Mã văn bản: 50/IG-TCC
Số văn bản: 50

9 /0
Ngày ban hành: 29/01/2018

h
42

nT
ye
7:1

gu
STT Người ký Đơn vị Thời gian ký Ý kiến

rN
_1

e
1 NGUYỄN THẾ Chief Technology 29/01/2018

ng

fic
NGHĨA Officer - Telecom 16:02:32

Of
Du
International

gy
Myanmar Co.,Ltd

olo
iet
2 NGUYỄN HUY Director of Center - 29/01/2018

hn
DŨNG Technical center - 15:05:36

cV

ec
Headquarters -

fT
Telecom

hu

ie
International

_K

Ch
Myanmar Co.,Ltd

80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
ffic
iet

yO
cV

log
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 1 of 163

rN
_1

e
ng
TRACKING TABLE FOR AMENDMENTS

fic
Of
Du
No Page Modified content Effective date

gy
To replace for the Instruction Guide No. 28/IG-

olo
iet
1
TCC issued on 11/01/2018.

hn
cV

ec
2 Updated the content related to cable holes

fT
hu
3 Added some visual picture for reference

ie
_K

Ch
4 Added Table of Content

80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

Compilation Verification Approval


ief
86

Ch
11

NGUYỄN ĐỨC
:32

TOÀN
:02

Signature
KHÚC VIỆT
16
18

DŨNG
18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 2 of 163

rN
_1

e
ng

fic
PURPOSE

Of
Du
- To control installation quality of power equipment at self-built BTS access sites.

gy
- To list materials for installation.

olo
iet

hn
- To make detailed instruction guide to meet technical requirement.

cV

ec
OBJECTS AND SCOPE

fT
hu
- This instruction guide is applied for MyTel and MyTel's installation partners.

ie
_K

Ch
SAFETY AT WORK

80
- Human:

86
Must have good health, psychological stability.

2
2:3
11
- In construction:

6:0
Wear protective clothes, safety shoes - helmet - belt.

81
When working on tower, must arrange safety measures for lower affected area, not

01
1/2
allow people who have no duties to enter the construction area (accident prevention
8
01

sign should be used). 9/0


,2
1/2

Do not throw anything up or down. The man standing on the ground must wear safety
ky
9/0

helmet to avoid falling objects from the heights.


da

Stop construction when the weather is bad (thunderstorms, thunder, unusual wind).
ia
42

gh

Make sure the power must be switched off while connecting power cables.
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 3 of 163

rN
_1

e
ng

fic
Of
TABLE OF CONTENT

Du

gy
PART 1 ........................................................................................................................................................... 6

olo
iet
PREPARATION OF TOOLS, MATERIALS AND EQUIPMENT ............................................................ 6

hn
cV

ec
1. Materials and Equipment ....................................................................................................................... 6

fT
hu
2. Tools ....................................................................................................................................................... 7

ie
_K

Ch
PART 2 ........................................................................................................................................................... 9

80
INSTALLATION ........................................................................................................................................... 9

86

2
1. Preparation ............................................................................................................................................. 9

2:3
11
2. Overview of equipment and accessories ............................................................................................... 9

6:0
81
2.1. ATS cabinet (ZTE) ......................................................................................................................... 9

01
2.2. IPS with or without solar module (ZTE) ..................................................................................... 11

1/2
8
2.3. VRLA Battery Minishelter (Thien Viet) ..................................................................................... 14
01

9/0
,2
2.4. Lithium Battery Minishelter (Thien Viet) ................................................................................... 17
1/2

ky

2.5. Lithium Battery (ZTT and Coslight) ........................................................................................... 20


9/0

da

2.6. VRLA battery ............................................................................................................................... 22


ia
42

gh

2.7. Diesel generator (KBI and Yanmar) ............................................................................................ 23


eN
7:1

2.8. PBMU ........................................................................................................................................... 30


Th
_1

3. Before installation ................................................................................................................................ 31


en
ng

uy

4. Installation ............................................................................................................................................ 32
Ng
Du

4.1. Install fuel tank and diesel genertor (DG) ................................................................................... 32


er
fic
et

4.1.1. KBI generator ............................................................................................................................ 32


Of
Vi

4.1.2. Yanmar generator ...................................................................................................................... 43


gy
c

lo
hu

4.2. Install IPS, ATS, Lithium Battery Minishelter, VRLA Battery Minishelter .............................. 60
no
ch
_K

4.2.1. Steps of implementation ............................................................................................................ 60


Te
80

4.2.2. Requirement............................................................................................................................... 61
ief
86

Ch

4.2.3. Install Lithium Battery in Lithium Battery Minishelter ........................................................... 61


11

4.2.4. Install VRLA battery in VRLA Battery Minishelter ................................................................ 72


5. Cabling ................................................................................................................................................. 84
:32

5.1. Requirement.................................................................................................................................. 84
:02
16
18

5.2. Cable hole definition .................................................................................................................... 85


18
/20

6. Connection between equipments ......................................................................................................... 88


/20
/01

6.1. Make cable lug and LAN terminal............................................................................................... 88


/01
29

6.2. Pin for RS485 of equipment for communication in Modbus RTU ............................................. 89
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 4 of 163

rN
_1

e
ng
6.3. Cabling .......................................................................................................................................... 90

fic
Of
Du
6.4. Single line diagram connection .................................................................................................... 92

gy
6.4.1. Good-grid site ............................................................................................................................ 92

olo
iet

hn
6.4.2. Bad grid site ............................................................................................................................... 99

cV

ec
6.4.3. Off grid site:............................................................................................................................. 105

fT
hu

ie
6.5. Connection .................................................................................................................................. 111

_K

Ch
6.5.1. From ATS to IPS ..................................................................................................................... 111

80
6.5.2. From ATS to Diesel Generator ............................................................................................... 112

86

2
2:3
6.5.3. From IPS to Diesel Generator (for off grid site) .................................................................... 117

11

6:0
6.5.4. From Battery Minishelter to IPS ............................................................................................. 118

81
6.5.5. IPS internal connection ........................................................................................................... 121

01
1/2
6.5.6. Grounding ................................................................................................................................ 122
8
01

9/0
6.6. Marking label for cables ............................................................................................................. 123
,2
1/2

6.7. Checking insulation before turning power on ........................................................................... 123


ky
9/0

da

6.8. Install rectifier / Solar charger ................................................................................................... 124


ia
42

6.9. Power on ..................................................................................................................................... 125


gh
eN

6.9.1. For on-grid site ........................................................................................................................ 125


7:1

Th

6.9.2. For Off grid site ....................................................................................................................... 131


_1

en

PART 3 ....................................................................................................................................................... 136


ng

uy
Ng

SETTING PARAMETER .......................................................................................................................... 136


Du

er

1. Setting paramater for equipment in Battery Minishelter .................................................................. 136


fic
et

Of

1.1. DC aircon .................................................................................................................................... 136


Vi

gy

1.2. LIB Battery ................................................................................................................................. 138


c

lo
hu

no

2. Setting parameter for KBI diesel generator (DG) ............................................................................. 138


ch
_K

Te

3. ATS..................................................................................................................................................... 140
80

ief

3.1. Change the switch module Socomec to auto mode ................................................................... 140
86

Ch

3.2. Turn switch to set the output of battery charger for genset battery .......................................... 141
11

3.3. Set the operatin mode and alarm thresholds of ATS ................................................................. 141
:32

3.3.1. Setting under-voltage threshold .............................................................................................. 142


:02

3.3.2. Setting application mode (mode 2 MG+B): ........................................................................... 144


16
18

3.3.3. Setting date and time: Change to real time ............................................................................. 144
18
/20

/20

4. Setting parameter for controller CSU510B of IPS............................................................................ 145


/01

/01

4.1. Update software for CSU ........................................................................................................... 145


29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 5 of 163

rN
_1

e
ng
2. Import parameter by using USB ........................................................................................................ 148

fic
Of
Du
3. Setting parameter after importing ...................................................................................................... 150

gy
3.1. Date & time: Set 2 items according to actual date and time. .................................................... 150

olo
iet

hn
3.2. Setting Local IP/Mask/GW ........................................................................................................ 150

cV

ec
3.3. DG/Mains Period Start ............................................................................................................... 152

fT
hu

ie
3.4. DG Forced Stop Enable/Time .................................................................................................... 152

_K

Ch
3.5. Setting parameter of genset on CSU .......................................................................................... 153

80
3.6. Set battery capacity .................................................................................................................... 154

86

2
2:3
3.7. Set BMU on CSU ....................................................................................................................... 154

11

6:0
3.8. Get CSU’s MAC information .................................................................................................... 154

81
PART 4 ....................................................................................................................................................... 156

01
1/2
COMMISSIONING.................................................................................................................................... 156
8
01

9/0
1. Check HEX (Heat exchanger), DC aircon ........................................................................................ 156
,2
1/2

2. Communication test ........................................................................................................................... 156


ky
9/0

da

3. Alarm test ........................................................................................................................................... 158


ia
42

4. Check Temperature Sensor in CSU ................................................................................................... 160


gh
eN

5. Check remote control of genset ......................................................................................................... 160


7:1

Th

6. Check communication between IPS and server ................................................................................ 161


_1

en

PART 5 ....................................................................................................................................................... 162


ng

uy
Ng

SITE CLEANING ...................................................................................................................................... 162


Du

er

1. Fixing HDPE, corrugated pipe, cable ................................................................................................ 162


fic
et

Of

2. Sealing cable hole and 2 ends of pipes .............................................................................................. 163


Vi

gy

3. Cleaning up ........................................................................................................................................ 163


c

lo
hu

no

4. Locking the door with lock cover to protect lock avoid rain, sunshine ........................................... 163
ch
_K

Te

5. Finish the installation ......................................................................................................................... 163


80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 6 of 163

rN
_1

e
ng
PART 1

fic
Of
PREPARATION OF TOOLS, MATERIALS AND EQUIPMENT

Du

gy
1. Materials and Equipment

olo
iet
a. Good grid site (where diesel genset can’t be placed such as rooftop site)

hn
cV
Note

ec
No Item Unit Q’ty

fT
hu
1 ATS cabinet included accessories Set 01

ie
_K

Ch
IPS (w/o solar) cabinet included The quantity of IPS, Rectifier
2 Set 01 or 02
materials (Rectifier) & accessories follows the call-off

80
Lithium battery Minishelter included

86
3 Set 01 or 02 The quantity follows the call-off
accessories

2
2:3
11
4 Lithium battery included accessories Pcs -- The quantity follows the call-off

6:0
b. Bad grid site

81
No Item Unit Q’ty Note

01
1 ATS cabinet included accessories Set 01

1/2
8
IPS (w/o solar) cabinet included The quantity of IPS, Rectifier,
01

2 materials (Rectifier, PBMU, Set 9/0


01 or 02 PBMU & Temperature Sensor
,2
1/2

Temperature Sensor) & accessories follows the call-off


ky
9/0

VRLA battery Minishelter included


da

3 Set 01 or 02 The quantity follows the call-off


accessories
ia
42

gh

VRLA battery 2V-300Ah included


4 String -- The quantity follows the call-off
eN
7:1

accessories
Th

Diesel generator 8/12kVA (single


_1

en

5 phase) or 30kVA (3-phase) included Set 01


ng

uy

fuel tank and accessories


Ng
Du

c. Off-grid site without solar module


er

No Item Unit Q’ty Note


fic
et

Of

IPS (w/o solar) cabinet included The quantity of IPS, Rectifier


Vi

1 Set 01 or 02
gy

materials (Rectifier) & accessories follows the call-off


c

lo
hu

LIB battery minishelter included


no

2 Set 01 or 02 The quantity follows the call-off


accessories
ch
_K

Te

3 Lithium battery included accessories Pcs -- The quantity follows the call-off
80

ief

Diesel generator 8/12kVA (single


86

Ch

4 phase) or 30kVA (3-phase) included Set 01


11

fuel tank and accessories


d. Off-grid site with solar module
:32

No Item Unit Q’ty Note


:02

IPS (with solar) cabinet included The quantity of IPS, Rectifier,


16
18

1 materials (Rectifier, Solar Charger) & Set 01 or 02 Solar Charger follows the call-
18
/20

accessories off
/20

LIB battery minishelter included


/01

2 Set 01 or 02 The quantity follows the call-off


/01

accessories
29
29

3 Lithium battery included accessories Pcs -- The quantity follows the call-off
,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 7 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Note

Of
Diesel generator 8/12kVA (single

Du

gy
4 phase) or 30kVA (3-phase) included Set 01

olo
iet
fuel tank and accessories

hn
cV
2. Tools

ec
No Description Unit Q’ty Purpose Image

fT
hu
I Tool

ie
_K

Ch
80
Drill and drill bits To fix cabinet, fuel tank on
1 Set 1
14 concrete foundation

86

2
2:3
11

6:0
Wrench / Torque

81
2 Set 1 To wrench bolts
wrench

01
1/2
8
01

9/0
Flat & crosshead
3 Set 1 To drive screws
,2
1/2

screw driver
ky
9/0

da
ia
42

gh

To press and shape round lugs,


eN

4 Crimping Pliers Set 1


7:1

tube lugs
Th
_1

en
ng

uy
Ng
Du

Diagonal Pliers,
er

5 Set 1 To cut plastic tie, power cable


Wire Stripper
fic
et

Of
Vi

gy
c

6 Knife Pcs 2 To cut head of cable sheath


lo
hu

no
ch
_K

Te
80

7 Hexagonal head Set 1 To drive hexagonal screws


ief
86

Ch
11

8 I-beam level Set 1 To determine flatness


:32
:02
16
18

To check insultation, voltage,


9 Multi meter Pcs 1
18

current
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 8 of 163

rN
_1

e
Q’ty

ng
No Description Unit Purpose Image

fic
Of
Du

gy
10 Hacksaw Pcs 1

olo
iet

hn
cV

ec
fT
hu
To determine position of cabinet,
11 Tape rule Set 1

ie
fuel tank on the foundation

_K

Ch
80
86

2
12 Socket wrench Set 1 To turn a fastener

2:3
11

6:0
81
II Labor protection Each person is equipped one set

01
1/2
8
01

9/0
1 Safety helmet Pcs 1 To protect head
,2
1/2

ky
9/0

da

To protect the wearer's body


2 Protective clothes Set 1
ia
42

from injury or infection


gh
eN
7:1

Th
_1

To protect the foot from falling


en

3 Safety shoes Set 1


objects or compression
ng

uy
Ng
Du

er
fic

To protect for wearer from


et

4 Insulating glove Set 1


Of

electrical shocks
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 9 of 163

rN
_1

e
ng
PART 2

fic
Of
INSTALLATION

Du

gy
Installation procedure

olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
1. Preparation ,2
- Inspect all materials and equipment in accordance with the list of supply for each site.
1/2

ky

- Ensure materials and accessories are not deformed, distorted.


9/0

da

2. Overview of equipment and accessories


ia
42

2.1. ATS cabinet (ZTE)


gh
eN

Q’ty
7:1

No Item Unit Image Purpose


Th
_1

en
ng

uy
Ng
Du

To switch between Main


er

A ATS Cabinet Set 1


fic
et

Grid and Genset


Of
Vi

gy
c

lo
hu

no
ch
_K

Synchronized
Te

A.1
accessories
80

ief
86

Ch
11

To fix ATS cabinet on


1 Steel anchor Set 1
concrete foundation
:32
:02
16
18

18
/20

/20

2 Junctor Set 1 Not use


/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 10 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet
To seal cable hole and two

hn
cV
3 Silicon Pcs 1 ends of each corrugated

ec
pipe

fT
hu

ie
_K

Ch
External

80
A.2
accessories

86

2
2:3
16~25sq.mm tube Tube lug for power cable

11
1 Pcs 12
cable lug from main grid, genset

6:0
81
01
Outdoor black To connect from terminal

1/2
8
3 cable 2-core M 5 12VDC of ATS to B+, B-
01

9/0
2x2.5mm2 ,2 dominos of genset
1/2

ky
9/0

da

48VDC power: Connect


Outdoor cable from -48V & GND
ia
42

4 M 18
gh

2x1mm2 terminals of IPS to


eN
7:1

terminals 19-20 of ATS


Th
_1

en
ng

uy
Ng

To connect from grounding


Du

Yellow-green
5 M 6 bar of ATS to grouding bar
er

1×25mm2 Wire
at BTS site
fic
et

Of
Vi

gy
c

lo
hu

01 twisted pair (Red +


no

Blue): Connect from RS485


ch
_K

of CSU of IPS to terminals


Te

3-4 of ATS. Red wire for


80

ief

2 twisted pairs RS485A, blue wire for


86

Ch

6 cable (4-core) for M 18 RS485B.


11

Modbus 01 twisted pair (Orange +


Green): Connect from
X7.1, X7.2 of UIB (User
:32

Interface Board) of IPS to


:02

terminals 5-6 of ATS


16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 11 of 163

rN
_1

e
ng
2.2. IPS with or without solar module (ZTE)

fic
Of
Du
No Item Unit Q’ty Image Purpose

gy
olo
iet

hn
cV

ec
fT
hu

ie
Is DC power cabinet as

_K

Ch
IPS with or well as the space to install
A without solar Set 1

80
BTS, Transmission
module
equipment

86

2
2:3
11

6:0
81
01
Synchronized

1/2
A.1
8
accessories
01

9/0
,2
1/2

ky

CSU (Centralized Local Supervision Unit at


1 Pcs 1
9/0

Supervision Unit) Site - CSU510B


da
ia
42

gh
eN
7:1

Th

UIB (User Interface For communication


_1

2 Pcs 1
en

Board) connection
ng

uy
Ng
Du

er
fic
et

Of
Vi

Environment To measure environment


gy

3 M 2
c

temperature sensor temperature inside the IPS


lo
hu

no
ch
_K

Te
80

ief
86

Ch

To fix IPS cabinet on


4 Steel anchor Set 1
11

concrete foundation
:32
:02
16
18

Insulated tape and To fix cable & corrugated


5 Bag 1
18
/20

plastic tie pipe


/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 12 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
To buffer at 4 holes

olo
iet
between foundation and

hn
6 U-Shape Set 1

cV
IPS cabinet to make

ec
balance if necessary

fT
hu

ie
_K

Ch
80
86
7 Lock cover Pcs 1 To protect lock

2
2:3
11

6:0
81
01
1/2
8
8 Lifting ears Set 1 To lift when using crane
01

9/0
,2
1/2

ky
9/0

da

To seal cable hole and two


ia
42

9 Silicon Bag 1 ends of each corrugated


gh

pipe
eN
7:1

Th
_1

en
ng

uy
Ng

To fulfill the gap between


Du

10 Plastic part Set 1


CBs
er
fic
et

Of
Vi

gy
c

lo
hu

no

To fix equipment on 19
ch

11 Bolts, caged nut Set 1


_K

inch rack.
Te
80

ief
86

Ch
11

Redundancy for
12 door, smoke sensor Redundancy
cable
:32
:02

External
16
18

A.2
accessories
18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 13 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
Only for the site has

olo
iet
VRLA battery: This sensor

hn
Battery temperature is sticked on VRLA battery

cV
1 M 10

ec
sensor and connected to IPS.

fT
hu
01 VRLA battery string

ie
need 01 kit (10m)

_K

Ch
80
86

2
Cable lug for grounding

2:3
35 sq.mm bare

11
2 Pcs 10 cable, positive cable of
connecting terminal

6:0
battery

81
01
1/2
8
01

9/0
,2
4×16 square meter Connect from AC input
1/2

CB of IPS to ”Load” CB of
ky

3 outdoor power M 18
9/0

da

cable ATS
ia
42

gh
eN
7:1

Tube lug for power cable


Th

16- 25 sq.mm bare


4 Pcs 5 from ATS to IPS, negative
_1

cos for power cable


en

cable of battery.
ng

uy
Ng
Du

er

To protect power, signal


fic
et

Of

32mm / 40mm 8 cable outside from IPS to


Vi

5 M
corrugated pipe (10) ATS, IPS to grounding bar
gy
c

lo

of BTS site.
hu

no
ch
_K

Te
80

ief
86

Ch

Grounding cable To connect from grounding


2
6 1x35 mm / yellow- M 8 bar of IPS minishelter to
11

green grouding bar of BTS site


:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 14 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du
Need to divide cable is two

gy
cables:

olo
iet
- For signal cable between

hn
cV
IPS and ATS (about 15m).

ec
(Not use 01 twisted pair

fT
hu
(Red + Blue). Use 01

ie
twisted pair (Orange +

_K

Ch
Green) to connect from

80
2 twisted pairs cable X9.1, X9.3 of UIB of IPS
7 M 20
(4-core) for Modbus to terminals 7-8 of ATS).

