng
-
fic
Of
Press “MAN”, change to Manual mode.
Du
-
gy
- To make sure that genset is good and available to work: Press “Start” to start genset.
olo
iet
After warming-up time. Check the output voltage (at terminal) of genset and at AC
hn
cV
ec
input CB of IPS. The voltage must follow Table bellow:
fT
hu
No Position Point to Point Range measurement Requirement
ie
_K
Ch
2 IPS – AC input CB L1-N, L2-N, L3-N 400 VAC 220 VAC (*)
80
Note: (*) depend on the AC voltage of grid (normally is in the range 180-230VAC)
86
If the voltage is not in proper range must re-check / re-connect if necessary.
2
2:3
11
Turn on CB of AC input in IPS to supply power for IPS to check rectifier working. All
6:0
leds of all rectifiers must be in table below:
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
gh
KBI controller:
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
Note: 32: Start; 33: Stop; 10, 11, 12,13, 14: LED shows the mode/function of genset
86
Ch
11
Yanmar genset:
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 133 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
- Press “Auto”, when the led on Auto button off, it has ben changed to Manual mode.
11
- To make sure that genset is good and available to work: Press “Start” to start genset.
After warming-up time. Check the output voltage (at terminal) of genset and at AC
:32
/20
2 IPS – AC input CB L1-N, L2-N, L3-N 400 VAC 220 VAC (*)
/01
/01
Note: (*) depend on the AC voltage of grid (normally is in the range 180-230VAC)
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 134 of 163
rN
_1
e
ng
- Turn on AC input CB to supply power for IPS.
fic
Of
❖ Step 2: In IPS
Du
gy
- Install rectifier, one by one after every 3 minutes to check rectifier working. All leds of
olo
iet
all rectifiers must be in table below:
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
Turn on CBs (CB has mark “ Do not disconnect”) for HEX, DC aircon, ATS.
2:3
-
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
Of
gy
lo
hu
ZTT lithium battery: Press ”Reset” key. Coslight lithium battery: Press ”On/Off” button.
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 135 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
Coslight lithium battery
2
2:3
11
+ Check the voltage of battery. The voltage must be in the range:
6:0
No Position Point to Point Range measurement Requirement
81
01
1 Batt Minishelter Positive vs negative bar 60 VDC 48-56 VDC
1/2
8
2 Batt Minishelter Terminal 3, 4 at Domino Terminal Block 60 VDC 48-56 VDC
01
9/0
,2
1/2
On Genset: Press “Auto”, when the led on Auto button on, it has been changed to Auto mode.
ky
9/0
da
Requirement:
42
gh
eN
Th
en
uy
Ng
er
lo
no
Te
ief
Ch
Note: (*) depend on the AC voltage of grid (normally is in the range 180-230VAC).
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 136 of 163
rN
_1
e
ng
PART 3
fic
Of
SETTING PARAMETER
Du
gy
1. Setting paramater for equipment in Battery Minishelter
olo
iet
1.1. DC aircon
hn
cV
The parameters need to be set:
ec
fT
Date and time
hu
No Object Address Temperature setpoint
ie
_K
Ch
1 Battery Minishelter 1 20 250C Real time
80
2 Battery Minishelter 2 21 250C Real time
86
Steps to set:
2
2:3
11
ON/OFF: Press the button 5s to ON/OFF the
6:0
equipment.
81
Enter: To confirm.
01
ESC: To quit, to return the previous page.
1/2
8
↑: To increase the setting value or select the
01
9/0
previous record/menu.
,2
1/2
record/menu.
da
gh
Th
a. Setting temperature:
_1
en
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
b. Setting address:
Main menu System Func Para set Addr 20 Enter ESC.
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 137 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
c. Set date and time:
2
2:3
11
Main menu System Func TimeAdj Year Month Date Hour Min Second
6:0
Enter ESC.
