Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 4

MP–003:

USE AND MAINTENANCE OF AIR CONDITIONER

Author: Mohd Safuan Bin A. Rahim Revision Number: 0


Effective Date: 16/08/2021 Next Review Date: 16/08/2024

Revision Record
Date
Revision Responsible Re- Document
Description of Change
Date Person approved Implemented
& Authorized
16/08/2021 Mohd Safuan New Documents - 16/08/2021

Author: Approved by:

………………………. ……………………….

Date: Date:

BIO GENETICS SDN BHD - 202001013049 (1369369-H)


Unit B-05-3, 5th Floor, Block B (West Wing), PJ8 Office Suite,
No. 23, Jalan Barat, Seksyen 8 46050 Petaling Jaya, Selangor
Tel No. 03-77815542
Reference No: MP-003 Revision-0 Page 2 of 4

TABLE OF CONTENT

1. INTRODUCTION...............................................................................3

2. SCOPE..............................................................................................3

3. REFERENCES..................................................................................3

4. RESPONSIBILITIES..........................................................................3

5. SAFETY.............................................................................................3

6. PROCEDURE....................................................................................3
6.0 Equipment List and Location............................................................................................3
6.1 Switching ON the Air Conditioning.....................................Error! Bookmark not defined.
6.2 Switching OFF the Air Conditioning...................................Error! Bookmark not defined.

7. MAINTENANCE................................................................................4
Reference No: MP-003 Revision-0 Page 3 of 4

1. INTRODUCTION

Bio Genetics Sdn Bhd facilities needed a control environment of below 30 degree
Celsius. Hence, using Air Conditioner are required to facilitate.

2. SCOPE

This procedure covers basic and routine operations that can be undertaken by the in-
house operators.

3. REFERENCES

 Nil

4. RESPONSIBILITIES

All BioGen staff responsible in proper use and maintain Air Conditioner.

5. SAFETY

The Air Conditioner use thermal fuse that will cut off supply if any sudden rush of
load toward the equipment.

6. PROCEDURE

6.0.1 Equipment List and Location

Name Model Location


Daikin Ceiling Cassette Daikin BioGen production
and warehouse

6.1 Switching on the Air Conditioner


6.1.1 Turn ON the wall plug located near the wall.
Reference No: MP-003 Revision-0 Page 4 of 4

6.1.2 Use the remote and press ON button.

6.1.3 Select your desire temperature and fan setting.

6.1.4 Set the timer if needed.

6.2 Switching Off the Air Conditioner

6.1.1 Use the remote and press OFF button.

6.1.2 Wait for 10 second before switching OFF the wall plug

6.1.3 Make sure all the switches already switch OFF before leaving

7. MAINTENANCE

Monthly check the evaporator filter and clean with water. Check the blower fan as
well for dust, clean with brush and vacuum cleaner.

Yearly maintenance works for Air conditioner is performed by external contractor.


The maintenance scope includes outdoor unit and indoor unit.

You might also like