86

2
- For communication

2:3
11
between IPS and Battery

6:0
minishelter (about 5m) (01

81
twisted pair (Red for
RS485A, Blue for

01
RS485B). Not use 01

1/2
8
remaining twisted pair
01

9/0 Orange + Green.


,2
1/2

ky

2.3. VRLA Battery Minishelter (Thien Viet)


9/0

da

No Item Unit Q’ty Image Purpose


ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng

VRLA Battery
Du

A 1 Pcs To install VRLA Battery


Minishelter
er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te

Synchronized
A.1
80

accessories
ief
86

Ch
11

Cable Cu/PVC To connect from grounding


1 Green-Yellow M 5 bar of VRLA minishelter to
:32

35mm2 grouding bar at BTS site


:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 15 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet
To connect from CB of

hn
M35 (35mm2) blue

cV
2 M 12 VRLA Battery Minishelter

ec
power cable
to Battery CB in IPS

fT
hu

ie
_K

Ch
80
To connect from 0VDC

86
M35 (35mm2) terminal of Battery No.1 in

2
3 M 12

2:3
11
black power cable VRLA Battery Minishelter

6:0
to GND bar in IPS

81
01
1/2
8
01

LAN cable 9/0 For communication between


,2
1/2

4 M 6 DC aircon of VRLA Battery


(RS458/RJ45)
ky

Minishelter to IPS.
9/0

da
ia
42

gh
eN

Because the length of cable


7:1

is not enough. Therefore,


Th
_1

this cable is only for door


en

sensor.
ng

uy

5 Cable 2x1mm2 M 12
Use 7.5m of new cable
Ng
Du

2x0.75mm2 or 2x1mm2
er

(white cover) for smoke


fic
et

sensor (refer to Item A.2)


Of
Vi

gy
c

To connect from -48VDC


lo
hu

no

terminal in IPS to domino


ch
_K

6 Cable 2x1.5 M 6 terminal block in Battery


Te

Minishelter to supply power


80

ief

for DC aircon, smoke sensor


86

Ch
11
:32

7 HDPE Ø40 M 12 To protect outside cable


:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 16 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet

hn
8 Door lock Pcs 2 To lock the door

cV

ec
fT
hu

ie
_K

Ch
80
9 Lock cover Pcs 1 To proteck the lock

86

2
2:3
11

6:0
81
01
10 Plastic tie Kit 1 To fix cable

1/2
8
01

9/0
,2
1/2

ky

For cable connection to


9/0

11 Cable lugs M35 Pcs 6


da

terminal
ia
42

gh
eN
7:1

Th

To fix VRLA Battery


_1

12 Steel anchor Set 1 Minishelter on concrete


en

foundation
ng

uy
Ng
Du

er
fic
et

Of
Vi

13 Anti-theft bolt Set 1 To install secure bar


gy
c

lo
hu

no
ch
_K

Te
80

To protect 2V VRLA battery


14 Secure bar Set 1
ief

from being stolen or moved


86

Ch
11
:32
:02

15 Plastic separator Set 1 To separate battery


16
18

18
/20

/20

External
/01

/01

A.2
accessories
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 17 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
Cable 2x0.75mm2

iet

hn
1 or 2x1mm2 (white M 7.5 For smoke sensor

cV

ec
cover)

fT
hu

ie
_K

Ch
2.4. Lithium Battery Minishelter (Thien Viet)

80
No Item Unit Q’ty Image Purpose

86

2
2:3
11

6:0
81
01
1/2
8
Lithium Battery
01

9/0
A Set 1 To isnstall Lithium Battery
Minishelter ,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Synchronized
Th

A.1
accessories
_1

en
ng

uy
Ng
Du

Cable Cu/PVC To connect from grounding


er

1 Green-Yellow M 5 bar in LIB minishelter to


fic
et

35mm2 grouding bar at BTS site


Of
Vi

gy
c

lo
hu

no
ch
_K

To connect from -48VDC


Te

M35 (35mm2) blue


80

2 M 6 bar of LiB Minishelter to


ief

power cable
Battery CB in IPS
86

Ch
11
:32

To connect from 0VDC bar


:02

M35 (35mm2)
3 M 6 of LiB Minishelter to GND
black power cable
16
18

bar in IPS
18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 18 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet

hn
cV

ec
For communication between
LAN cable

fT
4 M 6 DC aircon & IPS.

hu
(RS458/RJ45)

ie
_K

Ch
80
86

2
2:3
11
This cable is connected from

6:0
door sensor, smoke sensor to
UIB board of IPS (need to

81
5 Cable 2x1 M 12
divide into two cables with

01
same length from LiB

1/2
8
Minishelter to IPS)
01

9/0
,2
1/2

To connect from -48VDC


ky

terminal in IPS to domino


9/0

da

6 Cable 2x1.5 M 6 terminal block in LiB


ia
42

Minishelter to supply power


gh

for DC aircon, smoke sensor


eN
7:1

Th
_1

en
ng

uy

7 HDPE Ø40 M 6 To protect outside cable


Ng
Du

er
fic
et

Of
Vi

gy
c

lo

8 Door lock Pcs 1 To lock the door


hu

no
ch
_K

Te
80

ief
86

Ch

9 Plastic tie Kit 1 To fix cable


11
:32
:02
16
18

10 Cable lugs M35 Pcs 6 For cable connection


18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 19 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet
10 Supporting bar Set 1 To install battery on 19” rack

hn
cV

ec
fT
hu

ie
_K

Ch
To fix hanger of battery on

80
11 Anti-theft bolt Set 1
19” rack

86

2
2:3
11

6:0
81
To fix LiB Minishelter on

01
12 Steel anchor Set 1
concrete foundation

1/2
8
01

9/0
,2
1/2

External
A.2
ky

accessories
9/0

da
ia
42

gh

Repeater kit for ZTT


eN

Lithium Battery To collect data of batteries to


7:1

1 Set 1
(applied only for transfer to CSU of IPS
Th
_1

Shipment 1 & 2)
en
ng

uy
Ng
Du

er
fic
et

- Repeater Pcs 1
Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

Power cable for


ief

- Pcs 1
86

Ch

repeater
11
:32
:02
16
18

4-pin LAN cable for


- Pcs 1
18
/20

repeater
/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 20 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet

hn
cV
- 8-pin LAN cable Pcs 1 Redundancy

ec
fT
hu

ie
_K

Ch
80
2.5. Lithium Battery (ZTT and Coslight)

86

2
No Item Unit Q’ty Image Purpose

2:3
11

6:0
81
Lithium Battery

01
A Pcs 1
ZTT

1/2
8
01

9/0
,2
1/2

Synchronized
ky

A.1
accessories
9/0

da
ia
42

gh

To protect for battery


eN

1 Hanger (19” rack) Set 2


7:1

stolen
Th
_1

en
ng

uy
Ng

Create space when


Du

2 Rubber piece Set 1 stacking 2 batteries. Not


er
fic

use
et

Of
Vi

gy
c

lo
hu

no

LAN cable (length To connect RS485 port of


ch
_K

3 Pcs 1
Te

70cm) battery
80

ief
86

Ch
11

To connect from negative


Blue power cable terminal of battery to -
4 Pcs 1
100cm, 16mm2
:32

48VDC bar of LiB


Minishelter
:02
16
18

To connect from positive


18
/20

/20

Black power cable terminal of battery to


5 Pcs 1
100cm, 16mm2
/01

0VDC bar of LiB


/01

Minishelter
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 21 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet
Not use. Use anti-thelf
Bolt and nut for 19”

hn
6 Set 1 bolts supplied in Battery

cV
rack installation

ec
Minishelter (Thien Viet)

fT
hu

ie
_K

Ch
80
Lithium Battery

86
B Pcs 1
Coslight

2
2:3
11

6:0
81
Synchronized
B.1

01
accessories

1/2
8
01

9/0
,2
1/2

ky

1 Hanger (19” rack) Set 2


9/0

da
ia
42

gh
eN
7:1

Th
_1

en

Create space when


ng

uy

2 Rubber piece Set 1 stacking 2 batteries. Not


Ng
Du

use
er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

LAN cable (length To connect RS485 port of


Te

3 Pcs 1
80

70cm) battery
ief
86

Ch
11
:32

To connect from negative


:02

Blue power cable terminal of battery to -


16
18

4 Pcs 1
100cm, 16mm2 48VDC bar of LiB
18
/20

Minishelter
/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 22 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
To connect from positive

olo
iet
Black power cable terminal of battery to

hn
5 Pcs 1

cV
100cm, 16mm2 0VDC bar of LiB

ec
Minishelter

fT
hu

ie
_K

Ch
80
To protect negative,

86
6 Terminal cap Pcs 2 positive terminals of

2
2:3
11
battery

6:0
81
01
1/2
8
Not use. Using anti-thelf
01

9/0
Bolt and nut for 19”
7 Set 1 bolts supplied by Battery
,2
1/2

rack installation
Minishelter vendor
ky
9/0

da
ia
42

gh

2.6. VRLA battery


eN
7:1

Th

No Item Unit Q’ty Image Purpose


_1

en
ng

uy
Ng
Du

VRLA Battery
er
fic

A Sacred Sun /
et

Of

Leoch
Vi

gy
c

lo
hu

no

Synchronized
ch
_K

A.1
Te

accessories
80

ief
86

Ch
11

To connect in series two


1 Bar connector Set 1
batteries in the same row
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 23 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet

hn
cV

ec
Plastic cover for bar

fT
hu
2 Set 1 To protect battery terminal
connector terminal

ie
_K

Ch
80
86

2
2:3
11

6:0
To connect in series two

81
3 Flexible connector Set 1 batteries of 2 different

01
rows

1/2
8
01

9/0
,2
1/2

ky
9/0

da

Plastic cover for


4 Set 1 To protect battery terminal
ia

flexible connector
42

gh
eN
7:1

Th
_1

en
ng

uy

Bolt, washer, anti-


To fix connector on
Ng
Du

5 slip ring and fasten Set 1


terminal of batteries
er

handle tool
fic
et

Of
Vi

gy
c

lo
hu

no

To mark numerical order


6 Label Set 1
ch
_K

of battery
Te
80

ief
86

Ch

To protect postive termnial


11

of battery No.1 and


7 Terminal cap Set 1
negative terminal of
battery No.24
:32
:02
16
18

2.7. Diesel generator (KBI and Yanmar)


18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 24 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet

hn
cV
Diesel Generator

ec
A Set 1
KBI

fT
hu

ie
_K

Ch
80
External

86
A.1
accessories

2
2:3
11

6:0
To connect from L1/L2 of

81
Power cable generator to Gen CB of

01
Cu/PVC/PVC
1 M 15 ATS (on-grid site) or AC-
2x10mm2/

1/2
8
input CB of IPS (off- grid
2x16mm2
01

9/0 site)
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

2 Fuel funnel Pcs 1 To fill fuel in the tank


Th
_1

en
ng

uy
Ng
Du

er

Grounding cable
fic
et

yellow/ green To connect from grounding


Of
Vi

3 CU/PVC/PVC M 5 terminal of generator to


gy

1x10mm2 / grouding bar at BTS site


c

lo
hu

1x16mm2
no
ch
_K

- To connect from remote-


Te
80

start dry contact on domino


ief
86

of generator to dry contact


Ch

RS485 cable ”G1-start” of ATS.


11

4 M 20
1x18AWG - To connect from D+, D-
of Trans-485 of genset to
:32

RS485 of ATS
:02

(only use for bad-grid site)


16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 25 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
Lengthened Exhaust

iet

hn
pipe 1.5m and 02

cV
5 Set 1

ec
stainless steel cable

fT
ties 25cm

hu

ie
_K

Ch
80
86

2
2:3
6 Fuel tank Set 1 To store fuel

11

6:0
81
01
1/2
8
01

9/0
,2
1/2

To fix fuel tank on


7 Steel anchor Set 1
ky

concrete foundation
9/0

da
ia
42

gh
eN
7:1

Th
_1

Bolts, washer, anti- To fix generator with fuel


en

8 Set 1
slip ring tank
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy

Trans-485 To fix comunication


c

lo
hu

9 communication Pcs 1 function between genset


no

module controller and IPS


ch
_K

Te
80

ief
86

Ch

Diesel generator
B
Yanmar
11
:32

To connect from L1, L2,


:02

1 4x16 Power Cable M 20 L3, N of generator to Gen


16
18

CB of ATS
18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 26 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu
2 Fuel funnel Pcs 1 To fill fuel in the tank

ie
_K

Ch
80
86

2
2:3
11

6:0
81
To connect from grounding

01
M16 grounding
3 M 5 terminal of generator to

1/2
cable
8
MGB3
01

9/0
,2
1/2

ky
9/0

da

To connect from (TX+ and


RX+), (TX- and RX-) of
ia
42

gh

4 RS485 cable M 20 CCr Modbus module of


eN
7:1

genset to terminal 3,4 of


Th

ATS
_1

en
ng

uy
Ng
Du

1.5m Exhaust
er

Extension pipe,
5 Set 1
fic
et

corner connector &


Of
Vi

steel cable ties 20cm


gy
c

lo
hu

no
ch
_K

Te
80

6 16-8 cable lug Pcs 10 To make cable lug


ief
86

Ch
11
:32

Anti-theft screw and


:02

7 Pcs 13 Not use


driver M8
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 27 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet

hn
8 Anti-theft screw and

cV
Pcs 88 Not use

ec
driver M6

fT
hu

ie
_K

Ch
80
86
To pump fuel from external

2
9 External hand pump Pcs 1

2:3
11
fuel tank to genset by hand

6:0
81
01
1/2
8
External reverse
01

9/0
10 Pcs 1 To store coolant water
water tank ,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

To monitor gensent
11 GPS module Pcs 1
Th

position
_1

en
ng

uy
Ng
Du

er
fic
et

Of

To communicate between
Vi

USB to RS485
12 computer and genset
gy

module
c

lo

controller (CEM7)
hu

no
ch
_K

Te
80

ief
86

Ch

13 Plastic tie Pcs 20 To fix cable, fuel pipe


11
:32
:02
16
18

Cable lug for


14 Pcs 2 At battery terminal
18
/20

12VDC cable
/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 28 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet

hn
External fuel tank

cV
15 Pcs 1 To store fuel

ec
1000L

fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
Accessory for
01

9/0
16 Set 1
external fuel tank
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

To cover the gap between


- Secure bar L845 Bar 2
er

genset and fuel tank


fic
et

Of
Vi

gy
c

Fuel feed pipe


lo

To fill fuel to external fuel


hu

no

- D60:L400 and Set 1


tank
ch
_K

rubber gaskets
Te
80

ief
86

Must be cut into 2 hoses:


Ch

+ 1st hose: 1m to supply


11

fuel from external tank to


Rubber hose D8 +
- Set 1 hand pump
Colie
:32

+ 2nd hose: 2m to return


:02

fuel from engine to


16

external tank
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 29 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet

hn
cV

ec
To fix external fuel tank on
- Steel anchor ɸ12 Pcs 4

fT
hu
concrete foundation

ie
_K

Ch
80
86
Bolts M10x20 To fix genset on fuel tank

2
2:3
11
(include slip-ring but not use. To do it, use
- Pcs 8

6:0
washer and flat bolt, slip-ring washer of
washer) genset

81
01
1/2
8
01

-
Anti-thelf bolts
Pcs 8 9/0 To fix secure bar with
,2
1/2

M8x15 external fuel tank


ky
9/0

da
ia
42

gh
eN
7:1

This is the washer to fix


Th

- Washer 50x30x3 Pcs 12 genset and external fuel


_1

en

tank
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no

To protect fuel feed pipe


- Lock Pcs 2
ch
_K

and fuel drain box


Te
80

ief
86

Ch
11
:32
:02

Fuel feed pipe, fuel Already installed on the


- Set 1
return pipe fuel tank
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 30 of 163

rN
_1

e
ng

fic
No Item Unit Q’ty Image Purpose

Of
Du

gy
olo
iet

hn
cV
Already installed on the

ec
- Fuel level indicator Pcs 1
fuel tank

fT
hu

ie
_K

Ch
80
86
To fix fuel feed pipe

2
Blind flange and 6

2:3
D60:L400 with fuel tank

11
- bolt M6x20 (include Pcs 1
(Already installed on the

6:0
two flat washer, nut)
fuel tank)

81
01
1/2
8
Already installed on the
01

9/0
- Fuel level sensor Pcs 1 ,2 fuel tank
1/2

ky
9/0

da

To mount reverse water


Reverse water tank
ia

- Pcs 1 tank on genset cover


42

support bar
gh

(inside)
eN
7:1

Th
_1

en

To fix reverse water tank


ng

uy

- Drill screws Pcs 1 support bar on genset cover


Ng
Du

(inside)
er
fic
et

Of
Vi

gy
c

2.8. PBMU
lo
hu

no

No Item Unit Q’ty Picture Purpose


ch
_K

Te
80

ief
86

Ch

1 PBMU Pcs 1 To monitor batteries


11
:32
:02
16
18

PBMU V1.0 Power To supply power and


2 Kit 1
18
/20

Cable grounding
/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 31 of 163

rN
_1

e
ng
Q’ty

fic
No Item Unit Picture Purpose

Of
Du

gy
olo
PBMU V1.0 one

iet
To connect from battery
3 battery complete set Kit 1

hn
cV
terminal to PBMU

ec
of cable

fT
hu

ie
_K

Ch
To connect from RS485

80
terminal of PBMU to Pin

86
PBMU V1.0 RS485
4 Kit 1 1, 2 of domino terminal

2
extension cable

2:3
11
block in VRLA Battery

6:0
Minishelter

81
01
1/2
8
Cable, cable lug,
01

9/0
5 Kit 1 Redundancy
connector
,2
1/2

ky
9/0

da

3. Before installation
ia
42

a. General requirement of installation


gh
eN

- Front side of equipment is the side has door. For VRLA Battery Minishelter, the front side
7:1

Th

is the side has DC aircon.