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 138 of 163
rN
_1
e
ng
1.2. LIB Battery
fic
Of
Address table:
Du
gy
No Object ZTT Lithium Battery Coslight Lithium Battery
olo
iet
1 Battery Minishelter 1 1-10 1-10
hn
cV
2 Battery Minishelter 2 11-15 11-15
ec
Steps to set:
fT
hu
ie
ZTT Coslight
_K
Ch
Address Address
80
86
2
2:3
11
6:0
Swich number Switch number
81
Address Address
Sw 1 Sw 2 Sw 3 Sw 4 Sw1 Sw2 Sw3 Sw4 Sw5 Sw6
01
1/2
1 OFF OFF OFF OFF 1 OFF ON OFF OFF OFF ON
8
01
2 ON OFF OFF OFF OFF OFF OFF OFF ON OFF
9/0
2
3 OFF ON OFF OFF 3 OFF OFF OFF OFF ON ON
,2
1/2
ky
da
gh
en
uy
Of
gy
lo
hu
Te
Slave address: 89 (if the site has 2 DGs DG no.1: 89, DG no. 2: 90).
80
ief
Baud rate: 3
86
Ch
Parity: 0
11
Stop bit: 0
Datalog period: 1 min
:32
:02
ASCII/RTU: RTU
18
- Steps to set:
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 139 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
Check the information of KBI genset which must be displayed on IPS controller:
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
Set the thresholes of fuel level of external fuel tank to shutdown genset:
ief
Ch
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 140 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
3. ATS
01
3.1. Change the switch module Socomec to auto mode
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 141 of 163
rN
_1
e
ng
3.2. Turn switch to set the output of battery charger for genset battery
fic
Of
- SW2:
Du
gy
ON: Battery genset is NCd type.
olo
iet
OFF: Battery genset is VRLA type
hn
cV
Choose OFF
ec
fT
hu
- SW1:
ie
ON: Output voltage to battery is 24VDC
_K
Ch
OFF: Output voltage to battery is 12VDC
80
Choose OFF
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
Icon Function
:32
:02
To enter into or exit parameter setting by pressing and holding this button for 2 seconds
16
18
When failure occurs, alarm buzzer sounds. Press this button will mute the sound. Press it
18
/20
/20
again to clear mute function. Press and hold this button for 2 seconds, all LEDs illuminate
/01
/01
simultaneously.
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 142 of 163
rN
_1
e
ng
Icon Function
fic
Of
Press and hold ”Auto” button for 2 sec, the LED above the button is illuminated; the
Du
gy
controller is running in AUTO mode.
olo
iet
When in parameters setting mode, this button is used to increase value or scroll down
hn
cV
menu.
ec
fT
Press and hold ”MAN” button for 2 sec, the LED above the button is illuminated; the
hu
ie
controller is running in MAN mode.
_K
Ch
When in parameters setting mode, this button is used to decrease value or scroll up
80
menu.
86
Press and hold ”TEST” button for 2 sec, the LED above the button is illuminated; the
2
2:3
11
controller is running in TEST mode.
6:0
When in parameters setting mode, this button is used to enter into submenu or confirm
81
setting parameter.
01
1/2
This push button is used for locking the control output of the controller. Press this
8
01
9/0
button (2 sec), the LED indicator inlluminated, and the controller is in the status of lock.
,2
1/2
When in parameter setting mode, this button is used for returning to upper menu.
ky
9/0
da
Thi button is used in the condition of maintaining the power supplied by alternate power
ia
gh
When in parameters setting mode, this button is used to move to next parameters setting
eN
7:1
position.
Th
_1
en
uy
Hot button: There are 3 hot buttons respectively lay in different interfaces and with
Ng
Du
different function
er
fic
Of
Vi
lo
hu
no
Te
80
ief
86
Ch
Uses to confirm.