_1

en

- Prepare enough tools and labor protection.


ng

uy

- Cable lug: Make cable lug for all connections exept LAN cable for RS485 at domino
Ng
Du

terminal block (legs 1, 2) of Battery Minishelter. Choose proper size and type of cable lug
er
fic

for each connection.


et

Of
Vi

- All cable lug must have end cap or be insulated.


gy
c

- Using dedicated tools to install, assemble equipment.


lo
hu

no

- Cut (cable) smoothly & flat.


ch
_K

- Wrapped all tools by insulated tape.


Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

b. Layout of equipment at site


/20

- Requirement: According to the design of each station. Example:


/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 32 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh

4. Installation
eN
7:1

4.1. Install fuel tank and diesel genertor (DG)


Th

4.1.1. KBI generator


_1

en

No Image Implementation
ng

uy
Ng

Must remember: finish fuel hoses and signal


Du

cable tasks on the surface of external fuel


er

A Fuel tank installation


tank (as below instruction) before placing
fic
et

Of

genset on the fuel tank


Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 33 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
Fixing fuel tank on concrete foundation:

86

2
Locate position of fuel tank follow

2:3
11
layout drawing

6:0
Locate the hole to drill

81
Fix fuel tank on concrete foundation

01
1 Must add 1 big washer on each bolt (it is

1/2
8
taken when removing IPS from wood
01

9/0pallet - as per left picture) to fix fuel tank


,2
1/2

with concrete foundation.


ky
9/0

Note: The side of external fuel tank that


da

has fuel drain must towards ATS


ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Locate the position (box) that contains fuel


Te

hoses and fuel level sensor for external fuel


80

ief

2 tank.
86

Ch

The kit of fuel hoses and fuel level sensor


wire is equipped with the fuel tank
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 34 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet
❖ Locate the position of 2 fuel hoses of the

hn
cV
fuel tank:

ec
Small hose (4mm): Fuel return hose

fT
hu
3 from engine to fuel tank.

ie
_K

Ch
Large hose (8mm): Fuel feed hose

80
from fuel tank to generator.
❖ Connect the connector to the sensor

86

2
2:3
11

6:0
81
01
1/2
8
The fuel hoses must pass through the box
01

4
9/0
with rubber seal hole
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en

❖ Connect the fuel feed and fuel return


ng

uy
Ng

hoses
Du

❖ Connect signal wires


er

5
fic

❖ Fixed by plastic tie


et

Of
Vi

Note: Check the connection clearly, tighten


gy

the hose clamp to ensure no fuel leakage


c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

Lock the box


6
:32
:02
16
18

18
/20

/20
/01

B Genset installation
/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 35 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
Move pallet at bottom of the generator
1

fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

Move bottom cover of generator which is


ky

near the engine side (total 8 screws, each


9/0

2
da

side of genset has 4 screws). Purpose: To


ia

mount genset on the fuel tank


42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no

Prepare bolts to fix fuel tank and generator:


ch
_K

(1): Used to fix outside of fuel tank and


Te

3 generator
80

(2): Used to fix inside of fuel tank and


ief
86

Ch

generator
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 36 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
Note when mounting DG on the fuel tank:

_K

Ch
The front of DG and the side of fuel tank

80
4
that has the fuel drain are at the same

86
direction

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

Place the generator on the fuel tank and fix


en

5 using bolts, nuts. Tighten 4 bolts on the outer


ng

uy

flange between fuel tank and generator


Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 37 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
Tighten 4 bolts on the inner flange between

2:3
11
6
fuel tank and generator

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy

Locate the fuel feed (fuel supply) hose and


Ng
Du

7 fuel return hose at engine position (now are


er

connected to internal fuel tank)


fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Remove the fuel return hose at engine


Ch

8 position. Maintain integrity of this fuel


11

return hose at internal fuel tank position


:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 38 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet
Put the stopper Ø5-Ø9 to seal the fuel return

hn
cV
hose that has just been removed from engine

ec
position (the stopper Ø5-Ø9 is in the part list

fT
9

hu
bag and put inside generator / fuel tank).

ie
Note: Ø5 end of stopper is used at this step.

_K

Ch
Ø9 end is used at step B.11

80
86

2
2:3
11

6:0
81
01
1/2
8
Remove the fuel feed hose at crude fuel filter
01

9/0
10 ,2position. Maintain integrity of this fuel feed
hose at internal fuel tank position
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy

❖ Take the fuel feed hose that has just been


Ng
Du

removed to the stopper which was


er

mentioned at step B.9. Choose the Ø9


fic
et

Of

end of stopper to seal this hose (because


Vi

gy

11 Ø5 end of stopper was used for fuel


c

lo
hu

return hose at step B.9). Now, fuel feed


no

hose and fuel return hose from internal


ch
_K

Te

fuel tank are looped together


80

❖ Tighten the hose clamps


ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 39 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
4mm fuel return hose which was mentioned
12 at Step A.3 will be connected to fuel return

80
position of engine

86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky

8mm fuel feed hose which was mentioned at


9/0

da

13 Step A.3 will be connected to crude fuel


ia
42

filter position
gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no

Locate the holes for cable run of:


ch
_K

❖ Power cable (B+, B-) from fuel sensor


Te

(on external fuel tank) to power box


80

14
ief

❖ Signal cable (A+, B-) from fuel sensor


86

Ch

(on external fuel tank) to EMKO


11

controller of genset.
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 40 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
Determine the power cable and signal cable
15

80
from Fuel Sensor

86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

Remove bolts on power box cover


da

16
ia
42

gh
eN
7:1

Th
_1

en
ng

uy

Connect power cable (B+, B-) from fuel


Ng
Du

sensor to B+, B- legs on the domino terminal


er

17 block of power box. Cable run is inside


fic
et

genset
Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief

18 Open the cover of controller box


86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 41 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
Locate the position of RS485 terminal on
19

fT
hu
EMKO controller of genset

ie
_K

Ch
80
86

2
2:3
11
Connect the signal cable RS485 of Fuel

6:0
Sensor (which was mentioned at step B.15 -

81
2-core type) to EMKO controller:
❖ Signal wire (A+) from Fuel Sensor is

01
20

1/2
connected to Port 43 (A+) of controller
8
❖ Signal wire (B-) from Fuel Sensor is
01

9/0connected to Port 44 (B-) of controller


,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

21 Fixing wires by plastic tie


Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo

Trans-485 communication module between


hu

no

22
DG and IPS
ch
_K

Te
80

ief
86

Ch
11
:32
:02

Connect Trans-485 module to EMKO


23
controller
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 42 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
Fix Trans-485 module on EMKO controller

hu
24

ie
by latch

_K

Ch
80
86

2
2:3
11

6:0
81
Fix Trans-485 module on EMKO controller

01
1/2
(the rear side of Trans-485 module can be
8
25
mounted easily on plastic rail which is ready
01

9/0
on surface of EMKO controller)
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy

26 Connecting battery of generator


Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch

Install lengthened exhaust pipe and fix to the


11

27 BTS shelter post or hang from shelter


stringer
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 43 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
1) Switch CB to “OFF” for safety

hu
2) Switch the key to “ON”

ie
_K

Ch
3) Press to navigate Item “Ext. Fuel
Lv”. If the value is in the range 0% ÷

80
100%  Connection is OK

86
28 4) Note: If it displays “!!!!”  Connection

2
2:3
is not OK  Re-check

11

6:0
5) After checking the connection between
fuel sensor and EMKO controller:

81
Switch key to “OFF” and disconnect

01
battery of generator if not use for safety

1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

4.1.2. Yanmar generator


gh
eN
7:1

No Image Implementation
Th
_1

A ASSEMBLY ACCESSORIES FOR GENERATOR


en
ng

uy

A.1 Assembly internal exhaust pipe (if genset is not assembled this)
Ng
Du

er
fic
et

Of
Vi

gy
c

Remove 8 anti-theft screws at rear side of


lo
hu

no

1 genset.
ch
_K

Tool is supplied by gensent manufacturer


Te
80

ief
86

Ch
11
:32
:02
16
18

2 Take exhaust pipe out


18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 44 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu
Remove 4 anti-theft screws at exhaust pipe

ie
3

_K
position

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh

4 Loosen the belt


eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

5 Elbow for exhaust pipe


:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 45 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu
6 Assemble the elbow with exhaust pipe

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh

Put the internal exhaust pipe into the hole


eN

7
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

Fix the internal exhaust pipe with genset


8
cover by 4 anti-theft screws
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 46 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
9 Tightening the belt

_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky

Install the cover by 8 anti-theft screws at rear


9/0

da

10
side of genset
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

A.2 Install reverse water tank


er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch

1 Marking position to install reverse water tank


11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 47 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
Using drill screws to fix reverse water tank
2
support bar on genset cover (inside)

81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

3 Mounting the reverse water tank


Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 48 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
4 Connect the water pipe to reverse water tank

2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh

A.3 Install GPS module


eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

1 GPS module
gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

2 Remove 2 screws to open GPS module cover


18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 49 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86
3 Insert sim card

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er

4 Install GPS module cover


fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 50 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
5 Remove two screws to open

_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

Locate position to connect power for GPS


ky

6
9/0

module
da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

Connect red wire of GPS module to pin “8-


gy

36V”
c

lo

7
hu

Connect black wire of GPS module to pin “-


no

BAT”
ch
_K

Te
80

ief
86

Ch
11
:32
:02

Turn power on, switch the key to position


16
18

8 “1”
18
/20

Remember: Must connect 12V battery first


/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 51 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
If the LED of GPS module lights, it is OK. If
9

fT
hu
not, check the connection

ie
_K

Ch
80
86

2
B Install external fuel tank

2:3
11

6:0
81
01
Divide 3m length of rubber hose into 2

1/2
8
hoses:
01

9/0
1
+ One hose has length 1m
,2
1/2

+ Other hose has length 2m.


ky
9/0

da
ia
42

gh
eN
7:1

Th

Locate the position of 2 fuel pipes of external


_1

en

fuel tank:
ng

uy

Small pipe: Fuel return pipe from


Ng
Du

engine to fuel tank


er

Large pipe: Fuel feed pipe from fuel


fic
et

Of

tank to generator
Vi

2
gy

Connect large pipe with the rubber


c

lo

hose length 1m.


hu

no

Connect small pipe with the rubber


ch
_K

hose length 2m.


Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 52 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
Remove blind flange and 6

_K

Ch
3
bolts M6x20 (including two flat washer, nut)

80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy

Fuel tank layout


Ng
Du

er
fic
et

Of
Vi

gy
c

lo

Fixing fuel tank on concrete foundation:


hu

no

Locate position of fuel tank follow


ch
_K

layout drawing
Te
80

Locate the hole to drill


ief
86

Ch

Fix fuel tank on concrete foundation


4 Note: The side of external fuel tank has
11

Hole the Hole must towards ATS


Must add the square washer to fix fuel
:32

tank on concrete foundation


:02

Must fix enough 4 holes at 4 conners.


16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 53 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh

Lifting the generator higher than the fuel


eN
7:1

tank.
Th

Hole at the bottom of genset must be fit with


_1

en

5 the fuel filling position of fuel tank.


ng

uy

Move 2 bottom bars of generator by


Ng

removing 8 bolts.
Du

Purpose: To mount genset on the fuel tank.


er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 54 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
Fixing genset with external fuel tank by 8

11

6:0
6 bolts that remove at step 5.
Bolts must be added black square washer.

81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

7
Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 55 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
Connect hand pump to the hose that has

80
length 1m.

86
This hose comes from external fuel tank.

2
8

2:3
11
Tighten the hose clamps
Note: The direction (→) of hand pump must

6:0
be from external fuel tank to crude filter

81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er

Locate the fuel feed hose that connected


fic
et

Of

from crude filter to internal fuel tank.


Vi

Remove the fuel feed hose at internal fuel


gy
c

9 tank position.
lo
hu

no

Connect this fuel feed hose to the hand


ch
_K

pump.
Te

Tighten the hose clamps


80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 56 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
Remove the fuel return hose at engine

_K

Ch
10
position

80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
Connect the hose that has length 2m to fuel
,2
1/2

return pipe at engine position.


ky

11 This hose comes from external fuel tank.


9/0

da

Tighten the hose clamps


ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Fuel supply pipe D60:L400 and rubber


Of
Vi

gaskets
gy

12
6 bolts M6x20 (include two flat washer, nut)
c

lo
hu

are taken in step B.3


no
ch
_K

Te
80

ief
86

Ch
11
:32
:02

Locate the hole to install fuel supply pipe


13
16
18

D60:L400
18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 57 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
Install fuel supply pipe D60:L400 by 6 bolts

_K

Ch
14
M6x20

80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

15 Locate hole to put cable


en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 58 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
Take fuel level sensor cable through the

2:3
11
16
bottom hole

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

Connect “PWR+” wire of fuel level sensor


er

17
cable to fuse
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32

Connect other wire of the fuse to pin “2” of


:02

18
terminal.
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 59 of 163

rN
_1

e
ng

fic
No Image Implementation

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
Connect “PWR-“ wire of fuel level sensor

_K

Ch
19
cable to negative terminal

80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky

Connect “OUT” wire of fuel level sensor


9/0

20
da

cable to Pin “FL NC” of Controller.


ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er

Turn power on, switch the key to position


fic
et

“1”
Of
Vi

21 Remember: Must connect 12V battery first.


gy
c

See item A.3.8.


lo
hu

no

If Controller display “ FL %”, it is OK.


ch
_K

Te
80

ief
86

Ch
11
:32

If Controller doesn’t display “FL …%”, it is


22
:02

NOT OK. Must re-check connection.


16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 60 of 163

rN
_1

e
ng
4.2. Install IPS, ATS, Lithium Battery Minishelter, VRLA Battery Minishelter

fic
Of
4.2.1. Steps of implementation

Du

gy
- Step 1: Locate the Cabinet / Minishelter according to the layout design.

olo
iet
- Step 2: Locate, mark the bolting position of equipment on the concrete foundation.

hn
cV

ec
- Step 3. Drilling and bolting.

fT
hu
- Step 4. Place the Cabinet / Minishelter in right position and tighten the bolts.

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy

Using U-shape to create balance for cabinet


Ng
Du

if necessary
er
fic
et

Of

Must add 1 big washer on each bolt (it is taken


Vi

gy

when removing IPS from wood pallet) to fix


c

lo
hu

IPS on concrete foundation


no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 61 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
4.2.2. Requirement

1/2
- Right place, in accordance with design.
8
01

9/0
- Enough the quantity, right type of bolts, screws ... and ensure the balance of equipment.
,2
1/2

4.2.3. Install Lithium Battery in Lithium Battery Minishelter


ky

a. Install battery supporting bar


9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 62 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
Step 1: Locate the hole position for the first Step 2: Locate the hole position for the 2nd battery

1/2
8
battery supporting bar (the hole number 5, 6 supporting bar (space of 9 blank holes). Do the
01

from the bottom) 9/0


same for the 3rd, 4th…, 10th bars
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch

Requirement: Asembly full 20 battery supporting bars with 4 caged nuts and 4 bolts per one
11

supporting bar.
b. Install battery caged nuts and anti-thelf bolts at position of battery supporting bar
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 63 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da

Step 1: Locate the position to install the first Step 2: The second hole is the number 9 from the
ia

caged nut: Same height as the pin number 1 of first hole.


42

gh

the battery supporting bar Repeat step 1 and step 2.


eN
7:1

Th

Requirement: Assembly full caged nuts & bolts for all Lithium Batteries that equipped for site.
_1

en

c. Differentiate types of Lithium Battery


ng

uy

CAUTION (VERY IMPORTANT)


Ng
Du

❖ ZTT Lithium Battery: Because 04 shipments of ZTT battery are different from each other
er

(about installation)  can not mix shipments together.


fic
et

Of

How to differentiate these 04 shipments and requirement for each shipment:


Vi

• Shipment 1 & 2 (Cylindrical cell packaging, W482 x D460 x H132 mm): Need repeater
gy
c

lo

to monitor batteries. No white mark on the box cover and batteries.


hu

no

• Shipment 3 (Cylindrical cell packaging, W482 x D460 x H132 mm): No need repeater.
ch
_K

Have white mark on the box cover and batteries.


Te
80

• Shipment 4 (Prismatic cell packaging, W482 x D400 x H132 mm): No need repeater.
ief
86

Ch

Have white mark on the box cover and batteries. On the white mark of batteries of
Shipment 4, extra with character “P”.
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 64 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
One more sign to differentiate shipments: Based on the Number of Packages:

11

6:0
Shipment Code Equipment Number of Packages

81
1 1000

01
2 Lithium-ion Battery 1500
ZTT-4850

1/2
3 (48V-50Ah) 2000
8
01

9/0
4 ,2 2800
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch

❖ COSLIGHT Lithium Battery: Check the outside battery boxes. Notice the yellow labels
11

“A” and “C” in red circle as below picture (“A” means Class A, “C” means Class C).
:32

COSLIGHT has Classes A, B, C, D, E, F. At one site, use only one Class.


:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 65 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
d. Assembly
❖ Step 1: Fix the hanger on battery:
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy

❖ Step 2: Fix the hanger on poosition of anti-thef bolts which mentined at Item 4.2.3.b. Tighten
Ng
Du

the bolts using equipped tool:


er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 66 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
Requirement: Install enough anti-thelf bolts for the supporting bars of batteries.
,2
1/2

ky

e. Connecting power cable


9/0

❖ Step 1: Connect Blue Cable from Negative terminal of battery to -48VDC Bar of Battery
da
ia

Minishelter (on the left of cabinet). Must follow the cable rule as below:
42

gh

Battery No. Hole No. on the -48VDC Bar


eN

Note
7:1

(From the bottom up) (From the bottom)


Th

1 1
_1

en

2 2
ng

uy

3 3
Ng

4 4
Du

5 5
er
fic
et

6 The holes No. 6 & 7 on the -48VDC


Of
Vi

Bar are used to connect power cable


gy

7 from Battery Minishelter to IPS


c

lo
hu

6 8
no

7 9
ch
_K

8 10
Te
80

9 11
ief

10 12
86

Ch

❖ Step 2: After finishing connection from negative battery terminal to -48VDC bar for all
11

batteries, then connect Positive terminal of battery to 0V Bar of Battery Minishelter (on the
right of cabinet) using Black Cable.
:32

Note: The cable is threaded through the battery drawer, and connect to terminal battery from the
:02

top down.
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 67 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

Requirement:
:32

- The batteries are connected in the correct holes.


:02

- The cable is neat and tidy. Using plastic tie to fix cable.
16
18

18

- Plastic cover is ensured for 02 Bars of Battery Minishelter and each terminal of battery.
/20

/20

f. Connecting RS485 cable


/01

/01

❖ Connect RS485 cable from DC aircon to domino terminal block


29
29

Pin Numbers for RS485 of DC aircon:


,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 68 of 163

rN
_1

e
ng

fic
From To
Cable Label

Of
Du
Equipment Terminal Equipment Terminal

gy
1 (A) Domino 1 (RS485_A)

olo
AIRCON COM.OUT LAN RS_AIR

iet
2 (B) terminal block 2 (RS485_B)

hn
cV
Step 1: Connect LAN cable to COM.OUT of DC aircon

ec
fT
Step 2: Measure the length of RS485 (LAN) cable from DC aircon to domino terminal block.

hu

ie
Step 3: Cut LAN cable for enough length which was measured from Step 2 (normally is

_K

Ch
1.5m).