:02
16
18
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 143 of 163
rN
_1
e
ng
fic
Menu Press Menu Press
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 144 of 163
rN
_1
e
ng
3.3.2. Setting application mode (mode 2 MG+B):
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
Note: After finishing setup, ATS must be changed to ”Auto” mode, by pressing and holding
16
18
18
/20
/20
/01
/01
for 2 sec. If the LED on this button is lighted up change to ”Auto” mode successfully.
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 145 of 163
rN
_1
e
ng
4. Setting parameter for controller CSU510B of IPS
fic
Of
4.1. Update software for CSU
Du
gy
❖ Preparation:
olo
iet
- Step 1: Copy file ”powernew.tar.gz.2.x” to the root directory of USB (This USB must
hn
cV
contain only this file).
ec
fT
hu
Download this file at:
ie
https://drive.google.com/drive/folders/1kruS3A7GFK4C6DodWezFyxmobcgTtMr
_K
Ch
K?usp=sharing
80
86
- Step 2: Insert USB to USB interface of CSU panel
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
- Step 3: Get the admin user authorized following below figure, use password ”0063”
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
ief
86
Ch
Enter
11
Enter Enter
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 146 of 163
rN
_1
e
ng
fic
Of
Du
gy
Enter Enter
olo
iet
hn
cV
ec
fT
hu
ie
Don’t remove USB before this step is completed. After completion, CSU will automatically
_K
Ch
restart. It takes 15 minutes to finish.
80
After the upgrade is completed:
86
✓ Check the version software. If Software version is: V2.05.03.02 it is ok:
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
✓ Check “Build Time”. If the “Build Time” is “Dec 18 2017 08:36:47”, it is ok. If not,
ia
42
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
❖ Manual setup
80
ief
86
- Before importing parameter by using USB, need to manually set three parameters:
11
AC in scenario
Battery type (VRLA or LiFePO4-LIB)
:32
:02
Battery vendor:
✓ None (VRLA)
16
18
18
✓ ZTT (LIB)
/20
/20
✓ Coslight (LIB)
/01
/01
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 147 of 163
rN
_1
e
ng
+ Main and DG: For bad grid site (it means BTS site has grid power and genset) and for
fic
Of
good grid site (BTS site has grid power and has no genset, normally are BTS sites on
Du
gy
the rooftop of building).
olo
iet
+ DG: For off grid site (BTS site has no power grid).
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
b) Battery Type:
gh
eN
uy
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
Ch
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 148 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
2. Import parameter by using USB
80
❖ Preparation
86
- Step 1: Copy the configuration file for the specific site into USB, the USB must be less
2
2:3
11
than 16GB (This USB must be had only this file).
6:0
Download configuration file at:
81
https://drive.google.com/drive/folders/1kruS3A7GFK4C6DodWezFyxmobcgTtMr
01
K?usp=sharing
1/2
8
01
Copy the file that is suitable with the real site to USB: 9/0
,2
1/2
ky
da
DG)/3-ZTT
eN
7:1
DG)/3-Coslight
_1
en
Bad grid site: IPS, ATS, Genset, Sacred sun C-4 Access Bad Grid/ 4-Sacred Sun No
3
ng
uy
Bad grid site: IPS, ATS, Genset, Leoch 2V300Ah, No C-4 Access Bad Grid/ 4-Leoch No Night
5
er
Of
Off grid site: IPS, Genset, ZTT lithium, No night C-5 Access Off Grid/5-ZTT No
Vi
7
restriction Restriction
gy
c
lo
Off grid site: IPS, Genset, Coslight lithium, No night C-5 Access Off Grid/5-Colight No Night
hu
no
9
restriction Restriction
ch
_K
Off grid, solar site: IPS, Genset, solar, ZTT lithium, C-6 Access Off Grid Solar/6-ZTT No
Te
11
80
Ch
Off grid, solar site: IPS, Genset, solar, Coslight C-6 Access Off Grid Solar/6-Colight No
13
11
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 149 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
USB port in CSU panel If connection successes, the bottom right
6:0
corner of the screen should be a disk icon
81
- Step 3: Get the admin user authorized following below figure (password ”0063”):
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
Th
_1
en
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Enter Enter
Te
80
ief
86
Ch
11
is “Abort!” check the AC in scenario, Battery Type, Battery manufacturer to make sure
:02
they are correct, Format the USB, copy file again then try one more time.