80
Step 4: Determine 2 wires: Pin 1 for RS485_A, Pin 2 for RS485_B of LAN cable (the wire

86
color of Pin 1, Pin 2 of LAN cable might be different due to different cable brands. Example

2
2:3
11
here is White-Orange for RS485_A and Orange for RS485_B). Cut 6 other wires left because

6:0
of unneccesary.

81
Step 5: Connect this cut end of cable (with only 2 wires for Pin 1, Pin 2) to domino terminal

01
block.

1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 69 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th

Connect RS485 of Lithium Battery


_1

en

Coslight LiB: Connecting LAN cable of one Battery to each other must be straight:
ng

uy

- RS485-Port 1 of Battery No.1 connect to RS485-Port 1 of Battery No.2.


Ng
Du

- RS485-Port 2 of Battery No.2 connect to RS485-Port 2 of Battery No.3. And so on.


er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 70 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16

ZTT LIB: Because of difference between 04 shipments (mentioned at Item 4.2.3.c),


18

18

therefore:
/20

/20

- Connect RS485 for batteries from Shipmment 1 & 2:


/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 71 of 163

rN
_1

e
✓ 01 repeater can manage 12 pcs of Lithium Battery. But because Battery

ng

fic
Of
Minishelter just contains maximum 10 pcs  Use 01 repeater for 01 Battery

Du

gy
Minishelter (applied only for Shipment 1 & 2 of ZTT LiB).

olo
iet
✓ Connect RS485 from ZTT LiB (Shipment 1&2) to Repeater as below:

hn
cV

ec
fT
hu
Display
RS485

ie
2 ADD
10

_K

Ch
1

80
Display
9

86
RS485
1 ADD

2
2:3
2

11

6:0
Display
RS485

81
8 2 ADD
1

01
1/2
8
Display
01

9/0
7 RS485
2 ADD ,2
1
1/2

ky
9/0

da

Display
CH 1 CH 2 CH 3 CH 4 OUT PWR
RS485
ia
42

6 2 ADD
gh

1
eN
7:1

Th

RS485 Display
5
_1

1 ADD
en

2
ng

uy
Ng
Du

RS485 Display
er

2 ADD
4
fic

1
et

Of
Vi

Display
gy

RS485
c

2 ADD
lo

3
hu

1
no

4
ch
_K

Display
Te

RS485
80

2 1 ADD 3
ief

2
86

Ch

2
Display
11

RS485
1 2 ADD 1
1
:32
:02

- Connect RS485 for Lithium Battery from Shipment 3&4: Similar to Coslight Lithium
16
18

Battery  No need Repeater.


18
/20

Connect RS485 from Lithium Battery to Domino Terminal Block:


/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 72 of 163

rN
_1

e
ng

fic
From To
Cable Label

Of
Du
Equipment Terminal Equipment Terminal

gy
ZTT Battery No.1 RS485 1,8 (B) Domino 2 (B)

olo
LAN RS_LIB

iet
(from Shipment 3, 4) Port 2 2,7 (A) Terminal Block 1 (A)

hn
cV
1,8 (B) 2 (B)

ec
Repeater for ZTT_LIB Domino
Port OUT LAN RS_LIB

fT
(from Shipment 1, 2) 2,7 (A) Terminal Block 1 (A)

hu

ie
3,4 (B) 2 (B)

_K

Ch
RS485 Domino
Coslight Battery No.1 LAN RS_LIB
Port 2 1,2 (A) Terminal Block 1 (A)

80
Note: 1,8 (B) means combine 2 wires No.1 and No.8 together for RS485_B. Similar to others.

86

2
- Perform step by step, similar to Connect RS485 cable from DC aircon to domino

2:3
11
terminal block:

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

4.2.4. Install VRLA battery in VRLA Battery Minishelter


gy
c

lo

a. Install lock cover: Follow step by step:


hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02

Requirement: Enough 04 screws, firmly clamped and easy to open/close.


16
18

b. Remove cable 2x1mm2 from smoke sensor


18
/20

Because the Cable 2x1mm2 (mentioned in Part 1, Section 2.3, Item A.1.5) is now looped for both
/20

smoke sensor and door open sensor but this cable is just enough for door open sensor  remove
/01

/01

this cable from smoke sensor and use it only for door open sensor. External accessories of VRLA
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 73 of 163

rN
_1

e
ng
Battery Minishelter included new cable 2x0.75mm2 or 2x1mm2 white cover (mentioned in Part

fic
Of
1, Section 2.3, Item A.2.1). Steps are as below:

Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
Step 1: Locate the position of smoke sensor Step 2: Open smoke sensor and use screwdriver

01
(ceiling of Battery Minishelter) to remove cable lugs of Cable 2x1mm2

1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy

Step 3: Use nipper to cut these 2 cable lugs Step 4: Pull this cable out of smoke sensor. Use
Ng
Du

it for door open sensor only


er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

Step 5: Insert new cable 2x0.75mm2 or 2x1mm2 Step 6: Make cable lug for new white cable 2-
:32

white cover for smoke sensor alarm (white cable, core (Blue/Brown)
:02

2-core (Blue/Brown))
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 74 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11
Step 7: Connect new cable to Pin 3, 4 (not Step 8: Close the cover for smoke sensor

6:0
differentiate polarity)

81
01
c. Install PBMU (Pricise Battery Monitoring Unit)

1/2
8
- Step 1: Locate the position of PBMU in VRLA Battery Minishelter.
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32

- Step 2: Change PBMU plate to upper position (to be easy to connect)


:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 75 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia

Before After
42

gh
eN

- Step 3: Set Address of PBMUs


7:1

Th

Address table:
_1

en

PBMU 1- DIP Switch PBMU 2- DIP Switch


ng

No Object Note
uy

Bit1 Bit2 Bit3 Bit4 Bit1 Bit2 Bit3 Bit4


Ng
Du

1 Battery Minishelter 1 OFF ON ON OFF OFF ON OFF ON ON = 0, OFF = 1


er

2 Battery Minishelter 2 OFF ON OFF OFF OFF OFF ON ON


fic
et

Of

Steps to set:
Vi

gy

Note: Bit 1 is switch to select battery type (ON: 12V VRLA, OFF: 2V VRLA).
c

lo

❖ Locate the position of DIP Switch S1 on PBMU


hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 76 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

❖ Turn on/off the switch for battery group following the address table as above.
da

- Step 4: Mount (easily) PBMU on its position(s) using bolt Φ8 (additional material that is
ia
42

gh

signed raising memorandum with installation team). One string of battery need one
eN
7:1

PBMU. Start from the Front Door (with DC aircon) first for installation (PBMU-1). The
Th
_1

rear door is for PBMU-2.


en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

d. Install 2V VRLA Battery


❖ Assembly batteries in to rack
:32

- Step 1: Install the plastic seperators on the support frame of each layer (total 8 layers) to
:02

separate batteries on same layer as well as to separate bateries between front side and
16
18

back side.
18
/20

- Step 2. Install batteries from bottom to top, according to the rule:


/20

Odd layer: Negative terminal (-) of battery is on the left, Positive termianl (+) of
/01

/01

battery is on the right.


29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 77 of 163

rN
_1

e
ng
Even layer: Positive terminal (+) of battery is on the left, Negative terminal (-) of

fic
Of
battery is on the right.

Du

gy
Repeat until the end.

olo
iet
- Step 3: Label for batteries.

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20

Requirement:
/01

/01

- The batteries are assembled in the correct order.


29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 78 of 163

rN
_1

e
ng
- Insert plastic separator for all batteries (to separate batteries next to each other and

fic
Of
separate batteries between front side and rear side).

Du

gy
- Marking full labels for batteries.

olo
iet
❖ Connection

hn
cV
- Rule: Positve terminal of Battery No. 24 connect to negative terminal of battery No.23,

ec
fT
positve terminal of battery No. 23 connect to negative terminal of battery No.22,...

hu

ie
- Perform:

_K

Ch
Step 1: Connect 2 batteries on same layer by hard connector.

80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

Step 2: Connect power cable of PBMU to [Terminal (+) of Batt No.1 of String,
ky
9/0

Terminal (-) of Batt No. 24 of String and Grounding Bar in Battery Minishelter].
da

Grounding Bar 1 (Front Door) Battery String No.1


ia
42

gh

of Battery Minishelter
eN
7:1

+ 1 - + 2 - + 24 -
Th
_1

en
ng

uy
Ng
Du

er

PBMU-1
fic
et

Of
Vi

gy
c

lo

1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2
hu

no

X1 X2 ... X5 X6
ch
_K

Te
80

PBMU-2
ief
86

Ch

X1 X2 ... X5 X6
11

1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2
:32
:02

Battery String No.2


16
18

18
/20

/20

Grounding Bar 2 (Rear Door) + 1 - + 2 - + 24 -


/01

/01

of Battery Minishelter
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 79 of 163

rN
_1

e
ng
Step 3: Connect signal wires from PBMU to negative terminals of batteries. Only

fic
Of
Terminal (+) of Batt No. 1 is used to connect to PBMU as a voltage reference point

Du

gy
for whole String.

olo
iet

hn
cV

ec
fT
hu

ie
+ 1 - + 2 - + 3 -

PBMU-1
_K

Ch
1 2 3 4
X1
80
86

2
- 6 + - 5 + - 4 +

2:3
11

6:0
1 2 3 4 5 6
X2
81
01
1/2
8
01

9/0
+ 7 - + 8 - + 9 - ,2
1/2

ky

1 2 3 4 5 6
9/0

da

X3
- 12 + - 11 + - 10 +
ia
42

gh
eN
7:1

Th
_1

en

1 2 3 4 5 6
ng

uy

+ 13 - + 14 - + 15 -
X4
Ng
Du

er
fic
et

Of
Vi

- 18 + - 17 + - 16 +
gy
c

lo
hu

no

1 2 3 4 5 6
ch
_K

X5
Te
80

ief
86

Ch

+ 19 - + 20 - + 21 -
11
:32

X6
1 2
:02

- 24 + - 23 + - 22 +
16
18

18
/20

/20
/01

/01

Battery String No.1


29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 80 of 163

rN
_1

e
ng
Summarize for Step 2 & Step 3:

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
Connect to X1 Connect to X2 Connect to X3 Connect to X4

01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

Connect to X5 Connect to X6 After connecting all terminals at PBMU


er
fic
et

From To
Of
Vi

Label
gy

Equipment Terminal Equipment Terminal


c

lo

PE Bar of Battery PE Bar of Battery Minishelter (as


hu

no

1
Minishelter per above drawing)
ch
_K

X1 2 2V. BAT No.1 2V.Batt.No.1 (+0V) +0V


Te
80

3 2V. BAT No.24 2V.Batt.No.24 (-48V) -48V


ief
86

Ch

4 2V.BAT No.1 (+) BATT.1.REF


11

1 2V.BAT No.1 (-) BATT.1


PBMU1
Or 2 2V.BAT No.2 (-) BATT.2
X2
:32

PBMU2 ... ..... ... ...


:02

6 2V.BAT No.6 (-) BATT.6


16
18

... .... .... ....


18

1 2V.BAT No.19 (-) BATT.19


/20

/20

X5 ... ..... ...


/01

/01

6 2V.BAT No.24 (-) BATT.24


29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 81 of 163

rN
_1

e
ng
Step 4: Connect 2 batteries in different layers using soft connector. Note: Red plastic

fic
Of
cover is used to protect for Positive Terminal.

Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
Soft connector and plastic cover for 2 batteries in different layers

01
Note: Keep one connector not to connect for 2 batteries to ensure safety. Make sure no short

1/2
8
circuit accident when pull cable from Battery Minishelter to IPS Cabinet (use plastic cover)
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er

Keep one connector do not connect to ensure Use plastic cover to make sure no short-circuit
fic
et

safety during installation happens


Of
Vi

Step 5: After finishing cable run, connection of negative cable of batteries to Battery
gy
c

lo

CB (Circuit Breaker in Battery Minishelter) and connection of positive cable of


hu

no

batteries GND Bar in IPS  Connect the last connector for 2 batteries which was
ch
_K

Te

mentioned as above.
80

ief

Step 6: Re-check the tightening of all connectors and mount all plastic covers for
86

Ch

terminals of batteries.
11

Step 7: Install Battery Secure Bars: At the Layer 1 (the lowest layer)  install screw
at Position 2. At layers 2 ÷ 8, install screw at Position 1.
:32

Must install enough 16 Secure Bars for both 2 sides even in the case the rear side
:02

doesn’t install batteries.


16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 82 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
Secure Bar At Layer 1: Install Secure Bar at Position 2

86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

After installing secure bar for Layer 1 From Layers 2 ÷ 8: Install secure bar at
Th

Position 1
_1

en

Requirement: Batteries are connected in correct order and follow the rule. Install full 04 screws
ng

uy

per 01 secure bar.


Ng
Du

e. Connecting RS485
er

❖ Connecting RS485 cable from DC aircon to Domino Terminal Block


fic
et

Of

Pin Number for RS485 of DC aircon:


Vi

gy

From To
c

lo

Cable Label
hu

no

Equipment Terminal Equipment Terminal


ch
_K

1 (A) Domino 1 (A)


AIRCON COM.OUT LAN RS_AIR
Te

2 (B) Terminal Block 2 (B)


80

ief

Step 1: Connect LAN cable to COM.OUT of DC aircon


86

Ch

Step 2: Measure the length of RS485 (LAN) cable from DC aircon to domino terminal block.
11

Step 3: Cut LAN cable for enough length which was measured from Step 2 (normally is
1.5m).
:32

Step 4: Determine 2 wires: Pin 1 for RS485_A, Pin 2 for RS485_B of LAN cable (the wire
:02

color of Pin 1, Pin 2 of LAN cable might be different due to different cable brands. Example
16
18

here is White-Orange for RS485_A and Orange for RS485_B). Cut 6 other wires left because
18
/20

/20

of unneccesary.
/01

/01

Step 5: Connect this cut end of cable (with only 2 wires for Pin 1, Pin 2) to domino terminal
29

block.
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 83 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32

❖ Connect signal cable RS485 from PBMU to Domino Terminal Block of Battery
:02

Minishelter
16
18

From To
18

Cable Label
/20

Equipment Terminal Equipment Terminal


/20

1 (A) 1 (A)
/01

Domino
/01

PBMU-1 X6 RS_PBMU1
2 (B) Terminal Block 2 (B)
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 84 of 163

rN
_1

e
ng

fic
From To
Cable Label

Of
Du
Equipment Terminal Equipment Terminal

gy
1 (A) 1 (A)

olo
PBMU-2 X6 RS_PBMU2

iet
2 (B) 2 (B)

hn
cV
Domino Terminal Block of Battery Minishelter

ec
fT
hu

ie
1
2
3
4
_K

Ch
80
86

2
2:3
11
PBMU-1

6:0
X1 X2 X... X5 X6

81
1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2

01
1/2
8
01

9/0
,2
1/2

ky

PBMU-2
9/0

da

X1 X2 X... X5 X6
ia
42

1 2 3 4 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2
gh
eN
7:1

5. Cabling
Th
_1

5.1. Requirement
en
ng

- The cables follow the design (layout drawing).


uy
Ng

- The cables must be put in the corrugated pipe and on the cable ladder OR put in the HDPE
Du

er

pipe, PVC pipe to run under Minishelter.


fic
et

- Position of cable entry in Minishelter, IPS must be followed the rule which was mentioned
Of
Vi

before.
gy
c

lo

- The curvature of the cable at bending points is not less than 4 times the cable diameter.
hu

no

- The cable is straight, no overlapping, neat and fixed by plastic tie.


ch
_K

Regulates the direction of the incoming / outgoing cable in the hole of minishelter.
Te
80

- Step 1. Determine the number of cables to be inserted in the pipe


ief
86

Ch

- Step 2. Mark the cable with colored tape as specified to avoid some mistake.
11

- Step 3. Identify cable holes incoming/outgoing the minishelter.


- Step 4. Using insulated tape to seal the head cables to avoid splashing of water into the
:32

cable and bundle the cable ends that put in the same tube.
:02

- Step 5. Pull the cable into the tube, push and pull the cable into the cabinet.
16
18

- Step 6. Pull the cables from the outside into the cabinet through the correct cable holes to
18
/20

the connection position (spare 50 cm residual connection)


/20

- Step 7. Remove the cable bundle


/01

/01

- Step 8: Mesurement and cut cable so that enough to connect.


29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 85 of 163

rN
_1

e
ng
- Step 9: Make cable lug and connection

fic
Of
- Step 10: Fix the cable on outdoor with plastic tie.

Du

gy
5.2. Cable hole definition

olo
iet
a) Cable hole for ME, transmission and radio equipment

hn
cV

ec
IPS MINISHELTER
COAXIAL CABLE FOR ACCESS MW COAXIAL CABLE FOR BACKBONE

fT
hu
FIBER OPTICAL CABLE RRU OPTICAL CABLE

ie
_K

Ch
SIGNAL CABLE FROM BATTERY
MINISHELTER RRU POWER CABLE

80
GROUNDING CABLE

86
1 10

2
2:3
CABLE FROM ATS/GENSET RRU POWER CABLE

11
2 9

6:0
3 4 5 6 7 8

81
BATTERY POWER CABLE FROM
FIBER OPTICAL CABLE
BATTERY MINISHELTER NO.1

01
1/2
8
POWER CABLE FROM BATTERY POWER CABLE FROM
01

9/0
SOLAR JUNCTION BOX BATTERY MINISHELTER NO.2
,2
1/2

b) Cable hole definition for ME equipment


ky
9/0

Item Cable hole numerical order Regulation for cable hole


da
ia
42

gh
eN
7:1

No.1: Grounding cable (outgoing)


Th
_1

No.2: Grid power cable (incoming)


en

No.3: Genset power cable


ng

uy

(incoming)
Ng
Du

ATS
No.5: Power cable (outgoing to IPS)
er

No.9: Signal cable (outgoing to IPS)


fic
et

Of

No.11: Signal cable (outgoing to


Vi

genset)
gy
c

lo
hu

no
ch
_K

Te

No.2: Grounding cable and Signal


80

ief

cable incoming from Battery


86

Ch

Minishelter
No.3: Power cable and signal cable
11

(incoming from ATS or genset)


IPS No.7: Battery power cable from
:32

Battery minishelter 1 (incoming)


:02

No.6: Battery power cable from


16
18

Battery minishelter 2 (incoming)


18

No.5: Solar cable (incoming from


/20

/20

solar junction box)


/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 86 of 163

rN
_1

e
ng

fic
Item Cable hole numerical order Regulation for cable hole

Of
Du

gy
olo
iet

hn
cV

ec
No.1: Negative battery cable

fT
hu
(outgoing)

ie
LIB

_K

Ch
No.2: Positive battery cable
Mini-
(outgoing)

80
shelter
No.3: Signal cable (outgoing)

86
No.4: Grounding cable (outgoing)

2
2:3
11

6:0
81
01
No.1: Positive battery cable

1/2
8
(outgoing) - string 1
01

9/0 No.2: Negative battery cable


,2
1/2

(outgoing) - string 1
ky

No.3: Smoke sensor cable, door


9/0

da

open sensor cable, 48VDC cable


VRLA
ia

(that connected to Domino terminal


42

Battery
gh

block pin 3,4) (outgoing)


Mini-
eN
7:1

No.4: LAN, temperature sensor


shelter
Th

cable (outgoing)
_1

No.1.1: Positive battery cable


en
ng

uy

(outgoing) - string 2
Ng

No.2.1: Negative battery cable


Du

(outgoing) - string 2
er
fic

No.4.1: Grounding cable (outgoing)


et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch

Genset
Cable hole for RS485 signal
KBI
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 87 of 163

rN
_1

e
ng

fic
Item Cable hole numerical order Regulation for cable hole

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
Cable hole for AC power cable,

_K

Ch
remote control cable, 12VDC power

80
cable

86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th

Genset
_1

As per explanation on picture


en

Yanmar
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 88 of 163

rN
_1

e
ng
6. Connection between equipments

fic
Of
6.1. Make cable lug and LAN terminal

Du

gy
a. For ring lug

olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

b. For tube lug 9/0


,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

c. Make LAN terminal RJ45 (for connection between CSU and site router) - straight LAN cable
no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 89 of 163

rN
_1

e
ng
6.2. Pin for RS485 of equipment for communication in Modbus RTU

fic
Of
Du
Position for
Signal

gy
No Equipment RS485 Type Pin Note
definition

olo
iet
connection

hn
cV

ec
fT
hu
1 RS485_A

ie
_K

Ch
COM.OUT
1 DC aircon RJ45
on aircon

80
86
2 RS485_B

2
2:3
11

6:0
1,8

81
Repeater for RS485_B
Lithium combine

01
Port OUT on
2 Battery ZTT RJ45

1/2
repeater
8
of Shipment 2,7
01

9/0
1, 2 RS485_A
combine
,2
1/2

ky
9/0

1,8
da

Lithium RS485_B
RS485 combine
ia
42

Battery ZTT
gh

3 Port_2 on RJ45
of Shipment
eN

Battery No.1
7:1

3, 4 2,7
RS485_A
Th

combine
_1

en
ng

uy

1,2
Ng

RS485_A
Du

Lithium RS485 combine


er

3 Battery Port_2 on RJ45


fic
et

Coslight Battery No.1


Of

3,4
Vi

RS485_B
combine
gy
c

lo
hu

no

X6.1 RS485_A
ch
_K

PBMU for
Te

X6 on
4 2V VRLA
80

PBMU
ief

Battery
86

X6.2 RS485_B
Ch
11
:32

3 RS485_A
:02

Domino
Terminal
16
18

5 ATS access
Block in
18
/20

ATS cabinet
/20

4 RS485_B
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 90 of 163

rN
_1

e
ng

fic
Position for
Signal

Of
No Equipment RS485 Type Pin Note

Du
definition

gy
connection

olo
iet

hn
cV
D+ D+

ec
Port RS485

fT
hu
6 Genset KBI on Trans-485

ie
_K
module

Ch
D- D-

80
86

2
2:3
11
RX- and

6:0
TX- RS485_B
looping

81
CCrs
Genset

01
7 Modbus
Yanmar

1/2
Module
8
RX+ and
01

TX+ 9/0
RS485_A
,2
1/2

looping
ky
9/0

da
ia
42

gh

1 RS485_A
eN
7:1

Th

Domino
_1

Battery
en

8 Terminal
Minishelter
ng

uy

Block
Ng
Du

er

2 RS485_B
fic
et

Of
Vi

gy
c

6.3. Cabling
lo
hu

no

a. Ground-slab site and elevated slab (< 1m) site


ch
_K

- Cable from ATS to IPS, Grid to ATS must be put in manhole.


Te
80

b. Elevated-slab (≥ 1m) site


ief
86

- Cable from ATS to IPS, Grid to ATS is not put in manhole. The cabling option is as
Ch

follows:
11

Option 1: Grid pole near ATS


:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 91 of 163

rN
_1

e
ng

fic
IF GRID POLE NEAR ATS

Of
Du

gy
olo
iet
D62 PIPE FOR

hn
D62 PIPE FOR

cV
CABLE FROM ATS IPS
CABLE FROM

ec
GRID TO ATS
ATS TO IPS

fT
hu

ie
_K

Ch
80
86
PIPE STRAP

2
2:3
11

6:0
81
01
1/2
8
01

VIEW FROM TOWER 9/0


,2
1/2

ky
9/0

da

Option 2: Grid pole near IPS


ia
42

gh

IF GRID POLE NEAR IPS


eN
7:1

Th
_1

D62 PIPE FOR D62 PIPE FOR


en

ATS CABLE FROM IPS CABLE FROM


ng

uy

ATS TO IPS GRID TO ATS


Ng
Du

er
fic
et

Of
Vi

gy
c

PIPE STRAP
lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

VIEW FROM TOWER


:32

Layout:
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 92 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet
MAN HOLE
1

hn
BATTERY BATTERY

cV
IPS SPARE

ec
MINISHELTER MINISHELTER

fT
2 1

hu

ie
_K

Ch
80

PVC PIPE
86

2
NEW 2 x D62 PIPES

2:3
11
FOR CABLE FROM

6:0
ATS TO IPS, FROM

81
GRID TO ATS

01
GENSET

1/2
8
ATS MAN HOLE
01

9/0
,2 2
1/2

ky
9/0

da
ia
42

gh

6.4. Single line diagram connection


eN
7:1

6.4.1. Good-grid site


Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 93 of 163

8
01

9/0
,2
- Power cable:

1/2

ky
POWER CABLE CONNECTION FOR GOOD GRID SITE

9/0

da
Plug
IPS ATS

ia
42 Batt1

Batt2
Batt3

Batt4
gh
MAIN GEN Load-1 Load-2 N

eN
7:1
N N

Th
_1
N

en
ng

uy
GRID

Ng
Du

Cable 1x35 Y/G


er
SPD
fic
iet

Of
cV

Cable 2x10/2x16
gy

1x35mm2 Blue

GEN
lo
hu

noINPUT

LIB Minishelter
AC
ch
_K

+ 0V
DC
Te
80

- LIB48V +
ief
86

Ch

- LIB48V + MGB03
11

-48V

+0V
DC

DC
N
2
Cable 1x35 Y/G 02:3
18 4x16

-48VDC - LIB48V +
:
16
18

PE
Cable

- LIB48V +
/20

Cable 1x35 Y/G


/20
/01

/01
29
29

ATS.PWR
,
ky

Cable 1x35 Black MGB02


:14

MGB01 +0VDC
da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 94 of 163

8
01

9/0
- Cabling: Put cable in HDPE/corrugated pipe for cabling from cablinet to cabinet. Measure the length for cabling and cut enoug h for

,2
1/2

ky
connection. Make cable lugs before connecting.

9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
iet

Of
cV

gy
lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 95 of 163

8
01

9/0
,2
1/2
POWER CABLES RUN ON THE RIGHT SIDE OF

ky
LADDER, VIEW FROM TOWER

9/0

da
ia
42

gh
MAN HOLE MAN HOLE

eN
7:1
3 1

Th
_1
LIB Minishelter

HDPE
IPS

en
ng HDPE PIPE PIPE FOR GRID
CABLE TO ATS IF

uy
GRID POLE COME

Ng
Du

FROM MAN HOLE


CORRUGATED PIPE
er
1 OR 3
fic
iet

PVC PIPE
Of
cV

gy

1 10
lo
hu

no

1 2 2 9 PIPE FOR
3 4 CABLE FROM
ch
_K

3 4 ATS TO IPS
Te

5 6 7 8
80

ief
86

Ch

ATS
11

HDPE/PVC
10 12 8 6 4 2
:32

1 MAN HOLE
:02

9 11 7 5 3 2
16
18

Note:
18
/20

- D62/D42 PVC pipe for power cable and signal cable (M&E)
HDPE/PVC
/20

- D110 PVC pipe for fiber optical cable (Transmission)


/01

/01
29
29

- Signal cable:
,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 96 of 163

8
01

9/0
,2
1/2
MONITORING AND CONTROL SIGNALS FOR GOOD GRID SITE

ky
9/0

da
CSU510B UIB

ia
RS485 X7. Out_RL7,8

42

gh
X13. TB1 X14. TB2 X15. TB3 X16.TB4
B0 A0 B1 A1 RS232 RJ45 1 2 3 4 5 6
1 1 1 2 1 2

eN
2 2
1 1 2

7:1
2
NO7 COM7 NC7 NO8 COM8 NC8 TB1 +5V TB2 +5V TB3 +5V TB4 +5V
B A

Th
-48V +0V 1

_1

en
4 3 X9. IN_RL X10.EX_RL X12. TE

RS_ATS
X11. Door ALM
RS_BAT1

ng

uy
1 2 3 4 5 6 1 2 3 4 5 6 1 2 1 2

Ng
Du

er 19 S1 S2 48VP S3 S4 48VP ES1 ES2 48VP ES3 ES4 48VP Door 48V TE +5V

IPS 20
fic
iet

COM NC
Of

E_ START
M_FAIL
cV

48VDC-ATS
LIB
gy

TE
CABINET DC AIR
lo

RJ45 MINISHELTER
hu

48VDC-BATT
no

IN OUT DR_SW
ch
_K

RS_AIR

SMOKE
Te
80

LIB ADD: 1100


RS485
ief

1 2
86

TEMP1
Ch

SMOKE
11

LIB ADD: 0100 DETECTOR ATS


RS485
1 2
:32

LIB ADD: 1000 DOOR + - A B


RS485 SWITCH
:02

1 2
16
18

LIB ADD: 0000


RS485
18
/20

1 2
/20
/01

-48V
/01

4
B 3 +0V
29

2
29

1 1 2 3 4 5 6 7 8 13 14 19 20
A
,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 97 of 163

8
01

9/0
- Cabling description and labelling:

,2
1/2

ky
Power cable:

9/0

da
From To
Cable Label Cable is supplied from

ia
42
Equipment Terminal Cable hole Equipment Terminal Cable hole

gh
eN
Main Grid CB 2 Main Grid - - 4x16mm2 GRID

7:1

Th
2x10/16mm2 (1P)
Generator CB 3 Generator - - GEN

_1
Or 4x16mm2 (3P)

en
ATS ng
Load-1 CB 5 IPS AC input 3 4x16mm2 ATS.PWR IPS

uy
Ng
Du

PE Bar 1 Earthing bar MGB03 - - 1x35mm2 (y/g) ATS


er
CB1 (for Battery) 7 -48V bar 1 1x35mm2 (blue) -48V.BAT1 Battery Minishelter
fic
iet

LIB_ BAT cabinet 1


IPS
Of

GND Bar 7 +0V bar 2 1x35mm2 (black) +0V.BAT1 Battery Minishelter


cV

gy

PE Bar 2 Earthing bar MGB01 - - 1x35mm2 (y/g) IPS


lo
hu

Earthing bar
no

Grounding Bar at site - LIB_ BAT cabinet 1 PE Bar 4 1x35mm2 (y/g) Battery Minishelter
MGB02
ch
_K

Signal cable:
Te
80

ief

From To Cable is
86

Ch

Cable Cable Cable Label supplied Note


Equipment Terminal Equipment Terminal
11

hole hole from


Use 01 twisted
B0 4 (B) pair of 4-core
:32

2-twisted-
cable: Red wire
:02

RS485 3 9 pair cable RS_ATS ATS


for RS485_A,
(4-core)
16
18

IPS A0 ATS 3 (A) blue wire for


18

RS485_B
/20

/20

-48Vdc -48V 20 (-48V input)


/01

Terminal 3 9 2x1 mm2 ATS


/01

48VDC_ATS
Block +0V 19 (+0V input)
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 98 of 163

8
01

9/0
,2
1/2
From To Cable is

ky
Cable Cable Cable Label supplied Note

9/0
Equipment Terminal Equipment Terminal

da
hole hole from

ia
X7-1 Use the

42

gh
5 (Emergency start)
(NO7) remaining

eN
2-twisted-

7:1
twisted pair of
UIB_X7 3 9 pair cable E_START ATS

Th
X7-2 4-core cable:
6 (Emergency start) (4-core)

_1
(COM7) Orange and

en
green wires
ng

uy
1 (S1) 7 (Main failure) 01 twisted pair

Ng
Du

2 twisted
of 4-core cable
UIB_X9 3 9 pairs cable IPS
3
er M_FAIL
8 (Main failure) (Orange +
fic
iet

(48VP) (04 core)


Green)
Of
cV

Use 01 twisted
gy

B0 2 (B) pair of 4-core


lo

Domino 2-twisted-
hu

cable: Red wire


no

RS_BAT.
RS485 2 Terminal 3 pair cable MINISHELTER 1
IPS
for RS485_A,
ch
_K

A0 Block 1 (A) (4-core)


blue wire for
Te
80

RS485_B
ief

2 (ES2)
86

Ch

LIB_BAT Battery
3 2 Door Door switch 3 2x1mm2 DOOR_SW
11

Cabinet Minishelter
(48VP)
UIB_X10
4 (ES3) COM
Battery
:32

6 2 Smoke 3 2x1mm2 SMOKE


NC Minishelter
:02

(48VP)
16

-48Vdc Domino
18

+ 0V 3 (+0V) 48VDC_BAT. Battery


Terminal 2 Terminal 3 2x1.5mm2
18

MINISHELTER 1
/20

-48 V 4 (-48V) Minishelter


Block Block
/20

Site router: Installation Need 2m length


/01

/01

FE 0/2/20 LAN cable team (accept with molded


CSU panel RJ45 SRT Port - IPS_MONITOR
29

Microwave: CAT6 for additional patch at 2


29

Port 3 cost) terminals


ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 99 of 163

8
01

9/0
6.4.2. Bad grid site

,2
1/2

ky
- Power cable:

9/0

da
POWER CABLE CONNECTION FOR BAD GRID SITE

ia
42

gh
PLUG
IPS ATS

BAT4
BAT2

BAT3
BAT1

eN
7:1
MAIN GENERATOR LOAD_1 LOAD_2 N

Th
N N

_1

en
N
ng

uy
Ng
Du

er GRID

1x35mm2 Y/G
fic
iet

SPD
Of
cV

Cable 2x10/2x16mm2
gy

GEN
lo

GEN
1x35mm2 Blue
hu

no

VRLA BAT CABINET


INPUT
ch
_K

AC

+ 0V DC
+
Te

+ 1 - + 2 - + 3 -
80

ief

1x35mm2 Black
86

- 4 + - 5 + - 6 +
Ch

MGB03
11

N
:32

+0VDC
+ 19 - + 20 - + 21 -
4x16mm2
:02

-48VDC
-
16
18

1x35mm2 Y/G

- 24 + - 23 + - 22 +
125A
CB
18
/20

PE MGB02
/20
/01

/01

1x35mm2 Y/G
ATS.PWR
29
29

MGB01
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 100 of 163

8
01

9/0
- Cabling: Put cable in HDPE/corrugated pipe for cabling from cablinet to cabinet. Measure the length for cabling and cut enough for

,2
1/2

ky
connection. Make cable lugs before connecting.

9/0

da
POWER CABLES RUN ON THE RIGHT

ia
SIDE OF LADDER, VIEW FROM TOWER

42

h
MAN HOLE MAN HOLE

Ng
3 1

7:1

he
nT
_1
IPS
HDPE

ye
4.1 3.1 2.1 1.1
ng

gu
PIPE FOR GRID
Du

rN
CABLE TO ATS IF
gy Battery

GRID POLE COME

PVC PIPE
Minishelter
ice
FROM MAN HOLE
iet

CORRUGATED PIPE
f

1 OR 3
Of

1 10
cV

VRLA

2 9
lo
hu

3 4
no

5 6 7 8
ch
_K

PIPE FOR
Te

1 2 3 4 CABLE FROM
80

ATS TO IPS
ief
86

Ch

GND
11

L2
:32

Trans-485

Diesel
L1

Generator
:02

ATS
HDPE/PVC
16
18

2
PVC 10 12 8 6 4
18
/20

MAN HOLE
/20

PIPE 2
/01

9 11 7 5 3 1
/01

Note: STRAP
- D62/D42 PVC pipe for power cable and signal cable (M&E)
29
29

- D110 PVC pipe for fiber optical cable (Transmission) HDPE/PVC


,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 101 of 163

8
01

9/0
- Signal cable:

,2
1/2

ky
MONITORING AND CONTROL SIGNALS FOR BAD GRID SITE

9/0

da
CSU510B UIB

ia
RS485 X7. Out_RL7,8 COM8

42
X13. TB1 X14.TB2 X15.TB3 X16.TB4
RJ45

gh
B0 A0 B1 A1 RS232 1 2 3 4 5 6 1 2 1 2 1 2 1 2
1 2 1 2

eN
7:1
NO7 COM7 NC7 NO8 NC8 TB1 +5V TB2 +5V TB3 +5V TB4 +5V
B A

Th
+0V

_1
-48V X9. IN_RL X10.EX_RL X11.Door ALM X12. TE

en
RS_ATS
ng 4 3 1 2 3 4 5 6 1 2 3 4 5 6 1 2 1 2

uy
RS_BAT1

S1 S2 48VP S3 S4 48VP ES1 ES2 48VP ES3 ES4 48VP Door +5V TE +5V

Ng
20 19
Du

IPS
er

E_ START
M_FAIL
48VDC-ATS
fic
iet

VRLA BAT

48VDC-BAT.MINISHELTER
Of

CABINET DC AIR
cV

RJ45

TE

TB2
TB1
gy
1234 123456 123456 123456 1 2

IN OUT
DR_SW
X6

lo

SMOKE
hu

no

G1_START
ch
_K

RS_GEN
24
X5

TEMP1
RS_AIR1
Te

12V_DG
80

23

SMOKE
ief

DETECTOR
2V-VRLA
86

Ch
X...