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 150 of 163
rN
_1
e
ng
3. Setting parameter after importing
fic
Of
3.1. Date & time: Set 2 items according to actual date and time.
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
uy
Ng
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 151 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
Third: Set IP, Mask, gateway as the planed local IP/mask/gateway address.
86
The planned local IP/mask/gateway address for the site is download at (File “M&E
2
2:3
11
System IP address.pdf”):
6:0
https://drive.google.com/drive/folders/1kruS3A7GFK4C6DodWezFyxmobcgTtMrK
81
?usp=sharing
01
✓ IP setup:
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
✓ Mask setup:
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 152 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
✓ Gateway setup:
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
When import from USB, it has default setting parameter that optimized by M&E Dept (MyTel).
7:1
uy
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
that optimized by M&E Department. If want to change, please access step by step as below:
:02
- Setup DG.Force stop time: (00: 00 – 00:00). Can setup three period time.
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 153 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
3.5. Setting parameter of genset on CSU
80
a) Set DG power (kVA):
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
If site has 1 genset. DG1 must be set for 8 or 13 or 30 kVA (real genset power). DG2 must be set
9/0
da
for 0.
ia
gh
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
ief
86
Ch
11
:32
:02
16
18
18
/20
/01
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 154 of 163
rN
_1
e
ng
3.6. Set battery capacity
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
Battery Cap -1#: Total capacity of battery connect to CB1.
8
01
9/0
Battery Cap -2#: Total capacity of battery connect to CB2. ,2
1/2
da
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
gy
After getting CSU’s MAC Address information join Viber Group (“M&E integration for
c
lo
hu
MyTel”) and send MAC Address into group to integrate on NMS (network management
no
ch
_K
system).
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
Join viber group by copy the link and paste on Web Browser JOIN CHAT:
/20
https://invite.viber.com/?g=vAbwzWTDQ0ep1Fomo1FcdoeWfZB9rZ8X
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 155 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 156 of 163
rN
_1
e
ng
PART 4
fic
Of
COMMISSIONING
Du
gy
1. Check HEX (Heat exchanger), DC aircon
olo
iet
- Check HEX operation:
hn
cV
After turning on CB for HEX (CB has mark “Do not disconnect”), if HEX and DC
ec
fT
aircon work normally (has airflow), it is OK. If not, check the power connnection of
hu
ie
two positions 48VDC domino terminal, RJ45 at HEX controller module, see Item 6.9
_K
Ch
in Part 1).
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
no
2. Communication test
ch
_K
❖ Communication between CSU and genset: If CSU displays as picture below it is OK. If
Te
80
Ch
11
:32
:02
16
18
18
/20
/20
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 157 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
If has GCP Version it is OK (Yanmar genset)
80
86
2
2:3
11
6:0
81
01
1/2
8
01
❖ Communication between CSU and ATS: If CSU displays as picture below it is OK. If not
ky
9/0
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
❖ Communication between CSU and DC aircon: If CSU displays as picture below it is OK.
gy
c
lo
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
❖ Communication between CSU and VRLA battery: If CSU displays as picture below it is
18
/20
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 158 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
If having “BMU Version” it is OK
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
Go to FBMU message, navigate to battery string number in CSU that you have just connected
ng
uy
battery to corresponding CB to view status information of battery (press ↓ key to view all)
Ng
Du
Must review all quantity of battery in CSU to make sure that CSU can monitor all batteries.
er
Of
Vi
Note: If Cell voltage displays in CSU is 0V or about 4V, check the connection because some
gy
of wiring is not correct. The cell voltage is in the range 2 ÷ 2.4 VDC.
c
lo
hu
❖ Communication between CSU and LIB battery: If in CSU displays as “Lithium Battery
no
ch
_K
Version” it is OK. If not check RS485 cable (must review all quantity of battery in CSU
Te
to make sure CSU can monitor all batteries. If can’t view all check cable between batteries.