DG
11

DOOR
ATS
4

SWITCH

+ -
3

A B + - A B
-48VDC
:32
X2

2
:02
PBMU

1
16
18

X1

4 -48V
3 +0V 1 2 3 4 5 6
B
18

2
/20

1 2 3 4 5 6 7 8 13 14 19 20 Pin D+, D- at Trans-485


A 1
/20
/01

/01

BATT.TEMP2
29

BATT.TEMP1
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 102 of 163

8
01

9/0
- Cabling description and labelling:

,2
1/2

ky
Power cable:

9/0

da
From To

ia
Cable Cable Cable Label Cable is supplied from

42
Equipment Terminal Equipment Terminal

gh
hole hole

eN
7:1
Main Grid CB 2 GRID - - 4x16mm2 GRID

Th
Generator CB 3 Generator Out - 2x10/2x16mm2 or 4x16mm2 GEN Genset

_1

en
ATS
Load-1 CB ng 5 IPS AC input 3 4x16mm2 ATS.PWR IPS

uy
Ng
PE Bar 1 Earthing Bar MGB03 - - 1x35mm2 (y/g) ATS
Du

er
CB1 7 CB125 2 1x35mm2 (blue) -48V.BAT1 Battery Minishelter
fic
iet

(+) of
Of

GND Bar 7 1 1x35mm2 (black) +0V.BAT1 Battery Minishelter


Batt.No24
cV

VRLA_BAT cabinet 1
gy

IPS CB2 7 CB125 2.1 1x35mm2 (blue) -48V.BAT2 Battery Minishelter


lo
hu

no

(+) of
GND Bar 7 1.1 1x35mm2 (black) +0V.BAT2 Battery Minishelter
ch
_K

Batt.No24
Te

PE Bar 2 Earthing bar MGB01 - - 1x35mm2 (y/g) IPS


80

ief

Earthing bar MGB02 - VRLA_BAT cabinet 1 PE Bar 4.1 1x35mm2 (y/g) Battery Minishelter
86

Ch

PE
Earthing bar MGB03 Generator - 1x10/2x16mm2 (y/g) Genset
11

- Terminal
Signal cable:
:32

From To Cable is
:02

Cable Cable Cable Label supplied Note


Equipment Terminal Equipment Terminal from
16

hole hole
18

Use 01 twisted
18
/20

B0 4 (B) pair of 4-core


/20

2 twisted pairs cable: Red wire


/01

/01

IPS RS485 3 ATS 9 RS_ATS ATS


cable (4-core) for RS485_A,
29

A0 3 (A)
29

blue wire for


,

RS485_B
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 103 of 163

8
01

9/0
,2
From To

1/2
Cable is

ky
Cable Cable Cable Label supplied Note
Equipment Terminal Equipment Terminal

9/0

da
hole hole from

ia
-48Vdc 20 (-48V

42
-48V

gh
Terminal 3 input) 9 2x1 mm2 48VDC_ATS ATS

eN
7:1
Block +0V 19 (+0V input)

Th
X7-1 5 (Emergent

_1
Use 01 twisted

en
(NO7)
ng start) 2 twisted pairs pair of 4-core
UIB_X7 3 9 E_START ATS

uy
X7-2 6 (Emergent cable (4-core) cable (Orange +

Ng
Du

(COM7) er start) Green)


7 (Main Use 01 twisted
fic
iet

1 (S1)
failure)
Of

2 twisted pairs pair of 4-core


UIB_X9 3 9 M_FAIL IPS
cV

8 (Main cable (4-core) cable (Orange +


gy

3 (48VP)
failure) Green)
lo
hu

no

Use 01 twisted
ch
_K

B0 2 (B) pair of 4-core


Domino
Te

RS_BAT.
2-twisted-pair cable: Red wire
80

RS485 2 Terminal 4 MINISHELTER IPS


ief

cable (4-core) 1 for RS485_A,


Block
86

Ch

A0 1 (A) blue wire for


RS485_B
11

X13 2 VRLA 1 Temp. sensor 4 - TB1 IPS


X14 2 VRLA VRLA 2 Temp. sensor 4 - TB2 IPS
:32

UIB BAT
X15 2 VRLA 3 Temp. sensor 4 - TB3 IPS
:02

Cabinet
X16 2 VRLA 4 Temp. sensor 4 - TB4 IPS
16
18

2 (ES2) Battery
18
/20

2 Door Door switch 3 2x1 mm2 DOOR_SW


3 (48VP) Minishelter
/20

UIB_X10
/01

4 (ES3) COM
/01

2x1/2x0.75 Battery
2 Smoke 3 SMOKE
6 (48VP) NC mm2 Minishelter
29
29

+ 0V 2 3 (+0V) 3 2x1.5mm2
,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 104 of 163

8
01

9/0
,2
From To

1/2
Cable is

ky
Cable Cable Cable Label supplied Note
Equipment Terminal Equipment Terminal

9/0

da
hole hole from

ia
-48Vdc Domino 48VDC_BAT.

42
Battery

gh
Terminal -48 V Terminal 4 (-48V) MINISHELTER
Minishelter

eN
Block Block 1

7:1
Site router: Installation Need 2m length

Th
_1
Site FE 0/2/20 LAN cable team with molded

en
CSU RJ45 Port - IPS_MONITOR
ng router Microwave: CAT6 (accept for patch at 2

uy
Port 3 raising cost) terminals

Ng
Du

1
B+
er
(+12VDG) Domino
fic
iet

11 Terminal 2x 2.5 mm2 12V_DG ATS


Of

2 Block
cV

B-
(-12VDG)
lo gy

White wire:
hu

3
no

(RS485_A)
D+ Connect to “D+”
ch
_K

Terminal Genset Trans- RS485 cable pin.


ATS
Te

Block 11 KBI RS_GEN Genset


485 1x18AWG Black wire:
80

4
ief

(RS485_B)
D- connect to “D-“
86

Ch

pin
11

13
Domino B-
(G1.Start) RS485 cable
11 Terminal G1_START Genset
14 1x18AWG
:32

Block 92
(G1.Start)
:02

1
12VDC (+)
16
18

(+12VDG)
11 battery 2x 2.5 mm2 12V_DG ATS
2
18
/20

Terminal Genset terminal (-)


(-12VDG)
/20

ATS
Block Yanmar
/01

/01

White wire:
3 CCrs RS485 cable
11 TX+, RX+ RS_GEN Genset Connect to “TX+,
29

(RS485_A) module 1x18AWG


29

RX+” pins.
,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 105 of 163

8
01

9/0
,2
From To

1/2
Cable is

ky
Cable Cable Cable Label supplied Note
Equipment Terminal Equipment Terminal

9/0

da
hole hole from

ia
Black wire:

42
4

gh
TX-, RX- connect to “TX-,
(RS485_B)

eN
RX-“ pins

7:1
13

Th
Domino Pin 5

_1
(G1.Start) RS485 cable

en
11 Terminal RS_GEN Genset
14
ng Negative 1x18AWG

uy
Block
(G1.Start) terminal

Ng
Du

6.4.3. Off grid site: er


- Power cable:
fic
iet

Of
cV

gy
lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 106 of 163

8
01

9/0
,2
1/2
PLUG
IPS

ky
POWER CABLE CONNECTION FOR OFF GRID SITE

9/0
BAT BAT BAT BAT

da
1 2 3 4

ia
42
NEUTRAL

gh
eN
7:1
4x16mm2

GENERATOR
Th
GEN

_1

en
ng

uy
Ng
SPD
Du

er
fic
iet

Of

1X35mm2 Y/G
cV

1x35mm2 Blue
gy
AC INPUT

LITHIUM
lo
hu

CABINET

+ 0V DC
no
ch
_K

- LITHIUM 48V +
Te
80

ief

- LITHIUM 48V + MBG03


86

Ch

- 48V DC

+ 0V DC
11

NEUTRAL
:32

- LITHIUM 48V +
4x16mm2

:02

- 48VDC
1X35mm2 Y/G16
18

- LITHIUM 48V +

GND
18
/20

1X35mm2 Y/G
/20
/01

/01
29
29

GEN.PWR
,
ky

MBG01
1x35mm2 Black
:14

MBG02
da

+0VDC
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 107 of 163

8
01

9/0
- Cabling: Put cable in HDPE/corrugated pipe for cabling from cablinet to cabinet. Measure the length for cabling and cut enough for connection.

,2
1/2

ky
Make cable lugs before connecting.

9/0

da
POWER CABLES RUN ON THE RIGHT

ia
42
SIDE OF LADDER, VIEW FROM TOWER

gh
eN
7:1
MAN HOLE MAN HOLE

Th
3 1

_1

en
ng
LIB minishelter IPS

uy
CORRUGATED PIPE

Ng

HDPE
Du

er
PIPE FOR GRID
fic
iet

HDPE
CABLE TO ATS
Of
cV

IF GRID POLE
gy

COME FROM

PVC PIPE
lo
hu

MAN HOLE 1 OR
no

1 10 3
ch
_K

1 2 3 4 2 9
Te
80

3
ief

4 5 6 7 8
86

Ch

PIPE FOR
11

CABLE FROM
GND

ATS TO IPS
L1 L2
:32

DIESEL
:02

Trans-485

GND
GENERATOR
16
18

D-

D+
18
/20

/20

PVC MAN HOLE


Note:
/01

/01

- D62/D42 PVC pipe for power cable and signal cable 2


29

(M&E)
29

- D110 PVC pipe for fiber optical cable (Transmission) PIPE STRAP
,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 108 of 163

8
01

9/0
- Signal cable:

,2
1/2

ky
MONITORING AND CONTROL SIGNALS FOR OFF GRID SITE

9/0

da
CSU510B UIB

ia
42

gh
RS485 X7. Out_RL7,8
X13. TB1 X14.TB2 X15.TB3 X16.TB4
B0 A0 B1 A1 RS232 RJ45

eN
1 2 3 4 5 6 1 1 1 2 1 2
2 2

7:1
1 2 1 2
NO7 COM7 NC7 NO8 COM8 NC8 TB1 +5V TB2 +5V TB3 +5V TB4 +5V

Th
B A

_1
1

en
+0V X9. IN_RL
ng -48V X10.EX_RL X11. Door ALM X12. TE
RS_BAT1

uy
4 3 1 2 3 4 5 6 1 2 3 4 5 6 1 2 1 2

Ng
Du

S1 S2 48VP S3 S4 48VP ES1 ES2 48VP ES3 ES4 48VP Door 48V TE +5V
er
IPS
fic
iet

Of

E_ START
cV

TE
LIB CABINET
gy

DC AIR
lo

MINISHELTER
RJ45

48VDC-BATT
hu

no

IN OUT DR_SW
ch
_K

SMOKE
RS_AIR

G1_START
Te

LIB ADD: 1100 TEMP1


80

RS485 RS_GEN
ief

1 2
86

Ch

SMOKE
LIB ADD: 0100 DETECTOR
DG
11

RS485
1 2
+ - AB
LIB ADD: 1000 DOOR
:32

RS485 SWITCH
1 2
:02

LIB
16

ADD: 0000
18

RS485
1 2
18

1 2 3 4 5 6
/20

Pin D+, D- at Trans-485


/20

-48V
4
/01

/01

3
B +0V
2
A
1
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 109 of 163

8
01

9/0
- Cabling description and labelling:

,2
1/2

ky
Power cable:

9/0

da
From To

ia
42
Cable Label Cable is supplied from

gh
Equipment Terminal Cable hole Equipment Terminal Cable hole

eN
7:1

Th
AC input 3 Generator Out - 4x16mm2 GEN IPS

_1

en
CB1 ng 7 -48V bar 1 1x35mm2 (blue) -48V.BAT1 Battery Minishelter
LIB_BAT cabinet 1

uy
IPS
GND Bar 7 +0V bar 2 1x35mm2 (black) +0V.BAT1 Battery Minishelter

Ng
Du

PE Bar er 2 Earthing bar MGB01 - 1x35mm2 (y/g) IPS


fic
iet

Earthing bar MGB02 - LIB_BAT cabinet 1 PE bar 4 1x35mm2 (y/g) Battery Minishelter
Of

Grounding
cV

bar at site PE
gy

Earthing bar MGB03 - Generator - 2x10/2x16mm2 (y/g) Genset


Terminal
lo
hu

no

Signal cable:
ch
_K

From To
Te

Cable is
80

Cable Cable Cable Label Note


supplied from
ief

Equipment Terminal Equipment Terminal


hole hole
86

Ch

Use 01 twisted pair


11

of 4-core cable:
B0 2 (B) Red wire for
:32

Domino 2-twisted- IPS or RS485_A, blue


RS_BAT.
:02

RS485 2 terminal 3 pair cable MINISHELTER 1


Genset_RS485 wire for RS485_B
LIB_BAT block (4-core) cable Or can use RS485
16
18

IPS cable of genset, if


A0 Cabinet 1 (A)
18
/20

twisted pair 04 core


/20

cable not enough.


/01

/01

2 (ES2)
Battery
29

UIB_X10 3 2 Door Door switch 3 2x1 mm2 DOOR_SW


29

Minishelter
(48VP)
,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
80
86
Mã văn bản: 50/IG-TCC

2
TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

2:3
Số văn bản: 50

11
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

6:0
INSTRUCTION GUIDE FOR POWER Expiry date:

81
INSTALLATION AT Issued time: 02

01
SELF-POWERED BTS ACCESS SITES

1/2
Page: 110 of 163

8
01

9/0
,2
1/2
From To
Cable is

ky
Cable Cable Cable Label Note
supplied from

9/0
Equipment Terminal Equipment Terminal

da
hole hole

ia
42
4 (ES3) COM

gh
Battery
6 2 Smoke 3 2x1 mm2 SMOKE

eN
NC Minishelter

7:1
(48VP)

Th
-48Vdc + 0V Domino 3 (+0V)

_1
48VDC_BAT. Battery

en
Terminal 2 terminal 3 2x1.5mm2 MINISHELTER 1
-48 V 4 (-48V) Minishelter
ng

uy
Block block

Ng
Use 01 twisted pair
Du

B0 D- - 2 twisted
er Trans- of 4-core cable:
RS485 pairs cable RS_GEN IPS
fic
485 Red for RS485_A,
iet

A0 D+ - (4-core)
Of

Blue for RS485_B


cV

3 Genset KBI
X7-1 Use twisted pair of
gy

Domino B- - 2 twisted
(NO7)
lo

4-core cable:
hu

UIB_X7 Terminal pairs cable G1_START IPS


no

X7-2 Orange and green


Block 92 - (4-core)
ch
_K

(COM7) wires
Te

Use 01 twisted pair


80

B0 TX-, RX- 2 twisted


ief

CCrs of 4-core cable:


RS485 - pairs cable RS_GEN IPS
86

Ch

module Red for RS485_A,


A0 TX+, RX+ (4-core)
11

Genset Blue for RS485_B


3
X7-1 Yanmar Use twisted pair of
Domino Pin 5 2 twisted
(NO7) 4-core cable:
:32

UIB_X7 Terminal - pairs cable G1_START IPS


X7-2 Negative Orange and green
:02

Block (4-core)
(COM7) terminal wires
16
18

Site router: Installation


Need 2m length
18

FE 0/2/20 LAN cable team (accept


/20

CSU RJ45 Site router Port - IPS_MONITOR with molded patch


/20

Microwave: CAT6 for raising


at 2 terminals
/01

Port 3 cost)
/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 111 of 163

rN
_1

e
ng
6.5. Connection

fic
Of
6.5.1. From ATS to IPS

Du

gy
- Connect AC power cable:

olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11
N

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en

Picture shows the input CBs (Mains, Gens) and output Picture shows the position of AC input in IPS
ng

uy

CB in ATS cabinet. cabinet (Yellow - Green - Red - Blue)


Ng
Du

Note:
er

1. Main Grid is normally 3-phase 4-pole  connect


fic
et

Of

to CB 3-phase 4-pole at Mains position


Vi

2. If genset is 3-phase 4-pole  connect to CB 3-


gy
c

lo
hu

phase 4-pole at Gens position


no

3. If genset is single phase 2-pole  use link


ch
_K

Te

connector (or cable) to loop 3 phases


80

ief

- Connect signal cable:


86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 112 of 163

rN
_1

e
ng

fic
Of
IPS

Du

gy
olo
iet

hn
cV

ec
fT
hu
UIB

ie
X9. IN_RL

_K

Ch
1 2 3 4 5 6

80
S1 S2 48VP S3 S4 48VP

86

2
2:3
11
UIB

6:0
X7. Out_RL7,8

81
1 2 3 4 5 6

01
NO7 COM7 NC7 NO8 COM8 NC8

Emergent /2
8

1
01

9/0

48VDC
Failure
RS485

failure

Alarm
ky G1 12

Mode
ATS

Start

Start
SPD
start
CSU510B
,2
1/2

G1

G1

G2
M
RS485 1 2 3 4 5 6 7 8 9 10 1112 1314 1516 1718 1920
+ - + -
9/0

RS232 RJ45
da

B0 A0 B1 A1
1 2 1 2
ia
42

gh
eN
7:1

Th
_1

en
ng

uy

6.5.2. From ATS to Diesel Generator


Ng

a. ATS to KBI generator


Du

er

Picture Note
fic
et

Of
Vi

gy
c

lo
hu

no

L1, L2: To connect power cable


ch
_K

2x10/2x16mm2
Te
80

ief
86

Ch
11
:32
:02

Remote control: 92 and B-


16

Battery charger: B+ and B-


18

Fuel sensor power cable: B+ and B-


18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 113 of 163

rN
_1

e
ng

fic
Picture Note

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
D+, D- on Trans-485: To connect RS485.

80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh

Cabling for Genset


eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 114 of 163

rN
_1

e
ng

fic
Picture Note

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
Cable hole for genset cable

86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
hia
42

Ng
7:1

he
nT
_1

ye
ng

gu
Du

rN
ice

Trans-485
et

Mode Off

Remote

12VDC
Vi
Emergent

G1 Start

G2 Start

48VDC
noFailure
RS485

Alarm
failure
G1 12

start
SPD
ATS
log
Mc
hustart

ch G1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 92 B- B- B+ D+ D-
-
_K

+- +
Te
80

ief
86

Ch
11
:32
:02

b. ATS to Yanmar generator


16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 115 of 163

rN
_1

e
ng

fic
Picture Note

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
L1, L2, L3, N: To connect power cable

86
4x16mm2

2
Must be same sequence at ATS and Genset

2:3
11
terminal:

6:0
L1: Yellow

81
L2: Green

01
L3: Red

1/2
8
N: Blue
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo

Remote control cable is connected to Pin 5


hu

no

and Negative terminal


ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 116 of 163

rN
_1

e
ng

fic
Picture Note

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
TX+, RX+ and TX-, RX- on CCrs module:
,2
1/2

To connect RS485
ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

Connect 12VDC cable from battery charger


:32

of ATS to 12VDC battery of genset


:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 117 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86 Remote

12VDC

module
Battery
2

CCrs
2:3
start
11
Emergent

48VDC
Alarm
SPD
RS485

Failure
failure
G1 12

6:0
Mode

Start
ATS

Start
start

G1

G2
G1

Pin 5 Negative - + TX+, RX+ TX-, RX-


M

81
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

01
+ - + -

1/2
8
01

9/0
,2
1/2

ky
9/0

6.5.3. From IPS to Diesel Generator (for off grid site)


da
ia
42

IPS
gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

UIB
X9. IN_RL
er
fic
et

1 2 3 4 5 6
Of
Vi

S1 S2 48VP S3 S4 48VP
gy
c

lo
hu

no

UIB
ch
_K

X7. Out_RL7,8
Te

1 2 3 4 5 6
80

ief

NO7 COM7 NC7 NO8 COM8 NC8


86

Ch
11

CSU510B
Remote

12VDC
:32

Trans-

RS485
start

485
:02

B0 A0 B1 A1 RS232 RJ45
92 B- B- B+ D+ D-
16
18

1 2 1 2
18
/20

/20
/01

/01

Using only one twisted pair cable (04 core) to connect (KBI generator)
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 118 of 163

rN
_1

e
ng

fic
IPS

Of
Du

gy
olo
iet

hn
cV

ec
UIB
X9. IN_RL

fT
hu
1 2 3 4 5 6

ie
_K

Ch
S1 S2 48VP S3 S4 48VP

80

CCrs module
UIB
X7. Out_RL7,8

86 Remote
1 2 3 4 5 6

2
2:3
start
11
NO7 COM7 NC7 NO8 COM8 NC8

6:0
Negative
Pin 5 TX+, RX+ TX-, RX-
terminal

81
CSU510B
RS485

01
B0 A0 B1 A1 RS232 RJ45

1/2
1 2 1 2
8
01

9/0
,2
1/2

ky

Using only one twisted pair cable (04 core) to connect (Yanmar generator)
9/0

da

6.5.4. From Battery Minishelter to IPS


ia
42

- Connect battery power cable (reference picture is for Lithium Battery cable connection.
gh
eN

Be similar to VRLA Battery)


7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01

-48VDC bar +0V bar


29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 119 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
- Door open sensor and smoke sensor connection:

01
1/2
DOOR OPEN SENSOR CONNECTION
8
01

Rear Rear
9/0
,2
1/2

ky

ES2
9/0

da
ia
42

48VP
gh
eN
7:1

Front Front
Th
_1

en
ng

uy
Ng
Du

er

ES3
fic
et

Of
Vi

gy

48VP
c

lo
hu

no
ch
_K

SMOKE SENSOR CONNECTION


Te
80

ief

- Connect -48VDC cable, RS485 cable (RS485 cable connection between two battery
86

Ch

cabinets uses twisted pair 4-core cable: Red for RS485_A, Blue for RS485_B. If the
11

twisted pair 4-core cable is not enough length, can use RS485 cable of genset).
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 120 of 163

rN
_1

e
ng

fic
BATTERY CABINET 2 BATTERY CABINET 1

Of
Du

gy
olo
iet
48V connection

hn
cV
terminal

ec
fT
hu

ie
_K

Ch
Grounding busbar

80
in IPS Cabinet

86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
4 4
3 3
,2
1/2

2 2
1 1
ky
9/0

da
ia
42

- Only for VRLA Battery: Connect battery temperature sensor (10m):


gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

Temperature sensor must be pasted on the side near negative terminal.


gy
c

lo

UIB
hu

no

X7. Out_RL7,8
X13. TB1 X14.TB2 X15.TB3 X16.TB4
ch
_K

1 2 3 4 5 6 1 2 1 2 1 2 1 2
Te
80

NO7 COM7 NC7 NO8 COM8 NC8 TB1 +5V TB2 +5V TB3 +5V TB4 +5V
ief
86

Ch
11

X9. IN_RL X10.EX_RL X11. Door ALM X12. TE


1 2 3 4 5 6 1 2 3 4 5 6 1 2 1 2
:32

S1 S2 48VP S3 S4 48VP ES1 ES2 48VP ES3 ES4 48VP Door +5V TE +5V
:02
16
18

TE
Environment
18
/20

BATT.TEMP1 temperature sensor


/20

BATT.TEMP2 TB1
/01

/01

TB2
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 121 of 163

rN
_1

e
ng
6.5.5. IPS internal connection

fic
Of
- Connect environment temperature sensor to monitor temperature in IPS:

Du

gy
olo
UIB

iet

hn
X14.TB2 X15.TB3 X16.TB4

cV

ec
1 2 1 2 1 2

fT
hu
TB2 +5V TB3 +5V TB4 +5V

ie
_K

Ch
80
X11. Door ALM X12. TE

86

2
1 2 1 2

2:3
11
Door 48V TE +5V

6:0
Environment temperature sensor (2m)

81
TEMP1

01
TE

1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Position of TE: The heigh of TE sensor must be same


Of
Vi

with the heigh of return air of HEX


gy
c

lo

- Connect LAN cable to Site router / Microwave:


hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 122 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
Site router Huawei ATN910B-B port FE 0/2/20

iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
Microwave iPasolink VR2 port 3

1/2
8
6.5.6. Grounding
01

9/0
- Connect from grounding bar of equipment to grounding bar of BTS site.
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 123 of 163

rN
_1

e
ng
6.6. Marking label for cables

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da

Requirement:
ia

- Marking full labels for all wires that connected to the equipment (power cable, signal
42

gh

cable, alarm cable).


eN
7:1

- The position of label is about 5-10cm from terminal.


Th
_1

- Easy to observe.
en
ng

uy

6.7. Checking insulation before turning power on


Ng

- Note: Recheck and tighten all connections.


Du

er

- Using multimeter: Turn the knob of multimetter to buzzer scale to check short-circuit.
fic
et

- Points must be checked: Negative vs Positive, Negative vs GND, line vs line, line vs
Of
Vi

gy

neutral, all signal cable vs ground.


c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 124 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Requirement: The buzzer does not sound. If buzzer sounds, must check to locate short-circuit
Of
Vi

point and eliminate.


gy
c

lo

6.8. Install rectifier / Solar charger


hu

no

- Install rectifier:
ch
_K

Te
80

1 2
ief
86

Ch
11
:32
:02
16
18

18
/20

/20

Requirement: Must be assembled consecutively from left to right, upper row to lower row (solar
/01

/01

charger is similar). Use screwdriver to fix rectifier.


29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 125 of 163

rN
_1

e
ng
6.9. Power on

fic
Of
Note: All CBs at ATS, IPS, Output CB of genset must be at OFF position.

Du

gy
Tighten the 48VDC domino terminal, RJ45 of HEX controller module in IPS cabinet, to make

olo
iet
sure no loose point.

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
On the left side of IPS On the right side of IPS

01
1/2
6.9.1. For on-grid site
8
❖ Step 1: Check voltage and turn on Main CB at EPC power box
01

9/0
,2
1/2

Requirement:
ky

Range
9/0

No Position Point to Point Requirement


da

measurement
ia
42

Main CB at Electric
gh

1 L1-L2, L2-L3, L3-L1 400 VAC 380 VAC


box
eN
7:1

Main CB at Electric
Th

2 L1-N, L2-N, L3-N 400 VAC 220 VAC (*)


box
_1

en

Note: (*) depend on the AC voltage of grid (normally is in the range 180-230VAC)
ng

uy

If the voltage is in the range, turn ON Main CB.2


Ng
Du

❖ Step 2: Check voltage and turn on Main CB at ATS


er
fic
et

Requirement:
Of
Vi

Range
gy

No Position Point to Point Requirement


c

measurement
lo
hu

1 ATS – Main CB
no

L1-L2, L2-L3, L3-N 400 VAC 380


ch
_K

2 ATS – Main CB L1-N, L2-N, L3-N 400 VAC 220 VAC (*)
Te

Note: (*) depend on the AC voltage of grid (normally is in the range 180-230VAC)
80

ief

If the voltage is in the range, turn ON Main CB at ATS. If not, checking and reconnect.
86

Ch

❖ Step 3: Turn on “Load-1” CB for IPS.


11

1- Change the switch to “Manual” mode.


:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 126 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

2- Change switch to “I” position (power is supplied from grid) 9/0


,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

Tool
er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

3- Turn on “Load-1” CB to supply power to IPS.


18
/20

/20

4- Turn on the CB: QF1, QF2, QF3, QF4, QF5.


/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 127 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

❖ Step 4: Supply power for IPS 9/0


,2
1/2

Check line voltage L-L, phase voltage L-N of CB. The voltage must follow Table
ky
9/0

da

bellow:
ia

Range
42

No Position Point to Point Requirement


gh

measurement
eN
7:1

IPS – AC input
1 L1-L2, L2-L3, L3-L1 400 VAC 380 VAC
Th

CB
_1

IPS – AC input
en

2 L1-N, L2-N, L3-N 400 VAC 220 VAC (*)


ng

uy

CB
Ng
Du

Note: (*) depend on the AC voltage of grid (normally is in the range 180-230VAC)
er

If the voltage is not in proper range  must re-check / re-connect if necessary.


fic
et

Of

Turn on CB of AC input in IPS.


Vi

gy

Install rectifier / solar converter.


c

lo
hu

Wait for 5 minutes to ensure the system works stably.


no
ch
_K

Check all LEDs of all rectifiers (must be in table below):


Te
80

ief
86

Ch
11
:32
:02

Measure the AC, DC voltage. Required: DC voltage is in the range -48 ÷ -56 VDC.
16
18

Turn on CBs for HEX, DC aircon, ATS.


18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 128 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

❖ Step 5: Genset: Switch key to “ON” position.


9/0
,2
1/2

KBI genset:
ky

- Press “MAN”, change to Manual mode.


9/0

da

- To make sure that genset is good and available to work: Press “Start” to start genset.
ia
42

gh

- After warming-up time (about 3 minute). Check the output voltage (at terminal) of genset,
eN
7:1

and at Gen CB of ATS, the voltage must be in the range 220-230 VAC.
Th

Range
_1

No Position Point to Point Requirement


en

measurement
ng

uy

1 ATS – Gen CB L1-N, L2-N, L3-N 400 VAC 220 VAC (*)
Ng
Du

If the voltage is not in proper range  must re-check / re-connect if necessary.


er

If the voltage is in the range 200-240VAC:


fic
et

- Then press “Stop” to stop genset.


Of
Vi

gy

- Press “Auto”, change to Auto mode.


c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

Note: 32: Start; 33: Stop; 10, 11, 12,13, 14: LED shows the mode/function of genset.
/20
/01

/01

Yanmar genset:
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 129 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky

Switch key to “1” position.


9/0

-
da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

- Press “Auto”, when the LED on “Auto” button off, it has ben changed to Manual mode.
To make sure that genset is good and available to work: Press “Start” to start genset.
:32

-
:02

- After warming-up time. Check the output voltage (at terminal) of genset and at Gen CB
16
18

of ATS, the voltage must be in the range 220-230 VAC for phase to neutral/ 380-400 VAC
18
/20

for phase to phase.


/20

No Position Point to Point Range measurement Requirement


/01

/01

ATS – Gen CB
29

1 L1-N, L2-N, L3-N 400 VAC 220 VAC (*)


29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 130 of 163

rN
_1

e
Then press “Stop” to stop genset.

ng
-

fic
Of
Press “Auto”, when the led on Auto button on, it has been changed to Auto mode.

Du
-

gy
- Measure the voltage after power-on:

olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
VAC range (600) DC range (60)

1/2
8
01

❖ Step 6: Turn on battery. 9/0


,2
1/2

- VRLA battery:
ky
9/0

+ Check the voltage at CB for Battery in IPS.


da

+ Check the voltage at CB for Battery in Battery minishelter.


ia
42

gh

The DC voltage must be in the range:


eN
7:1

No Position Point to Point Range measurement Requirement


Th
_1

en

1 IPS Negative vs positive 60 VDC 48-56 VDC


ng

uy
Ng

Turn on CB for battery in IPS and in Battery minishelter.


Du

er

- Lithium battery:
fic
et

+ Check the voltage at CB for Battery in IPS.


Of
Vi

+ Turn on CB for battery at Battery minishelter.


gy
c

lo

+ Turn on lithium battery.


hu

no

ZTT lithium battery: Press ”Reset” key. Coslight lithium battery: Press ”On/Off” button.
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

ZTT lithium battery


18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 131 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
Coslight lithium battery

80
Check the voltage of battery. The voltage must be in the range:

86

2
2:3
11
No Position Point to Point Range measurement Requirement

6:0
1 Batt Minishelter Positive vs negative bar 60 VDC 48-56 VDC

81
01
2 Batt Minishelter Terminal 3, 4 at Domino Terminal Block 60 VDC 48-56 VDC

1/2
8
❖ Step 7: Change ATS to auto mode
01

Change the switch in Socomec: 9/0


,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch

Press button ”Auto”. If LED lights on the ”Auto” button, it is in auto mode.
11
:32
:02
16
18

18
/20

/20

6.9.2. For Off grid site


/01

/01

❖ Step 1: Genset
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 132 of 163

rN
_1

e
Switch key to “ON” position.

ng
-

fic
Of
Press “MAN”, change to Manual mode.

Du
-

gy
- To make sure that genset is good and available to work: Press “Start” to start genset.

olo
iet
After warming-up time. Check the output voltage (at terminal) of genset and at AC

hn
cV

ec
input CB of IPS. The voltage must follow Table bellow:

fT
hu
No Position Point to Point Range measurement Requirement

ie
_K

Ch
2 IPS – AC input CB L1-N, L2-N, L3-N 400 VAC 220 VAC (*)

80
Note: (*) depend on the AC voltage of grid (normally is in the range 180-230VAC)

86
If the voltage is not in proper range  must re-check / re-connect if necessary.

2
2:3
11
Turn on CB of AC input in IPS to supply power for IPS to check rectifier working. All

6:0
leds of all rectifiers must be in table below:

81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da

- Then press “Stop” to stop genset.


ia
42

gh

- Press “Auto”, change to Auto mode.


eN
7:1

KBI controller:
Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief

Note: 32: Start; 33: Stop; 10, 11, 12,13, 14: LED shows the mode/function of genset
86

Ch
11

Yanmar genset:
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 133 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da

- Switch key to “1” position.


ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch

- Press “Auto”, when the led on Auto button off, it has ben changed to Manual mode.
11

- To make sure that genset is good and available to work: Press “Start” to start genset.
After warming-up time. Check the output voltage (at terminal) of genset and at AC
:32

input CB of IPS. The voltage must follow Table bellow:


:02
16
18

No Position Point to Point Range measurement Requirement


18
/20

/20

2 IPS – AC input CB L1-N, L2-N, L3-N 400 VAC 220 VAC (*)
/01

/01

Note: (*) depend on the AC voltage of grid (normally is in the range 180-230VAC)
29

If the voltage is not in proper range  must re-check / re-connect if necessary.


29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 134 of 163

rN
_1

e
ng
- Turn on AC input CB to supply power for IPS.

fic
Of
❖ Step 2: In IPS

Du

gy
- Install rectifier, one by one after every 3 minutes to check rectifier working. All leds of

olo
iet
all rectifiers must be in table below:

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
Turn on CBs (CB has mark “ Do not disconnect”) for HEX, DC aircon, ATS.

2:3
-

11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er

❖ Step 3: Turn on Lithium battery


fic
et

Of

+ Check the voltage at CB for Battery in IPS.


Vi

gy

+ Turn on CB for battery in IPS


c

lo
hu

+ Turn on lithium battery:


no
ch
_K

ZTT lithium battery: Press ”Reset” key. Coslight lithium battery: Press ”On/Off” button.
Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20

ZTT lithium battery


/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 135 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86
Coslight lithium battery

2
2:3
11
+ Check the voltage of battery. The voltage must be in the range:

6:0
No Position Point to Point Range measurement Requirement

81
01
1 Batt Minishelter Positive vs negative bar 60 VDC 48-56 VDC

1/2
8
2 Batt Minishelter Terminal 3, 4 at Domino Terminal Block 60 VDC 48-56 VDC
01

9/0
,2
1/2

On Genset: Press “Auto”, when the led on Auto button on, it has been changed to Auto mode.
ky
9/0

da

After power on, check voltage at all terminal as table below:


ia

Requirement:
42

gh
eN

No Position Point to Point Range measurement Requirement


7:1

Th

1 ATS – Main CB L-L, L-N 400 VAC 380/220 VAC (*)


_1

en

2 IPS – AC input CB L-L, L-N 400 VAC 380/220 VAC (*)


ng

uy
Ng

3 IPS Negative vs positive 60 VDC 48-56 VDC


Du

er

4 Batt Minishelter Positive vs negative bar 60 VDC 48-56 VDC


fic
et

Terminal 3, 4 at Domino Terminal


Of
Vi

4 Batt Minishelter 60 VDC 48-56 VDC


Block
gy
c

lo

5 ATS Terminal 1, 2 60 VDC 12-13.5 VDC


hu

no

6 ATS Terminal 19, 20 60 VDC 48-56 VDC


ch
_K

Te

7 Genset L1, L2 400 VAC 220-240VAC


80

ief

8 Genset B+, B- 60 VDC 12-13.5 VDC


86

Ch

Table 1: Voltage requirement


11

Note: (*) depend on the AC voltage of grid (normally is in the range 180-230VAC).
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 136 of 163

rN
_1

e
ng
PART 3

fic
Of
SETTING PARAMETER

Du

gy
1. Setting paramater for equipment in Battery Minishelter

olo
iet
1.1. DC aircon

hn
cV
The parameters need to be set:

ec
fT
Date and time

hu
No Object Address Temperature setpoint

ie
_K

Ch
1 Battery Minishelter 1 20 250C Real time

80
2 Battery Minishelter 2 21 250C Real time

86
Steps to set:

2
2:3
11
ON/OFF: Press the button 5s to ON/OFF the

6:0
equipment.

81
Enter: To confirm.

01
ESC: To quit, to return the previous page.

1/2
8
↑: To increase the setting value or select the
01

9/0
previous record/menu.
,2
1/2

↓: To decrease the setting value or select the next


ky
9/0

record/menu.
da

←: To select the bit of previous data.


ia
42

gh

→: To select the bit of next data.


eN
7:1

Th

a. Setting temperature:
_1

en

Passwword: 0001  Setpoint  Cool SP  25  Enter  ESC.


ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

b. Setting address:
Main menu  System Func  Para set  Addr  20  Enter  ESC.
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 137 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86
c. Set date and time:

2
2:3
11
Main menu  System Func  TimeAdj  Year  Month  Date  Hour  Min  Second

6:0
 Enter  ESC.

81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 138 of 163

rN
_1

e
ng
1.2. LIB Battery

fic
Of
Address table:

Du

gy
No Object ZTT Lithium Battery Coslight Lithium Battery

olo
iet
1 Battery Minishelter 1 1-10 1-10

hn
cV
2 Battery Minishelter 2 11-15 11-15

ec
Steps to set:

fT
hu

ie
ZTT Coslight

_K

Ch
Address Address

80
86

2
2:3
11

6:0
Swich number Switch number

81
Address Address
Sw 1 Sw 2 Sw 3 Sw 4 Sw1 Sw2 Sw3 Sw4 Sw5 Sw6

01
1/2
1 OFF OFF OFF OFF 1 OFF ON OFF OFF OFF ON
8
01
2 ON OFF OFF OFF OFF OFF OFF OFF ON OFF
9/0
2
3 OFF ON OFF OFF 3 OFF OFF OFF OFF ON ON
,2
1/2

ky

4 ON ON OFF OFF 4 OFF OFF OFF ON OFF OFF


9/0

da

5 OFF OFF ON OFF 5 OFF OFF OFF ON OFF ON


ia

6 ON OFF ON OFF 6 OFF OFF OFF ON ON OFF


42

gh

7 OFF ON ON OFF 7 OFF OFF OFF ON ON ON


eN
7:1

8 ON ON ON OFF 8 OFF OFF ON OFF OFF OFF


Th

9 OFF OFF OFF ON 9 OFF OFF ON OFF OFF ON


_1

en

10 ON OFF OFF ON 10 OFF OFF ON OFF ON OFF


ng

uy

11 OFF ON OFF ON 11 OFF OFF ON OFF ON ON


Ng
Du

12 ON ON OFF ON 12 OFF OFF ON ON OFF OFF


er

13 OFF OFF ON ON 13 OFF OFF ON ON OFF ON


fic
et

Of

14 ON OFF ON ON 14 OFF OFF ON ON ON OFF


Vi

gy

15 OFF ON ON ON 15 OFF ON* ON ON ON ON


c

lo
hu

2. Setting parameter for KBI diesel generator (DG)


no
ch

- Set address, Modbus protocol for KBI genset as followings:


_K

Te

Slave address: 89 (if the site has 2 DGs  DG no.1: 89, DG no. 2: 90).
80

ief

Baud rate: 3
86

Ch

Parity: 0
11

Stop bit: 0
Datalog period: 1 min
:32
:02

Time out: 3 min


16
18

ASCII/RTU: RTU
18

- Steps to set:
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 139 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

Check the information of KBI genset which must be displayed on IPS controller:
en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

Set the thresholes of fuel level of external fuel tank to shutdown genset:
ief

Conf. AI2 low shutdown: 3%.