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
3. Alarm test
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 159 of 163
rN
_1
e
ng
Create fake smoke alarm on smoke detector using smoke tester. If having smoke alarm in
fic
Of
CSU it is OK. If not check cable and connection.
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
Strictly forbid using cigarette, lighter or something similar (dangerous) for this test.
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
❖ Check main failure alarm: Switch off Main CB in ATS. If having alarm in CSU it is OK.
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
Te
- Close the door of all Minishelters to clear all door open alarm in CSU.
80
ief
- Open the door of Battery Minishelter. If having door open alarm in CSU it is OK. If
86
Ch
not check door sensor cable between Battery Minishelter and CSU. After that, close the
11
history alarm to check alarm because when closing the door of IPS, can’t see the CSU.
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 160 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
Door open alarm of IPS Door open alarm of Battery Minishelter
2
2:3
11
4. Check Temperature Sensor in CSU
6:0
- Check temperature in CSU via environment/battery temperature sensor. If CSU displays
81
same as picture below it is OK. If not check connection between sensor and CSU.
01
In main menu, using →, ↓, ↑ buttons to navigate “ENV”, “Battery-1”, “Battery-2… menu.
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
Of
- Start DG1 manually on CSU, if genset starts normally it is OK, else check connection
Vi
gy
between X7.1, X7.2 of UIB and Terminal 5, 6 of ATS, connection between Terminal 5,6
c
lo
hu
no
of ATS and terminal 92, B- on domino of genset (Genset, ATS must be at Auto mode).
ch
_K
- Stop DG1 manually on CSU, if genset stop it is OK, else check connection cable.
Te
80
+ Start:
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
+ Stop:
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 161 of 163
rN
_1
e
ng
fic
Of
Du
gy
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
6. Check communication between IPS and server
80
(check after having planned IP for monitoring IPS)
86
- Step 1: Preparation
2
2:3
11
Straight LAN cable.
6:0
Laptop.
81
- Step 2: Set IP address, IP Gateway, subnet mask of Laptop same with IP Address, IP
01
Gateway, Subnet Mask of IPS that is planned.
1/2
8
- Step 3: Connect LAN cable between Laptop and Port of site/switch (Port number follows
01
ky
If port is not bright, not activated call IP Division of Transmission Dept to get
9/0
da
Th
uy
If OK perform Step 5.
Ng
Du
- Step 5:
er
fic
Of
Vi
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 162 of 163
rN
_1
e
ng
PART 5
fic
Of
SITE CLEANING
Du
gy
1. Fixing HDPE, corrugated pipe, cable
olo
iet
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
9/0
,2
1/2
ky
9/0
da
ia
42
gh
eN
7:1
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
29
29
,
ky
:14
da
ia
17
gh
Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC
9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018
h
42
Expiry date:
nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02
ye
7:1
gu
SELF-POWERED BTS ACCESS SITES Page: 163 of 163
rN
_1
e
ng
Requirement:
fic
Of
The cable is laid neatly.
Du
gy
Safe in operation.
olo
iet
2. Sealing cable hole and 2 ends of pipes
hn
cV
ec
fT
hu
ie
_K
Ch
80
86
2
2:3
11
6:0
81
01
1/2
8
01
3. Cleaning up 9/0
,2
1/2
Requirements: Cut the excess of plastic tie; clean inside minishelter & working area.
ky
9/0
4. Locking the door with lock cover to protect lock avoid rain, sunshine
da
gh
Th
_1
en
ng
uy
Ng
Du
er
fic
et
Of
Vi
gy
c
lo
hu
no
ch
_K
Te
80
ief
86
Ch
11
:32
:02
16
18
18
/20
/20
/01
/01
Re-check every thing one more time before leaving the site.