86

Ch

Conf. AI2 low prealarm: 16%.


11

Conf. AI2 low reset: 17%.


:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 140 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
3. ATS

01
3.1. Change the switch module Socomec to auto mode

1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 141 of 163

rN
_1

e
ng
3.2. Turn switch to set the output of battery charger for genset battery

fic
Of
- SW2:

Du

gy
ON: Battery genset is NCd type.

olo
iet
OFF: Battery genset is VRLA type

hn
cV
 Choose OFF

ec
fT
hu
- SW1:

ie
ON: Output voltage to battery is 24VDC

_K

Ch
OFF: Output voltage to battery is 12VDC

80
 Choose OFF

86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da

3.3. Set the operatin mode and alarm thresholds of ATS


ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

Icon Function
:32
:02

To enter into or exit parameter setting by pressing and holding this button for 2 seconds
16
18

When failure occurs, alarm buzzer sounds. Press this button will mute the sound. Press it
18
/20

/20

again to clear mute function. Press and hold this button for 2 seconds, all LEDs illuminate
/01

/01

simultaneously.
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 142 of 163

rN
_1

e
ng
Icon Function

fic
Of
Press and hold ”Auto” button for 2 sec, the LED above the button is illuminated; the

Du

gy
controller is running in AUTO mode.

olo
iet
When in parameters setting mode, this button is used to increase value or scroll down

hn
cV
menu.

ec
fT
Press and hold ”MAN” button for 2 sec, the LED above the button is illuminated; the

hu

ie
controller is running in MAN mode.

_K

Ch
When in parameters setting mode, this button is used to decrease value or scroll up

80
menu.

86
Press and hold ”TEST” button for 2 sec, the LED above the button is illuminated; the

2
2:3
11
controller is running in TEST mode.

6:0
When in parameters setting mode, this button is used to enter into submenu or confirm

81
setting parameter.

01
1/2
This push button is used for locking the control output of the controller. Press this
8
01

9/0
button (2 sec), the LED indicator inlluminated, and the controller is in the status of lock.
,2
1/2

When in parameter setting mode, this button is used for returning to upper menu.
ky
9/0

da

Thi button is used in the condition of maintaining the power supplied by alternate power
ia

after power recovered in prior.


42

gh

When in parameters setting mode, this button is used to move to next parameters setting
eN
7:1

position.
Th
_1

en

The LED will illuminate permanently when warning or failure occours


ng

uy

Hot button: There are 3 hot buttons respectively lay in different interfaces and with
Ng
Du

different function
er
fic

3.3.1. Setting under-voltage threshold


et

Of
Vi

Password: 2213 to set parameters.


gy
c

lo
hu

no

Uses to increase value.


ch
_K

Te
80

ief
86

Ch

Uses to move to next parameter setting


position.
11
:32

Uses to confirm.
:02
16
18

✓ Threshold: S1 under alarm: 65%; S1 under restore: 80%.


18
/20

✓ Must set all three phases: S1, S2, S3.


/20
/01

✓ Set S1 as below. Set S2, S3 similar to S1.


/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 143 of 163

rN
_1

e
ng

fic
Menu Press Menu Press

Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 144 of 163

rN
_1

e
ng
3.3.2. Setting application mode (mode 2 MG+B):

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da

3.3.3. Setting date and time: Change to real time


ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02

Note: After finishing setup, ATS must be changed to ”Auto” mode, by pressing and holding
16
18

18
/20

/20
/01

/01

for 2 sec. If the LED on this button is lighted up  change to ”Auto” mode successfully.
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 145 of 163

rN
_1

e
ng
4. Setting parameter for controller CSU510B of IPS

fic
Of
4.1. Update software for CSU

Du

gy
❖ Preparation:

olo
iet
- Step 1: Copy file ”powernew.tar.gz.2.x” to the root directory of USB (This USB must

hn
cV
contain only this file).

ec
fT
hu
Download this file at:

ie
https://drive.google.com/drive/folders/1kruS3A7GFK4C6DodWezFyxmobcgTtMr

_K

Ch
K?usp=sharing

80
86
- Step 2: Insert USB to USB interface of CSU panel

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

USB port in CSU panel If connection succeeds, the bottom right


Th
_1

corner of the screen should be a disk icon


en

- Step 3: Get the admin user authorized following below figure, use password ”0063”
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

- Step 4: Import from USB


Te
80

ief
86

Ch

Enter
11

Enter Enter
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 146 of 163

rN
_1

e
ng

fic
Of
Du

gy
Enter Enter

olo
iet

hn
cV

ec
fT
hu

ie
Don’t remove USB before this step is completed. After completion, CSU will automatically

_K

Ch
restart. It takes 15 minutes to finish.

80
After the upgrade is completed:

86
✓ Check the version software. If Software version is: V2.05.03.02  it is ok:

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da

✓ Check “Build Time”. If the “Build Time” is “Dec 18 2017 08:36:47”, it is ok. If not,
ia
42

try one more time.


gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te

❖ Manual setup
80

ief
86

To set parameters, must access as user Admin


Ch

- Before importing parameter by using USB, need to manually set three parameters:
11

AC in scenario
Battery type (VRLA or LiFePO4-LIB)
:32
:02

Battery vendor:
✓ None (VRLA)
16
18

18

✓ ZTT (LIB)
/20

/20

✓ Coslight (LIB)
/01

/01

a) AC in Scenario (Password ”0063”):


29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 147 of 163

rN
_1

e
ng
+ Main and DG: For bad grid site (it means BTS site has grid power and genset) and for

fic
Of
good grid site (BTS site has grid power and has no genset, normally are BTS sites on

Du

gy
the rooftop of building).

olo
iet
+ DG: For off grid site (BTS site has no power grid).

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

b) Battery Type:
gh
eN

Choose the battery type that the site is using.


7:1

+ VRLA battery: Choose ”VRLA Batt”


Th
_1

+ Lithium Battery: Choose ”LiFePO4 Batt”


en
ng

uy

+ First: Access with user Admin (0063).


Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief

c) Battery Manufacturer Config:


86

Ch

+ VRLA: Choose ”None”.


11

+ LIB: Choose ”ZTT”, ”Cos light”.


+ First: Access with user: Admin (0063).
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 148 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
2. Import parameter by using USB

80
❖ Preparation

86
- Step 1: Copy the configuration file for the specific site into USB, the USB must be less

2
2:3
11
than 16GB (This USB must be had only this file).

6:0
Download configuration file at:

81
https://drive.google.com/drive/folders/1kruS3A7GFK4C6DodWezFyxmobcgTtMr

01
K?usp=sharing

1/2
8
01

Copy the file that is suitable with the real site to USB: 9/0
,2
1/2

ky

No The site configuration Folder


9/0

da

C-3 Access Good Grid (Rooftop - No


ia
42

1 Good grid site: IPS, ATS, ZTT Lithium


gh

DG)/3-ZTT
eN
7:1

C-3 Access Good Grid (Rooftop - No


2 Good grid site: IPS, ATS, Coslight Lithium
Th

DG)/3-Coslight
_1

en

Bad grid site: IPS, ATS, Genset, Sacred sun C-4 Access Bad Grid/ 4-Sacred Sun No
3
ng

uy

2V300Ah, No night restriction Night Restriction


Ng
Du

Bad grid site: IPS, ATS, Genset, Leoch 2V300Ah, No C-4 Access Bad Grid/ 4-Leoch No Night
5
er

night restriction Restriction


fic
et

Of

Off grid site: IPS, Genset, ZTT lithium, No night C-5 Access Off Grid/5-ZTT No
Vi

7
restriction Restriction
gy
c

lo

Off grid site: IPS, Genset, Coslight lithium, No night C-5 Access Off Grid/5-Colight No Night
hu

no

9
restriction Restriction
ch
_K

Off grid, solar site: IPS, Genset, solar, ZTT lithium, C-6 Access Off Grid Solar/6-ZTT No
Te

11
80

No night restriction Night Restriction


ief
86

Ch

Off grid, solar site: IPS, Genset, solar, Coslight C-6 Access Off Grid Solar/6-Colight No
13
11

lithium, No night restriction Night Restriction


:32

- Step 2: Insert USB to USB interface of CSU panel.


:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 149 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11
USB port in CSU panel If connection successes, the bottom right

6:0
corner of the screen should be a disk icon

81
- Step 3: Get the admin user authorized following below figure (password ”0063”):

01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh

- Step 4: Import from USB


eN
7:1

Th
_1

en

Enter Enter Enter


ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Enter Enter
Te
80

ief
86

Ch
11

Don’t remove USB before this step is completed.


As the feedback is “Succeed!” then the parameter file is imported successfully; If the feedback
:32

is “Abort!”  check the AC in scenario, Battery Type, Battery manufacturer to make sure
:02

they are correct, Format the USB, copy file again then try one more time.
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 150 of 163

rN
_1

e
ng
3. Setting parameter after importing

fic
Of
3.1. Date & time: Set 2 items according to actual date and time.

Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en

3.2. Setting Local IP/Mask/GW


ng

uy
Ng

First: Set Network mode: ETHO


Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief

Second: Set IP mode is “static”


86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 151 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
Third: Set IP, Mask, gateway as the planed local IP/mask/gateway address.

86
The planned local IP/mask/gateway address for the site is download at (File “M&E

2
2:3
11
System IP address.pdf”):

6:0
https://drive.google.com/drive/folders/1kruS3A7GFK4C6DodWezFyxmobcgTtMrK

81
?usp=sharing

01
✓ IP setup:

1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

✓ Mask setup:
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 152 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
✓ Gateway setup:

86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

3.3. DG/Mains Period Start


gh
eN

When import from USB, it has default setting parameter that optimized by M&E Dept (MyTel).
7:1

If want to change, please access step by step as below:


Th
_1

- Setup DG/Mns.per.st.end: Enable.


en
ng

uy

- Setup DG/Mns.Per.St.End: (00: 00 – 00:00). Can setup three period time.


Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11

3.4. DG Forced Stop Enable/Time


Setting prohibit running time generator: When import from USB, it has default seting parameter
:32

that optimized by M&E Department. If want to change, please access step by step as below:
:02

- Setup DG.Force stop En: Enable.


16
18

- Setup DG.Force stop time: (00: 00 – 00:00). Can setup three period time.
18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 153 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
3.5. Setting parameter of genset on CSU

80
a) Set DG power (kVA):

86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky

If site has 1 genset. DG1 must be set for 8 or 13 or 30 kVA (real genset power). DG2 must be set
9/0

da

for 0.
ia

If site doesn’t have genset. DG1 set to 0, DG2 set to 0.


42

gh

b) Set Tank Shape:


eN
7:1

If site has genset  must set to “Cube”.


Th

If site has no genset  set to “No Configure”.


_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

c) Set Tank Feature


Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

If DG power is 8kVA  Set: Length:1250mm, Wide: 0674mm, Heigh: 0764mm.


/20

If DG power is 13kVA  Set: Length: 1420mm, Wide: 0944mm, Heigh: 0764mm.


/01

/01

If DG power is 30kVA  Set: Length: 2094mm, Wide: 0839mm, Heigh: 0574mm.


29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 154 of 163

rN
_1

e
ng
3.6. Set battery capacity

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
Battery Cap -1#: Total capacity of battery connect to CB1.
8
01

9/0
Battery Cap -2#: Total capacity of battery connect to CB2. ,2
1/2

Battery Cap -3#: Total capacity of battery connect to CB3.


ky

Battery Cap -4#: Total capacity of battery connect to CB4.


9/0

da

3.7. Set BMU on CSU


ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of

3.8. Get CSU’s MAC information


Vi

gy

After getting CSU’s MAC Address information join Viber Group (“M&E integration for
c

lo
hu

MyTel”) and send MAC Address into group to integrate on NMS (network management
no
ch
_K

system).
Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

Join viber group by copy the link and paste on Web Browser  JOIN CHAT:
/20

https://invite.viber.com/?g=vAbwzWTDQ0ep1Fomo1FcdoeWfZB9rZ8X
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 155 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 156 of 163

rN
_1

e
ng
PART 4

fic
Of
COMMISSIONING

Du

gy
1. Check HEX (Heat exchanger), DC aircon

olo
iet
- Check HEX operation:

hn
cV
After turning on CB for HEX (CB has mark “Do not disconnect”), if HEX and DC

ec
fT
aircon work normally (has airflow), it is OK. If not, check the power connnection of

hu

ie
two positions 48VDC domino terminal, RJ45 at HEX controller module, see Item 6.9

_K

Ch
in Part 1).

80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

If fan rotates and has air flow, it is OK


lo

If HEX has air flow, it is OK


hu

no

2. Communication test
ch
_K

❖ Communication between CSU and genset: If CSU displays as picture below  it is OK. If
Te
80

not  check RS485 cable or address parameter setting.


ief
86

Ch
11
:32
:02
16
18

18
/20

/20

If has GCP Version it is OK (KBI genset)


/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 157 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
If has GCP Version it is OK (Yanmar genset)

80
86

2
2:3
11

6:0
81
01
1/2
8
01

View status information of Genset 9/0


,2
1/2

❖ Communication between CSU and ATS: If CSU displays as picture below  it is OK. If not
ky
9/0

 check RS485 cable.


da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

If having ATS version it is OK


Of
Vi

❖ Communication between CSU and DC aircon: If CSU displays as picture below  it is OK.
gy
c

lo

If not  check RS485 cable.


hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02

If having CDC ACD. Version  it is OK View status information of DC air con


16
18

❖ Communication between CSU and VRLA battery: If CSU displays as picture below  it is
18
/20

OK. If not  check RS485 cable.


/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 158 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
If having “BMU Version”  it is OK

80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en

Go to FBMU message, navigate to battery string number in CSU that you have just connected
ng

uy

battery to corresponding CB to view status information of battery (press ↓ key to view all)
Ng
Du

Must review all quantity of battery in CSU to make sure that CSU can monitor all batteries.
er

If can’t view all  check cable between battery and PBMU.


fic
et

Of
Vi

Note: If Cell voltage displays in CSU is 0V or about 4V, check the connection because some
gy

of wiring is not correct. The cell voltage is in the range 2 ÷ 2.4 VDC.
c

lo
hu

❖ Communication between CSU and LIB battery: If in CSU displays as “Lithium Battery
no
ch
_K

Version”  it is OK. If not  check RS485 cable (must review all quantity of battery in CSU
Te

to make sure CSU can monitor all batteries. If can’t view all  check cable between batteries.
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20

If having Li Battery version it is OK


/01

/01

3. Alarm test
29

❖ Check smoke alarm:


29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 159 of 163

rN
_1

e
ng
Create fake smoke alarm on smoke detector using smoke tester. If having smoke alarm in

fic
Of
CSU  it is OK. If not  check cable and connection.

Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86
Strictly forbid using cigarette, lighter or something similar (dangerous) for this test.

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh

❖ Check main failure alarm: Switch off Main CB in ATS. If having alarm in CSU  it is OK.
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no

❖ Check door alarm:


ch
_K

Te

- Close the door of all Minishelters to clear all door open alarm in CSU.
80

ief

- Open the door of Battery Minishelter. If having door open alarm in CSU  it is OK. If
86

Ch

not  check door sensor cable between Battery Minishelter and CSU. After that, close the
11

door to release alarm.


- Open the door of IPS cabinet. If having door open alarm in CSU  it is OK. Note: View
:32
:02

history alarm to check alarm because when closing the door of IPS, can’t see the CSU.
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 160 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86
Door open alarm of IPS Door open alarm of Battery Minishelter

2
2:3
11
4. Check Temperature Sensor in CSU

6:0
- Check temperature in CSU via environment/battery temperature sensor. If CSU displays

81
same as picture below  it is OK. If not  check connection between sensor and CSU.

01
In main menu, using →, ↓, ↑ buttons to navigate “ENV”, “Battery-1”, “Battery-2… menu.

1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic

5. Check remote control of genset


et

Of

- Start DG1 manually on CSU, if genset starts normally  it is OK, else check connection
Vi

gy

between X7.1, X7.2 of UIB and Terminal 5, 6 of ATS, connection between Terminal 5,6
c

lo
hu

no

of ATS and terminal 92, B- on domino of genset (Genset, ATS must be at Auto mode).
ch
_K

- Stop DG1 manually on CSU, if genset stop  it is OK, else check connection cable.
Te
80

+ Start:
ief
86

Ch
11
:32
:02
16
18

18
/20

/20

+ Stop:
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 161 of 163

rN
_1

e
ng

fic
Of
Du

gy
olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
6. Check communication between IPS and server

80
(check after having planned IP for monitoring IPS)

86
- Step 1: Preparation

2
2:3
11
Straight LAN cable.

6:0
Laptop.

81
- Step 2: Set IP address, IP Gateway, subnet mask of Laptop same with IP Address, IP

01
Gateway, Subnet Mask of IPS that is planned.

1/2
8
- Step 3: Connect LAN cable between Laptop and Port of site/switch (Port number follows
01

the plan). 9/0


,2
1/2

ky

If port is not bright, not activated  call IP Division of Transmission Dept to get
9/0

da

support for configuration.


ia
42

If port is bright and activated  perform Step 4.


gh
eN

- Step 4: Ping to Gateway:


7:1

Th

Ping [IP Gateway that planned]


_1

If Not OK  call IP Division of Transmission Dept to get support.


en
ng

uy

If OK  perform Step 5.
Ng
Du

- Step 5:
er
fic

Checking one more time IP address, IP Gateway, subnet mask as planned.


et

Of
Vi

Wait 15-20 minutes, port is bright and activated.


gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 162 of 163

rN
_1

e
ng
PART 5

fic
Of
SITE CLEANING

Du

gy
1. Fixing HDPE, corrugated pipe, cable

olo
iet

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

9/0
,2
1/2

ky
9/0

da
ia
42

gh
eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01
29
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm
0
1 /2
Mã văn bản: 50/IG-TCC
Số văn bản: 50 TELECOM INTERNATIONAL MYANMAR Code: /IG-TCC

9 /0
Ngày ban hành: 29/01/2018 COMPANY LIMITED Effective date: 01/01/2018

h
42
Expiry date:

nT
INSTRUCTION GUIDE FOR POWER
INSTALLATION AT Issued time: 02

ye
7:1

gu
SELF-POWERED BTS ACCESS SITES Page: 163 of 163

rN
_1

e
ng
Requirement:

fic
Of
The cable is laid neatly.

Du

gy
Safe in operation.

olo
iet
2. Sealing cable hole and 2 ends of pipes

hn
cV

ec
fT
hu

ie
_K

Ch
80
86

2
2:3
11

6:0
81
01
1/2
8
01

3. Cleaning up 9/0
,2
1/2

Requirements: Cut the excess of plastic tie; clean inside minishelter & working area.
ky
9/0

4. Locking the door with lock cover to protect lock avoid rain, sunshine
da

- Lock the door by key of equipement.


ia
42

gh

- Mount protect cover. Lock.


eN
7:1

Th
_1

en
ng

uy
Ng
Du

er
fic
et

Of
Vi

gy
c

lo
hu

no
ch
_K

Te
80

ief
86

Ch
11
:32
:02
16
18

18
/20

/20
/01

/01

5. Finish the installation


29

Re-check every thing one more time before leaving the site.
29

,
ky
:14

da
ia
17

gh

Tài liệu này thuộc sở hữu của Viettel. Việc phát tán, sử dụng trái phép bị nghiêm cấm